Loading...
HomeMy WebLinkAbout20091085 Ver 2_Stormwater Approval_20100212AF."W; NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director February 12, 2010 Mr. Brian Fletcher 124 Iron Gate Circle Mooresrillc, NC 28117 Dee Freeman Secretary DWQ EXP # 09-1085v2 Iredell County. Subject Property: Troutman Towne Center (under North Point Resources Property) APPROVAL OF STORMWATER MANAGEMENT PLAN (SMP) Dear Mr. Fletcher: On January 4, 2010, the Division of Water Quality (DWQ) issued a 401 Water Quality Certification to you to place fill within or otherwise impact 226 linear feet of unnamed stream to Kerr Branch for the purpose of constructing the proposed development, Troutman Towne Center in Iredell County. On January 20, 2010 and January 25, 2010, the 401 Oversight/Express Review Permitting Unit of the Division of Water Quality (DWQ) received your stormwater management plan (SMP) application dated January 22, 2009, along with supporting information including stormwater management plan sheets dated January 19, 2009 (Engineer's Seal), design calculations, subsurface (soil) investigation report and operation and maintenance (O & M) agreements dated January 7, 2010 for the two wet detention ponds from Ms. Beverly Rosenbloom, El and Mr. Matt Edwards, PE of Kimley-Horn and Associates for the purpose of meeting Condition 7 of the 401 Water Quality Certification for this project. On February 3, 2010 and February 11, 2010, the DWQ received additional information including revised SMP sheets dated February 2, 2010 and February 8, 2010, and O &M agreement dated February 10, 2010 for the level spreader - filter strip system. After carefully reviewing the information, the DWQ approves the revised SMPs dated February 2, 2010 and February 8, 2010 to satisfy the stormwater condition required by the Water Quality Certification. You are required to meet the following conditions: The stormwater management system consisting of two (2) wet detention ponds and a level spreader-filter strip system, and all associated appurtenances, stormwater conveyances, and the grading and drainage patterns depicted on the final revised plans, as approved by this office must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. The stormwater management structures shall have maintenance access and at least a 10-foot drainage easement on each side to allow for the ability to maintain the structures, and to perform corrective actions. The stormwater easements shall be recorded to provide protection of the structures from potential alterations by future property owners. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: http:l/h2o.enr.state.nc.uslncwetlands/ NonrthCaMina ?atura!!? An Equal Opportunity 1 Affirmative Action Employer Troutman Towne Center (North Point Resources Property SMP) Brian Fletcher Page 2 of 2 February 12, 2010 2. You must submit two (2) copies of an executed Declaration of Deed Restrictions and Protective Covenants within thirty (30) days of recording with the Register of Deeds, Iredell County, North Carolina. The recorded deed shall include the language in the DWQ 401/Express Permitting Unit's Sample DEED RESTRICTIONS AND PROTECTIVE COVENANTS signed and notarized on January 22, 2009 and received with your application on January 25, 2010. These shall include, but not limited to, the maximum allowable built upon areas for the various lots, parking areas, streets and roads draining to stormwater wet detention ponds 1 and 2. 3. All operation and maintenance activities shall be followed as stipulated in the operation and maintenance agreements for the wet detention basins and level spreader-filter strip system received in our office on January 20, 2010 and February 11, 2010 respectively. 4. Notification of Construction: The applicant and/or authorized agent shall contact the DWQ Express Review Program in writing at the letterhead address within ten (10) days of the commencement of construction. This letter completes the review of your application by the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Joseph Gyamfi or Lia M. Gilleski at 919-733-1786. Sincerely, J6 Cyndi Karoly, Supervisor 401 Oversight/Express Review Program CBK/jg cc.`. File copy USACE Asheville Regulatory Field Office. Alan Johnson, DWQ Mooresville Regional Office Matt Edwards, PE, Kimley-Horn & Assoc., 1919 South Blvd, Suite 100, Charlotte, NC 28203