HomeMy WebLinkAboutNC0001422_02_CAP Update 2020_Figures (1 of 2)_20200814Corrective Action Plan Update August 2020
L.V. Sutton Energy Complex
FIGURES
SynTerra
•
♦.
BUTTON PLANT /
PARCEL LINE ♦
r•
r
I ♦
♦
I ♦
♦ COMPLIANCE I BOUNDARY ` FORMER ASH BASIN �♦� � LANDFILL WASTE
• WASTE BOUNDARY • ♦ BOUNDARY
•
Lake Sutton
•
• FORMER 1984 44
• ASH BASIN •
I •
EXCAVATED1971
•
♦♦ 'r r �. � � ASH BASIN �s � FORMER PROCESS AREA
♦r ♦, FORMER ASH DISPOSAL
\ • /AREA WASTE BOUNDARY
l••
SOURCE:
2019 USGS TOPOGRAPHIC MAP, CASTLE HAYNE AND
LELAND QUADRANGLES, OBTAINED FROM THE USGS STORE AT
https://store.usgs.gov/map-locator.
FORMER COAL PILE AREA
WASTE BOUNDARY
� L
EFFLUENT DISCHARGE CANAL
I I POWER PLANT
L__J
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011).
%� DUKE
ENERGY
w(NsroN-saLEror
FIGURE ES-1
SITE LOCATION MAP
CORRECTIVE ACTION PLAN UPDATE
PROGRESSCHARLOTTE
rNEW
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
DRAWN BY:J.NIRTz DATE:11/18/201scRAPHIcscALE
REVISED BY: C. CURRIER DATE: 07/22/2020
000 0 000 000
CHECKED BYT DATE: 07/22/2020
synTerra
B.
APPROVED BY: B. WYLIE DATE: 07/22/2020
WYLIEN
PROJECT MANAGER: B. WYLIE
(IN FEET)
www.svnterracorD.com
A: ``s •
k
AREA 1 B
•
j
1984 ASH
BASIN
(LIN
1071
AREA 2
1983
r crrcuc�nu ..
I Gr_GAIn
NPDES OUTFALL LOCATION
EXTRACTION WELL
• SUPPLY WELLS
GROUNDWATER FLOW DIRECTION
SURFACE WATER FLOW DIRECTION
EFFLUENT DISCHARGE CANAL
- ASH BASIN COMPLIANCE BOUNDARY
ANTICIPATED EFFLUENT CANAL
EXTENSION
ASH BASIN WASTE BOUNDARY
ONSITE LANDFILL BOUNDARY
FORMER ASH DISPOSAL AREA WASTE
BOUNDARY
ONSITE LANDFILL COMPLIANCE
BOUNDARY
FORMER PROCESS AREA BOUNDARY
FORMER COAL PILE AREA BOUNDARY
_ DUKE ENERGY PROGRESS PROPERTY
LINE
AREAS 1A/1 B/4 - CONFIRMATION
GROUNDWATER MONITORING
AREAS 2/3A- ONGOING CLOSURE
ACTIVITIES
AREA 3B - MNA REMEDY
NOTES:
1. THE OUTLINE OF AREAS 1 THROUGH 4 REPRESENT THE
AREAS WHERE THE MAXIMUM EXTENT OF COIS ARE
GREATER THAN COMPARISON CRITERIA IN GROUNDWATER
ASSOCIATED WITH THE SUTTON SOURCE AREAS.
2. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
PROGRESS.
3. ALL BOUNDARIES ARE APPROXIMATE.
4. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA SERVER
ON JUNE 17, 2019. IMAGE COLLECTED APRIL 4, 2019.
5. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
(NAD83/2011).
(' DUKE
ENERGY
PROGRESS
1
AREA 1A � 0
AREA 3B
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 10/07/2019
REVISED BY: C. CURRIER DATE: 07/30/2020
CHECKED BY: T. HARTMAN DATE: 07/30/2020
APPROVED BY: B. WYLIE DATE: 07/30/2020
PROJECT MANAGER: B. WYLIE
•
FIGURE ES-2
•
•
7
AREAS PROPOSED FOR CORRECTIVE ACTION
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
♦
♦.
BUTTON PLANT /
PARCEL LINE ♦
• ,
r•
r
I ♦
r
r
I ♦
COMPLIANCE I BOUNDARY ` FORMER ASH BASIN �♦� •� ` LANDFILL WASTE
r WASTE BOUNDARY`
• ♦ BOUNDARY
rr � �
1 •
r
I Lake Sutton •
FORMER 1984
ASH BASIN
ft
r I ;
♦ ♦ . �� • EXCAVATED 1971 FORMER PROCESS AREA
♦`� � � � • ` ASH BASIN lk • "
♦r r r ♦, FORMER ASH DISPOSAL
` •� AREA WASTE BOUNDARY
FORMER COAL PILE AREA' 1
WASTE BOUNDARY
i
L
'EFFLUENT DISCHARGE CANAL t`
r • I I POWER PLANT
s� INTAKE CANAL
SOURCE: •,
2019 USGS TOPOGRAPHIC MAP, CASTLE HAYNE AND
LELAND QUADRANGLES, OBTAINED FROM THE USGS STORE AT
https://store.usgs.gov/map-locator.
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011).-�
DUKE
t�ENERGY
wiNsroN-sa�Eror
FIGURE 1-1
SITE LOCATION MAP
CORRECTIVE ACTION PLAN UPDATE
PROGRESS
CHARLOTTE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
NEW HANOVER
COUNTY
DRAWN BY: J. NIRTz DATE: 11/18/2019
REVISED BY: C. CURRIER DATE: 07/22/2020
cRAPHIc SCALE
000 0 000 000
CHECKED BY T. N DATE: 07/22/2020
s)mTerra
B.
APPROVED BY: B. WYLIE DATE: 07/22/2020
WYLIE
PROJECT MANAGER: B. WYLIE
(IN FEET)
www.svnterracorD.com
\\ MID 6
andin8_
FUTURE LANDFILL
0i� �� J WASTE BOUNDARY
;', 1�� ,,.. � per/ art ,. � �� __�� -� !� • � II
;1;�•• _ FUTURE COMPLIANCE BOUNDARY s
rFUTURE ASH BASIN
WASTE BOUNDARY - p 7-4.
i r FUTURE ` k �V
C1. �. • I i I COOLING a
POND
.• ,Ai- FUTURE 1984 ASH BASIN \�,
FUTURE PROCESS AREA /
-0 - �\\ I� FUTURE ASH DISPOSAL Cree
-- FUTURE 1971 ASH BASIN AREA WASTE BOUNDARY Nes'6
,29 -
�ll C ar—Hill
FUTURE COAL PILE
�0 WASTE BOUNDARY r
/01
FUTURE DUKE ENERGY
PROGRESS PROPERTY LINE
cl
NEW - — 1
m I
28
+&�r� Cam.. COAST M£ BRI"�F . �a I �l •��'
I` R
;I •s1 • BM 6 28 !,
-PTO Ourn
I
�_
,
SOURCE:
USGS TOPOGRAPHIC MAPS (1944,1947,1948,
&1954) OBTAINED FROM THE
NRCS GEOSPATIAL DATA GATEWAY AT http://datagateway.nres.usda.gov/
\ -
GRAPHIC SCALE
c4*)DUKE
2000 0 2000 4000
ENERGY
IN FEET
PROGRESS
DRAWN BY: J. CHASTAIN
DATE: 7/30/2015
REVISED BY: C. NEWELL
DATE: 5/22/2019
CHECKED BY: T.HARTMAN
DATE:6/15/2020
APPROVED BY: B. WYLIE
DATE: 6/15/2020
141P
PROJECT MANAGER: B. WYLIE
R
t � 1
WI
uddy
l
I L7 r (LI, S.
CUS
SE
NION;
ATION
FIGURE 1-2
HISTORICAL USGS TOPOGRAPHIC MAP
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
www.synterracorp.com
/ MW-41B
- MW-41C
-- MW-41D
MW-08B
--/ MW-41E ♦ MW-08D
MW-8E
♦ MW-8
M W-5A
MW-5B
MW-5C
MW-5CD
MW-5D
MW-5E
MW-5RE
♦
LEGEND
EXTRACTION WELL
WELL IN UPPER SURFICIAL FLOW ZONE
WELL IN LOWER SURFICIAL FLOW ZONE
lie WELL IN UPPER PEEDEE FLOW ZONE
lie WELL IN LOWER PEEDEE FLOW ZONE
ABANDONED WELL
PIEZOMETER IN UPPER SURFICIAL FLOW
ZONE
• PIEZOMETER IN UPPER PEEDEE FLOW
ZONE
ABANDONED PIEZOMETER
WATER SUPPLY WELL
NPDES OUTFALL LOCATION
ASH BASIN WASTE BOUNDARY
- ASH BASIN COMPLIANCE BOUNDARY
ONSITE LANDFILL BOUNDARY
ONSITE LANDFILL COMPLIANCE
BOUNDARY
FORMER ASH DISPOSAL AREA WASTE
BOUNDARY
FORMER PROCESS AREA BOUNDARY
FORMER COAL PILE AREA BOUNDARY
DUKE ENERGY PROGRESS PROPERTY
LINE
EFFLUENT DISCHARGE CANAL
NOTES
1. NPDES - NATIONAL POLLUTANT DISCHARGE ELIMINATION
SYSTEM.
4. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
PROGRESS
5. ALL BOUNDARIES ARE APPROXIMATE.
6. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA SERVER
ON JUNE 17, 2019. IMAGE COLLECTED APRIL 4, 2019.
7. DRAWING HAS BEEN SET WITH A PROJECTION OF
NORTH CAROLINA STATE PLANE COORDINATE SYSTEM
FIPS 3200 (NAD83/2011).
97 •,
je O GWPZ-1A ♦/
GWPZ-16 4
GWPZ-2A c '
GWPZ-2 B
M W-34
M W-34
1983
MW-48B M�v J FPA-3B
MW-48C FPA-3C
ABMW-2S / 4WW447B
TW-L098 • MW-45B TW-L 15D MW-15 MW-15RB
MW-15RC
MW-45C MW-15RD MW-46B
MW-45D MW-20
MW-46D
MW-20D MW-50B
M W-20 P D M W-50C
MW-44B MW-43C
MW-44C MW-43B
OUTFALL 001
I
•
A
FPA-4B
0
AW-5C �v
J AW-5D SMW-3B
♦ SMW-3C
MW-19
MW-28B MW-32C MW-33C •
MW-28C
MW-28T
16 M W 7 B ` t; '.
D MW-7C
AW-913
AW-9C i �� ' • ."� ' �� �� .
AW-9D .. .
GRAPHIC SCALE
DUKE
tENERGY
600 0 6aa 1,200
(IN FEET)
DRAWN BY: J. KIRTZ DATE: 05/21/2019
PROGRESS
REVISED BY: J. KIRTZ DATE: 06/15/2020
CHECKED BY: T. HARTMAN DATE: 06/15/2020
APPROVED BY: B. WYLIE DATE: 06/15/2020
synTeria
PROJECT MANAGER: B. WYLIE
www.synterracorp.com
MW-37B
MW-37C
MW-37D
` 6
MW-37CD
MW-37E
• L
PZ-23D `�
FIGURE 1-3
SITE LAYOUT WITH
MONITORING WELL LOCATIONS
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
MW-8/B/D/E A
i
W-41 B/C/D/E
a
40
PZ-10S/D •
MW- I,
MW-38B/C/D
MW-36B/C CCR-208C/D `MW 11 41vSMW-4B/C
MW-27B/C }R�� CCR-201C/D
DMW-1 •
CCR-115B/C/D BMW-1
GWPZ-1A/B �
MW-40'B/C/D l O MW-35B/, 0
AW-2B/C/D
CCR-116B/C CCR-207C/D ` AW-3B/C
CR-114B/C/DJQ� GWPZ-2A/B DMW 2 ♦ BMW-3
MW-34B/C CCR-202C/D
CCR-117B/C •
R-113B/C/D �� MW-31RB/RC
ITFALL 004 A CCR-118B/C
CCR-206C/D AW-7RD wlllSMW-5B/C
R-112B/C/D BMW-2 5.: _
CCR-119B/C
® MW-246/C
® MW-24RB/RClii
• CCR-203C/D
11 B/C/D • DMW-3
® GWPZ 3A/3B
PZ-INT 0
� BMW-4 •
SMW-6B/C/D
CCR-120B/C CCR-205C/D • DMW-4 ,
CCR-110B/C/D ® CCR-204C/D
CCR-121 RB/RC CCR-121 B/C •' ate..
• MW-12R
CCR-109B/C/D ® TW-202 CCR-122RB/RC CCR-122B/C �AW-6RB/RD/RE r
CCR-108RB/RC/RD SMW-1 B/C
e CCR-108B/C/D GW Z-4A/B • MW-23B/C/D/E
-- AC�CR-�123B/COU00TW-132 MW-IAP-1 D
CCR-107RB/RC/RD B/RC
_
AW-4B/C
CCR-1076/C/D PZ-1971 vu
L CCR-124RB/RC MW-42B/C/D SMW-2B/C
•
OUTFACE 008 CCR-1066/C/D
CCR-1056/C/D 1983 8
MW-22B/C
EXTENSIO
FPA-96/C
FPA-2B/2C
FPA-4B/C AW-5B/C/D/E
MVITA 3R/D CCR-103B/C/D ��
MW-19 MW 32C ` SMW-3B/C
•SMW-49B/C MW-21C � �MW-33C �
COOLING POND CCR-102B/C FPA-3B/C
• ABMW-2S/D
TW-L098
d-
®MW-28B/C/T
• '-.k
AB-2 MW-47B/C
MW-48B/C MW-14
'
'
FORMERAS
TW-L024A DISPOSAL MW-16/D
MW
®MW-7A/B/C
MW-15RB/RC/RD
�.
�00
LEGEND
MONITORING WELL LOCATIONIN
OUTFACE 001
��
ABANDONED WELL LOCATION
I
•``'
C PIEZOMETER LOCATION
WATER SUPPLY WELL LOCATION
NPDES OUTFALL LOCATION
-
ASH BASIN WASTE BOUNDARY
_
. ASH BASIN COMPLIANCE BOUNDARY
ONSITE LANDFILL BOUNDARY
FORMER ASH DISPOSAL AREA WASTE
BOUNDARY
FORMER PROCESS AREA BOUNDARY
FORMER COAL PILE AREA BOUNDARY
. DUKE ENERGY PROGRESS PROPERTY LINE
NOTES:
1. NPDES - NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM
GRAPHIC SCALE
4. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
I'DUKE 490 0 490 980
FIGURE 1-4
PROGRESS.
ENERGY (IN FEET)
SIMPLIFIED SITE LAYOUT MAP
5. ALL BOUNDARIES ARE APPROXIMATE.
PROGRESS DRAWN BY: J.KIRTZ DATE:11/18/2019
CORRECTIVE ACTION PLAN UPDATE
6. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA SERVER
ON JUNE 17, 2019. IMAGE COLLECTED APRIL 4, 2019.
REVISED BY: J. KIRTZ DATE: 06/15/2020
L.V. SUTTON ENERGY COMPLEX
CHECKEDBY:1 ARTMAN DATE:06/15/2020
7. DRAWING HAS BEEN SET WITH A PROJECTION OF
APPROVED BY: B.WYLIE DATE:06/15/2020
WILMINGTON, NORTH CAROLINA
NORTH CAROLINA STATE PLANE COORDINATE SYSTEM
FIPS 3200 (NAD83/2011).
Terra PROJECT MANAGER: B.
www.synterraterracorp.com
LEGEND
NOTES:
(' DUKE
ENERGY
PROGRESS
:
'a
,flL III
4M.71'�-'
Kv
GRAPHIC SCALE
375 0 375 750
(IN FEET)
DRAWN BY: C. WYATT
DATE: 03/30/2020
REVISED BY: C. CURRIER
DATE: 07/22/2020
CHECKED BY: T. HARTMAN
DATE: 07/22/2020
APPROVED BY: B. WYLIE
DATE: 07/22/2020
PROJECT MANAGER: B. WYLIE
NIL"
by
�.
FIGURE 2-1
MAP OF CCR AND FORMER COAL PILE
MANAGEMENT AREAS
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
0
^ J�
z
0
Q
> 0
W
J
W
1
A -
(WEST)
i COOLING POND
W.L.ELEV. B_10_
L. V. SUTTON ENERGY COMPLEX
CCR SURFACE IMPOUNDMENT
LIMIT OF POND BASED 1
00 U
cl
C9
00 00
0
K
00 N
m
-i
i
w
�
FORMER
-_ m
¢
0--
ASH
L)
SURFACE
U
c�
U
%
EXCAVATED
L-_-�_
AREA
— —
—
DREDGED
AREA
ll�
AREA -LINED
n
in
m
>
N
Q
U
o
U
0
J
W
a
SALINE AQUIFER CONDITIONS IN THE �—
LOWER PEEDEE FORMATION UPPER PEEDEE FORMATION
ZONES OF SILTS AND FINE SANDS
---------------------------------------------------------------------
LOWER PEEDEE FORMATION i
ZONES OF SILTS AND FINE SANDS
LEGEND
- A'
(EAST)
100
50 ^
4f
z
0
Q
0 >
W
J
W
-50
-100
MW 23B
WELL IN UPPER SURFICIAL FLOW ZONE
UPPER SURFICIAL FLOW ZONE GROUNDWATER
NOTES
MW 23C
WELL IN LOWER SURFICIAL FLOW ZONE
WELL WATER LEVEL ELEVATION
MW-23D
WELL IN UPPER PEEDEE FLOW ZONE
LOWER SURFICIAL FLOW ZONE GROUNDWATER
1. DEPTH TO WATER GAUGED IN MONITORING WELLS ON FEBRUARY 26 AND 27, 2020.
WELL WATER LEVEL ELEVATION
MW-23E
WELL IN LOWER PEEDEE FLOW ZONE
2. ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM 1988, (NAVD 88).
V
UPPER PEEDEE FLOW ZONE GROUNDWATER
ABMW 5S
WELL ABANDONED
WELL WATER LEVEL ELEVATION
3. ALL BOUNDARIES ARE APPROXIMATE.
SUT EW 5
EXTRACTION WELL IN LOWER SURFICIAL FLOW ZONE
V
LOWER PEEDEE FLOW ZONE GROUNDWATER
S 12
WATER SUPPLY WELL
WELL WATER LEVEL ELEVATION
11.98'
WATER LEVEL ELEVATION (NAVD 88)
. _
GENERALIZED WATER TABLE
LABEL COLORING BY FLOW ZONE
( )
_P,
GENERALIZED GROUNDWATER
�
WELL SCREEN
FLOW DIRECTION
ASH BASIN COMPLIANCE BOUNDARY
O
SURFACE WATER
LOWER SURFICIAL
DUKE
0 125 250 500
NM
NOT MEASURED
'
CAICDr'V
HORIZONTAL SCALE: 1" = 500'
VERTICAL SCALE: 1 " = 100'
FIGURE 2-2
CROSS SECTION LOCATION
m
z
OO
w
w
Qli
B---a
(NORTH)
1984 ASH BASIN (LINED)
COMPLIANCE BOUNDARY
1971 ASH BASIN
FORMER
B'
(SOUTH)
-
PROCESS -
1984 ASH BASIN
m
U
p
AREA(FPA)
(2006INTERIOR
Q
a
�oCONTAINMENT
O
m
oLo
AREA)
N
Orn
1:15
rn
�
Nco
0I
0
Lu
Jm
¢
U
U
U
LL
d
a
d
�
U
�
�
m
°0
c�
0
�
0
�
�
GRAVEL
m
�
FORMERASH�
SURFACE
>
�
�
� �
FORMER ASH
SURFACE
m
�
Q
UUU
UUU
/ROAD FORMER ASH
/ SURFACE
O
16-
CLAY LINER
—CLAY
—
LINER
_
—
7
------
-----------
-- I
NM
969.34'
8.91
---------------- -'SATURATEDSOIL_____ _
------
----
-----DREDGED ------
----8.64'
---- 8.41'
8.46'
-----------------9.62'
---- AREA ---------
9.6
8.99
-------------------
------
---
-
--------------- -
---------
®.33'
8.45,
8.67'
------------------ -----
LOWER SURFICIAL
ZONE WITH COARSE
--------------------
9.37'
-----------------------------
8.79
UPPER PEEDEE FORMATION
-------------------
---------
---
----
----------------------------------------------
SANDS AND SILT
9.68'
ZONES OF SILTS AND FINE SANDS
LOWER PEEDEE FORMATION
ZONES OF SILTS AND FINE SANDS
SALINE AQUIFER CONDITIONS
�
SALINE AQUIFER CONDITIONS
IN THE PEEDEE FORMATION
LOWER PEEDEE FORMATION
IN THE PEEDEE FORMATION
ZONES OF SILTS AND FINE SANDS
LEGEND
MW 41B
WELL IN UPPER SURFICIAL FLOW ZONE
MW 41C
WELL IN LOWER SURFICIAL FLOW ZONE
MW 41D
WELL IN UPPER PEEDEE FLOW ZONE
MW 41E
WELL IN LOWER PEEDEE FLOW ZONE
ABMW 1S
WELL ABANDONED
- -
GENERALIZED WATER TABLE
SURFACE WATER
LOWER SURFICIAL
SATURATED SOIL
NM
NOT MEASURED
UPPER SURFICIAL FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
LOWER SURFICIAL FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
V UPPER PEEDEE FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
V LOWER PEEDEE FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
9 37' WATER LEVEL ELEVATION (NAVD 88)
(LABEL COLORING BY FLOW ZONE)
WELL SCREEN
ASH BASIN COMPLIANCE BOUNDARY
LOWER SURFICIAL ZONE WITH
COARSE SANDS AND SILT
100
50
z
0 O
Q
w
w
-50
-100
-150
NOTES
1. DEPTH TO WATER GAUGED IN MONITORING WELLS ON FEBRUARY 26 & 27, 2020.
2. ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM 1988,
(NAVD 88).
3. GROUNDWATER FLOW IS APPROXIMATELY NORTHEAST TO SOUTHWEST, PERPENDICULAR TO
THE CROSS SECTION.
4. ALL BOUNDARIES ARE APPROXIMATE.
CROSS SECTION LOCATION
CFORMER
COAL
FORMER ASH DISPOSAL AREA
PILE AREA
(NORTH)
(FADA)
(FCPA)
o
FORMER
w
O 00
ASH EXTENT
Q� 11
100
D
N NCN
CO
U 0]
J
cnw
o�� o
J
�
co
¢ ¢ H
50 w
J
J
Z
U
w
0
Q
6.13'
4.5U
w
J
w
6.18'
4.57'
-50 UPPER SURFICIAL \
ZONE WITH SILTS & /
SANDS
UPPER PEEDEE FORMATION 'LOWER SURFICIAL
ZONES OF SILTS AND FINE SANDS 5 82' ZONE WITH COURSE
-100 SANDS & SILT
LOWER PEEDEE FORMATION
-150 1 ZONES OF SILTS AND FINE SANDS
LEGEND
MW 46B
WELL IN UPPER SURFICIAL FLOW ZONE
MW 46C
WELL IN LOWER SURFICIAL FLOW ZONE
MW 46D
WELL IN UPPER PEEDEE FLOW ZONE
ABMW 2S
WELL ABANDONED
GENERALIZED WATER TABLE
SURFACE WATER
LOWER SURFICIAL
PEEDEE FLOW ZONE
0
(PEEDEE FORMATION)
UPPER SURFICIAL FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
LOWER SURFICIAL FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
UPPER PEEDEE FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
4.57' WATER LEVEL ELEVATION (NAVD 88)
(LABEL COLORING BY FLOW ZONE)
WELL SCREEN
ASH BASIN COMPLIANCE BOUNDARY
_ co
(SOUTH)
100
50
Z
0 O
Q
w
w
-50
-100
-150
NOTES
1. DEPTH TO WATER GAUGED IN MONITORING WELLS ON FEBRUARY 26 & 27, 2020.
2. ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM 1988,
(NAVD 88).
3. GROUNDWATER FLOW IS APPROXIMATELY NORTHEAST TO SOUTHWEST, PERPENDICULAR TO
THE CROSS SECTION.
4. ALL BOUNDARIES ARE APPROXIMATE.
CROSS SECTION LOCATION
D-no
(SOUTHWEST)
— D'
FORMERASH (NORTHEAST)
DISPOSAL AREA
(FADA)
0
J C6 W O
ZII 0 C6
100 p U m CaJ > p a U p m a p ¢ 11 100
> �n I.C) UJ J O O O O O O Lo Lo Lo co (D =>
Y W N N N Of —> .--I r>-I .-I c-I rl U J
11 H J 2i > > 2i 1 W
Q Z F J
50 LL w i w 50
ww ¢
J
LL
O 0 — — — —5.49' 6.85' �6.13' 7.29' 9.48' 0 O
J 5.34' �� �� w
w 50 6.79' 6.18' 7.28' \ 9.37' 50 w
UPPER SURFICIAL ZONE
UPPER WITH SILTS & SANDS
PEEDEE
5.55' 5 82' 7.20' � UPPER PEEDEE FORMATION
5.50' ZONES OF SILTS AND FINE SANDS
-100 LOWER SURFICIAL_ _ _ _ 100
ZONE WITH COURSE
SANDS &SILT
LOWER PEEDEE FORMATION
-150 ZONES OF SILTS AND FINE SANDS -150
LEGEND
MW 46B
WELL IN UPPER SURFICIAL FLOW ZONE
UPPER SURFICIAL FLOW ZONE GROUNDWATER
NOTES
MW 46C
WELL IN LOWER SURFICIAL FLOW ZONE
WELL WATER LEVEL ELEVATION
1. DEPTH TO WATER GAUGED IN MONITORING WELLS ON FEBRUARY 26 & 27, 2020.
MW 15RD
WELL IN UPPER PEEDEE FLOW ZONE
LOWER SURFICIAL FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
2. ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM 1988,
GENERALIZED WATER TABLE
UPPER PEEDEE FLOW ZONE GROUNDWATER
(NAVD 88).
GENERALIZED GROUNDWATER
WELL WATER LEVEL ELEVATION
3. ALL BOUNDARIES ARE APPROXIMATE.
FLOW DIRECTION
6.18 WATER LEVEL ELEVATION (NAVD 88)
SURFACE WATER
(LABEL COLORING BY FLOW ZONE)
LOWER SURFICIAL
WELL SCREEN
PEEDEE FLOW ZONE
ASH BASIN COMPLIANCE BOUNDARY
0
(PEEDEE FORMATION)
CROSS SECTION LOCATION
Corrective Action Plan Update August 2020
L.V. Sutton Energy Complex SynTerra
Figure 4-1
Water Level Map — Surficial Flow Zone —
February 26 & 27, 2020
Provided in separate electronic figure file as a
large sheet size
►E
i
AW-04C Well Cluster
12
11
10
9
8
7
6
1 /1 /2015 1 /1 /2016 1/11/2017 1 /1 /2018 1 /1 /2019 1 /1 /2020
Date
AW-04B (Upper Surficial Flow Zone Well — Near Extraction System)
AW-04C (Lower Surficial Flow Zone Well — Near Extraction System)
13
00
00
C 12
Q
z 11
C
O_
'' 10
R
>
07
W
9
07
>
0)
J
L 8
M
AW-5C Well Cluster
�i
i
MW-12R Well Cluster
13
I
12
11
I
10
I
9
I
8
I
7
1/1/2015 1/1/2016 1/1/2017 Date/1/2018 1/1/2019 1/1/2020
MW-112R (Lower Surficial Flow Zone Well — Near Extraction System)
AW-6RD (Upper Peedee Flow Zone Well — Near Extraction System)
1 /1 /2015 1 /1 /2016 1/1/2017 1 /1 /2018 1 /1 /2019 1 /1 /2020
Date
AW-5C (Lower Surficial Flow Zone Well —
Near Extraction System)
AW-5D (Upper Peedee Flow Zone Well —
Near Extraction System)
LEGEND
Notes:
DUKE
DRAWN BY: D.AVARD DATE:02/03/2020
FIGURE 4-2a
NAVD 88 - North American Vertical
Datum 1988
ENERGY
REVISED BY: D.AVARD DATE:05/05/2020
HYDROGRAPHS -EASTERN PROPERTY LINE
Start of Excavation of 1971/1984 Ash Basins - January 2016
— — — Initial Ash Placement in CCP Landfill - July 7, 2017
in - inches
PROGRESS
CHECKED BY: T. HARTMAN DATE:05/07/2020
CORRECTIVE ACTION PLAN UPDATE
Extraction System Online - August 9, 2017 Upper Surficial Flow Zone
APPROVED BY: L. DRAGO DATE:05/07/2020
L.V. BUTTON ENERGY COMPLEX
— — — Hurricane Florence Landfall - September 14, 2018
Lower Surficial Flow Zonetip
UpperPeedeeFlowZone
PROJECT MANAGER: B. WYLIE
WILMINGTON, NORTH CAROLINA
Terra
synwww.synterracorp.com
Historical Southeast Flow Transect — 1971 Ash Basin and FPA
November 2015
12.0
11.5
11.0
10.5
10.0
9.5
9.0
8.5
8.0
7.5
7.0
6.5
6.0
0 300 600 900 1200 1500 1800 2100 2400 2700 3000 3300
Distance From ABMW-01S (feet)
1971 Ash Basin Southeast Waste Boundary
1971 Ash Basin Southeast Compliance Boundary
Water Level (NAVD 88)
Notes:
Water levels collected during sampling — November 2015
FPA — Former Process Area
NAVD 88 — North American Vertical Datum 1988
Inset image is a portion of Figure 1-3
DUKE
DRAWN BY: D. AVARD
ENERGY
REVISED BY: B.WYLIE
PROGRESS
CHECKED BY: T. HARTMAN
APPROVED BY: L. DRAGO
l'
PROJECT MANAGER: B. WYLIE
1971 f984 ASH
ASHBABASIN
BASIN (LINED)
sur-Ew-3
'�
f983 ,�I��hJ��S s
- EXTENSION!��
$UT-EW-2
SUT-EW-1
FORAIERASH {�
DISPOSAL A17EA, I ! FORA
ER
Nr PROCESS
4REA
FORINER
� •�� COAL PfLE '•I -
•i
DATE: 02/03/2020
DATE: 05/05/2020
DATE: 05/07/2020
DATE: 05/07/2020
syrilerra www.synterracorp.com
Historical Groundwater Flow Direction
(Southeast)
FIGURE 4-2b
HISTORICAL HYDROGRAPH
1971 ASH BASIN AND FPA
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
M111111
00 9.75
00
C
Q 9.50
Z
c 9.25
.41
fC
9.00
W
8.75
J
L
8.50
3
8.25
8.00
Historical North Flow Transect — 1984 Ash Basin
September 2015
I
I
GWPZ-1 B
I
MW-27C
MW-36C
MW-10
I
I
I
I
I
I
0 200 400 600 800 1000
Distance From GWPZ-113 (feet)
1984 Ash Basin North Waste Boundary
1984 Ash Basin North Compliance Boundary
Water Level (NAVD 88)
Notes: DUKE DRAWN BY: D. AVARD DATE: 02/03/2020
Water levels collected during sampling — September 2015 ENERGY REVISED BY: B. WYLIE DATE: 05/05/2020
NAVD 88 — North American Vertical Datum 1988 PROGRESS CHECKED BY: T. HARTMAN DATE: 05/07/2020
Inset image is a portion of Figure 1-3 // APPROVED BY: L. DRAGO DATE:05/07/2020
11111 PROJECT MANAGER: B. WYLIE
synTerra www.synterracorp.com
:�z.z to ■■ •
MW-27C'
MW 36C m ,, ■
• � � GWPZ-1B :�
C ■:
W
OUTFACE 004 ® ♦
a o
Historical Groundwater Flow
Direction (North/Northeast)
FIGURE 4-2c
HISTORICAL HYDROGRAPH
1984 ASH BASIN
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
00
co
Q
Z
c
0
4j
M
_0
W
G7
G7
J
L
M
9.5
9.0
8.5
8.0
7.5
7.0
6.5
6.0
5.5
5.0
4.5
4.0
3.5
3.0
-400 -200
FADA and FCPA
February 2020
0 200 400 600 800 1000 1200 1400 1600 1800
Distance From MW-16D (feet)
FADA Waste Boundary
FCPA Waste Boundary
1971 Ash Basin South Compliance Boundary
Water Level (NAVD 88)
Y
i
MW-16D
-15RC I, 1♦ 0
M W-43C
OUTFALL 001
Groundwater Flow Direction
(Southwest)
Notes:
DUKE
tENERGY
DRAWN BY: D.AVARD DATE:02/03/2020
FIGURE 4-2d
Water levels collected during 24 hour sweep — February 2020
REVISED BY: B. WYLIE DATE:05/05/2020
HYDROGRAPH — FORMER ASH DISPOSAL
FADA—Former Ash Disposal Area
PROGRESS
CHECKED BY: T.HARTMAN DATE:05/07/2020
AREA (FADA) AND FORMER COAL PILE
FCPA — Former Coal Pile Area
APPROVED BY: L. DRAGO DATE: 05/07/2020
AREA (FCPA)
///
NAVD 88 — North American Vertical Datum 1988
PROJECT MANAGER: B. WYLIE
CORRECTIVE ACTION PLAN UPDATE
Inset image is a portion of Figure 1-3
1111
L.V. SUTTON ENERGY COMPLEX
syrlTerla I www.synterracorp.com WILMINGTON, NORTH CAROLINA
6.75 O
O �
1 �
� O
�o
�o
1p
(N5�
O 11
0 5.75
1 4
0.5 e
LEGEND
1 GROUNDWATER FLOW DIRECTION
HYDRAULIC HEAD (FEET)
NPDES OUTFALL LOCATION
EXTRACTION WELL LOCATION
ASH BASIN COMPLIANCE BOUNDARY
ASH BASIN WASTE BOUNDARY
FORMER ASH DISPOSAL AREA WASTE
BOUNDARY
FPABOUNDARY
FCPA BOUNDARY
EFFLUENT DISCHARGE CANAL
ONSITE LANDFILL BOUNDARY
■ DUKE ENERGY PROGRESS PROPERTY LINE
NOTES:
1.ARROWS INDICATE APPROXIMATE GROUNDWATER FLOW
DIRECTION, NOT MAGNITUDE.
2. UPDATED GROUNDWATER FLOW AND TRANSPORT MODELING
REPORT FOR L.V. SUTTON ENERGY COMPLEX WILMINGTON,
NORTH CAROLINA (FALTA, GRAZIANO, GEBRAI, EBENHACK,
MURDOCH, AND YU, 2020). HEAD CONTOURS AND FLOW
DIRECTIONS SHOWN FOR MODEL LAYER 8.
3. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
PROGRESS.
4. ALL BOUNDARIES ARE APPROXIMATE.
5. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
(NAD83).
6. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA SERVER ON
JUNE 17, 2019. IMAGE COLLECTED APRIL 4, 2019.
7. NPDES - NATIONAL POLLUTANT DISCHARGE ELIMINATION
SYSTEM
8. FPA-FORMER PROCESS AREA
9. FCPA- FORMER COAL PILE AREA
X.
♦ i
s
' N
SUT-EW-9
♦ r`
SUT-EW-8
•
•'= SUT-EW-7
•
•
SUT-EW-S
•
1 SUT-EW 4 � Lp
� ' ♦ xis`
Lo
SUT EW 3
•ti SUT-EW-2
-
F�
S N
7.75
s.
6
4.75 5.5
• 8MOM noun S -
o ■• \
amma■■_�♦
S 9.25 •��•■��
OUTFACE 001 • � � � , �
��♦♦Moon ♦
■
lk
9-(6
s
♦ O T 25 >.
l
N cS j
r' cNn O 4.75 3
(' DUKE 750 GRAPHIC SCALE FIGURE 4-3a
0 750 1,500
ENERGY (IN FEET) SIMULATED GROUNDWATER FLOW DIRECTION
PROGRESS DRAWN BY: C.WYATT DATE:03/19/2020 UPPER SURFICIAL FLOW ZONE
REVISED BY: R. KIEKHAEFER DATE: 06/24/2020 CURRENT CONDITIONS
CHECKED BY:T. HARTMAN DATE: 06/24/2020 CORRECTIVE ACTION PLAN UPDATE
APPROVED BY: B. WYLIE DATE: 06/24/2020 L.V. SUTTON ENERGY COMPLEX
WnTeaa PROJECT MANAGER: B. WYLIE WILMINGTON, NORTH CAROLINA
www.synterracorp.com
D
LEGEND
1 GROUNDWATER FLOW DIRECTION
HYDRAULIC HEAD (FEET)
NPDES OUTFALL LOCATION
EXTRACTION WELL LOCATION
■ ■ ■ ASH BASIN COMPLIANCE BOUNDARY
ASH BASIN WASTE BOUNDARY
FORMER ASH DISPOSAL AREA WASTE
BOUNDARY
FPA BOUNDARY
FCPA BOUNDARY
EFFLUENT DISCHARGE CANAL
ONSITE LANDFILL BOUNDARY
■ ■ DUKE ENERGY PROGRESS PROPERTY LINE
NOTES:
1.ARROWS INDICATE APPROXIMATE GROUNDWATER FLOW
DIRECTION, NOT MAGNITUDE.
2. UPDATED GROUNDWATER FLOW AND TRANSPORT MODELING
REPORT FOR L.V. SUTTON ENERGY COMPLEX WILMINGTON,
NORTH CAROLINA (FALTA, GRAZIANO, GEBRAI, EBENHACK,
MURDOCH, AND YU, 2020). HEAD CONTOURS AND FLOW
DIRECTIONS SHOWN FOR MODEL LAYER 12.
3. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
PROGRESS.
4. ALL BOUNDARIES ARE APPROXIMATE.
5. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
(NAD83).
6. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA SERVER ON
JUNE 17, 2019. IMAGE COLLECTED APRIL 4, 2019.
7. NPDES - NATIONAL POLLUTANT DISCHARGE ELIMINATION
SYSTEM
8. FPA-FORMER PROCESS AREA
9. FCPA- FORMER COAL PILE AREA
1984 ASH
BASIN
(LINED)
t
DUKE
IENERGY
PROGRESS
s)mTena
11
001
91S -,1
s
Illlll�irriai
mI
A
R
♦ S
r■■■I-■■EVA" IN
■c
GRAPHIC SCALE
750 0
750 1,500
(IN FEET)
DRAWN BY: C. WYATT
DATE: 03/19/2020
REVISED BY: R. KIEKHAEFER
DATE: 06/24/2020
CHECKED BY: H. SHARITT
DATE: 06/24/2020
APPROVED BY: B. WYLIE
DATE: 06/24/2020
PROJECT MANAGER: B. WYLIE
• ly
O ♦
v
9 9 25
67 \ ,
• 6.75
FIGURE 4-3b
SIMULATED GROUNDWATER FLOW DIRECTION
LOWER SURFICIAL FLOW ZONE
CURRENT CONDITIONS
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
LEGEND
SURFACE WATER SAMPLE LOCATION
NPDES OUTFALL LOCATION
- ■ - ASH BASIN COMPLIANCE BOUNDARY
ASH BASIN WASTE BOUNDARY
ONSITE LANDFILL BOUNDARY
FORMER ASH DISPOSAL AREA BOUNDARY
FORMER PROCESS AREA BOUNDARY
FORMER COAL PILE AREA BOUNDARY
r DUKE ENERGY PROGRESS PROPERTY LINE
EFFLUENT DISCHARGE CANAL
SURFACE WATER FLOW DIRECTION
NOTES:
1. NPDES - NATIONAL POLLUTANT DISCHARGE ELIMINATIC
SYSTEM
2. W.E. - WATER ELEVATION (APPROXIMATE).
3. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
PROGRESS.
4. ALL BOUNDARIES ARE APPROXIMATE.
5. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA SERVE
ON JUNE 17, 2019. IMAGE COLLECTED APRIL 4, 2019.
6. DRAWING HAS BEEN SET WITH A PROJECTION OF
NORTH CAROLINA STATE PLANE COORDINATE SYSTEM
FIPS 3200 (NAD83/2011).
m
r '
♦
♦
I
I
%' DUKE
ENERGY
PROGRESS
r a.
OUTFALL
002 Ilk 1984 ASH
BASIN
(LINED
M
SW_7 asN hL
BASIN
• 11:
(LAKE SUT ON) O/SCyARGF 1983 ,,21
W.E. 8.10_ C 14114
EXTENSICOOLING POND
ON A
J
GRAPHIC SCALE
600 0 600 1,200
(IN FEET)
DRAWN BY: J. KIRTZ DATE: 11/15/2019
REVISED BY: J. KIRTZ DATE: 06/15/2020
CHECKED BY: H. SHARITT DATE: 06/15/2020
APPROVED BY: B. WYLIE DATE: 06/15/2020
PROJECT MANAGER: B. WYLIE
www.synterracorp.com
001
J
•
v
FIGURE 4-4
POTENTIAL SURFACE WATER RECEPTORS
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
li _\ '
\ xcii�"
DUKEENERGY
L. V. SUTTON ENERGY COMPLEX
DW-15
9 PRW-1
LEGEND
0 OFFERED AND/OR SUPPLIED FILTRATION SYSTEM
CONNECTED TO MUNICIPAL WATER SUPPLY LINE
9 DW 14 WATER SUPPLY WELL -APPROXIMATE
CFPUA WATER LINE - APPROXIMATE
DUKE ENERGY PROGRESS PROPERTY LINE
— — — — ASH BASIN COMPLIANCE BOUNDARY
NEW HANOVER COUNTY PARCEL LINE
SOURCES:
WATER LINE LOCATED BASED ON INFORMATION SUPPLIED TO SYNTERRA BY (CFPUA) CAPE FEAR PUBLIC
UTILITY AUTHORITY ON APRIL 19, 2016.
JUNE 14. 2019 AERIAL PHOTOGRAPH FROM GOOGLE EARTH.
WIL FERGIE LLC
3881 US HWY 421 N
FiIiifddl+►:11:7A]
DW75r 5JDW8
�R
� DW-10�
\TURNERASPHALT\
221 SUTTON LAKE RD Gy \
EZZELL TRUCKING LLC \ J�
233 SUTTON LAKE RD \ R FLEMINGTON WATER TANK
o°
BETWEEN THE
` 212 TRANSCOA
� T
d
ABSOLUTE PROPERTIES OF THE CAROLINAS LLC
331 METRO CIR� N y / PORTI
218 R(
MAOLA MILK & ICE CREAM CO
307 METRO CIR `
-�
DUKE ENERGY
L. V. SUTTON ENERGY COMPLEX
STATE PROPERTIES LLC
US HWY 421 N ��
V
DUKE
ENERGY
PROGRESS
161P
synTerra
GRAPHIC SCALE
500 0 500 1000
IN FEET
DRAWN BY: J. CHASTAIN DATE: 6/16/2020
REVISED BY: J. CHASTAIN DATE: 7/23/2020
CHECKED BY: H, SHARITT DATE: 6/16/2020
APPROVED BY: B. WYLIE DATE: 7/23/2020
PROJECT MANAGER: B. WYLIE
www.synterracorp.com
CT
4S LLC
LD (OWNER)
C OR {�\
1
FIGURE 4-5
HB 630 COMPLIANCE
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
Analytical Parameter
Arsenic
Arsenic
Analytical Method
Total Inorganics
SPLP
Reporting Units
mg/kg
pg/L
PSRG Protection of Groundwater
5.8
NA
15A NCAC 02L Standard
NA
10
2020 Provisional Background Threshold Values
1.8
1.56
Sample ID
Depth Interval Sample
(FEET BGS) Collection Date
1971 Ash Basin Samples
No concentrations greater than applicable standard were observed in 1971 Ash Basin samples.
Former Process Area Samples
FPA-02 (0-0.5)
0 - 0.5
02/27/2020
94
29
FPA-02 (2-2.5)
2 - 2.5
02/27/2020
100
14
FPA-03 (7-7.5)
7 - 7.5
02/27/2020
6.8
1.8
FPA-03SB (1-2)
1 - 2
07/15/2019
19
1
14
FPA-06SB (8-10)
8 - 10
07/16/2019
21
9.5
FPA-08SB (1-2)
1 - 2
07/16/2019
45
38
FPA-08SB (2-4)
2- 4
07/16/2019
110
28
FPA-08SB (4-6)
4 - 6
07/16/2019
9.3
13
Former Ash Disposal Area Samples
No concentrations greater than applicable standard were observed in FADA samples.
Former Coal Pile Samples
MW-43SB (1-2)
1 1 - 2 1 7/10/2019
13
Q
MW-45SB
1
♦
♦ u 1M
♦ n
♦ �7!�/� I
♦ (lU:i�iA'J O
0
�UIL'3ilJ
1
Y
I
J
FORMER 1984
ASH BASIN
O 0 (�)
0 0
0 0�
0
ISE1.11.'Gl ORM
■
INSET
■
O Ullfl'/U
e 0 99= gum
'* 0 %♦ 0
OG.' : .♦ O MM
} O�
O
O
gum
01- — 0
SET SCALE: 1" = 160'
i
FPA-3SB
0
INSET
LEGEND
FIGURE NOTES:
TABLE NOTES:
GRAPHIC SCALE
FIGURE 5-1a
('DUKE
v5 0 175 350
ARSENIC IN UNSATURATED SOIL
ENERGY
(IN FEET)
SOURCE AREA 1 & 2
PROGRESS
DRAWN BY: C.DAVIS DATE:05/21/2019
1971 ASH BASIN, FORMER PROCESS AREA, COAL PILE AND
REVISED BY: K. KING DATE: 05/21/2020
CHECKED BY:T. HARTMAN DATE: 05/21/2020
FORMER ASH DISPOSAL AREA
CORRECTIVE ACTION PLAN UPDATE
APPROVED BY: B. WYLIE DATE: 05/21/2020
L.V. SUTTON ENERGY COMPLEX
synTerra
PROJECT MANAGER: B. WYLIE
WILMINGTON, NORTH CAROLINA
www.synterracorp.com
Analytical Parameter
Selenium
Selenium
Analytical Method
Total Inorganics
SPLP
Reporting Units
mg/kg
pg/L
PSRG Protection of Groundwater
2.1
NA
1SA NCAC 02L Standard
NA
20
2020 Provisional Background Threshold Values
1.9
1
Sample ID Depth Interval Sample
(FEET BGS) Collection Date
1971 Ash Basin Samples
No concentrations greater than applicable standard were observed in 1971 Ash Basin samples.
Former Process Area Samples
Former Ash Disposal Area Samples
No concentrations greater than applicable standard were observed in FADA samples.
Former Coal Pile Samples
No concentrations greater than applicable standard were observed in Former Coal Pile samples.
r�
L
MW-45SB
1
0
ItUKE
E� ERGY
PROGRESS
FORMER 1984
ASH BASIN
um 1 110
♦ O
OO U1L- M
1
O
71 B-02 11 B-11
1
SET SCALE: 1" = 1
SEEINSET,
O '
O In
"PA
O O
O if
dirb
p'0 O
%
♦ I
O� O� ♦i
♦ O i
I
O
LEGEND
O
---•
FIGURE NOTES:
.�
-- -.- - -4
GRAPHIC SCALE
175 0 175 350
(IN FEET)
DRAWN BY: C. DAVIS DATE: 05/21/2019
REVISED BY: K. KING DATE: 06/16/2020
CHECKED BY: T. HARTMAN DATE: 06/16/2020
APPROVED BY: B. WYLIE DATE: 06/16/2020
PROJECT MANAGER: B. WYLIE
TABLE NOTES:
I
INSET
FIGURE 5-1c
SELENIUM IN UNSATURATED SOIL
SOURCE AREA 1 & 2
1971 ASH BASIN, FORMER PROCESS AREA, COAL PILE
AND FORMER ASH DISPOSAL AREA
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
Analytical Parameter
Vanadium
Vanadium
Analytical Method
Total Inorganics
SPLP
Reporting Units
mg/kg
pg/L
PSRG Protection of Groundwater
350
NA
15A NCAC 02L Standard
NA
0.3*
2020 Provisional Background Threshold Values
11
2
Sample ID Depth Interval Sample
(FEET SGS) Collection Date
1971 Ash Basin Samples
No concentrations greater than applicable standard were observed in 1971 Ash Basin
samples.
Former Process Area Samples
No concentrations greater than applicable standard were observed in FPA sanples.
Former Ash Disposal Area Samples
No concentrations greater than applicable standard were observed in FADA sanples.
Former Coal Pile Samples
MW-43SB (1-2) 1 1- 2 1 7/10/2019 1 850
1 15
e
lir
INSET
110
0 vM U7LR.L7
OULL3UJ
O UIl um
O Ullfl'/U �®.
GG 10'09M 00M
O♦ -
' Oom
0
O --�
INSET SCALE: 1" = 16w O
SEE INSET A
■
® ; a
O O ■
O O _Opp .
O -- —
po O
♦ T
b
O
If
LEGEND
0
`• w
as as
MW-45SB
MW-46SB
FORMER
COAL
PILE MW-50SB
I
41
P43S
• I FIGURE NOTES:
TABLE NOTES:
GRAPHIC SCALE
FIGURE 5-1d
I ('DUKE
175 0 175 350
VANADIUM IN UNSATURATED SOIL
ENERGY
(IN FEET)
SOURCE AREA 1 & 2
DRAWN BY: C.DAVIS DATE:05/21/2019
REVISED BY: K. KING DATE: 06/16/2020
CHECKEAPPROVDBY: TB.WYLI AN DATE:06/16/2020
PROGRESS
1971 ASH BASIN, FORMER PROCESS AREA, COAL PILE
AND FORMER ASH DISPOSAL AREA
CORRECTIVE ACTION PLAN UPDATE
APPROVED BY: B. WYLIE DATE: O6/16/2020
PROJECT MANAGER: B. WYLIE
L.V. SUTTON ENERGY COMPLEX
synTerra
WILMINGTON, NORTH CAROLINA
www.synterracorp.com
Analytical Parameter
Analytical Method
Reporting Units
PSRG Protection of Groundwater
15A NCAC 02L Standard
2020 Provisional Background Threshold Values
Sample ID
Depth Interval
FEET BGS
Sample
Collection Date
84B-42
0-0.5
6 7 2019
84B-64
0-0.5
6/6/2019
846-88
0-0.5
6/6/2019
84B-113
0-0.5
6 6 2019
84B-113
2-2.5
6/6/2019
84B-115
0-0.5
1 6/5/2019
84B-119
0-0.5
6 6 2019
84B-134
0-0.5
6 3 2019
84B-136
0-0.5
6/ 3 2019
84B-138
0-0.5
6/6/2019
84B-174
84B-194
84B-196
84B-198
84B-207
0-0.5
84B-303 1 2-2.5
84B-344 1 2-2.5
■
FIGURE NOTES:
TABLE NOTES:
19
19
19
Arsenic
Arsenic
Total
for anics
SPLP
m k
L
5.8
NA
NA
10
1.8
1.56
7.3
4.9
11
42
7_1
14
6_2
11
8.7
15
6_7
13
8_5
19
10
17
12
44 -
48
2.5
9.2
19
12
46
19
25
16(
19
24
50(
19
14
73
19
41
40
)19
46
17(
19
38
28(
19
17
26(
19
12
30(
19
1 7.6
1 61
7/3/2019 8.9
7 3 2019 7.5
7/3/2019 12
7/3/2019 1 35
•
40
140 •
78 ■�
93 1
58 ■
41
130 ■
37
84B-184 P84BL166
846-217 846-198
- A- A ,,% 1,
•
•
♦
♦
♦
•
♦
♦
•
♦
Y•�r
•
`.
♦
r
•
• O
♦♦
Q:L' dE
l'J:LiIlW
•
Qng@
Qnu
•
•
•
♦
I
•i
v
♦I ■tom
i LEGEND
o
•
(' DUKE
ENERGY
PROGRESS
GRAPHIC SCALE
200 0 200 400
(IN FEET)
DRAWN BY: C. DAVIS DATE: 05/21/2019
REVISED BY: C. CURRIER DATE: 07/22/2020
CHECKED BY: T. HARTMAN DATE: 07/22/2020
APPROVED BY: B. WYLIE DATE: 07/22/2020
PROJECT MANAGER: B. WYLIE
www.synterracorp.com
•
FIGURE 5-2a
ARSENIC IN UNSATURATED SOIL
SOURCE AREA 1
1984 ASH BASIN
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
R
kI
Analytical Parameterl Selenium I Selenium T
Analytical Method Total SPLP -
Inor anics
Reporting Units m k L_
ction of Groundwater 2.1 NA
1 1 1 • �®
ry
r
84B-2
1
846-7
FORMER 1984 ASH BASIN 84B-11 ` r
1 _
84B-26 84B-24 84B-22 84B-30 84B-28
I
8413-46 84B-44 84B-42 84B-51 84B-49
i
I y
84B-68 coca
84B-69
coca
84B-91
84B-113 84B-111 84B-109 84B-119 84B-117R 84B-115
846-138 84B-136 MGM
8413-142 84B-140 A
8413-184 84B-16600006
84B-170
84B_P17 84B-198 84B-196 84B-194 84B-209 84B-207 8413-205 8413-203
84B-253 84B-233 84B-231 84B-229 84B-245 84B-243 8413-241 84B-239 846-237
846-268 846-266 846-264 846-280 846-278 846-276 8461274 8461272
846-303 84B-311 84B-309 846-307
846-332 84B-330 84B-328
84L, 6-346� 84B-344 846-342
A
(' DUKE
ENERGY
PROGRESS
GRAPHIC SCALE
200 0 200 400
(IN FEET)
DRAWN BY: C. DAVIS DATE: 05/21/2019
REVISED BY: C. CURRIER DATE: 07/22/2020
CHECKED BY: T. HARTMAN DATE: 07/22/2020
APPROVED BY: B. WYLIE DATE: 07/22/2020
PROJECT MANAGER: B. WYLIE
846-356 846-354
84B-366 846-364
846.367
846-373
I
LEGEND
•
FIGURE 5-2b
SELENIUM IN UNSATURATED SOIL
SOURCE AREA 1
1984 ASH BASIN
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
0
1 4,
2025
2040
♦ 4r
�1
1984 A S
BASIN
(LINED
1983
iXTENS/ON
i
FORMERASH FORM
)ISPOSALAREA PROCESSAREA.
FORMER
COAL PILEI
a
I BASIN
1983
EXTENSION
LEGEND
ARSENIC CONCENTRATION > 100 Ng/L
ARSENIC CONCENTRATION 14 - 100 Ng/L
• SPLP SAMPLE LOCATION
ASH BASIN WASTE BOUNDARY
■ ASH BASIN COMPLIANCE BOUNDARY
ONSITE LANDFILL BOUNDARY
FORMER ASH DISPOSAL AREA WASTE BOUNDARY
FPABOUNDARY
FCPABOUNDARY
EFFLUENT DISCHARGE CANAL
DUKE ENERGY PROGRESS PROPERTY LINE
C3
ll�
2030
Ll
NOTES:
1. SPLP — SYNTHETIC PRECIPITATION LEACHING PROTOCOL
2.FPA—FORMER PROCESS AREA
3. FCPA— FORMER COAL PILE AREA
4. CCP — COAL COMBUSTION PRODUCTS
5. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
PROGRESS.
6. ALL BOUNDARIES ARE APPROXIMATE.
7. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA SERVER ON
JUNE 17, 2019. IMAGE COLLECTED APRIL 4, 2019.
8. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
(NAD83/2011).
GRAPHIC SCALE
725 0 725 1,450
(IN FEET)
DRAWN BY: R. KIEKHAEFER DATE: 05/21/2020
REVISED BY: R. KIEKHAEFER DATE: 06/16/2020
CHECKED BY: H. SHARITT DATE: 06/16/2020
APPROVED BY: B. WYLIE DATE: 06/16/2020
PROJECT MANAGER: B. WYLIE
t
DUKE
ENERGY
PROGRESS
FIGURE 5-3a
1984 ASH BASIN ARSENIC SPLP MODEL SIMULATIONS
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
2030
- ♦•�5 -
♦♦
f
♦
�os
- ♦
♦ o
• • • • • • • • '
• • • • • • • • -< Y-
♦"
♦ ` 2
1
faml
'i
205
• • • • • • • • �.
• • • • • • • • a <.
•
♦ , ..
■
f
I.
}
LEGEND
NOTES:
GRAPHIC SCALE
725 0 725 1,450 t�ENERGYSUKE
FEErI
BORON 700-4,000Ng/L
1. SIMULATIONS SHOW NO BORON ABOVE
2. SPLP -SYNTHETIC PRECIPITATION LEACHING
700 pg/L IN 2040 or 2050. (IN
DRAWN BY:R.KIEKHAEFER DATE:05/21/2020 PROGRESS
PROTOCOL
• SPLP SAMPLE LOCATION
ASH BASIN WASTE BOUNDARY
3. FPA-FORMER PROCESS AREA
4. FCPA- FORMER COAL PILE AREA
REVISED BY: R. KIEKHAEFER DATE: 07/27/2020
CHECKED BY: H.SHARITT DATE:07/27/2020
APPROVED BY: B.WYLIE DATE:07/27/2020 10011
ASH BASIN COMPLIANCE BOUNDARY
— ONSITE LANDFILL BOUNDARY
5. CCP - COAL COMBUSTION PRODUCTS
PROJECT MANAGER: B. WYLIE synTerra
FORMER ASH DISPOSAL AREA WASTE BOUNDARY
6.PROPERTYBOUNDARYPROVIDEDBYDUKEENERGY
PROGRESS.
m
www.synterracorp.co
FIGURE 5-3b
FPA BOUNDARY
FCPABOUNDARY
7. ALL BOUNDARIES ARE APPROXIMATE.
JUNE17L 019.IMAGECOL ECTEDAPRIL04,2019ASERVERON
1984 ASH BASIN BORON SPLP MODEL SIMULATIONS
CORRECTIVE ACTION PLAN UPDATE
EFFLUENT DISCHARGE CANAL
DUKE ENERGY PROGRESS PROPERTY LINE
9. DRAWING HAS BEEN SET WITH A PROJECTION
CAROLINA SjATEPLANE COORDINATE SYSTEM
(NAD83201
OF NORTH L.V. SUTTON ENERGY COMPLEX
FIPS3200
WILMINGTON, NORTH CAROLINA
2025
1984 A S
BASIN
(LINED
1983
iXTENS/ON
i
FORMERASH FORM
)ISPOSALAREA PROCESSAREA.
FORMER
COAL PILEI
a
2040
LEGEND
SELENIUM 20 - 139 Ng/L
• SPLP SAMPLE LOCATION
ASH BASIN WASTE BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
ONSITE LANDFILL BOUNDARY
FORMERASH DISPOSALAREA WASTE BOUNDARY
FPA BOUNDARY
FCPABOUNDARY
EFFLUENT DISCHARGE CANAL
DUKE ENERGY PROGRESS PROPERTY LINE
L'A
ll�
Ll
2030
NOTES:
1. SPLP - SYNTHETIC PRECIPITATION LEACHING PROTOCOL
2.FPA-FORMER PROCESS AREA
3. FCPA- FORMER COAL PILE AREA
4. CCP - COAL COMBUSTION PRODUCTS
5. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
PROGRESS.
6. ALL BOUNDARIES ARE APPROXIMATE.
7. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA SERVER ON
JUNE 17, 2019. IMAGE COLLECTED APRIL 4, 2019.
8. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
(NAD83/2011).
GRAPHIC SCALE
725 0
(IN FEET)
725 1,450
UKE
t�EN RGY
DRAWN BY: R. KIEKHAEFER
DATE:05/21/2020
PROGRESS
REVISED BY: R. KIEKHAEFER
CHECKED BY: H. SHARITT
DATE: 06/16/2020
DATE: 06/16/2020
APPROVED BY: B. WYLIE
DATE: 06/16/2020
PROJECT MANAGER: B. WYLIE
FIGURE 5-3c
1984 ASH BASIN SELENIUM SPLP MODEL SIMULATIONS
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
Note:
*sampling events prior
to 1/1/2018 1p° o\°
V o Background Wells Ash Pore Water Wells
1984 Ash Basin Wells a ° x
p � 2� ■ MW-05B AMBW-01S*
■ CCR-110B 0 MW-24RB oo � 1Z> • MW-05C AMBW-02S*
• CCR-110C MW-24RC , RD■ , A, MW-08
CCR-112B o MW-31RC Boa * �� o\° V MW-08B
V CCR-112C O MW-40B a MW-37B
♦ CCR-114B x MW-40C z MW-37C FPA Wells
z CCR-114C SMW-05B Z AL* MW-41B
* CCR-115B SMW-05C ■ FPA-02B
CCR-115C • FPA-02C
A FPA-03B
v FPA-03C
♦ FPA-09B
1971 Ash Basin Wells D° , '`po z FPA-09C
AW-06RB z MW-33C 80% D 80%
■
MW-12R a SMW-01B
MW-19 • SMW-01C �� 60% ,�U � �60% 0'D
MW-21C A SMW-06B o\o � 61 p
MW-23B V SMW-06C ,40% �Q * \209%
■ ova moo � �,,
z0��a
0 -0 0 0 0 a° o°
0 ryo �o �o Ca
s— Ca Cl
(votes: DRAWN BY: M. GUNN DATE: 5/5/2020
DUKE
Groundwater data collected Q1 2020 (February 2020) unless noted with (_>. REVISED BY: FIGURE 5-4�� ENERGY
Ash porewater groundwater data is most recent valid sample. DATE: 5/7/2020 ASH BASIN GROUNDWATER
PROGRESS CHECKED BY: T. HARTMAN
DATE: 5/7/2020 QUALITY PIPER DIAGRAMS
APPROVED BY: L. DRAGO CORRECTIVE ACTION PLAN UPDATE
'6 PROJECT MANAGER: B. WYLIE L.V. SUTTON ENERGY COMPLEX
synTerra WILMINGTON, NORTH CAROLINA
www.synterracorp.com
Note:
*sampling events prior
to 1/1/2018
Offsite Private Wells
S-01 New Well
- S-07*
• S-01 Old Well
= S-08 Well 1*
A' S-02 Pumphouse
`' S-09 Well 2
V S-02 Well 1& 2
S-12
* S-03
S-17*
X S-04
S-18
* S-06*
/o
0
0
U ��o❑
o°
co 3a
D
O O
1
D
■
Z
y
Background Wells Ash Pore Water Wells
■ MW-05B AMBW-01S*
• MW-05C AMBW-02S
AL MW-08
V MW-08B
MW-37B
z MW-37C
* MW-41B
o 0 , , 11110
80% ' 2 U5 ■ 80%
]' �k x o ■ 'L
60% o o ZV QI 60°I0
a �
AD 20%
yk# Z■
10P D 00D o,° S a a d!o
OD OD ry�
o a a o
4-- Ca CI --w
(Votes: DRAWN BY: M. GUNN DATE: 5/5/2020
Background groundwater data collected Q1 2020 (February 2020). DUKE REVISED BY: FIGURE 5-5
Off -Site supply well data collected January 2018 unless noted with (*). ENERGY DATE:5/7/2020 SUPPLY WELL GROUNDWATER
Ash porewater groundwater data is most recent valid sample. PROGRESS CHECKED BY: T. HARTMAN
DATE: 5/7/2020 QUALITY PIPER DIAGRAMS
APPROVED BY: L. DRAGO CORRECTIVE ACTION PLAN UPDATE
417 PROJECT MANAGER: B. WYLIE L.V. SUTTON ENERGY COMPLEX
I WILMINGTON, NORTH CAROLINA
�11.1TEna www.synterracorp.com
C
ve
6
v
x
x
Surface
Water
p°
?y Background
Surface Water
co 4
8-0
■
SW-01
,
■
SW-14
SW-02
D°
o� •
SW-15
o
�
A
SW-03
SW-04
SW-05
Z
SW-06
*
SW-08
❑
SW-09
0
�'
,
0
SW-10
N
$0%
2
G� $0% R
IL
SW-11
Q
SW-12
�4' 60%
,ZV 60% Np
P,
Q
SW-13
,
oho
moo°
g
SW-16
40%
40%\
�
SW- 17
�
moo°
z0°ifl
zo%
0
D° D°
r�
D° Do
f— Ca
_•
._• Cl
Notes:
('DUKE
DRAWN BY: M. GUNN DATE: 5/5/2020
FIGURE 5-6
Surface water samples collected
June 2019 as part of current
conditions 2B/21- evaluation, (See Appendix
K).
ENERGY
EN
REVISED BY:
DATE: 5/7/2020
SURFACE WATER
CHECKED BY: T. HARTMAN
DATE:5/7/2020
QUALITY PIPER DIAGRAMS
APPROVED BY: L. DRAGO
CORRECTIVE ACTION PLAN UPDATE
L�
PROJECT MANAGER: B. WYLIE
L.V. SUTTON ENERGY COMPLEX
www.synterracorp.com
synTena
WILMINGTON, NORTH CAROLINA
♦ NOTES:
TABLE 5-4.
TABLE 5.4
1;1 �qp"
a,
*r
OUTFACE 004 � �� `♦ � ,
OUTFACE 002
OUTFALL 008 / '� • •
LEGEND �� • •
s
n
j:
GRAPHIC SCALE
DUKE 500 0 500 1,000 FIGURE 5-7a
AP ENERGY (IN FEET) ISOCONCENTRATION MAP - SOURCE AREA 1
PROGRESS DRAWN BY. C.WYATT DATE:04/30/2020 ARSENIC IN UPPER SURFICIAL FLOW ZONE
REVISED BY: C. CURRIER DATE: 07/30/2020 CORRECTIVE ACTION PLAN UPDATE
_ CHECKED BY:T.HARTMAN DATE: 07/30/2020 L.V. SUTTON ENERGY COMPLEX
APPROVED BY: B. WYLIE DATE: 07/30/2020 WILMINGTON, NORTH CAROLINA
���, -ainTPrm PROJECT MANAGER: B. WYLIE
NOTES:
TABLE 5.4
ki
OUTFACE
TABLE 5-4.
1984 ASH-- • `
BASIN ••-
- (LINED) ••
1984ASH •• •,-
BASIN
1971 /I (LINED) _
• I A I ,
ASH
ASH • � '�
•• BASINro
�� � ,•
•
198S
COOLING POND EXTENSION �' ',, •
(LAKE SUTTON)
ON
• •• i . ,
FORMER
_ � ` FORMER AREA I/ � PROCESS AREA
�I DISPOSAL
///� m
EFFL
FORMER
COAL PILE
CAPE FEAR
RIVER
GRAPHIC SCALE
DUKE
500 0 500 i,o00
FIGURE 5-7b
ENERGY
(IN FEET)
ISOCONCENTRATION MAP - SOURCE AREA 1
PROGRESS
DRAWN Br. C.WYATT
DATE:04/30/2020
ARSENIC IN LOWER SURFICIAL FLOW ZONE
_
REVISED BY: C. CURRIER
CHECKED BY:T.HARTMAN
DATE: 07/30/2020
DATE: 07/30/2020
CORRECTIVE ACTION PLAN UPDATE
L.V. S UTTO N ENERGY COMPLEX
APPROVED BY: B. WYLIE
DATE: 07/30/2020
WILMINGTON, NORTH CAROLINA
///�
synTerra
PROJECT MANAGER:
erranorn.com
NOTES:
TABLE 5-4.
EA
IOUTFALL 0081
LEGEND
♦
♦
LD
FORMER
COAL PILE
CANAL •
(' DUKE
V ENERGY
PROGRESS
+i,
TABLE 5.4
� \ a
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 04/30/2020
REVISED BY: C. CURRIER DATE: 07/30/2020
CHECKED BY: T. HARTMAN DATE: 07/30/2020
APPROVED BY: B. WYLIE DATE: 07/30/2020
PROJECT MANAGER: B. WYLIE
•
0
o'o
a a — _ _ -
s v
3
_, 'ir6'r:eesi� ♦
FIGURE 5-8a
ISOCONCENTRATION MAP - SOURCE AREA 1
BORON IN UPPER SURFICIAL FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
I.
� OUTFACE 001
(' DUKE
V ENERGY
PROGRESS
17
NOTES:
TABLE 5.4
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 04/30/2020
REVISED BY: C. CURRIER DATE: 07/30/2020
CHECKED BY: T. HARTMAN DATE: 07/30/2020
APPROVED BY: B. WYLIE DATE: 07/30/2020
PROJECT MANAGER: B. WYLIE
TABLE 5-4.
FIGURE 5-8b
ISOCONCENTRATION MAP - SOURCE AREA 1
BORON IN LOWER SURFICIAL FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
EA
OUTFALL
OUTFALL
I•
C
TABLE 5.4
l,.
am
•
f
TABLE 5-4.
0CY�� 0
Yam.
i` •
"• Q •
O... •
�' • ; fix: a O
♦ �� • . - � 1r ,� � - *h ��� :fit � »
v
DUKE
GRAPHIC SCALE
500 0 500 i,o00
FIGURE 5-9a
ENERGY
(IN FEET)
ISOCONCENTRATION MAP - SOURCE AREA 1
PROGRESS
DRAWN Br. C.WYATT
DATE:04/30/2020
MOLYBDENUM IN UPPER SURFICIAL FLOW ZONE
REVISED BY: C.CURRIER
DATE:07/30/2020
CORRECTIVE ACTION PLAN UPDATE
-
CHECKED BY:T.HARTMAN
DATE:07/30/2020
L.V. SUTTON ENERGY COMPLEX
APPROVED BY: B. WYLIE
DATE: 07/30/2020
WILMINGTON, NORTH CAROLINA
��,
tvnTPrra
PROJECT MANAGER: B. WYLIE
OUTFACE 008
LEGEND
0
O
� OUTFACE 001
I
NOTES:
TABLE 5.4
i
CCP
LANDFILL 1
TABLE 5-4.
DUKE
GRAPHIC SCALE
500 0 500 1,000
FIGURE 5-9b
ENERGY
(IN FEET)
ISOCONCENTRATION MAP - SOURCE AREA 1
PROGRESS
DRAWN Br. C.WYATT
DATE:04/30/2020
MOLYBDENUM IN LOWER SURFICIAL FLOW ZONE
_
REVISED BY: C.CURRIER
CHECKED BY:T.HARTMAN
DATE:07/30/2020
DATE:07/30/2020
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
APPROVED BY: B. WYLIE
DATE: 07/30/2020
WILMINGTON, NORTH CAROLINA
///�
synTerra
PROJECT MANAGER:
erranorn.com
♦ NOTESE-1
1
7
Q� T� - --�- _:: •
III[ _-
elm`
INTAKE CANAL /�
(' DUKE
V ENERGY
PROGRESS
m
TABLE 5.4
�0
0
0
Ie 0•
•
0
FLUEN
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 04/30/2020
REVISED BY: C. CURRIER DATE: 07/30/2020
CHECKED BY: T. HARTMAN DATE: 07/30/2020
APPROVED BY: B. WYLIE DATE: 07/30/2020
PROJECT MANAGER: B. WYLIE
www.synterraoorp.com
TABLE 5-4.
♦
♦ R�
FIGURE 5-10
ISOCONCENTRATION MAP - SOURCE AREA 1
SELENIUM IN LOWER SURFICIAL FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
EA
OUTFALL
I L�\\\ —A
�i
OUTFALL 0 22
OUTFALL 008
LEGEND
0
A
NOTES:
+i,
TABLE 5.4
�.
CCP
LANDFIL
984 ASH- ��
BASIN
(LINED) -
1984 ASH ��
■ BASIN
(LINED)
ASH
ASH
BASIN
ty
FORMER
COAL PILE
]e
•
TABLE 5-4.
GRAPHIC SCALE
DUKE
500 0 500 l'o00
FIGURE 5-11a
ENERGY
(IN FEET)
ISOCONCENTRATION MAP - SOURCE AREA 1
PROGRESS
DRAWN BY:C.WYATT
DATE:04/30/2020
STRONTIUM IN UPPER SURFICIAL FLOW ZONE
_
REVISED BY: C.CURRIER
CHECKED BY:T.HARTMAN
DATE:07/30/2020
DATE:07/30/2020
CORRECTIVE ACTION PLAN UPDATE
L.V. S UTTO N ENERGY COMPLEX
APPROVED BY: B. WYLIE
DATE: 07/30/2020
WILMINGTON, NORTH CAROLINA
///�
synTerra
PROJECT MANAW:sB
erracoro.com
♦ NOTESE-1
1
INTAKE CANAL
(' DUKE
V ENERGY
PROGRESS
m
TABLE 5.4
•
i
0 0
�0 0
ELLA • •
•
0
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 04/30/2020
REVISED BY: C. CURRIER DATE: 07/30/2020
CHECKED BY: T. HARTMAN DATE: 07/30/2020
APPROVED BY: B. WYLIE DATE: 07/30/2020
PROJECT MANAGER: B. WYLIE
www.synterraoorp.com
TABLE 5-4.
}
FIGURE 5-11b
ISOCONCENTRATION MAP - SOURCE AREA 1
STRONTIUM IN LOWER SURFICIAL FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
E
z
0
H
> 0
W
J
W
A -
(WEST)
i COOLING POND
_--------W.L. ELEV. B_10_
L.V.SUTTON ENERGY COMPLEX
CCR SURFACE IMPOUNDMENT
LIMIT OF POND BASED 1
m U
0
o
CO
of Ir
00 00
0
o
=
00 NOf
m
w
-1
-1
FORMER
0-- m
¢
0
ASH
U
U
of
U
SURFACE
J C
c�
EXCAVATED
L
AREA
2-108RB
—_—_--
—
142
o—
DREDGED
AREA
AREA -LINED
0
O
Lu
Q
N
11
S. T. WOOTEN CORP.
SAND QUARRIES
W
UJ
Q
z—
�0
0
ry
p
N
rL
J
J
w
�
U
U
UPPER SURFICIAL ZONE
Q
WITH SILTS & SANDS
0
O
Lu
m
U)
0
0
C
J
- A'
(EAST)
100
50 --
4f
z
0
0 >
W
J
W
50 B rc I 453 BTW-13NC TW-136 MW-23C
B NC B 52 MW-12R B MW-6B4 -50
B 219 LOWER SURFICIAL ZONE WITH
SALINE AQUIFER CONDITIONS IN THE �— COARSE SANDS AND SILT
LOWER PEEDEE FORMATION UPPER PEEDEE FORMATION B 11
100 ZONES OF SILTS AND FINE SANDS -100
---------------------------------------------------------------------
LOWER PEEDEE FORMATION
ZONES OF SILTS AND FINE SANDS
LEGEND
MW 23B
WELL IN UPPER SURFICIAL FLOW ZONE
UPPER SURFICIAL FLOW ZONE GROUNDWATER
MW 23C
WELL IN LOWER SURFICIAL FLOW ZONE
WELL WATER LEVEL ELEVATION
MW 23D
WELL IN UPPER PEEDEE FLOW ZONE
LOWER SURFICIAL FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
MW 23E
WELL IN LOWER PEEDEE FLOW ZONE
V
UPPER PEEDEE FLOW ZONE GROUNDWATER
ABM W 5S
WELL ABANDONED
WELL WATER LEVEL ELEVATION
SUT EW 5
EXTRACTION WELL IN LOWER SURFICIAL FLOW ZONE
LOWER PEEDEE FLOW ZONE GROUNDWATER
S- 21
WATER SUPPLY WELL
WELL WATER LEVEL ELEVATION
MW-12R
B 1 219 1
BORON (B) CONCENTRATION (Ng/L)
GENERALIZED WATER TABLE
GENERALIZED GROUNDWATER
—,
FLOW DIRECTION
WELL SCREEN
SURFACE WATER
ASH BASIN COMPLIANCE BOUNDARY
O
LOWER SURFICIAL
NC
NOT CALCULATED
Al r1TC C
1. DEPTH TO WATER GAUGED IN MONITORING WELLS ON FEBRUARY 26 AND 27, 2020.
2. ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM 1988, (NAVD 88).
3. ALL BOUNDARIES ARE APPROXIMATE.
4. ALL CONCENTRATIONS SHOWN ARE EITHER LCL95s OR CTVs. REFER TO TABLE 5-4 FOR THE FULL DATASET.
5. BORON (B) CONCENTRATIONS ARE IN MICROGRAMS PER LITER (Ng/L).
6. NC - ANALYTICAL DATA DID NOT MEET CRITERIA TO CALCULATE AN LCL95 OR CTV VALUE (SEE TABLE 5-4).
7. LCL95 - 95% LOWER CONFIDENCE LIMIT VALUE.
8. CTV-CENTRAL TENDENCY VALUE.
9. < - LESS THAN
ANALYTICAL PARAMETER REPORTING B
UNITS ug/L
15A NCAC 02L STANDARD 700
BACKGROUND THRESHOLD VALUE 50
(SURFICIAL UPPER FLOW ZONE) +
BACKGROUND THRESHOLD VALUE 50
(SURFICIAL LOWER FLOW ZONE) +
+- BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM BACKGROUND
GROUNDWATER SAMPLES COLLECTED MARCH 2O10 TO SEPTEMBER 2019.
CROSS SECTION LOCATION
B-
(NORTH) COMPLIANCE BOUNDARY
1984 ASH BASIN (LINED) 1971 ASH BASIN
1984 ASH BASIN
(20061NTERIOR 0 CD 0
100
CONTAINMENT a0 N co
co U m AREA) 0 0
co C) m U o �� W W N Q Q U U U
m— W 00 00 0 -1 - co FORMERASH� > FORMER ASH
00 co co -1 GRAVEL SURFACE SURFACE
50 Q Q UUU /ROAD FORMER ASH O
UUU / SURFACE
CLAY LINERi----J
z — J CLAY LINER
z \------ B NC L
Op AW- B — — — — — — — — — — — — — — — — — —_—_—_—_—_—_— _—_—_—_—
B NC MW4 B ----------------------------- ---- -- DREDGED ------ --- B 86
----- _ _
B <50 ='SATURATED SOIL_---- ______ ___ _____ AREA ------- --
> MW-386 CCR-114B --------------------------------
--————————————----- ------------------
----- — -
J B N MW-40I B < — — — — — BCR-10677 B 1 335
W AW-8C B 243 TW-136
-50 B <50 MW-38C CR-114 B NC
-- — B 110----------- — B <---------------OWERSU---- ---------------------------- -------------------------------
LOWER SURFICIAL UPPER PEEDEE FORMATION
ZONE WITH COARSE R-1
SANDS AND SILT ZONES OF SILTS AND FINE SANDS LOWER PEEDEE FORMATION B 1,521
-100 ZONES OF SILTS AND FINE SANDS
SALINE AQUIFER CONDITIONS � SALINE AQUIFER CONDITIONS
IN THE PEEDEE FORMATION LOWER PEEDEE FORMATION IN THE PEEDEE FORMATION
ZONES OF SILTS AND FINE SANDS LOWER SURFICIAL ZONE WITH
COARSE SANDS AND SILT
-150
LEGEND
MW-41B
WELL IN UPPER SURFICIAL FLOW ZONE
MW 41C
WELL IN LOWER SURFICIAL FLOW ZONE
MW 41D
WELL IN UPPER PEEDEE FLOW ZONE
MW 41E
WELL IN LOWER PEEDEE FLOW ZONE
ABMW 1S
WELL ABANDONED
— —
GENERALIZED WATER TABLE
SURFACE WATER
LOWER SURFICIAL
SATURATED SOIL
NC
NOT CALCULATED
V
UPPER SURFICIAL FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
LOWER SURFICIAL FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
V
UPPER PEEDEE FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
LOWER PEEDEE FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
FPA-4B
BORON (B) CONCENTRATION (gg/L)
B 1 <50
WELL SCREEN
ASH BASIN COMPLIANCE BOUNDARY
NOTES
FORMER
PROCESS
AREA (FPA)
B'
(SOUTH)
100
50
z
0 O
Lu
-j
Lu
-50
-100
-150
1. DEPTH TO WATER GAUGED IN MONITORING WELLS ON FEBRUARY 26 AND 27, 2020.
2. ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM 1988, (NAVD 88).
3. ALL BOUNDARIES ARE APPROXIMATE.
4. ALL CONCENTRATIONS SHOWN ARE EITHER LCL95s OR CTVs. REFER TO TABLE 5-4 FOR THE FULL
DATASET.
4. BORON (B) CONCENTRATIONS ARE IN MICROGRAMS PER LITER (Ng/L).
5. NC - ANALYTICAL DATA DID NOT MEET CRITERIA TO CALCULATE AN LCL95 OR CTV VALUE (SEE
TABLE 5-4).
6. LCL95 - 95% LOWER CONFIDENCE LIMIT VALUE.
7. CTV - CENTRAL TENDENCY VALUE.
8. < - LESS THAN
ANALYTICAL PARAMETER
B
REPORTING UNITS
Ng/L
15A NCAC 02L STANDARD
700
BACKGROUND THRESHOLD VALUE
50
(SURFICIAL UPPER FLOW ZONE) +
BACKGROUND THRESHOLD VALUE
50
(SURFICIAL LOWER FLOW ZONE) +
+ - BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM
BACKGROUND GROUNDWATER SAMPLES COLLECTED MARCH 2O10 TO SEPTEMBER 2019.
CROSS SECTION LOCATION
0
1
A - - A'
(WEST) (EAST)
ZONES OF SILTS AND FINE SANDS
LEGEND
MW 23B
WELL IN UPPER SURFICIAL FLOW ZONE
UPPER SURFICIAL FLOW ZONE GROUNDWATER
MW 23C
WELL IN LOWER SURFICIAL FLOW ZONE
WELL WATER LEVEL ELEVATION
MW-23D
WELL IN UPPER PEEDEE FLOW ZONE
LOWER SURFICIAL FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
MW 23E
WELL IN LOWER PEEDEE FLOW ZONE
V
UPPER PEEDEE FLOW ZONE GROUNDWATER
ABM W 5S
WELL ABANDONED
WELL WATER LEVEL ELEVATION
SUT EW 5
EXTRACTION WELL IN LOWER SURFICIAL FLOW ZONE V
LOWER PEEDEE FLOW ZONE GROUNDWATER
S- 21
WATER SUPPLY WELL
MW-12R
WELL WATER LEVEL ELEVATION
ARSENIC (As) CONCENTRATION (Ng/L)
GENERALIZED WATER TABLE
Se <� p
SELENIUM (Se) CONCENTRATION (Ng/L)
_,
GENERALIZED GROUNDWATER
FLOW DIRECTION
WELL SCREEN
O
SURFACE WATER
ASH BASIN COMPLIANCE BOUNDARY
O
LOWER SURFICIAL
NC
NOT CALCULATED
100
50 ^
Z
O
0 >
W
J
W
50
100
NOTES
1. DEPTH TO WATER GAUGED IN MONITORING WELLS ON FEBRUARY 26 AND 27, 2020.
2. ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM 1988, (NAVD 88).
3. ALL BOUNDARIES ARE APPROXIMATE.
4. ALL CONCENTRATIONS SHOWN ARE EITHER LCL95s OR CTVs. REFER TO TABLE 5-4 FOR THE FULL
DATASET.
5. ARSENIC (As) AND SELENIUM (Se) CONCENTRATIONS ARE IN MICROGRAMS PER LITER (ug/L).
6. NC - ANALYTICAL DATA DID NOT MEET CRITERIA TO CALCULATE AN LCL95 OR CTV VALUE (SEE TABLE 5-4).
7. LCL95 - 95% LOWER CONFIDENCE LIMIT VALUE.
8. CTV - CENTRAL TENDENCY VALUE.
9. < - LESS THAN
ANALYTICAL PARAMETER
As
Se
REPORTING UNITS
Ng/L
Ng/L
15A NCAC 02L STANDARD
10
20
BACKGROUND THRESHOLD VALUE
2.0
1.0
(SURFICIAL UPPER FLOW ZONE) +
BACKGROUND THRESHOLD VALUE
14
1.0
(SURFICIAL LOWER FLOW ZONE) +
+ - BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM BACKGROUND
GROUNDWATER SAMPLES COLLECTED MARCH 2O10 TO SEPTEMBER 2019.
CROSS SECTION LOCATION
B-
(NORTH)
COMPLIANCE BOUNDARY
1984 ASH BASIN (LINED)
1971 ASH BASIN
1984 ASH BASIN
(20061NTERIOR o
`�
Lo
m
100
CONTAINMENT a0
0 0`0
co 0
m U m
N
AREA) 0_ O
co 0
co
N
a s
U U U
m e
ao �
00 00 °0
co c1
0 0 0 1
� � � GRAVEL
FORMER ASH
m
�
FORMER ASH � >
SURFACE
FORMER ASH
SURFACE
50
¢ Q
UUU /ROAD
UUU /
SURFACE
`
770
CLAY LINER
�--
CLAY LINER
L
-----�
— —
— — — _ — _
Tw 202
As NC
—�--
----
---
�
Se NC
L
0
AW-8B
MW-40B
_ _
-----
----------------- ----
Q
As NC
Se NC
MW- B As NC
As NC Se NC CCR-114B----�-----------SATURATED SOIL ______
SATURATED
—____
— ___-DREDGED ______ ___—
As 4.2
As <1.0
-----------------
----------
— — —
— — — — — AREA ——_—_—_—_—_— —
<1.
Lu
�
W
_
As <1.0
MW-40C Se <1.0
MW-38C As <1.0 CCR-114C
-------------------
------
---
—
_—
-- --NC-- CR-105B
—————— — — — — As 258
TW-136
FPA-9C
-50
e <1.0
As <1 0 Se 39.0 As
N
As 21.0
------------------
— —
— _ _ —
— — 20.0
----------------------------
-------
------------------------
a <1.0
LOWER SURFICIAL
ZONE WITH COARSE
UPPER PEEDEE FORMATION
/
CCR-105C
As 169
SANDS AND SILT
ZONES OF SILTS AND FINE SANDS
LOWER PEEDEE FORMATION
I Se I NC
-100
ZONES OF SILTS AND FINE SANDS
SALINE AQUIFER CONDITIONS
SALINE AQUIFER
CONDITIONS
IN THE
PEEDEE FORMATION
LOWER PEEDEE FORMATION
IN THE PEEDEE FORMATION
ZONES OF SILTS AND FINE SANDS
LOWER
SURFICIAL ZONE WITH
COARSE SANDS AND SILT
-150
LEGEND
MW 41B
WELL IN UPPER SURFICIAL FLOW ZONE
MW-41C
WELL IN LOWER SURFICIAL FLOW ZONE
MW 41D
WELL IN UPPER PEEDEE FLOW ZONE
MW 41E
WELL IN LOWER PEEDEE FLOWZONE
ABMW 1S
WELL ABANDONED
GENERALIZED WATER TABLE
SURFACE WATER
LOWER SURFICIAL
SATURATED SOIL
NC
NOT CALCULATED
B'
(SOUTH)
FORMER
PROCESS
AREA (FPA)
1.
DEPTH TO WATER GAUGED IN MONITORING WELLS ON FEBRUARY 26 AND 27, 2020.
2.
ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM 1988, (NAVD 88).
3.
ALL BOUNDARIES ARE APPROXIMATE.
4.
ALL CONCENTRATIONS SHOWN ARE EITHER LCL95s OR CTVs. REFER TO TABLE 5.4 FOR THE FULL
DATASET.
4.
ARSENIC (As) AND SELENIUM (Se) CONCENTRATIONS ARE IN MICROGRAMS PER LITER (ug/L).
5.
NC - ANALYTICAL DATA DID NOT MEET CRITERIA TO CALCULATE AN LCL95 OR CTV VALUE (SEE
TABLE 5-4).
6.
LCL95 - 95% LOWER CONFIDENCE LIMIT VALUE.
UPPER SURFICIAL FLOW ZONE GROUNDWATER
7,
CTV -CENTRAL TENDENCY VALUE.
WELL WATER LEVEL ELEVATION
LOWER SURFICIAL FLOW ZONE GROUNDWATER
8.
< - LESS THAN
WELL WATER LEVEL ELEVATION
V
UPPER PEEDEE FLOW ZONE GROUNDWATER
ANALYTICAL PARAMETER As Se
WELL WATER LEVEL ELEVATION
REPORTING UNITS Ng/L Ng/L
LOWER PEEDEE FLOW ZONE GROUNDWATER
15A NCAC 02L STANDARD 10 20
WELL WATER LEVEL ELEVATION
BACKGROUND THRESHOLD VALUE 2.0 1.0
(SURFICIAL UPPER FLOW ZONE) +
FPA-4C
ARSENIC (As) CONCENTRATION (Ng/L)
BACKGROUND THRESHOLD VALUE 14 1.0
1.9
Se I <1.0
SELENIUM (SE) CONCENTRATION (Ng/L)
(SURFICIAL LOWER FLOW ZONE) +
+ - BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM
WELL SCREEN
BACKGROUND GROUNDWATER SAMPLES COLLECTED MARCH 2O10 TO SEPTEMBER 2019.
ASH BASIN COMPLIANCE BOUNDARY
100
50
Z
0 O
Q
w
W
-50
-100
-150
CROSS SECTION LOCATION
0
1
A -
(WEST)
ZONES OF SILTS AND FINE SANDS
LEGEND
MW 23B
WELL IN UPPER SURFICIAL FLOW ZONE
UPPER SURFICIAL FLOW ZONE GROUNDWATER
MW 23C
WELL IN LOWER SURFICIAL FLOW ZONE
WELL WATER LEVEL ELEVATION
MW 23D
WELL IN UPPER PEEDEE FLOW ZONE
LOWER SURFICIAL FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
MW 23E
WELL IN LOWER PEEDEE FLOW ZONE
V
UPPER PEEDEE FLOW ZONE GROUNDWATER
ABMW 5S
WELL ABANDONED
WELL WATER LEVEL ELEVATION
SUT EW 5
EXTRACTION WELL IN LOWER SURFICIAL FLOW ZONE
LOWER PEEDEE FLOW ZONE GROUNDWATER
S 12
WATER SUPPLY WELL
SMW-06C
WELL WATER LEVEL ELEVATION
MOLYBDENUM (Mo) CONCENTRATION (Ng/L)
— —
GENERALIZED WATER TABLE
Sr `73
STRONTIUM (Sr) CONCENTRATION (ug/L)
_,
GENERALIZED GROUNDWATER
FLOW DIRECTION
WELL SCREEN
SURFACE WATER
ASH BASIN COMPLIANCE BOUNDARY
NC
LOWER SURFICIAL
NOT CALCULATED
- A'
(EAST)
NOTES
100
50 ^
Z
Q
Q H
W
J
W
-50
-100
1. DEPTH TO WATER GAUGED IN MONITORING WELLS ON FEBRUARY 26 AND 27, 2020.
2. ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM 1988, (NAVD 88).
3. ALL BOUNDARIES ARE APPROXIMATE.
4. ALL CONCENTRATIONS SHOWN ARE EITHER LCL95s OR CTVs. REFER TO TABLE 5-4 FOR THE FULL
DATASET.
5. MOLYBDENUM (Mo) AND STRONTIUM (Sr) CONCENTRATIONS ARE IN MICROGRAMS PER LITER (Ng/L).
6. INC - ANALYTICAL DATA DID NOT MEET CRITERIA TO CALCULATE AN LCL95 OR CTV VALUE (SEE TABLE 5-4).
7. LCL95 - 95% LOWER CONFIDENCE LIMIT VALUE.
8. CTV-CENTRAL TENDENCY VALUE.
9. <-LESS THAN
ANALYTICAL PARAMETER Mo Sr
REPORTING UNITS Ng/L Ug/L
15A NCAC 02L STANDARD NE NE
BACKGROUND THRESHOLD VALUE 1.0 71
(SURFICIAL UPPER FLOW ZONE) +
BACKGROUND THRESHOLD VALUE 1.0 167
(SURFICIAL LOWER FLOW ZONE) +
+ - BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM BACKGROUND
GROUNDWATER SAMPLES COLLECTED MARCH 2O10 TO SEPTEMBER 2019.
CROSS SECTION LOCATION
B---a
(NORTH)
z 1
Op
LOWER SURFICIAL
ZONE WITH COARSE
SANDS AND SILT
-100 SALINE AQUIFER CONDITIONS
IN THE PEEDEE FORMATION
Qli
1984 ASH BASIN (LINED)
I
COMPLIANCE BOUNDARY
(ZUUb IN I tKIUK 0
CONTAINMENT <
m U 0 2 AREA) 0O
m W N
FORMER ASH
GRAVEL � SURFACE
U U U /ROAD FORMER ASH 0
U U c) / SURFACE _ _
CLAY LINER � r''r — `� �'' ^ TW-202
------ �-- CLAY LINER Mo NC
\ — r— N--
CCR-1146 — _ _________ _- SATURATED SOIL _ _ _ _ _ _ _ _ _
Mo<1.0 ---------------------------------
-------------------
r 139 ______ �
LOWER PEEDEE FORMATION
ZONES OF SILTS AND FINE SANDS
LEGEND
1971 ASH BASIN
m U �
(.0O O O
co
< < 1-- U U U
\ FORMER ASH
SURFACE
----------------------------------
UPPER PEEDEE FORMATION
ZONES OF SILTS AND FINE SANDS LOWER PEEDEE FORMATION
ZONES OF SILTS AND FINE SANDS
MW 41B
WELL IN UPPER SURFICIAL FLOW ZONE
MW 41C
WELL IN LOWER SURFICIAL FLOW ZONE
MW 41D
WELL IN UPPER PEEDEE FLOW ZONE
MW 41E
WELL IN LOWER PEEDEE FLOW ZONE
ABMW 1S
WELL ABANDONED
GENERALIZED WATER TABLE
SURFACE WATER
LOWER SURFICIAL
SATURATED SOIL
NC
NOT CALCULATED
UPPER SURFICIAL FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
LOWER SURFICIAL FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
V
UPPER PEEDEE FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
V
LOWER PEEDEE FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
FPA-04B
MOLYBDENUM (Mo) CONCENTRATION (Ng/L)
Mo 1.
STRONTIUM (Sr) CONCENTRATION (Ng/L)
WELL SCREEN
—
ASH BASIN COMPLIANCE BOUNDARY
DREDGED—
_
FORMER
PROCESS
AREA (FPA)
B'
(SOUTH)
100
50
Z
0
Q
LU
w
-50
CCR-105C
FPA-04B
Mo 121
Mo <1.0
Sr NC
SALINE AQUIFER CONDITIONS
-100
IN THE PEEDEE FORMATION
LOWER SURFICIAL ZONE WITH
COARSE SANDS AND SILT
-150
AIl1TCC
1. DEPTH TO WATER GAUGED IN MONITORING WELLS ON FEBRUARY 26 AND 27, 2020.
2. ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM 1988, (NAVD 88).
3. ALL BOUNDARIES ARE APPROXIMATE.
4. ALL CONCENTRATIONS SHOWN ARE EITHER LCL95s OR CTVs. REFER TO TABLE 5-4 FOR THE FULL
DATASET.
4. MOLYBDENUM (Mo) AND STRONTIUM (Sr) CONCENTRATIONS ARE IN MICROGRAMS PER LITER (Ng/L).
5. INC - ANALYTICAL DATA DID NOT MEET CRITERIA TO CALCULATE AN LCL95 OR CTV VALUE (SEE
TABLE 5-4).
6. LCL95 - 95% LOWER CONFIDENCE LIMIT VALUE.
7. CTV - CENTRAL TENDENCY VALUE.
8. < - LESS THAN
ANALYTICAL PARAMETER
Mo
Sr
REPORTING UNITS
Ng/L
Ng/L
15A NCAC 02L STANDARD
NE
NE
BACKGROUND THRESHOLD VALUE
1.0
71
(SURFICIAL UPPER FLOW ZONE) +
BACKGROUND THRESHOLD VALUE
1.0
167
(SURFICIAL LOWER FLOW ZONE) +
+ - BACKGROUND THRESHOLD VALUES
WERE
CALCULATED USING DATA FROM
BACKGROUND GROUNDWATER SAMPLES COLLECTED MARCH 2O10 TO SEPTEMBER 2019.
CROSS SECTION LOCATION
Lower Surficial Upgradient of SA1
Lower
Surficial Upgradient of SA1
Upper
Surficial Upgradient of SA1
2.0
•
120
•
•
2
•
1.5
•
•
J
80
• ••
•
2
a'
We1CCR-120C
?
Well
?
• Well
•
"
•
• CCR-123C
• • CCR-120B
a=i
• • • • MW-19
y
• •
• MW-21 C
E
ti • CCR-123B
1.0
40
1
• • •
0.5
160 200 300 400 500
100 200 300 400 500
0 200 400
EH (mV)
EH (mV)
EH (mV)
Lower
Surficial Downgradient of
SA1
Upper Surficial Downgradient of
SA1
160
•
•
•
•
150
J 120
J
•
•
Well
?
• •
Well
•
CCR-109C
V
• CCR-112B
Space not used
125
•
• CCR-110C
•
• CCR-113B
L
L
•
Q
• •
Q
•
•
80
•
• •
•
100
• •
•
•
•
40
100 200 300
100 200 300 400
EH (mV)
EH (mV)
NOTES
441�DUKE
DRAWN BY: K.MARSAC DATE:7/20/2020
FIGURE 5-15a
pg/L - Micrograms per liter
ENERGY
REVISED BY: K. MARSAC
CONCENTRATION PLOTS
Eh - Redox Potential
PROGRESS
CHECKED BY: T. HARTMAN
ARSENIC VERSUS EH
mV - Millivolts
APPROVED BY: B. WYLIE
CORRECTIVE ACTION PLAN UPDATE
• Data included was collected between January 2018 and March 2020
10
PROJECT MANAGER: B. WYLIE
L.V. SUTTON ENERGY COMPLEX
• Refer To Table 2 of Appendix C for source data series
symTerm
WILMINGTON, NORTH CAROLINA
www. synterracorp. com
iD]X
J
cm
♦V�
50
L
I'
El
mus
100
a�
A�
N
50
Q
CCR-120B
c
. 0
I
5
c0
X
W
m
0
0
06
�
V
N
U
N
N
cn
o
w
o
U
m
X
O
Q
W
N
U�
W
C
N
f0
m
L
Q
2016 2017 2018 2019 2020
Date
CCR-120C
C
O
cu
X
W
C
E
C 0 LL
E 06
>
U N �
O
W EO
CU
"I
C
0
X
W >
Q U
X
W
C
N
c0
m
L
Q
2016 2017 2018 2019 2020
Date
400
100
J
CD
M
=L
200
L 50
Q
0
CCR-123B
C
a
C
ca
ca
X
X
W
ca
j,��V.2E
Q
U
X
W
C
.y
M
m
L
Q
2016 2017 2018 2019
Date
CCR-123C
125
ffirt
400
a�
75
ZOO
Q 50
25
2016 2017 2018 2019
Date
M
O
Q
X
O
W
a)C
Q
o °
06
N
c0
X
O
W C
C O—t.
O
ca o
U
m
L W
+o
+
Q
X
W
C
y
M
m
L
N
Q
1
1
400
.-.
M
J_
a)
=
_
V
�_
200 "
N
Q
500
400
2'
J
M
300
._
�
i 1i
Q
200
100
nalAi -In
Date
n111Ai n-It-%
Date
0=
0
0
0
0
0=
O�
0
LEGEND NOTES
Plots of arsenic left axis and E ri ht axis over time u radient /L - Micro rams er liter
( y-axis)" (g y-axis)pg E g p
+ Arsenic of Source Area 1 in the upper surficial flow zone (top row) and lower Eh - Redox Potential
surficial flow zone (bottom row). Dates of ash basin excavation mV - Millivolts
+ EH begins, extraction system online, and ash basin excavation complete
and FADA excavation start are marked with vertical lines. Refer to
44*) DUKE
ENERGY
PROGRESS
DRAWN BY: K. MARSAC DATE: 7/20/2020
REVISED BY: K. MARSAC
CHECKED BY: T. HARTMAN
APPROVED BY: B. WYLIE
PROJECT MANAGER: B. WYLIE
FIGURE 5-15b
TIME VERSUS CONCENTRATION
ARSENIC AND E UPGRADIENT OF
H
SOURCE AREA 1
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
10
synTerra
Table 2 of Appendix C for source data series.
www.synterracorp.com
WILMINGTON, NORTH CAROLINA
CCR-109B
CCR-110B
CCR-113B
cc
200
0
.LPU
400
200
0
400
200
400
.�
150
=
W
0
300
i
�,
ly
o
�
tl1
W
o
�
m
o
rn
150
m
o
300 rn
150
0
° 300 rn
•E
100
0
>,
200
•�
X
E
•c
X
E
X
.�
0
<
o = <
�..
Q
° _
"
100
Q
m
=
200...
i
Q
100
m
o
200
50
Q
W
100
Q
X
X
_
W
_
W
._
I
m
50
m
100
m
p
cop
Q
50
n 100
2016 2017 2018 2019 2020
2016
2017 2018 2019 2020
2016
2017 2018 2019 2020
Date
Date
Date
CCR-109C
CCR-110C
CCR-113C
U)
o
=
400
150
X
W
300
150
X
300
90
N
L)
X
^
J
_
N
Q
0
"
J
�
00
=
c
W
a
Q
^
J
_
cm
m
N W
__
= ¢ 300
rn
•�
100
0
200
•� 100
200
•�
60
c
`� E
W
--
W
=
s
0
0
<
<
m
�,
<
0 200 <
Q
i
m
m
o
!0
i
Q
m
x o
!0
m
N
>
X
N
Q
X
W
f0
U
30
N
Q
W
M
0
50
Q
100
50
100
100
M
m
m
CU
L
co
Q
L
Q
r
L
Q
2016 2017 2018 2019 2020
2016
2017 2018 2019 2020
0
2016
2017 2018 2019 2020 0
Date
Date
Date
LEGEND
NOTES
446) DUKE
DRAWN BY: K.MARSAC
DATE:7/20/2020
FIGURE 5-15c
Plots of arsenic (left y-axis) and EH (right y-axis) over time downgradient
IJg/- Micrograms
per liter
ENERGY
REVISED BY: K. MARSAC
VERSUS CONCENTRATION
}
Arsenic
of Source Area 1 in the upper surficial flow zone (top row) and lower
-
Eh Redox Potential
PROGRESS
CHECKED BY:
T. HARTMAN
ARSENIC AND ETIME
H DOWNGRADIENT OF
surficial flow zone (bottom row). Dates of ash basin excavation begins,
mV - Millivolts
APPROVED BY:
B. WYLIE
SOURCE AREA 1
+
EH
extraction system online, and ash basin excavation complete and FADA
10
PROJECT MANAGER: B. WYLIE
CORRECTIVE ACTION PLAN UPDATE
excavation start are marked with vertical lines.
Refer to Table 2 of
synTerm
L.V. SUTTON ENERGY COMPLEX
Appendix C for source data series.
www.synterracorp.com
WILMINGTON, NORTH CAROLINA
A: ``s •
k
AREA 1 B
•
AREA 2
LEUEND
AREAS 1A/1 B/4 - CONFIRMATION
L GROUNDWATER MONITORING
AREAS 2/3A- ONGOING CLOSURE
ACTIVITIES
AREA 3B - MNA REMEDY
EXTRACTION WELL
♦ NPDES OUTFALL LOCATION
• SUPPLY WELLS
ANTICIPATED EFFLUENT CANAL
EXTENSION
ASH BASIN WASTE BOUNDARY
■ ■ ASH BASIN COMPLIANCE BOUNDARY
ONSITE LANDFILL BOUNDARY
ONSITE LANDFILL COMPLIANCE
BOUNDARY
FORMER ASH DISPOSAL AREA WASTE
BOUNDARY
FORMER PROCESS AREA BOUNDARY
FORMER COAL PILE AREA BOUNDARY
_ DUKE ENERGY PROGRESS PROPERTY
LINE
EFFLUENT DISCHARGE CANAL
SURFACE WATER FLOW DIRECTION
GROUNDWATER FLOW DIRECTION
NOTES:
1. THE OUTLINE OF AREAS 1 THROUGH 4 REPRESENT THE
AREAS WHERE THE MAXIMUM EXTENT OF COIS ARE
GREATER THAN COMPARISON CRITERIA IN GROUNDWATER
ASSOCIATED WITH THE SUTTON SOURCE AREAS.
2. NPDES - NATIONAL POLLUTANT DISCHARGE ELIMINATION
SYSTEM
3. CCP - COAL COMBUSTION PRODUCTS
4. COIS - CONSTITUENTS OF INTEREST
5. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
PROGRESS.
6. ALL BOUNDARIES ARE APPROXIMATE.
7. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA SERVER
ON JUNE 17, 2019. IMAGE COLLECTED APRIL 4, 2019.
8. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
(NAD83).
1984 ASH
BASIN
(LINED)
(' DUKE
V ENERGY
PROGRESS
1984 ASH
BASIN
(LIN
Ak
AREA 3B
e
AREA 1A `0
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT
DATE: 10/07/2019
REVISED BY: C. CURRIER
DATE: 07/30/2020
CHECKED BY: H. SHARITT
DATE: 07/30/2020
APPROVED BY: B. WYLIE
DATE: 07/30/2020
PROJECT MANAGER: B. WYLIE
•
•
•
FIGURE 5-16
INTERIM ACTION SYSTEM LAYOUT
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
7
s�
/�.
I
I
I
i
i
r
�
4
i
I,
LEGEND
NPDES OUTFALL LOCATION
;
SUPPLY WELLS
RESTRICTED GROUNDWATER USE
DESIGNATION LIMIT
GROUNDWATER FLOW DIRECTION
I
1 SURFACE WATER FLOW DIRECTION
I
EFFLUENT DISCHARGE CANAL
CURRENT ASH BASIN COMPLIANCE
BOUNDARY
/
FORMER PROCESS AREA BOUNDARY /
FORMER COAL PILE AREA BOUNDARY , #'
ASH BASIN WASTE BOUNDARY
ONSITE LANDFILL BOUNDARY
.�
ONSITE LANDFILL COMPLIANCE
.1000,
BOUNDARY
FORMERASH DISPOSAL AREA WASTE
BOUNDARY
DUKE ENERGY PROGRESS PROPERTY
LINE
0 COMBINED SIMULATED BORON AND
SELENIUM 02L PLUME
ANTICIPATED EFFLUENT CANAL
EXTENSION
NOTES
1. THE PROPOSED RESTRICTED GROUNDWATER USE DESIGNATION IS
DRAWN AT THE LEADING DOWNGRADIENT EDGE WHERE PREDICTED
ONSITE COI CONCENTRATIONS ARE GREATER THAN COMPARISON
CRITERIA.
2. CALIBRATION OF THE COMBINED 02L PLUME CAN BE FOUND IN THE
UPDATED GROUNDWATER FLOW AND TRANSPORT MODELING REPORT
FOR L.V. SUTTON ENERGY COMPLEX WILMINGTON, NORTH CAROLINA
(FALTA, GRAZIANO, GEBRAI, EBENHACK, MURDOCH, AND YU, 2020).
3. NPDES - NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
4. CCP -COAL COMBUSTION PRODUCTS.
5.COIS-CONSTITUENTS OF INTEREST
6. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS.
DUKE
� ENERGY
TALL BOUNDARIES ARE APPROXIMATE.
PROGRESS
&AERIAL PHOTOGRAPHY OBTAINED FROM TERRASERVER ON JUNE 17,
2019. IMAGE COLLECTED APRIL 4, 2019.
9. DRAWING HAS BEEN SET WITHA PROJECTION OF NORTH CAROLINA
STATE PLANE COORDINATE SYSTEM RIPS 3200 (NAD83/2011).
A m-% -Y7
r i
r
GRAPHIC SCALE
600 0 600 1,200
(IN FEET)
DRAWN BY: C. WYATT
DATE: 04/27/2020
REVISED BY: C. CURRIER
DATE: 07/30/2020
CHECKED BY: H. SHARITT
DATE: 07/30/2020
APPROVED BY: B. WYLIE
DATE: 07/30/2020
PROJECT MANAGER: B. WYLIE
FIGURE 5-17
PROPOSED RESTRICTED GROUNDWATER USE
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
•1
a
M W-39B ivivl v-zirsl
MW-39C MW-27C
MW-40B
MW-40C
_ CCR-114B
CCR-114C
CCR-113B
CCR-113C
CCR-112B
CCR-112C
CCR-111 B
77R-1117.
11C.
CCR-110B
CCR-
CCR-109B "
CCR-109C
now n ao�
CCR-108RB
CCR-108RC
CCR-107RB /
CCR-107RC
LEGEND
WELL IN UPPER SURFICIAL FLOW ZONE
WELL IN LOWER SURFICIAL FLOW ZONE
SUPPLY WELL
Ak NPDES OUTFALL LOCATION
AREAS 1A/1B/4 - CONFIRMATION
GROUNDWATER MONITORING
_ AREA 2 - ONGOING CLOSURE ACTIVITIES
ANTICIPATED EFFLUENT CANAL EXTENSION
ASH BASIN COMPLIANCE BOUNDARY
ASH BASIN WASTE BOUNDARY
ONSITE LANDFILL BOUNDARY
ONSITE LANDFILL COMPLIANCE BOUNDARY
FORMER ASH DISPOSAL AREA BOUNDARY
FORMER COAL PILE AREA BOUNDARY
DUKE ENERGY PROGRESS PROPERTY LINE
EFFLUENT DISCHARGE CANAL
SURFACE WATER FLOW DIRECTION
GROUNDWATER FLOW DIRECTION
1. SEE APPENDIX P FOR MORE DETAILED INFORMATION
RELATED TO EFFECTIVENESS MONITORING PLAN (EMP)
ELEMENTS FOR THE 1971/1984ASH BASINS AND FPA.
MONITORING WELLS SHOWN ON THIS FIGURE ARE
PLANNED TO BE SAMPLED AS PART OF THE EMP.
2. THE OUTLINE OF AREAS 1A, 1 B, 2, AND 4 REPRESENT THE
AREAS WHERE THE MAXIMUM EXTENT OF COIS ARE
GREATER THAN COMPARISON CRITERIA IN GROUNDWATER
DOWNGRADIENT OF THE SUTTON SOURCE AREAS AT OR
BEYOND THE COMPLIANCE BOUNDARY FOR ALL FLOW
LAYERS.
3. CCP - COAL COMBUSTION PRODUCTS
4. NPDES - NATIONAL POLLUTANT DISCHARGE ELIMINATION
SYSTEM.
5. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
PROGRESS.
6. ALL BOUNDARIES ARE APPROXIMATE.
7. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA SERVER
ON JUNE 17, 2019. IMAGE COLLECTED APRIL 4, 2019.
8. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
(NAD83/2011).
�MW-31RB
0 MW-31RC .'., ` E
CCR-119B • '� `� �,
® CCR-119C �`' • -
CCR-120B
®CCR-120C `. ® SMW-6B
1 SMW-OC
• CCR-204C DMW-4
CCR-122RB ,• ® ',� AREA 4
CCR-122RC • MW-12R
AREA 1A • i, �' SMW-1B
MW-23B •`� � SMW-1C
�MW-23C • �
' CCR-124RB AW-4B
AW-4C
CCR-124RC MW-22B
FPA-9B FPA-49 "
FPA-9C MW-21C `®
FPA-3C
MW-28C •
MW-7B
_ .. MW-7C •
GRAPHIC SCALE
500 0
500 1,000
ESUKE RGY
N
IN FEET)
PROGRESS
DRAWN BY: J. KIRTZ
DATE: 11/15/2019
REVISED BY: C. CURRIER
CHECKED BY: H. SHARITT
DATE: 07/30/2020
DATE: 07/30/2020
APPROVED BY: B. WYLIE
DATE: 07/30/2020
�. T .�....�
PROJECT MANAGER: B. WYLIE
FIGURE 5-18
CONCEPTUAL CONFIRMATION MONITORING WELL
NETWORK - ALTERNATIVES 1 & 2
1971/1984 ASH BASIN AND FPA
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
- MW-40
MW-40C
CCR-114B
• • POND CCR-114C
(SUTTON
CCR-113B
CCR-113C
PROPOSED RESTRICTED GROUNDWATER
CCR-112B
USE AREA. GROUNDWATER USE IS
AUTOMATICALLY RESTRICTED IN AREAS
CCR-112C
CONTAINED WITHIN ACOMPLIANCE
BOUNDARY. THE NPDES PERMITTED
COOLING POND DOES NOT HAVE
CCR-111 B
COMPLIANCE BOUNDARY. A RESTRICTED
USE DESIGNATION IS PROPOSED FOR THE
CCR-111 C
SMALL AREA BENEATH THE COOLING POND
WHERE PREDICTIVE MODELING INDICATES
COI CONCENTRATIONS IN GROUNDWATER
MAY BE GREATER THAN APPLICABLE
CCR-110B
CRITERIA. THE PROPOSED DESIGNATION
CCR-110C
WOULD PREVENT PUBLIC USE OF
GROUNDWATER. ADDITIONAL INSTITUTIONAL
CONTROLS INCLUDING RESTRICTED
CCR-109B
ACCESS AND APPROPRIATE PERSONAL
�/
PROTECTIVE EQUIPMENT MAYALSO BE
CCR-109C
APPLIED.
CCR-108RB
LEGEND
WELL IN UPPER SURFICIAL FLOW ZONE
WELL IN LOWER SURFICIAL FLOW ZONE
WATER SUPPLY WELL
EXTRACTION WELL
ANTICIPATED EFFLUENT CANAL EXTENSION
COMBINED SIMULATED BORON AND SELENIUM
02L PLUME
RESTRICTED GROUNDWATER USE DESIGNATION
LIMIT
ASH BASIN COMPLIANCE BOUNDARY
ASH BASIN WASTE BOUNDARY
ONSITE LANDFILL BOUNDARY
ONSITE LANDFILL COMPLIANCE BOUNDARY
FORMER ASH DISPOSAL AREA BOUNDARY
FORMER PROCESS AREA BOUNDARY
FORMER COAL PILE AREA BOUNDARY
DUKE ENERGY PROGRESS PROPERTY LINE
EFFLUENT DISCHARGE CANAL
SURFACE WATER FLOW DIRECTION
GROUNDWATER FLOW DIRECTION
NOTES
1. THE PROPOSED RESTRICTED GROUNDWATER USE
DESIGNATION IS DRAWN AT THE LEADING
DOWNGRADIENT EDGE WHERE PREDICTED ONSITE COI
CONCENTRATIONS ARE GREATER THAN COMPARISON
CRITERIA.
2. CALIBRATION OF THE COMBINED 02L PLUME CAN BE
FOUND IN THE UPDATED GROUNDWATER FLOW AND
TRANSPORT MODELING REPORT FOR L.V. SUTTON
ENERGY COMPLEX WILMINGTON, NORTH CAROLINA
(FALTA, GRAZIANO, GEBRAI, EBENHACK, MURDOCH, AND
YU,2020).
3. SEE APPENDIX P FOR MORE DETAILED INFORMATION
RELATED TO EFFECTIVENESS MONITORING PLAN (EMP)
ELEMENTS FOR THE 1971 & 1984 ASH BASINS AND FPA.
MONITORING WELLS SHOWN ON THIS FIGURE ARE
PLANNED TO BE SAMPLED AS PART OF THE EMP.
4. CCP - COAL COMBUSTION PRODUCTS
5. NPDES - NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM.
6. COI - CONSTITUENT OF INTEREST.
7. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
PROGRESS.
8. ALL BOUNDARIES ARE APPROXIMATE.
9. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA
SERVER ON JUNE 17, 2019. IMAGE COLLECTED APRIL 4,
2019.
10. DRAWING HAS BEEN SET WITH A PROJECTION OF
NORTH CAROLINA STATE PLANE COORDINATE SYSTEM
FIPS 3200 (NAD83).
1984 ASH
BASIN
(LINED)
CCR-107R
CCR-107R
� r
iff
•
,Ilk
F; j
CCR-120C � SMW-6C �,�
CCR-2047CDMW-4 b
ME ml
jCCR-122RB SMW-1 B
® CCR-122RC SMW-1C
• •
MW-23B � ♦
MW-23C AW-413♦� AW-4C j
C CCR-124RB
CCR-124RC , MW-22B
(�- MW-22C •
• FPA-4B
FPA-9B
FPA-4C
� FPA-9C
MW-21C
B
1 JFORMER"i
4NA4
(' DUKE
ENERGY
PROGRESS
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: J. KIRTZ
DATE: 06/01/2020
REVISED BY: C. CURRIER
DATE: 07/30/2020
CHECKED BY: H. SHARITT
DATE: 07/30/2020
APPROVED BY: B. WYLIE
DATE: 07/30/2020
PROJECT MANAGER: B. WYLIE
FIGURE 5-19
REMEDIAL ALTERNATIVE 2
CONFIRMATION MONITORING
WITH RS DESIGNATION
SOURCE AREA 1
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
� •
� a
ell
e �►
of
• e '� 1' � rt
! e .. r
r ♦ �
♦
Frw
•
-
w
w^ y,
COOLING.
. �•COOLING
POND �• t —
(LAKE
SUTTON)
�•
(LAKE SUTTON)
•-
•_ •
• •- 2
i DISPOSAL
'
ICAPE FEAR
•
• C ♦
�.
ICAPE
FEAR•*
C
RIVER
INTAKE CANAL COAL PILE�
a
F-1
BASIN:.
♦
`.
COOLING•
• •
•• • ►il •
(LAKE SUTTON)
♦
e
1,
e v
.,
s...
GRAPHIC SCALE
970 0 970 1,940
FEET)
�� DUnC
(IN
ENERGY
DRAWN BY: R. KIEKHAEFER DATE: 05/22/2020
BORON 700 - 4,000 IJg/L
1. FPA- FORMER PROCESS AREA
PROGRESS
ASH BASIN WASTE BOUNDARY
2. FCPA- FORMER COAL PILE AREA
REVISED BY: C. CURRIER DATE: 07/27/2020
■ ASH BASIN COMPLIANCE BOUNDARY
3. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
PROGRESS.
CHECKED BY: H. SHARITT DATE: 07/27/2020
APPROVED BY: B. WYLIE DATE: 07/27/2020
ONSITE LANDFILL
BOUNDARY
4. CCP -COAL COMBUSTION PRODUCTS
PROJECT MANAGER: B. WYLIE
synTerra
www. syn to rra c o r p. c o m
FORMER ASH DISPOSAL
AREA WASTE BOUNDAR
FPA BOUNDARY
5. ALL BOUNDARIES ARE APPROXIMATE.
FCPA BOUNDARY
6. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA SERVER
ON JUNE 17, 2019. IMAGE COLLECTED APRIL 4, 2019.
EFFLUENT DISCHARGE CANAL
7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
DUKE ENERGY PROGRESS PROPERTY LINE
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
(NAD83/2011).
-
• a
a
• - r
/
/ ram/
•I �..
/ r
•�..
♦
a I
a
• a�EXTENSIONsCOOLING
y,
POND
(LAKE SUTTON)
•
a
FORMERASi
DISPOSAL
CAPE FEAR
r /RIVER`��.
•
rRIVER-
CAPE FEAR
tjj� FORMER
/
•
"� •
/
CANAL
A
C'
/•�INTAKE
•a•
Nwo
I `
I
♦
a
OWL
�.,
_•
a
_.
♦
COOLING• .
•
•
••
•
♦ 11
♦ s 1
fit`
- -
r
�,
♦
♦
a
Qe a
GRAPHIC SCALE
970 0 970 1,940
FEET)
�� DUnC
(IN
ENERGY
DRAWN BY: R. KIEKHAEFER
DATE:05/22/2020
SELENIUM 20 - 139 pg/L
1. FPA- FORMER PROCESS AREA
PROGRESS
ASH BASIN WASTE BOUNDARY
2. FCPA -FORMER COAL PILE AREA
REVISED BY: C. CURRIER
DATE: 07/27/2020
■ ASH BASIN COMPLIANCE BOUNDARY
3. CCP- COAL COMBUSTION PRODUCTS
CHECKED BY: H. TT
APPROVED BY: B..WYLIYLIE
DATE: 07/27/2020
DATE: 07/27/2020
ONSITE LANDFILL BOUNDARY
4. PROPERTY BOUNDARY PROVIDED BY
PROGRESS.
DUKE ENERGY
PROJECT MANAGER: B. WYLIE
synTerrd
www.synterraoorp.com
FORMERASH DISPOSAL AREA
WASTE BOUNDARY
FPA BOUNDARY
5. ALL BOUNDARIES ARE APPROXIMATE.
FCPA BOUNDARY
6. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA SERVER
ON JUNE 17, 2019. IMAGE COLLECTED APRIL 4, 2019.
EFFLUENT DISCHARGE CANAL
7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
■ DUKE ENERGY PROGRESS PROPERTY LINE
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
(NAD83/2011).
INCDEQapproves CAP (90 days)**
Implement EMP (30 days)*
Collect EMP data (1825 days)
Prepare 5-year Effectiveness Monitoring Report (180 days)
Notes:
- Implement the Effectiveness Monitoring Plan to fulfill
section G.S.130A-309.209.(b)(3).
** - Actual time may vary due to a variety of factors
including agency review and approvals, weather delays,
equipment availability, etc.
Days
0 150 300 450 600 750 900 1050 1200 1350 1500 1650 1800 1950 2100
f`�/DUKE
DRAWN BY: T.COLTON DATE 5/21/2020
1 ENERGY
REVISED BY: T. COLTON
CHECKED BY: H. SHARITT
PROGRESS
APPROVED BY: J. CLEMMER
10
PROJECT MANAGER: B. WYLIE
'Y1 literri a www.synterracorp.com
FIGURE 5-22
IMPLEMENTATION GANTT CHART -
SOURCE AREA 1
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
Note:
*sampling events prior
to 1/1/2018
FADA Wells
■ ABMW-02D
0
MW-45B
• MW-13R
o
MW-45C
A MW-13RD
O
MW-47B
♦ MW-15
x
MW-47C
♦ MW-15D
Y`s
MW-48B
z MW-15RD
MW-48C
MW-15RC
MW-49B
Fi MW-16
MW-49C
O MW-16D
Background Wells Ash Pore Water Wells
■ MW-05B AMBW-01S*
• MW-05C AMBW-02S
A, MW-08
V MW-08B
MW-37B
z MW-37C
* MW-41B
o
80%
dx
�O� d 80%
FADA/ Former Coal Pile Wells
Former Coal Pile Wells
oo
A V
MW-20
�� '
�
• MW-20D
•
MW-43C
�'60%
rV60% p
A MW_46B
♦
MW-44B
MW-44C
,
off° ai
�D
goo ❑ ,
♦ MW 46C
40%
0%
♦
MW-50B
■
oho
moo°
z
M W-50C
20% * �
o
{ F79 20%
It ❑
ry 6' z7 N o
°
a o n o
�—Ca Cl —�
Notes:
Groundwater data collected Ql 2020 (February unless noted with (*).
('DUKE
DRAWN BY: M. GUNN DATE: 5/5/2020
FIGURE 5-23
valid
Ash porewater groundwater data is most recent valid sample.
ENERGY
REVISED BY:
FADA AND FORMER COAL PILE
PROGRESS
CHECKED BY: T. HARTMAN DATE: 5/7/2020
GROUNDWATER QUALITY PIPER
APPROVED BY: L. DRAGO DATE: 5/7/2020
DIAGRAMS
"'
CORRECTIVE ACTION PLAN UPDATE
!
PROJECT MANAGER: B. WYLIE
L.V. SUTTON ENERGY COMPLEX
..synterracorp.com
synTena
WILMINGTON, NORTH CAROLINA
E:l
IR
,y
CCP
LANDFILL
1984 ASH��
BASIN
(LINED)
1984 ASH
BASIN
(LINED)
� 1971
ASH
BASIN
1983
li.
EXTENSION
FORMER
-� FORMER ASH i PROCESS AREA
DISPOSAL AREA • ;Yll�flff
•• e E L
i
FORMER ••
COAL PILE -
CAPE FEAR
RIVER - - ••
• oo
INTAKE CANAL ';;.
i
l•
-- ir
GRAPHIC SCALE
DUKE 500 0 500 1,000 FIGURE 5-24a
<CnENERGY (IN FEET) ISOCONCENTRATION MAP - SOURCE AREA 2
PROGRESS DRAWN BY:C.WYATT DATE:05/01/2020 ARSENIC IN UPPER SURFICIAL FLOW ZONE
REVISED BY: C. CURRIER DATE: 07/30/2020 CORRECTIVE ACTION PLAN UPDATE
- CHECKED BY:T.HARTMAN L.V. SUTTON ENERGY COMPLEX
APPROVED BY: B. WYLIE WILMINGTON, NORTH CAROLINA
synTerra PROJECT MANAGER: B. WYLIE
www.synterraoorp.com
♦♦ NOTES:
l `♦
♦ -
TABLE 5-12
,y
CCP
w �� LANDFILL
18��`L\
BASIN
(LINED)
t f�1
lry
1984 ASH l
/ BASIN
(LINED) �
I
ASH
BASIN
1983 `
COOLING POND EXTENSION'
(LAKE SUTTON) - A�
�.
- t ` FORMERASH
, PROCESS AREA
I�► �) DISPOSAL ARE
EFFLUEN
1 i� FORME
COAL PILE -
�� CAPE FEAR �
RIVER
M1
romT.-I-IRWO1 "
INTAKE CANAL . !
- a ►- .
t : 11 \ b
TABLE 5-12
GRAPHIC SCALE
DUKE
500 0 500 1,o00
FIGURE 5-24b
ENERGY
(IN FEET)
ISOCONCENTRATION MAP - SOURCE AREA 2
PROGRESS
DRAWN Br. C.WYATT DATE:05/01/2020
ARSENIC IN LOWER SURFICIAL FLOW ZONE
—
REVISED BY: C. CURRIER DATE: 07/30/2020
CHECKED BY:T. HARTMAN
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
APPROVED BY: B.WYLIE
WILMINGTON, NORTH CAROLINA
synTerra
PROJECT MANAGER: B. WYLIE
www.synterracorp.com
E:l
0
,y
CCP
LANDFILL
1984 ASH��
BASIN
(LINED)
1984 ASH
BASIN
(LINED)
� 1971
ASH
BASIN
li.
_
,1983
,I EXTENSION _
-
FORMER
- FORMER ASH �`- i' PROCESS AREA
DISPOSAL AREA
i
FORMER
CAPE FEAR
COAL PILE -
RIVER � '
i�
INTAKE CANAL i
�11
GRAPHIC SCALE
DUKE 500 0 500 1,000 FIGURE 5-25a
ENERGY (IN FEET) ISOCONCENTRATION MAP - SOURCE AREA 2
PROGRESS DRAWN BY:C.WYATT DATE:05/01/2020 BORON IN UPPER SURFICIAL FLOW ZONE
REVISED BY: C. CURRIER DATE: 07/30/2020 CORRECTIVE ACTION PLAN UPDATE
CHECKED BY:T. HARTMAN L.V. SUTTON ENERGY COMPLEX
APPROVED BY: B. WYLIE WILMINGTON, NORTH CAROLINA
�. T .�....� PROJECT MANAGER: B. WYLIE
TABLE 5-12
NOTES
E-1
TABLE 5-12
r�
rr
0000,
LEGEND
00
lie
lie
A
OUTFALL 001 4W
O
Moak
GRAPHIC SCALE
I& DUKE 500 0 500 1,000 FIGURE 5-25b
APENERGY (IN FEET) ISOCONCENTRATION MAP - SOURCE AREA 2
PROGRESS DRAWN BY.C. WYATT DATE: 05/01/2020 BORON IN LOWER SU RFICIAL FLOW ZONE
REVISED BY. C. CURRIER DATE: 07/30/2020 CORRECTIVE ACTION PLAN UPDATE
CHECKED BY.T. HARTMAN L.V. SUTTON ENERGY COMPLEX
APPROVED BY: B. WYLIE WILMINGTON, NORTH CAROLINA
synTerra PROJECT MANAGER: B. WYLIE
www.synterracorp.com
FORMER COAL
FORMER ASH DISPOSAL AREA
PILE AREA
(NORTH)
(FADA)
(FCPA)
(SOUTH)
o
FORMER
w
O 0
ASH EXTENT
/
100
Q
_>
m U m
00 N N
co
U m U
o
100
U) W
O O
�>
Q m
II
J
m m
~ ¢ < ~
>
Q
O w
50
w
W J
50
J Q
Yw
Q J_
w U
MW-49B
B 1 207
Z
Q
---__-'-`"
Q O
O
TW-L098'TW-L024
-46B
B <50
MW-43B
B 59
>
B NC B NC
>
MW-49C
MW-4
MW-43C
LLJ
WI
B 1 814
B 1075
B 145
W
-50
ABM 751 UPPER SURFICIAL
-50
ZONE WITH SILTS &
SANDS
UPPER PEEDEE FORMATION
LOWER SURFICIAL
ZONES OF SILTS AND FINE SANDS
ZONE WITH COURSE
-100
SANDS & SILT
-100
LOWER PEEDEE FORMATION
-150
ZONES OF SILTS AND FINE SANDS
-150
NOTES
1. DEPTH TO WATER GAUGED IN MONITORING WELLS ON FEBRUARY 26 & 27, 2020.
2. ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM 1988,
(NAVD 88).
3. GROUNDWATER FLOW IS APPROXIMATELY NORTHEAST TO SOUTHWEST, PERPENDICULAR TO
THE CROSS SECTION.
4. ALL BOUNDARIES ARE APPROXIMATE.
5. ALL CONCENTRATIONS SHOWN ARE EITHER LCL95s OR CTVs. REFER TO TABLE 5-12 FOR THE
FULL DATASET.
6.
BORON (B) CONCENTRATIONS ARE IN MICROGRAMS PER LITER (Ng/L).
7.
NC - ANALYTICAL DATA DID NOT MEET CRITERIA TO CALCULATE AN LCL95 OR CTV VALUE
(SEE TABLE 5-12).
LEGEND
8.
LCL95 - 95% LOWER CONFIDENCE LIMIT VALUE.
MW 46B
WELL IN UPPER SURFICIAL FLOW ZONE
UPPER SURFICIAL FLOW ZONE GROUNDWATER
9.
CTV - CENTRAL TENDENCY VALUE.
MW 46C
WELL IN LOWER SURFICIAL FLOW ZONE
WELL WATER LEVEL ELEVATION
MW 46D
WELL IN UPPER PEEDEE FLOW ZONE
LOWER SURFICIAL FLOW ZONE GROUNDWATER
10.
<- LESS THAN
WELL WATER LEVEL ELEVATION
ABMW 2S
WELL ABANDONED
UPPER PEEDEE FLOW ZONE GROUNDWATER
ANALYTICAL PARAMETER B
WELL WATER LEVEL ELEVATION
REPORTING UNITS Ng/L
GENERALIZED WATER TABLE
15A NCAC 02L STANDARD 700
BMW-43B9 BORON (B) CONCENTRATION (ug/L)
BACKGROUND THRESHOLD VALUE 50
SURFACE WATER
(SURFICIAL UPPER FLOW ZONE)+
LOWER SURFICIAL
WELL SCREEN
BACKGROUND THRESHOLD VALUE 50
(SURFICIAL LOWER FLOW ZONE)+
0
PEEDEE FLOW ZONE
ASH BASIN COMPLIANCE BOUNDARY
+- BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM
(PEEDEE FORMATION)
BACKGROUND GROUNDWATER SAMPLES COLLECTED MARCH 2O10 TO SEPTEMBER 2019.
NC
NOT CALCULATED
_ _ , „
n 19.11
grin snn
CROSS SECTION LOCATION
Ic
(SOUTHWEST)
D'
FORMERASH (NORTHEAST)
DISPOSAL AREA
(FADA)
0
J C6 w O
ZII 0W
100 Of �>Jio ¢
2> O CO CO (D Lo Lo� > COU JN
I� Fw
Q II
F J
50 U- J w
ww �Q
Q J LL Z
U� 1 wU
H MW-20 MW-46B MW-16
> B <50 B <50 B 57
B 52
w MW-20D B W-1 RBMW-16D
w MW-45C B O 166 B 1 575
-50 B 1194 MW-46C MW-15RC \ UPPER SURFICIAL ZONE
UPPER B 075 B 454 WITH SILTS & SANDS
PEEDEE
UPPER PEEDEE FORMATION
100 ZONES OF SILTS AND FINE SANDS
____ LOWER SURFICIAL _____
ZONE WITH COURSE
SANDS & SILT
LOWER PEEDEE FORMATION
-150 ZONES OF SILTS AND FINE SANDS
100
50
z
0 LD
Q
w
w
-50
-100
-150
NOTES
1. DEPTH TO WATER GAUGED IN MONITORING WELLS ON FEBRUARY 26 & 27, 2020.
2. ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM 1988,
(NAVD 88).
3. GROUNDWATER FLOW IS APPROXIMATELY NORTHEAST TO SOUTHWEST, PERPENDICULAR TO
THE CROSS SECTION.
4. ALL BOUNDARIES ARE APPROXIMATE.
5. ALL CONCENTRATIONS SHOWN ARE EITHER LCL95s OR CTVs. REFER TO TABLE 5-12 FOR THE
FULL DATASET.
6.
BORON (B) CONCENTRATIONS ARE IN MICROGRAMS PER LITER (Ng/L).
7.
NC - ANALYTICAL DATA DID NOT MEET CRITERIA TO CALCULATE AN LCL95 OR CTV VALUE
(SEE TABLE 5-12).
LEGEND
8.
LCL95 - 95% LOWER CONFIDENCE LIMIT VALUE.
MW 46B
WELL IN UPPER SURFICIAL FLOW ZONE
UPPER SURFICIAL FLOW ZONE GROUNDWATER
MW 46C
WELL IN LOWER SURFICIAL FLOW ZONE
WELL WATER LEVEL ELEVATION
9.
CTV - CENTRAL TENDENCY VALUE.
MW 15RD
WELL IN UPPER PEEDEE FLOW ZONE
LOWER SURFICIAL FLOW ZONE GROUNDWATER
10.
< THAN
WELL WATER LEVEL ELEVATION
-LESS
— —
GENERALIZED WATER TABLE
UPPER PEEDEE FLOW ZONE GROUNDWATER
ANALYTICAL PARAMETER B
GENERALIZED GROUNDWATER
WELL WATER LEVEL ELEVATION
REPORTING UNITS pg/L
FLOW DIRECTION
MW-45B
BORON (B) CONCENTRATION (Ng/L)
15A NCAC 02L STANDARD 700
SURFACE WATER
B 52
BACKGROUND THRESHOLD VALUE 50
(SURFICIAL UPPER FLOW O 4
LOWER SURFICIAL
WELL SCREEN
BACKGROUND THRESHOLD VALUE 50
PEEDEE FLOW ZONE
(SURFICIAL LOWER FLOW ZONE)+
(PEEDEE FORMATION)
ASH BASIN COMPLIANCE BOUNDARY
+- BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM
BACKGROUND GROUNDWATER SAMPLES COLLECTED MARCH 2O10 TO SEPTEMBER 2019.
CROSS SECTION LOCATION
C
(NORTH)
w�
C0 06
100 =
U Lu
W
F J
50 w
LL J Z
lL <
w U
Z -
O 0 rF
<
JW
FORMER ASH DISPOSAL AREA
FORMER COAL
PILE AREA
(FCPA)
(FADA)
FORMER
ASH EXTENT
N
(N
/
OGD
�j
O
cfl
CO (O
M
Q <
1_ /
T
-50 1 V 1 0.41 1 1 V 1 0.47 1 UPPER SURFICIAL
ZONE WITH SILTS &
SANDS
UPPER PEEDEE FORMATION LOWER SURFICIAL
ZONES OF SILTS AND FINE SANDS ZONE WITH COURSE
-100 SANDS & SILT
co
(SOUTH)
100
50
r
0 L)
-50
100
LOWER PEEDEE FORMATION
-150 1 ZONES OF SILTS AND FINE SANDS -150
LEGEND
MW 46B
WELL IN UPPER SURFICIAL FLOW ZONE
MW 46C
WELL IN LOWER SURFICIAL FLOW ZONE
MW 46D
WELL IN UPPER PEEDEE FLOW ZONE
ABMW 2S
WELL ABANDONED
GENERALIZED WATER TABLE
SURFACE WATER
LOWER SURFICIAL
PEEDEE FLOW ZONE
0 (PEEDEE FORMATION)
Q
W
W
NOTES
1. DEPTH TO WATER GAUGED IN MONITORING WELLS ON FEBRUARY 26 & 27, 2020.
2. ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM 1988,
(NAVD 88).
3. GROUNDWATER FLOW IS APPROXIMATELY NORTHEAST TO SOUTHWEST, PERPENDICULAR TO
THE CROSS SECTION.
4. ALL BOUNDARIES ARE APPROXIMATE.
5.
ALL CONCENTRATIONS SHOWN ARE EITHER LCL95s OR CTVs. REFER TO TABLE 5-12 FOR THE
FULL DATASET.
4.
ARSENIC (As) AND VANADIUM (V) CONCENTRATIONS ARE IN MICROGRAMS PER LITER (Ng/L).
UPPER SURFICIAL FLOW ZONE GROUNDWATER
5.
LCL95 - 95% LOWER CONFIDENCE LIMIT VALUE.
WELL WATER LEVEL ELEVATION
6.
CTV - CENTRAL TENDENCY VALUE.
V
LOWER SURFICIAL FLOW ZONE GROUNDWATER
WELL WATER LEVEL ELEVATION
ANALYTICAL PARAMETER As v
—
UPPER PEEDEE FLOW ZONE GROUNDWATER
REPORTING UNITS Ng/L ug/L
WELL WATER LEVEL ELEVATION
15A NCAC 02L STANDARD 10 0.3'
BACKGROUND THRESHOLD VALUE
MW-4 B
ARSENIC (As) CONCENTRATION (ug/L)
(SURFICIAL UPPER FLOW ZONE) + 2.0 2.0
As 32
VANADIUM (V) CONCENTRATION (Ng/L)
BACKGROUND THRESHOLD VALUE
(SURFICIAL LOWER FLOW ZONE) + 14 2.0
5
WELL SCREEN
`- INTERIM MAXIMUM ALLOWABLE CONCENTRATIONS (IMACs) OF THE 15A NCAC 02L STANDARD
APPENDIX 1, APRIL 1, 2013.
+ - BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM BACKGROUND
ASH BASIN COMPLIANCE BOUNDARY
GROUNDWATER SAMPLES COLLECTED MARCH 2O10 TO SEPTEMBER 2019.
CROSS SECTION LOCATION
Ic
(SOUTHWEST)
D'
FORMERASH (NORTHEAST)
DISPOSAL AREA
(FADA)
0
J C6 W O
Z0 W 100 Of II i �>Jip 2i ?i ¢2
100
> O CO (O (O Lo Lo� > COU JN
Of — FW
Q
F J
50 u- J w 50
ww Q
Q J LL Z
U > i LL Q
Z > W O Z
O Q _ _ — — MW-20 MW-46B — — — MW-16 0 O
< As <1.0 As 2.2 As 1.4 Q
> As <1.0 >
'w MW-2 D A W-1 RBs MW-16D w
w MW-45C As 1 1.5 1 As I <1.0 w
-50 As 19 MW-46 MW-1 R \ UPPER SURFICIAL ZONE -50
UPPER I As 1 1.4 As 1 WITH SILTS & SANDS
PEEDEE
UPPER PEEDEE FORMATION
ZONES OF SILTS AND FINE SANDS
-100 LOWER SURFICIAL_ _ _ _ -100
ZONE WITH COURSE
SANDS &SILT
LOWER PEEDEE FORMATION
-150 ZONES OF SILTS AND FINE SANDS -150
NOTES
1. DEPTH TO WATER GAUGED IN MONITORING WELLS ON FEBRUARY 26 & 27, 2020.
2. ALL VERTICAL ELEVATIONS ARE MEASURED IN FEET, NORTH AMERICA VERTICAL DATUM 1988,
(NAVD 88).
3. GROUNDWATER FLOW IS APPROXIMATELY NORTHEAST TO SOUTHWEST, PERPENDICULAR TO
THE CROSS SECTION.
4. ALL BOUNDARIES ARE APPROXIMATE.
5. ALL CONCENTRATIONS SHOWN ARE EITHER LCL95s OR CTVs. REFER TO TABLE 5-12 FOR THE
FULL DATASET.
LEGEND
4. ARSENIC (As) CONCENTRATIONS ARE IN MICROGRAMS PER LITER (Ng/L).
MW 46B
WELL IN UPPER SURFICIAL FLOW ZONE
UPPER SURFICIAL FLOW ZONE GROUNDWATER
MW 46C
WELL IN LOWER SURFICIAL FLOW ZONE
WELL WATER LEVEL ELEVATION
5. LCL95 - 95% LOWER CONFIDENCE LIMIT VALUE.
MW 15RD
WELL IN UPPER PEEDEE FLOW ZONE
LOWER SURFICIAL FLOW ZONE GROUNDWATER
6. CTV - CENTRAL TENDENCY VALUE.
WELL WATER LEVEL ELEVATION
— —
GENERALIZED WATER TABLE
UPPER PEEDEE FLOW ZONE GROUNDWATER
ANALYTICAL PARAMETER As
GENERALIZED GROUNDWATER
WELL WATER LEVEL ELEVATION
REPORTING UNITS Ng/L
_�
FLOW DIRECTION
MW-45B ARSENIC (As) CONCENTRATION (Ng/L)
15A NCAC 02L STANDARD 10
As <1.0
BACKGROUND THRESHOLD VALUE 2.0
SURFACE WATER
WELL SCREEN
(SURFICIAL UPPER FLOW ZONE) +
LOWER SURFICIAL
BACKGROUND THRESHOLD VALUE 14
PEEDEE FLOW ZONE
ASH BASIN COMPLIANCE BOUNDARY
(SURFICIAL LOWER FLOW ZONE) +
(PEEDEE FORMATION)
+- BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM
BACKGROUND GROUNDWATER SAMPLES COLLECTED MARCH 2O10 TO SEPTEMBER 2019.
CROSS SECTION LOCATION
MW-16
MW-20co
400
75
300
N
90
W
W
d c
o E
Q
300
50
ca
m
200 =
m
60
1 �,
3
Space not used
fn
y
o
.� .W
o
U
200 C
Q
L
m
0
25
100
Q 30
W
Q
I
x
W
100
0
0
0
m
0
2016 2017 2018 2019 2020
2016 2017 2018 2019 2020
Date
Date
MW-16D
MW-20D
150
600
r
r
co
co
75
300
a 100
c 0 400
C Q
E
N m
50
m o
a
LA
200 m
x
.�
Space not used
o 0 <
c o
p
<
L 50
m 0 200
L
m�
o
Q
Q W
Q 25
a W
100
X
W
C
%
0-1Q
N
l0
Qi
0
0
L
Q
0
2016 2017 2018 2019 2020
2016 2017 2018 2019 2020
Date
Date
LEGEND NOTES
lf DUKE
DRAWN BY: K.MARSAC DATE:7120/2020
FIGURE5-28
Plots of arsenic (left y-axis) and EH (right y-axis) over time near Source pg/L - Micrograms per liter
�� ENERGY
REVISED BY: K. MARSAC
TIME VERSUS CONCENTRATION
Area 2 in the upper surficial flow zone to row and lower surficial flow Eh - Redox Potential
Arsenic
PROGRESS
CHECKED BY: T. HARTMAN
ARSENIC AND EH NEAR
zone (bottom row). Dates of ash basin( excavation begins, extraction my - Millivolts
APPROVED BY: B. WYUE
SOURCE AREA 2
t EH system online, and ash basin excavation complete and FADA
PROJECT MANAGER: B. WYLE
CORRECTIVE ACTION PLAN UPDATE
excavation start are marked with vertical lines. Refer to Table 2 of
gynTena
L.V. SUTTON ENERGY COMPLEX
www.synterrecorp.com
Appendix C for source data series.
WILMINGTON, NORTH CAROLINA
r
a
U
C �
m
o
0
O
LL
m m
U
m �
L W
C
O
Q
�
W
m
LEGEND
la WELL IN UPPER SURFICIAL FLOW ZONE
WELL IN LOWER SURFICIAL FLOW ZONE
• SUPPLY WELL
AREAS 3A- ONGOING CLOSURE ACTIVITIES
AREA 3B - MNA REMEDY
ANTICIPATED EFFLUENT CANAL EXTENSION
- ASH BASIN COMPLIANCE BOUNDARY
ASH BASIN WASTE BOUNDARY
ONSITE LANDFILL BOUNDARY
- - ONSITE LANDFILL COMPLIANCE BOUNDARY
FORMER ASH DISPOSAL AREA BOUNDARY
FORMER PROCESS AREA BOUNDARY
FORMER COAL PILE AREA BOUNDARY
- DUKE ENERGY PROGRESS PROPERTY LINE
EFFLUENT DISCHARGE CANAL
SURFACE WATER FLOW DIRECTION
GROUNDWATER FLOW DIRECTION
1. SEE APPENDIX P FOR MORE DETAILED INFORMATION
RELATED TO EFFECTIVENESS MONITORING PLANMP
ELEMENTS FOR THE FADAAND FCPA. MONITORIN EWE LS
SHOWN ON THIS FIGURE ARE PLANNED TO BE SAMPLED AS
PART OF THE EMP.
2. THE OUTLINE OF AREAS 1A, 1 B, AND 4 REPRESENT THE
AREAS WHERE THE MAXIMUM EXTENT OF COIS ARE
GREATER THAN COMPARISON CRITERIA IN GROUNDWATER
ASSOCIATED WITH THE SUTTON SOURCE AREAS.
3. CCP - COAL COMBUSTION PRODUCTS.
4. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
ALL BOUNDARIES ARE APPROXIMATE.
6. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA SERVER
ON JUNE 17, 2019. IMAGE COLLECTED APRIL 4, 2019.
7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
(NAD83/2011).
1984 ASH
BASIN
(LINED)
AREA 3A-ING POND
TON LAKE)
r
I�
fDISPFORMERASH
• MW-16
MW-16D
MW-46B MW-15R-B
MW-20 MW-46C
MW-45B MW-15R-C
MW-20D
MW-45C lip
'' �NMW-50B
MW-44B
M W-44C M W-50C
MW-43B
MW-43C
OUTFALL 001
(' DUKE
ENERGY
PROGRESS
I;j
♦ � ^ w
L
' ♦ _ r a..rr. .
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: J. KIRTZ
DATE: 05/22/2020
REVISED BY: C. CURRIER
DATE: 07/30/2020
CHECKED BY: H. SHARITT
DATE: 07/30/2020
APPROVED BY: B. WYLIE
DATE: 07/30/2020
PROJECT MANAGER: B. WYLIE
•
FIGURE 5-29
CONCEPTUAL MNA WELL NETWORK
ALTERNATIVES 1 & 2
FADA AND FCPA
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
0
LEGEND
WELL IN UPPER SURFICIAL FLOW ZONE
WELL IN LOWER SURFICIAL FLOW ZONE
• SUPPLYWELL
ANTICIPATED EFFLUENT CANAL EXTENSION
COMBINED SIMULATED BORON AND SELENIUM
0 02L PLUME
RESTRICTED GROUNDWATER USE DESIGNATION
LIMIT
+ ASH BASIN COMPLIANCE BOUNDARY
ASH BASIN WASTE BOUNDARY
ONSITE LANDFILL BOUNDARY
+ ONSITE LANDFILL COMPLIANCE BOUNDARY
FORMER ASH DISPOSAL AREA BOUNDARY
FORMER PROCESS AREA BOUNDARY
FORMER COAL PILE AREA BOUNDARY
DUKE ENERGY PROGRESS PROPERTY LINE
EFFLUENT DISCHARGE CANAL
SURFACE WATER FLOW DIRECTION
GROUNDWATER FLOW DIRECTION
1984 ASH
BASIN
(LINED)
1971
ASH
BASIL
I
♦ r
A♦
�Y♦
MW-46B MW-15R-B
�e. MW-20 MW-46C
Mw--457%� MW-20D MW-15R-C
MW-45C
MW-44B MW-50B
M W-44C M W-50C
♦ � MW-43B
MW-43C
OUTFACE 001
1. THE PROPOSED RESTRICTED GROUNDWATER USE `
DESIGNATION IS DRAWN AT THE LEADING DOWNGRADIENT
EDGE WHERE PREDICTED ONSITE COI CONCENTRATIONS
ARE GREATER THAN COMPARISON CRITERIA.
2. CALIBRATION OF THE COMBINED 02L PLUME CAN BE
FOUND IN THE UPDATED GROUNDWATER FLOW AND
TRANSPORT MODELING REPORT FOR L.V. SUTTON ENERGY
COMPLEX WILMINGTON, NORTH CAROLINA (FALTA,
GRAZIANO, GEBRAI, EBENHACK, MURDOCH, AND YU, 2020).
3. SEE APPENDIX P FOR MORE DETAILED INFORMATION
SHOWN ON THIS FIGURE ARE PLANNED TO BE SAMPLED AS
PART OF THE EMP.
4. CCP - COAL COMBUSTION PRODUCTS.
5. FADA- FORMER ASH DISPOSALAREA.
6. FCPA- FORMER COAL PILE AREA.
DUKE
7. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
�'
E N E RGY
PROGRESS.
8. ALL BOUNDARIES ARE APPROXIMATE.
PROGRESS
9. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA SERVER
ON JUNE 17, 2019. IMAGE COLLECTED APRIL 4, 2019.
��
10. DRAWING HAS BEEN SET WITH A PROJECTION OF
NORTH CAROLINA STATE PLANE COORDINATE SYSTEM
FIPS 3200 (NAD83).
synTerrd
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: J. KIRTZ
DATE: 06/01/2020
REVISED BY: C. CURRIER
DATE: 07/30/2020
CHECKED BY: H. SHARITT
DATE: 07/30/2020
APPROVED BY: B. WYLIE
DATE: 07/30/2020
PROJECT MANAGER: B. WYLIE
PROPOSED RESTRICTED GROUNDWATER USE AREA.
GROUNDWATER USE IS AUTOMATICALLY RESTRICTED IN
AREAS CONTAINED WITHIN A COMPLIANCE BOUNDARY.
BECAUSE THE FADAAND FCPA DO NOT HAVEA
COMPLIANCE BOUNDARY, A RESTRICTED USE DESIGNATION
IS PROPOSED. THE PROPOSED DESIGNATION WOULD
PREVENT PUBLIC USE OF GROUNDWATER. ADDITIONAL
INSTITUTIONAL CONTROLS INCLUDING RESTRICTED
ACCESS AND APPROPRIATE PERSONAL PROTECTIVE
EQUIPMENT MAY ALSO BE APPLIED.
FIGURE 5-30
REMEDIAL ALTERNATIVE 2
MNA WITH RS DESIGNATION
SOURCE AREA 2
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
NCDEQapproves CAP (90 days)**
Implement EMP (30 days)*
Collect EMP data (1825 days)
Prepare 5-year Effectiveness Monitoring Report (180 days)
Notes:
Implement the Effectiveness Monitoring Plan to fulfill
section G.S.130A-309.209.(b)(3).
** - Actual time may vary due to a variety of factors
including agency review and approvals, weather delays,
equipment availability, etc.
Days
0 150 300 450 600 750 900 1050 1200 1350 1500 1650 1800 1950 2100
DUKE
DRAWN BY: T.COLTON DATE:5/21/2020
`%
l /ENERGY
REVISED BY: T. COLTON
CHECKED BY: H. SHARITT
PROGRESS
APPROVED BY: J. CLEMMER
10
PROJECT MANAGER: B. WYLIE
'Y1 literri a www.synterracorp.com
FIGURE 5-31
IMPLEMENTATION GANTT CHART -
SOURCE AREA 2
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
MW-41B
MW-41C
SW-2
r
6.—.—d
LEGEND
WELL IN UPPER SURFICIAL FLOW ZONE
WELL IN LOWER SURFICIAL FLOW ZONE
■ SURFACE WATER SAMPLE LOCATION
(APPROXIMATE)
EXTRACTION WELL
• SUPPLY WELL
ANTICIPATED EFFLUENT CANAL EXTENSION
-4EFFECTIVENESS MONITORING FLOW PATH
- ASH BASIN COMPLIANCE BOUNDARY
ASH BASIN WASTE BOUNDARY
ONSITE LANDFILL BOUNDARY
- — ONSITE LANDFILL COMPLIANCE BOUNDARY
FORMER ASH DISPOSAL AREA WASTE
BOUNDARY
FORMER PROCESS AREA BOUNDARY
FORMER COAL PILE AREA BOUNDARY
- DUKE ENERGY PROGRESS PROPERTY LINE
EFFLUENT DISCHARGE CANAL
SURFACE WATER FLOW DIRECTION
GROUNDWATER FLOW DIRECTION
AREAS 1A/1B/4 -CONFIRMATION
GROUNDWATER MONITORING
_ AREAS 2/3A- ONGOING CLOSURE ACTIVITIES
r1 AREA 3B - MNA REMEDY
APPROXIMATE HYDROLOGIC DIVIDE
1. SEE APPENDIX P FOR MORE DETAILED INFORMATION
RELATED TO EFFECTIVENESS MONITORING PLAN (EMP)
ELEMENTS FOR THE ASH BASINS, FADA, FPA, AND FCPA.
MONITORING WELLS SHOWN ON THIS FIGURE ARE
PLANNED TO BE SAMPLED AS PART OF THE EMP.
2. THE OUTLINE OF AREAS 1A, 1 B, 2, 3A, 3B AND 4
REPRESENT THE AREAS WHERE THE MAXIMUM EXTENT OF
COIS ARE GREATER THAN COMPARISON CRITERIA IN
GROUNDWATER ASSOCIATED WITH THE SUTTON SOURCE
CCP - COAL COMBUSTION PRODUCTS.
PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
5. ALL BOUNDARIES ARE APPROXIMATE
6. AERIAL PHOTOGRAPHY OBTAINED FROM TERRA SERVER
ON JUNE 17, 2019. IMAGE COLLECTED APRIL 4, 2019.
7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH
CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200
(NAD83/2011).
MW-08B
M W-8
0 4-�A'q
•
MW-5B ♦ � _
MW-5C
♦
10
•
• • AREA 4
SMW-1 B
• SMW-1C
• • •
• - ems+ ..:
•
AREA 3A A-3B •
MW-21C - - •
FPMW-28B ` - • - •
$ •
COOLIgWKE NG POND
SW 9 • FPA-3C
♦ �:
DISPOSAL MW-16 •
MW-16D AREA 1A
IA Irk
MW�6C MW-15R-B MW-7C
+' MW-15R-C _
-
CAPE FEAR
MW-20D
MW 446 MW-50BRIVER
— - -
-44C iii��► MW-50C � - - � - -
♦ % MW-43B
MINTAKE CAA&'
W-43C
AREA 3B
/ MW-37B
�� MW-37C � ♦
s
,
dN
('DUKE GRAPHIC SCALE FIGURE 5-32
500 0 500 1,000 EFFECTIVENESS MONITORING PROGRAM
ENERGY (IN FEET) SYSTEMS AND FLOW PATHS
PROGRESS DRAWN BY: J.KIRTZ DATE:11/15/2019 ALTERNATIVES 1 & 2
REVISED BY: C. CURRIER DATE: 07/30/2020 SOURCE AREAS 1 &2
CHECKED BY: H. SHARITT DATE: 07/30/2020 CORRECTIVE ACTION PLAN UPDATE
APPROVED BY: B. WYLIE DATE: 07/30/2020
L.V. BUTTON ENERGY COMPLEX
synTerra PROJECT MANAGER: B. WYLIE WILMINGTON, NORTH CAROLINA
www.synterraoorp.com
MW-27B
MW-27C ` • �
MW-40B
SW-3 MW-40C AREA
CCR-114B
CCR-114C
CCR-113B l ,
♦l CCR-113C , �
CCR-112B `
CCR-112C ® CCR-119B
CCR-119C
CCR-111 B �SW-4 ��
. CCR-120B
CCR-111C � CCR-120C
SW-5
CCR-110C CCR-122RB
CCR-109B CCR-122RC ,
CCR-109C �'�+ MW 12RAW-6RB
SW-6 �` �
CCR-108RB MW-23B, `�
CCR-108RC MW-23C � . � •
,
CCR-107RB r
CCR-107RC CCR-124RB �� �, ® AW-4C
SW-7 CCR-124RC
`-
MW-22C
AREA 2 FPA-4B �
FPA-4C n
SW-8 I
FPA-9B `
F FPA-9C
♦ MW-8/B/D � ♦4.
MW-41 B/C/D ♦
:
qld
DMW-1
CCR-208C/D
® ♦[BMW-1
' CCR-115B/C/D CCR-201C/D"
CCR-114B/C/D � DMW 2 ♦ �'� i
CCR-117B/C ® CCR-207C/D
CCR-113B/C/D ® � BMW-3
CCR-112B/C/D
CCR-111 B/C/D e
CCR-110B/C/D
CCR-118B/C
®BMW-2
CCR-206C/D
1984ASH �G
BASIN
(LINED)
•
CCR-109B/C/D �/
CCR-108RB/RC/RD
CCR-108B/C/D
CCR-107R6/RC/RD
CCR-107B/C/D
CCR-106B/C/D
CCR-105B/C/D
CCR-104B/C/D
CCR-10
♦ M, y
BMW-4 � CCR-203C/D
® CCR-205C/D
DMW-3
�CCR-1216/C ♦CCR-204C/D
CCR-121R -
CR-122&
®' CCR-122R
CR-123B/C ♦`
LEGEND
CCR RULE DETECTION MONITORING WELL �♦
• CCR RULE BACKGROUND MONITORING •�
WELL
ABANDONED DETECTION MONITORING♦`
WELL
• REPLACEMENT DETECTION MONITORING RIVER
♦♦
WELL I
ANTICIPATED AREA OF COOLING POND
EXTENSION
ASH BASIN WASTE BOUNDARY
ONSITE LANDFILL BOUNDARY
FORMER ASH DISPOSALAREABOUNDARY Al
FORMER PROCESS AREA BOUNDARY
FORMER COAL PILE AREA BOUNDARY
EFFLUENT DISCHARGE CANAL
DUKE ENERGY PROGRESS PROPERTY
LINE
NOTES:
1. W.E. - WATER ELEVATION (APPROXIMATE)
2. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY
PROGRESS.
3. ALL BOUNDARIES ARE APPROXIMATE.
4. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE
EARTH PRO ON SEPTEMBER 12, 2017. IMAGE COLLECTED
OCTOBER 29, 2016.
5. DRAWING HAS BEEN SET WITH A PROJECTION OF
NORTH CAROLINA STATE PLANE COORDINATE SYSTEM
RIPS 3200 (NAD83/2011).
CCR-124R
E.
GRAPHIC SCALE
UKE
500 0
500 1,000
�' ESN RGY
N FEET)
PROGRESS
DRAWN BY: J. KIRTZ
DATE: 05/26/2020
REVISED BY: C. CURRIER
CHECKED BY: H. SHARITT
DATE: 07/27/2020
DATE: 07/27/2020
APPROVED BY: B. WYLIE
DATE: 07/27/2020
�. T .�....�
PROJECT MANAGER: B. WYLIE
FIGURE 5-33
FEDERAL REGULATORY
GROUNDWATER MONITORING
SOURCE AREAS 1&2
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
Interim
Monitoring Plan Corrective Action
(IMP) sampling Y_ Plan Approval
Post -Excavation
Effectiveness Monitoring Plan (EMP)
monitor downgradient, sidegradient,
and background groundwater in
accordance with G.S. 130A-
309.214(a)(4)k for compliance with
NCAC 02L .0202 Groundwater Quality
aDDlicable Standards
No
Continue EMP sampling and
Annual Review and
Reporting
Based on Are the groundwater Based on
annual evaluation, Yes monitoring results Yes annual evaluation, No
is the remedial below applicable is the plume stable
system performance standards at the at the compliance
effective? compliance boundary boundary?
for three years?
No
Adjust remedial system
components; continue with EMP for
additional four years
then
If ineffective after 5 years,
implement contingency plan in
accordance with CAP Update Section
5.13; continue with EMP
Notes:
NCAC - North Carolina Administrative Code
02L - NCAC Title 15A, Subchapter 02L. Groundwater Classification and
Standards
Yes
Request completion of active remediation
or
Request completion of PCMP post -closure monitoring
in accordance with G.S. 130A-309.214(a)(3)b
DUKE
DRAWN BY: T. PLATING DATE: 10/112019
ENERGY
REVISED BY: B. WYLIE DATE: 6/10/2020
PROGRESS
CHECKED BY: T. HARTMAN DATE: 6/20/2020
APPROVED BY: B. WYLIE DATE: 6/20/2020
PROJECT MANAGER: B. WYLIE
www.synterracorp.com
WnTerm
FIGURE 5-34
EFFECTIVENESS MONITORING PLAN
WORK FLOW AND
OPTIMIZATION FLOW DIAGRAM
CORRECTIVE ACTION PLAN UPDATE
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA
Submit
Request for
Termination
Request shall include:
•
Discuss duration and
cost for continuation
•
Evaluate success of CAP
•
Evaluate alternate
technologies
•
Discuss health an
safety impacts if
constituent levels
remain
Demonstrate
• Continuation of CAP will
Implement GW
not result in significant
monitoring planit
reduction of constituents
Has the site
Termination
location of no le
• Constituents have not and
been identified
authorized
after health
than one year'
will not migrate onto
for resource
and safety
predicted time
adjacent properties
development.
analysis
travel upgradienGW
discharge to surface
any existing owater
will not violate 02B
foreseeable rece
standards
Public notice of the request
per Rule 0.0114 (b)
• Proposed termination is
consistent with all other
environmental laws
Is there
sufficient
.
evidence
that concentrations are
less than applicable
criteria from multiple
sampling
events?
No
further
action