HomeMy WebLinkAbout20190752 Ver 4_Seep C Interim Remediation System - 08132020_202008131 1
DRAFT - NOT FOR CONSTRUCTION
oil
3
El
5
THE CH MO R COMPANY
II
m
U
E
F
PREPARED FOR:
& Chemours TM
Geosynteclo'*'r
consultants of NC, P.C.
1
FAYETTEVILLE WORKS PROJECT
SEEP C INTERIM REMEDIATION SYSTEM
WILLIS CREEK AND CAPE FEAR RIVER CORRIDOR
FAYETTEVILLE, BLADEN AND CUMBERLAND COUNTIES
STATE OF NORTH CAROLINA
AUGUST 2020
INDEX OF DRAWINGS
DRAWING NO.
DRAWING TITLE
G-01
COVER SHEET
G-02
NOTES AND SYMBOLS
C-01
OVERALL SITE PLAN
C-02
SEEP C INTERIM REMEDIATION SYSTEM PLAN
C-03
SEEP C INTERIM REMEDIATION SYSTEM CONSTRUCTION DETAILS I
C-04
SEEP C INTERIM REMEDIATION SYSTEM CONSTRUCTION DETAILS II
C-05
PLATFORM AND LADDER STRUCTURAL DETAILS
D-01
SEEP C INTERIM REMEDIATION SYSTEM PROCESS FLOW DIAGRAM
SOURCE: U.S. BUREAU OF THE CENSUS
VICINITY MAP
SCALE: 1" = 30 MILES
22828 NC-87
FAYETTEVILLE, NC 28306
910.483.4681
ATRIUM AT BLUE RIDGE
2501 BLUE RIDGE ROAD, SUITE 430
RALEIGH, NC 27607
919.870.0576
v
- SITE
r
IN
¢" a
SOURCE: MICROSOFT CORPORATION BING MAPS 2017
LOCATION MAP
SCALE: 1" = 3,000'
30% DESIGN DRAWINGS
NOT FOR CONSTRUCTION
2 3 4 5 6
0 3,000
SCALE IN FEET
A
08.12.20
30% DESIGN SUBMITTAL
JFH
CAS
REV
DATE
DESCRIPTION
DRN
APP
�eV,/
GeosATRIUMyn
AT BLUE RIDGE
2501 BLUE RIDGE ROAD, SUITE 430
RALEIGH, NC 27607
consultants of NC, P.C.
919.870.0576
TITLE:
COVER SHEET
PROJECT: THE CHEMOURS COMPANY
SEEP C INTERIM REMEDIATION SYSTEM
SITE:
FAYETTEVILLE WORKS SITE
DESIGN BY: CMDS
DATE: AUGUST 2020
DRAWN BY: JFH
PROJECT NO.: TR0795
CHECKED BY: JWE
FILE: TR0795-GO01.(
REVIEWED BY: JJD
DRAWING NO.:
G-0 1
APPROVED BY: CAS
7
8
C
u
E
F
E
4 7 7 A G 7 O
I L 0 It J V / V
I
L
J
DRAFT — NOT FOR
COt4STRUCTION
a
��
i
\
a
c
\ \
\ \
o
FAYETTEVILLE
WORKS SITE
(
\ \
N 396500
SEEP C
PILOT TEST LAYOUT
—N—
EXISTING CLEARED AREA
a
I
'C'
6 A
WETLANDS (NOTE 4)
I
SEEP
LEGEND
a
\ I
FILTER BED 1 h
C-03
I
40 EXISTING CONTOUR
3
N 396000
— — — — — — — — — — — EXISTING CLEARED AREA
E
I
I
\
\
PROPERTY LINE
C
j
o I
o
PROPERTY LINE
m
1l
EXISTING ROAD
EXISTING STRUCTURE
3
15p
o
1
I
1
a
�j
G
m
STREAM / RIVER
CONSTRUCTION ROUTE
1401
WETLANDS
�13p
N 395500
°
J
C
1
0
a
L
Its
a
0
0
�..
/
`
120
�\
0
\
0NOTES:
N 395000
' 0
—130
°
DAM
1. GRID COORDINATE SYSTEM CORRESPONDS TO NAD83, NORTH CAROLINA.
2. ELEVATIONS PRESENTED ARE IN FEET, NAVD 88.
110
�00
�2 0
❑
"
3. TOPOGRAPHIC, ROADS, BUILDINGS, AND PROPERTY LINE INFORMATION
7p°
�110 ^O
0
OBTAINED FROM FREELAND-CLINK SCALES & ASSOCIATES, INC. OF NC. SURVEY
OF THE CHEMOURS FAYETTEVILLE WORKS SITE DATE 7 JANUARY 2019.
°
�100
�00
0 p
o
LOCK
4. APPROXIMATE EXTENT OF DELINEATED WETLANDS. (WATERS OF THE UNITED
STATES TECHNICAL REPORT, THE CHEMOURS COMPANY FAYETTEVILLE WORKS
PROJECT: FLOW -THROUGH CELLS, SEEP C PILOT STUDY, AND REVISED SEEP A.
°
000��
Q
,
\
PARSONS, AUGUST 2020)
9p
o
d
W.D. HUSKE
LOCK AND DAM
`80
P
o
a
�
1
0
N 394500
�\
I
b
o
\
0 150 300
90
°
1
SCALE IN FEET
E
A
08.12.20 30% DESIGN SUBMITTAL JFH CAS
\
J
1
REV
DATE DESCRIPTION DRN APP
ATRIUM AT BLUE RIDGEGeosyntec`o�
2501 BLUE RIDGE ROAD, SUITE 430
N 394000
J
�O o
p
RALEIGH, NC
919.870.0576.0576
consultants of NC, P.C.
o
ITITLE:
PROJECT:
OVERALL SITE PLAN
THE CHEMOURS COMPANY
SEEP C INTERIM REMEDIATION SYSTEM
OLD OUTFALL 002
SITE:
FAYETTEVILLE WORKS SITE
0
0
CDCDCDLn
N
0
0
CD
N
0
0
N
0
0
Ln
/N
0 0
0
N
N
90
0
0
Ln
I N
1
N
o
0
0
CDCD
co
N
DESIGN BY: CMDS DATE: AUGUST 2020
DRAWN BY: JFH PROJECT NO.: TR0795
F
CHECKED BY: JWE FILE: TR0795-Cl01.dwg
30 %
DESIGN
DRAWINGS
REVIEWED BY: JJD DRAWING NO.:
NOT FOR
CONSTRUCTION
APPROVED BY: CAS C-01
A
n
O
A
G
C 11
7 0
It
1 1 2 1 3 1 4 1 5 1 6
II
DRAFT - NOT FOR CONSTRUCTION
Lo
N
Lo
\ CD
N
W
ilk
m
E
F
INLET WEIR
EL = 40.85
RIPRAP
ARMORED SLOPE
8.17'
BOTTOM OF SLAB_
EL = 34.18
10'X10' FILTER BED
(TYP OF 2)
60 MAINTENANCE PLATFORM
EL = 42.35�
W MODULAR BLOCK WALL
W 50 (OR SHEET PILE)
IL
Z
---- _
O 40
T
FINISHED GRADE
j
IN FRONT OF WALL
30
J
W
FILTER BED
PERIMETER WALL
20
0+00
INLET WEIR
EL = 40.85
+ 26.67'
7.5'
TOP OF FILTER BED
PERIMETER WALL
EL = 42.35
RIPRAP
ARMORED SLOPE
EXISTING
GROUND
— f-- — — — -
TOP OF SLAB OUTLET PIPE INVERT
EL = 34.85 EL = 34.79
1 +00
DISTANCE (FEET)
SECTION A
HORIZONTAL: 1" =20'
VERTICAL: 1" =20'
TOP OF FILTER BED
PERIMETER WALL EXISTING
EL = 42.35 GROUND
- 8.17 BYPASS SPILLWAY
1--16' -EL = 42.10 — -
BYPASS SPILLWAY /
FLOW MEASUREMENT FLUME
EL = 41.35
_BOTTOM OF SLAB
FI = Rd 1 R
DISTANCE (FEET)
SECTION B
HORIZONTAL: 1" =20'
VERTICAL: 1" =20'
40
LEGEND
1+00
EXISTING CONTOUR
FINISHED GRADE CONTOUR
EXISTING CLEARED AREA
PROPERTY LINE
EXISTING ROAD
EXISTING STRUCTURE
STREAM / RIVER
WETLANDS
Fm
50 W
IL
Z
40 O
Q
30 J
L
' 20
1 +59
H
50 W
IL
40 z0
H
30 J
L
' 20
1 +40
NOTES:
1. GRID COORDINATE SYSTEM CORRESPONDS TO NAD83, NORTH CAROLINA.
2. ELEVATIONS PRESENTED ARE IN FEET, NAVD 88.
3. TOPOGRAPHIC, ROADS, BUILDINGS, AND PROPERTY LINE INFORMATION OBTAINED FROM
FREELAND-CLINK SCALES & ASSOCIATES, INC. OF NC. SURVEY OF THE CHEMOURS
FAYETTEVILLE WORKS SITE DATE 7 JANUARY 2019.
4. BYPASS SPILLWAY AND SLOPES SHALL BE ARMORED WITH 12-INCH THINK (MIN) LAYER OF
RIPRAP AND UNDERLAIN WITH A GEOTEXTILE SEPARATOR.
5. MAINTENANCE PLATFORM SHALL BE SURFACED WITH A 6-INCH (MIN) LAYER OF AGGREGATE
AND UNDERLAIN WITH A GEOTEXTILE SEPARATOR.
6. DISTURBED AREAS NOT SURFACED WITH AGGREGATE OR CONCRETE WILL BE SEEDED AND
MULCHED.
0 20 40
SCALE IN FEET
A 08.12.20 300 DESIGN SUBMITTAL JFH CAS
REV DATE DESCRIPTION DRN APP
Geosyntec 1/ ATRIUM AT BLUE RIDGE
2501 BLUE RIDGE ROAD, SUITE 430
RALEIGH, NC 27607
Lllt t f NC P C 919.870.0576
+ + 'Lo s +mac �_�,� —� i
cons an s o
,\ Lo F sit + p A 40 TITLE:
5' WIDE CONCRETE FLUME + + + + OUTLET PIPE + + + ���... SEEP C INTERIM REMEDIATION SYSTEM
WITH RECTANGULAR WEIR + + + + INV. EL = 34.79 + + + + + + + + C-02 �—�,_� .
PLAN
�� + + + + + + + + + + + + + + + + + + + PROJECT: THE CHEMOURS COMPANY
1 10'X10' FILTER
BED TYP OF 2 ROCK CHECK DAM �0 SEEP C INTERIM REMEDIATION SYSTEM
C-03 \
+ + + + C-03 + + + + + + + + + + + + + + + + + + v SITE:
+ + + + + + + + + + + + FAYETTEVILLE WORKS SITE
o I DESIGN BY: CMDS DATE: AUGUST 2020
cp
N
Ln DRAWN BY: JFH PROJECT NO.: TR0795
^o Ln
I � CHECKED BY: JWE FILE: TR0795-C102.dwg
CD 00 i WINGS I N G S REVIEWED BY: JJD DRAWING NO
3q% DESIGN D R
NOT FOR CONSTRUCTION APPROVED BY: CAS C-02
1 2 3 4 5 6 1 7 8
n
L
I
E
F
1
oil
DRAFT - NOT FOR CONSTRUCTION
3
.19
5
II
W
N
E
F
2" PVC BALL Vf
FILTER BED WALL
SCALE: 1 " = 2'
FACE MOUNT 5
SAFETY RAILING
(TYP) C-05
RIPRAP
6"
5'
INFLUENT d
3„ o00 00 000000 �00 0°0000^
Oo
STILLING BASIN 1 -14 0°°00°oa 0°0°0o°a 0 goo°poo°poo°
9 0°0000 �a00oo0000 a0
oO�0a0 00°00 o0n0 oD o
d . ... •.X — 77-X - V X i:'r^.3C' 000 oo
4' O o O
t.
d 'a
6" CONCRETE SLAB WITH
WELDED WIRE FABRIC
A SECTION
-03 BYPASS SPILLWAY FLOW
MEASUREMENT FLUME
SCALE: 1" = 2'
—13'
A MINIMUM DEPTH = 9"
�O0 ,0 0 50 100 D00 Do 0 D O0 000 000 000 000 Do 0 000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
-0-0 0 -0 0 -0 0 -0-0 0 -0 0 0 0
\_[1 oC1 o C1 oC1 o C1 oC1 o C1 o C1 oC1 o C1 oC1 o C1 0 o C1 o C1 oC1 o C1 oC1 oC1 S✓
OO`b �O`b �O`b �O`b �O`b �O`b �O`b �O`b �O`b �O`b �O`b �O `b �11ID00_11
�'1f 00 00 00 00 00 00 0000 00 00 0� 0yp 21 2 o n a&_� o00 01"3OOo �O o
�L3� �,�aa MAXIMUM HEIGHT = 2
GEOTEXTILE
NOTES:
1. STONE CHECK DAMS SHOULD BE CONSTRUCTED USING USING NC DOT CLASS B STONE. THE
UPSTREAM FACE OF THE ROCK STRUCTURE SHOULD BE COVERED WITH FINE GRAVEL (NCDOT
#57 OR #5 WASH STONE) A MINIMUM OF 1 FOOT THICK TO REDUCE THE DRAINAGE RATE.
2. GEOTEXTILE SHALL BE SELECTED IN ACCORDANCE WITH AASHTO M288-96 SECTION 7.3,
SEPARATION REQUIREMENTS.
2 DETAIL
C-0 ROCK CHECK DAM
SCALE: 1 " = 2'
8' max. standard strength fabric with wire fence
CARBON BED 1 DRAIN
6' max. extra strength fabric without wire fence
3" PVC PIPE
CARBON BED 2 DRAIN
3" PVC PIPE
Steel
post
Plastic or
wire ties
e
OFF VALVE (TYP)
Wire
M
18-24"
fence
DISCHARGE BASIN
Natural
DRAIN TO RIVER
;�a ground
8" PVC PIPE
;mm
8" down & 4"
forward along
24"
the trench
Filter
ifabric
NOTES:
1. A FIBERGLASS GRATE WILL BE INSTALLED OVER THE INFLUENT STILLING BASIN
AND TRANSFER BASIN TO PROVIDE OPERATOR ACCESS TO FLOW CONTROL
VALVES AND SAMPLE LOCATIONS. SEE DRAWING C-05 FOR DETAILS
2. TRANSDUCERS WILL BE INSTALLED IN THE INLET CHAMBER AND THE EFFLUENT
STILLING BASIN TO MONITOR WATER LEVELS. THE FLOW RATES THROUGH THE
BYPASS SPILLWAY FLUME AND THE FILTER BED SYSTEM WILL BE CALCULATED
BASED ON THE WATER LEVELS MEASURED IN THE INLET CHAMBER AND THE
EFFLUENT STILLING BASIN, RESPECTIVELY.
3. COMPOSITE SAMPLERS WILL BE PLACED WITHIN THE INLET CHAMBER AND THE
EFFLUENT STILLING BASIN FOR PERFORMANCE MONITORING. GRAB SAMPLES
WILL ALSO BE PERFORMED AS NECESSARY, INCLUDING FROM WITHIN THE
TRANSFER BASIN, TO EVALUATE BREAKTHROUGH.
4. SAFETY RAILING SHALL BE FACE -MOUNTED AND REMOVABLE.
30% DESIGN DRAWINGS
NOT FOR CONSTRUCTION
1 2 3 4 5 6
Wire
fence
Cross -Section
View
Filter
Steel
fabric Backfill trench Natural
post
and compact ground
thoroughly
°min
° °
8„
m°®m°m.0°m° min
24"
° ° ° °
KO'3 DETAIL
C-03 SILT FENCE
(SOURCE: NC DEQ)
SCALE: NTS
0 2 4
SCALE IN FEET
A 08.12.20 300 DESIGN SUBMITTAL JFH CAS
REV DATE DESCRIPTION DRN APP
Geosyntec ti ATRIUM AT BLUE RIDGE
2501 BLUE RIDGE ROAD, SUITE 430
P.C.RALEIGH, NC 27607
consultants of NC, P919.870.0576
TITLE: SEEP C INTERIM REMEDIATION SYSTEM
CONSTRUCTION DETAILS I
PROJECT: THE CHEMOURS COMPANY
SEEP C INTERIM REMEDIATION SYSTEM
SITE:
FAYETTEVILLE WORKS SITE
DESIGN BY: CMDS DATE: AUGUST 2020
DRAWN BY: JFH PROJECT NO.: TR0795
CHECKED BY: JWE FILE: TR0795-050l .dwg
REVIEWED BY: JJD DRAWING NO.:
APPROVED BY: CAS C-03
7 8
W
I:
L
I
E
F
1
DRAFT — NOT FOR CONSTRUCTION
oil
3
5
6 1 7 1 8
n
m
m
I
E
F
INLET RECTANGULAR WEIR 8" THICK REINFORCED CONCRETE
WITH HAND PULL WALL WITH #4 @ 12" OC (TYP)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
INLET CHAMBER INFLUENT STILLING BASIN
8" THICK REINFORCED CONCRETE WALL
WITH #4 @ 12" OC (TYP)
OVERFLOW RECTANGULAR
WEIR WITH HAND PULL
36" W X 24" H ADJUSTABLE
(DOWNWARD OPENING)
WEIR WITH GEAR ACTUATOR
- - - - - - - - - - - - - - - - - - - - -
4 .
d
. EFFLUENT
' < .. CTII I IAI!'`_ QACIAI '•e'
26'-8"
K'B SECTION
Q-03 FILTER BED SECTION B
SCALE: 1 " = 3'
INLET MANIFOLD PIPING
2" PVC PIPE (TYP)
..
.. .' d. '
.
.
e.
U.
+
d.
°, .. ,' .
ad..
4• d:
.•. ° .
e
'
I
•
° a. a • ; �;
•. "'
°
,. <:
a,
:a i
♦.
r r
i •d.'
e° d•
°f
N . • . .
..
.
.
a
.;..
: , . .a .
O
... . .d
• , Q.. ' ,
..
ar .
,. ., .
• 'd: ' Q
a
.1. 0
i.: ,.
...,. .'•
jj {
.
•d. 0.. '. .
i _
Q
r' •
a
.9'
'm ,°
a .. 'r
..d
<'
d
r
•d ..
. '�
I e
<'
..
a
r
:;
A :'4
d
4. r
d
1..
: ...
d' a ..
. •
•d' ..
p
TRANSFER
:
r • d
�a
d
d
L
4r
a
.. ... '9
`T
.'� d.
♦.
d
• a..•.4
•.b°
r• °i•�
BASIN
r
.. I
d'.
d
d
� a •• y
.•
�d
•j.
d
'FI
R'.BED
.
P '
' a
4� •
..
a'
.
,A
.
ed
•a .a
.4 ..
-
..
.. E. .;''
i.
I..
,:' i'"
... .. ..d
, a d'
d ,
a,
d%
p '
I.
♦ 'a
I
.�.. l
b
I � :1.
'd'
.*d 4 •
d
+
9'
..
d' r...
A.
.. ...
f 4.
i:. .<
•. . .
.
.. ,.'
b
.
d
.. •
'..d.
•4 .I.
..
14
ad
4...
° TRANSFER BASIN d' . .. a '4
. d". •e
,
•.I
•
a.'
r'• •d
b;a
-4��
d b '
d.
d•'
�d•
e
MANIFOLD PIPING
i. °
°e'''
..
• 'e
•
d
e
e
I
e' 8 PVC TYP
a
p
e
4 '
4:
..
a •e i
'e" .. 4
.'S
4 �•
a,
• ..'. b. _
.. ..
d.
'. ••.. x' .'
I. .
q
d ♦ '
a"
: p'.
a
.. ... ..a 4
b
d .
. C
,. ..
d.
d.•'•
:e
'.1
.. B.:
..�
•
.'a
..
�. .:.
4 .d:
a° t..
'.a:: °
,
..p • d` .
.'.
1:
.
d
d
4 .
,
I. 4
�� ..A.
2 9
E
�GAR'BO.I�EDs1':.D. .
�?P,
.4
.
i
B
e
. a
d
4
- •
..d
d
a' .
°rd
d
.. a
a
♦
e
<. .
°'a a m
, 11
4...
: P : P:.I PE
C
.e°
, .
a . ..
i d
. .' .
d ° . ..' a
a a..
d'
..
:4•
'd••
d
a<:
— ---
4 d'°
': n.
a
* -** :Z�
sLl
°,T.. —;1—�- -: d . :.: jrs_-- -- ��,.--�-- — -- —. <�
• .
d ..
a...,
4
.Q
�,'.SL
..:d
r4
• .
*
a,
44 . - . : - - * -� .'i . .
.. . I � . .
. : : . . . -�
. : .
..
.*. . . 4 '
. . . . ..
. .. . . .
T-6"
1
oil
26'-8"
KT" SECTION
�Q�-03 FILTER BED SECTION C
SCALE: 1 " = 3'
26'-8"
D SECTION
C-03 FILTER BED SECTION D
SCALE: 1 " = 3'
3
FACE MOUNT 5
SAFETY RAILING
(TYP) C-05
8'-2"
DISCHARGE BASIN
DRAIN TO RIVER
8" PVC PIPE
FACE MOUNT 5
SAFETY RAILING
(TYP) C-05
8'-2"
CARBON BED 2 DRAIN
3" PVC PIPE
SHUTOFF VALVE
FACE MOUNT 5
SAFETY RAILING
(TYP) C-05
8'-2"
T-6"
FACE MOUNT 5
8" THICK REINFORCED CONCRETE WALL SAFETY RAILING
WITH #4 @ 12" OC (TYP) (TYP)
C-05
..' TRANSFER <' INFLUENT d
' : BASIN . ' : STILLING BASIN
..1 .
.e .e. .
T8" KNIFE GATE VALVE (TYP) ".
.d .A.
.. t . :
d
I i
8" TRANSFER BASIN 4 ..
MANIFOLD PIPING
:-\\ .:
.°d
d d
+ 8'-2"
.
. *: �.*.' -La] o ..
� ;
'.:. " a .. a
a a
' < '
4 '.
1
,d .d
."•,'
. . * � . L . . . - . . -d
b
.m.
.
•i_ O a
,: ;, .° a .. a
.P UNDERDRAIN COLLECTION SYSTEM
16' 6" PERFORATED PVC PIPE (TYP)
K'E SECTION
C-03 FILTER BED SECTION E
SCALE: 1 " = 3'
FACE MOUNT 5
8" THICK REINFORCED CONCRETE WALL OVERFLOW RECTANGULAR WEIR SAFETY RAILING
`WITH #4 @ 12" OC (TYP) / WITH HAND PULL f (TYP) C-05
. ..d' .. " `d
. ,4'
a `
•
.4
+"
INFLUENT
•.
..4f .°...• .r a
. d
',
.. ♦ •. .
, 4. a.. °.j' .
a "
STILLING BASIN
a
a'
I*..
d .
.,
d
aO.. ...e
+.
d!
.
3
° ..
2'-6" •° .. i�
' "n'
,
' � da
{{
.
a.
_
... t
{
:
• j
b.
4
t
I °.
d
d
d '
.e , :'
'�.4
P-
;
'�.
a.d:. , '
p'
��
8 TRANSFER
.
4 ° . .
•v
.. .
d'
d
°..d
. e
BASIN MANIFOLD
4
d
4.
•.' a
•
• •d
e
e. .
p
PIPING
d ^•
`.
d
,
_
d ..
d ..
d
. a'e. a
.4
p '.
.4' .a
ad
° °.
.d
-
7 6
r: : 4 .d,
I
J'
'
•':.<.".
'da
i '
4
.. .. .
4.
°• a .. 'y .
a
i
,d
e' TRANSFER
e
a
.J.
• a'
d. .
n
-
82
.. a ..
d
. d :
.. •
BASIN
•. .p
': a'.
A `p
" "
. a
.*
"
,g.
♦ r
..
a a
, .0
4 '
'5 `d
a.
..
. .
*A,: 44
�d
'A
•a . 1'
i '
''d
i'
°d4.
°<
i'. r
`'.
d
•d
I d
e
j
d .
°'d
d•
..,
4.
'
e b.
° i
E
d', '
a . I�
9 4
-
•
d
d
a
• j..
d �
C '
�'
.
'' 4':
.. e
<"
..
:
a.a
1 "d
..
..
'.b'
:d.:
4:
p
p.Q
.4
<1i.
.. .
, d
AA 6)
>
<•
..
.<,', :4.
.: A.
.4L
'.
a♦ 4
. -
a
d is
%d
.4
... . 1Q
.
:e
'.d :d
e:•
°'
d+.
• 4'
... .
�
.
UNDERDRAIN COLLECTION SYSTEM
6" PERFORATED PVC PIPE (TYP)
16'
K'F
SECTION
C-03
FILTER BED
SECTION F
SCALE: 1 " = 3'
NOTES:
1. FIBERGLASS GRATING SHALL BE INSTALLED OVER THE INFLUENT STILLING BASIN
AND TRANSFER BASIN TO PROVIDE OPERATOR ACCESS TO FLOW CONTROL
VALVES AND SAMPLE LOCATIONS.
2. PIPE PENETRATIONS THROUGH CONCRETE WALLS WILL BE SEALED WITH GROUT
TO PREVENT LEAKAGE FROM CHAMBER TO CHAMBER.
3. PIPE SUPPORTS WILL BE INSTALLED TO SUPPORT PIPING AND VALVES AS NEEDED.
4. SAFETY RAILING SHALL BE FACE MOUNTED AND REMOVABLE.
UNDERDRAIN COLLECTION SYSTEM
6" PERFORATED PVC PIPE (TYP)
30% DESIGN DRAWINGS
NOT FOR CONSTRUCTION
4 1 5 1 6
0 2 4
SCALE IN FEET
A 1 08.12.20 1 300 DESIGN SUBMITTAL JFH CAS
REV DATE I DESCRIPTION DRN APP
Geosyntec'/ ATRIUM AT BLUE RIDGE
2501 BLUE RIDGE ROAD, SUITE 430
RALEIGH, NC 27607
consultants of NC, P.C. 919.870.0576
TITLE: SEEP C INTERIM REMEDIATION SYSTEM
CONSTRUCTION DETAILS II
PROJECT: THE CHEMOURS COMPANY
SEEP C INTERIM REMEDIATION SYSTEM
SITE:
FAYETTEVILLE WORKS SITE
DESIGN BY: CMDS
DATE: AUGUST 2020
DRAWN BY: JFH
PROJECT NO.: TRO795
CHECKED BY: JWE
FILE: TRO795-0502.dwg
REVIEWED BY: JJD
DRAWING NO.:
C-04
APPROVED BY: CAS
7 1 8
n
L
I�
J
E
F
E
4 7 7 A G 7 O
I L 0 It J V / V
E
4 7 7 A G 7 O
I L 0 It J V / V