HomeMy WebLinkAbout980023_Sludge Survey Extension_20200810ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Neil A. Strother
Strother Swine Farm
7302 Healthy Plains Church Rd
Sims, NC 27880
Dear Neil A. Strother
NORTH CARDi INA
Environmental Quality
August 10, 2020
NC Dept of Environmental Quality
UG 13 2020
Raleigh Regional Off1Ce
Subject: Sludge Survey Testing Dates
Certificate of Coverage No. AWS980023
Strother Swine Farm
Animal Waste Management System
Wilson County
The Division of Water Resources (Division) received your sludge survey information on January
6, 2020. With the survey results, you requested an extension of the sludge survey requirement
for Lagoon 1 and the ISO Lagoon at the Strother Swine Farm facility. Due to the amount of
treatment volume available, and the rate of sludge accumulation for the lagoon, the Division
agrees that a sludge survey is not needed until December 31, 2024 for the ISO Lagoon only.
The next sludge survey for Lagoon 1 at Strother Swine Farm should be performed before
December 31, 2020.
The next sludge survey for the ISO Lagoon at Strother Swine Farm should be performed before
December 31, 2024.
Please retain this letter and keep it with your farm records for reference.
Please call me at (919) 707-3705 if you have any questions.
Sincerely,
Dw Big"by by'2A26EEFFDDM8G
Heath C. Robinson
Animal Feeding Operations Program
cc: Raleigh Regional Office, Water Quality Regional Operations Section
Permit File AWS980023
DQ �� North Carolina Department of Environmental Quality I Division of Water Resources
` 512 North Sallsbury Street , 1636 Mail Service Center . Raleigh. North Carolina 276gg-1636
�...:• __.*n+o\'� g34.7079000