Loading...
HomeMy WebLinkAbout980023_Sludge Survey Extension_20200810ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Neil A. Strother Strother Swine Farm 7302 Healthy Plains Church Rd Sims, NC 27880 Dear Neil A. Strother NORTH CARDi INA Environmental Quality August 10, 2020 NC Dept of Environmental Quality UG 13 2020 Raleigh Regional Off1Ce Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS980023 Strother Swine Farm Animal Waste Management System Wilson County The Division of Water Resources (Division) received your sludge survey information on January 6, 2020. With the survey results, you requested an extension of the sludge survey requirement for Lagoon 1 and the ISO Lagoon at the Strother Swine Farm facility. Due to the amount of treatment volume available, and the rate of sludge accumulation for the lagoon, the Division agrees that a sludge survey is not needed until December 31, 2024 for the ISO Lagoon only. The next sludge survey for Lagoon 1 at Strother Swine Farm should be performed before December 31, 2020. The next sludge survey for the ISO Lagoon at Strother Swine Farm should be performed before December 31, 2024. Please retain this letter and keep it with your farm records for reference. Please call me at (919) 707-3705 if you have any questions. Sincerely, Dw Big"by by'2A26EEFFDDM8G Heath C. Robinson Animal Feeding Operations Program cc: Raleigh Regional Office, Water Quality Regional Operations Section Permit File AWS980023 DQ �� North Carolina Department of Environmental Quality I Division of Water Resources ` 512 North Sallsbury Street , 1636 Mail Service Center . Raleigh. North Carolina 276gg-1636 �...:• __.*n+o\'� g34.7079000