HomeMy WebLinkAbout20070542 Ver 1_Application_20070327~ ~~ ~ v ~ ~~ .~~~. ,l, N, .,_ 9 z? „~f ~~ ~~' STATE OF NORTH CAROLINA ~f~~^y:- DEPAR~ OF TRANSPORTATION ~`""~4.~, MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR SECRETARY March 15, 2007 ~. Mr. David Baker, NCDOT Regulatory Project Manager U.S. Arm Co s of Engineers o ~ r: Y ~ ®~ 151 Patton Avenue, Room 208 Asheville, NC 28801-2714 Subject: Nationwide 14 & 33 Permit Application Hiwassee Dam High School Access Road Cherokee County State Project No.: WBS 41355 (DWQ Minor Permit Fee $200) Dear Mr. Baker: The North Carolina Department of Transportation (NCDOT) is proposing to extend an access road to Hiwassee Dam High School off of NC 294 in Cherokee County. This proposal entails a small section of road on new location to connect to a section, which was completed in the summer of 2006. Funds have been allocated for this project, and NCDOT would like to perform these activities sometime during the 2007 paving season. I am enclosing a PCN application, cross sections, pipe installation details, photographs, as well as a marked county map and USGS quad map. We propose to install a new culverts slightly below the existing streambed elevations where bedrock is not encountered to minimize impacts to aquatic habitats and allow the existing stream gradients to remain as unchanged as physically possible. The best management practices will be used to minimize and control sedimentation and erosion on this project. The construction foreman will review all erosion control measures daily to ensure sedimentation and erosion is being effectively controlled. If the planned devices are not functioning as intended, they will be immediately replaced with better devices. Impacts to historic or cultural resources are not anticipated. If the State Historic Preservation Office (SHPO) and the Office of State Archaeology determines that further Andrews District Office 191 Robbinsville Road, Andrews, N. C. 28901 Phone: (828) 321-4105 Fax: (828) 321-3228 area. In addition, The North Carolina Natural Heritage Database was checked for records of threatened and endangered species. There are no records of listed species for the Thompson Branch watershed. Riparian habitat along Thompson Branch has been impacted from cattle grazing and poor land use practices throughout the watershed. Impacts associated with the culvert installations should be minimal. This project will have "no effect" on threatened and endangered species. Impacts to Waters of the United States In order to construct the project in accordance with our current secondary road standards, it will be necessary to impact waters of the United States in the Hiwassee River Basin. Specifically, NCDOT is requesting to install 40 linear feet of new culvert in Thompson Branch (DWQ Class: C), and extend an existing culvert 201inear feet in an unnamed tributary to Thompson Branch. In addition, we propose to impact a small wetland area (0.009 Acres), comprised of a depression in an old pasture, which is fed by stormwater runoff from the adjacent fire department building and parking lot. Below is a summary of the proposed impacts. Site No. Existing Condition Proposed Condition Net Impacts Station Site 1 45' x 24" CMP 65' x 24" CMP 20' Sta. 12+92 Site 1 A N/A Impervious Dike 5' Sta. 12+92 0.00046 Acres Site 1 B N/A Flow Diversion Pipe 40' Sta. 12+92 Site 2 15' x 25' Wetland Area Wetland Fill 0.009 Acres Sta. 17+50 Site 3 N/A 40' x 137" x 87" CMPA 40' Sta. 17+88 Site 3A N/A Impervious Dike 5' Sta. 17+88 0.0011 Acres Site 3B N/A Flow Diversion Pipe 80' Sta. 17+88 Total Permanent Stream Impact: 60 Feet Total Temporary Impacts, Diversions: 130 Feet Total Temporary Impacts, Dikes: 0.0016 Acres Total Wetland Impact: 0.009 Acres Permits Requested NCDOT is hereby requesting authorization under Section 404 of the Clean Water Act to proceed with the construction project outlined above. By copy of this letter, I am asking Mr. David McHenry, Mountain Region Coordinator, of the North Carolina Wildlife Resources Commission (NCWRC) to comment directly to you concerning the 404 Nationwide Permit request. Also, by copy of this letter, I am requesting authorization under Section 401 of the Clean Water Act from the North Carolina Department of Environment and Natural Resources (DENR), Division of Water Quality (DWQ). In addition, I am asking Mr. McHenry and Mr. Ed Ingle, (NCDOT) to comment directly to me concerning this permit request. If you have any questions or need additional information, please contact me at (828) 321-4105. Your early review and consideration will be greatly appreciated. Sincerely, ~~l ~~~~- Micheal Jones NCDOT Maintenance cc: Mr. John Hennessy, DWQ, DENR, Raleigh (seven copies) Mr. Mike Parker, DWQ, DENR, Asheville Mr. David McHenry, Mountain Region Coordinator, NCWRC, Waynesville Mr. J. B. Setzer, P.E., Division Engineer, NCDOT Mr. Mark Davis, Division Environmental Officer, NCDOT Mr. E. L. Ingle, Roadside Environmental Field Operations Engineer, NCDOT ', ~~~ `off ~~ o~ WAr~~ ~~ ~~~ ~~ Pre-Construction Notification (PCN) Application Form For Section 404 and/or Section 10 Nationwide, Regional and General Permits, Section 401 General Water Quality Certifications, and Riparian Buffer and Watershed Buffer Rules HIWASSEE DAM HIGH SCHOOL ACCESS ROAD ~Ot,yaAi~t ~"fo b„` * ~' O ~' O .a~h ,~Y ~rOF fR AN NCDOT Division 14, District III Prepared by: Michael A. Jones NCDOT Maintenance Division 14, District 3 Page 1 of 10 Office Use Only: Form Version March OS USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) I. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ^ Riparian or Watershed Buffer Rules ^ Section 10 Permit ^ Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ^ Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 14 & 33 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ^ 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ^ II. Applicant Information Owner/Applicant Information Name: North Carolina Department of Transportation Mailing Address: 191 Robbinsville Road Andrews NC 28901 Attn: Michael Jones Telephone Number: 828.321.4105 Fax Number: 828.321.3228 E-mail Address: mjones dot.state.nc.us 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Page 2 of 10 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Hiwassee Dam High School Access Road 2. T.I.P. Project Number or State Project Number (NCDOT Only): WBS: 41355 3. Property Identification Number (Tax PIN): N/A 4. Location County: Cherokee Nearest Town: Murphy Subdivision name (include phase/lot number): N/A Directions to site (include road numbers/names, landmarks, etc.): From Murphy, take US 64 west approximately 7 miles, take right on NC 294 and proceed north for approximately 8.2 miles to project site located on the left 0.10 miles past the entrance to Hiwassee Dam High School (Northwest side of EMS-Fire Station) 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 35.1428 °N 84.2389 °W 6. Property size (acres): N/A 7. Name of nearest receiving body of water: Thompson Branch (DWQ Class: C) 8. River Basin: Hiwassee (Note -this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Open Field (pasture) Page 3 of 10 10. Describe the overall project in detail, including the type of equipment to be used: This project involves cutting and filling earthwork where needed, installation of drainage structures, adding base, pavement, and erosion control devices. Equipment to be used includes track hoes, bulldozers, grader, dump trucks and pumps. 11. Explain the purpose of the proposed work: To complete construction of an emergency access road to Hiwassee Dam High School. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Permits were issued during July 2006 to construct part of the access road. The protect required the placement of 45 linear feet of CMP in an unnamed tributary to Thompson Branch. DWQ Project No. 061037. A USACE permit was not issued for this project. The project was built by default. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. None anticipated. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 4 of 10 1. Provide a written description of the proposed impacts: The project will require the installation of one new culvert totaling 40 linear feet in Thompson Branch, the extension of one existing culvert totaling 20 linear feet in an unnamed tributary to Thompson Branch, as well as 0.009 acres of wetland fill in order to complete the proposed new access road to Hiwassee Dam High School. This road will also serve as access to an adjacent tract of property, which is owned by Cherokee County which is proposed to be devel~ed as a park/recreation facility in the future. 2. Individually list wetland impacts. Types of impacts include, but. are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain es/no Distance to Nearest Stream linear feet Area of Impact (acres) Site 2 Sta. 17+50 Wetland Fill Herbaceous No 30' 0.009 Total Wetland Impact (acres) 0.009 3. List the total acreage (estimated) of all existing wetlands on the property: 0.009 Acres *This area is a depression in a field, which is fed by stormwater from the adjacent EMS -Fire Department building and parking lot. It has wetland plant species and soils, but hydrology may be suspect. The area is approximately 15' x 25'. 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Number indicate on ma Stream Name Type of Impact Perennial or Intermittent? Average Stream Width Before Im act Impact Length linear feet Area of Impact acres Site 1 Sta. 12+92 UT to Thompson Br. Culvert P 2' 20' 0.0009 Site lA Sta. 12+92 UT to Thompson Br. Temp. Dike P 2' S' 0.0002 Site 1B Sta. 12+92 UT to Thompson Br. Diversion Pipe P 2' 40' N/A Site 3 Sta. 17+88 Thompson Branch Culvert P 12' 40' 0.011 Site 3A Sta. 17+88 Thompson Branch Temp. Dike P 12' S' 0.0013 Site 3B Sta. 17+88 Thompson Branch Diversion Pipe P 12' 80' N/A Total Permanent Stream Impacts (by length and acreage) 60' 0.0119 Total Temporary Stream Impacts (by length and acreage) 130' 0.0015 Page 5 of 10 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredQin~, floodinc, drainase, bulkheads. etc. Open Water Impact Site Number indicate on ma Name of Waterbody (if applicable) T e of Im act ~ p Type of Waterbody lake and estua ( > p ry, sound, bay, ocean, etc. Area of Impact (acres N/A N/A N/A N/A N/A Total Open Water Impact (acres) N/A 6. List the cumulative impact to all Waters of the U.S. resulting from the proiect: Stream Im act (acres): Permanent (601inear feet) 0.0119 Stream Im act (acres): Tem ora (10 linear feet) 0.0015 Wetland Im act (acres): 0.0090 O en Water Im act acres): 0.0000 Total Im act to Waters of the U.S. (acres) 0.0224 Total Stream Im act (linear feet): Permanent 60' Total Stream Im act (linear feet): Tem ora 130' 7. Isolated Waters Do any isolated waters exist on the property? ^ Yes ®No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 8. Pond Creation N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts Page 6 of 10 were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Original roadway features were not designed to accommodate school traffic including cars and buses. Impacts (pipe len hs, etc.) were minimized to the maximum extent practical to construct the new road to current NCDOT secondary road standards. Pipes will be installed sli hg_tly below the existing streambed elevation to provide aquatic life passage during_periods of low flow. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that maybe appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina (see DWQ website for most current version.). Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. If mitigation is required for this protect, NCDOT will make payment to the NCEEP. Page 7 of 10 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://www.nceep.net/pages/inlieure~place.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): 60' Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount ofNon-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ^ 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ^ No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^ X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ^ No Page 8 of 10 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. N/A * Impact Required Zone ,_______ r__~~ Multiplier ,,,~,~,__,:__ 1 3 (2 for Catawba) 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss Stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. The area consists of partial existing impervious surface and undisturbed ground. The impervious roadwaysurface will be approximately 30% of the construction limit. Stormwater will be diverted through settling basins lined with filtering stone or grassed lined buffer areas prior to entering.any surface water. (See erosion control plan) XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ^ No Is this anafter-the-fact permit application? Yes ^ No Page 9 of 10 XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ^ No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). N/A Applicant/Agent's Sign~e Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 I~ i~ ~ _ ~ u W Ix ~ " - ~ ICE Im I~ l ~' ~ t _ P I~ P = S~ a I~ V i~ ~ Ib9 ~ _ I~ ~ ~ ~ \ it 1 . V ~ } ~ ~ \ - ~ 1 ~ ~ - . 0 1 ? N ~ -w, I ~ ~ / W J _ u ~ 1 ~ ~ v ~.' IW / ~ ~ '~` ~ i _ ; z g p ,.,., ~~ 3 , ICE .~ ~ ~ -., . i ~ -~' K13' B r. ?s. m ~' - r J ~ _ i" IP 4r ^b.,-..~~ yO VI VI ~, ~ '~ •~ _ nod . Z i' ~. "~ .,o n C . ' ~ ~ ~ ~ 1 \~ f~ yy Y V ~ /.. .< ~ ~~ I~ : ` ~ •~ I~ ~ ~ m o m . P _ IS y _ < m ~ ~ I~ z ~ u IW ~ ~' ~ - _ ~, _ / Z 1 I t_ 5~ o •A IW q• lu _IX Ki 1 ~ -.-_._ y _ ~,~ ~~~ - ~ • ~ I'W i ~•~ •. ~ - I~ . '~~ ~ y ~ ' rn ~~ r I ^' \ ~ - ~'~'~ \ m / ~ - ~ Y '. . S ~ \ / 4~ \ n o ~ V gyp'' '~ ' ~yy~ . ~ ~ I~ oZ .~._.~ i i D $ Q _ ` ~ ~ I l I~ ~ i %t~ ~ I u'ar _ , AI / ,~ \ .-) ~ ' ~ -Q A ~ ~. i / Q~'' - \ ~ laso~ -~ ~ y[~ I .2 4 p0 ~ ~ U'. ~ ~a ( ~ A ~I COUNTY:__ G~EROKEE GpS: 35 ° 05 ~ 27 ~~ ?~_ SR. N0. SC'HOOT Rn ~ , ~- NA~E:HIWASSEE` DAM SCHOO L 83 ° 14 49 „ PUMP N. STATI PIPE STA'. N~A SITE 2~0 . ~ 1 ' ~. PRO - - PROPOSED Rn. ~"_`_ ' ~ PIPE <. ~ ~~ ~'p J ~ CHECK ~ ~ -} ~$+ EXIST. ~' DAMS 45'X.24" ~ ~ `~ ~ j', HIGH SCHOOL f RIP RAP ~ ~' '. ~! ~ ~ ~ t 1 ~ S.F. w ~ ---3~~ R . 8 . I J}~ ~~ SILT BASIN,~~ TYPE B f' , ~ ~X~X2 r ; 1 , r F .~...,.._ _ ..... ._ . ~ ~ ~ ~. r EXIST. CMP - - - - - - - - -. I ~ I l ~~~ l i l L I I l l ~ l I _ I ~i ' r i _-; 1 M~ 1 ~ i ~ ~ l l l ~ i ~ i, i~ _i I i 1 I I I i i I I I 1 I I#~ I i"-1-I~ I I~ I f i I ~ I I I I' I 11 I 1 1 I I I ~ l t l I l l i I I I l i I I I 1 1 1 1 1 1 X 1 1 I I I I I F I t I 1~1 L I J _ _ _( _ _ _j _ _ 1 I I f_ 1 I T-I~ I I ' I 1-~- I I I I I I ~ I _ I I I I I i t I I 1 1 I I 1 1 I 1 I I I I I I I I ' I III I ~ - - - - - - = ^ I I I I I I I I i _ I- _ _ - -_ _ - - _ I _I i i I _ _ _ _ _' _ ~ - I I I I I I - -}- - _ - _ - - _ - - _ - - - - ~ --~- - - - ~~ T- ~j I I ~ . - - i I I _ ~- - - - I I - - -- - - - - - - ~ - I - I I - _ - _ - T _ I ~ - - I - - -- - - - -f- - - - - - - - - - - - - -- - - - - -- - - - _ ~ - ~ 1 - - - - _ I - ._ '' I - _ ._ - , ~ µ~ -- ~ - _ - - _ _ fi+ " -.. ~ ~ _ _ L 1 Z - - - A - - L ~ I I I ~ I 7 I - - ~ : - ., I I I I I I , - - I I I I I I I I I I I I I _ I I I I I I I I I I I I I I I I ~ I I I I I 1 1 1 1 1 1' 1 I I 1- I - 4~ I i l l I I 1 I I I I I I I I ' I I I I I I I I 1 1 '~~ 1 1 1 1 1 1 1 I. 1 1 1 1 1 1 ~ 1 i~, I ~ I ~. ~ I i I I I I I I I I i I ~ ~~ COUNTY:^ __ ('HER~KFE GPS: 35 ° 08 SR. NO_ N/A RD. NAME:~~~Tacc~~ nAtVt ~r'S F.D. $4 ~ 13 PIPE STA•. 17+88.1 SITE No. NEW CL ~ TEMP.SILT FENCE ~ ROCK BERM ~ PROP. CONC. HEADWALL ~ i E ~ T.S.F. & R.B. f ~ ~ 34 11 ~_ .. 40 N- ' '~ ~O~ ~ ~~ T . S . F . & R .13 . PROP. CONC. ENDWALL TE. .NO EXLST.PIPE PROP. ADD 40'X 90" ARCH CMP. TO U.S.-64 WEST N. C.-294 TO DUCKTOWN TENN. 1 1 1 1 1 1 1 1 I I 1 1 1 1 1 1 I I - I I I I t 1 1 1 1 1 1 I ~ I I I I 1 1 1 1 1 1 1 I I I 1 1 1 1 1 1 1 I I I I I I ~ I l I I l i 1 1 1 1 1 1 I I ' I I I i l l i l i l l ~Y 1 1 I d I 1 1 1 1 I _ _~ _ I_ I I i ~' I I 1 1 I I I I 1 I I I I I I .T t •I 1 1 I I I I 1 I 1 1 I I I I I I I I I _ _ _ I I r I I 1 I I I 1 I I 1 I I ' I I I III I i I I I I I I I I i I - - 1 - 1 _ - - _I I - I _ ' _ I _ I I I I I I I I - - - - - _ I I - - i I I I - I - I I - - - I I - _ I i I _ I - - I I I ~ 1 I - --r - - - - I 1 _ I I I I I I 1 1 I I I I I I I I I I 1 1 1 1 1 1 I 1 I 1 I I ' I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 I I I I I I~ I I 1 1 1 1 1 1 ~, 1 I I I I I I ; I i l l i 1 1 I 1 1 1 1 1 ~~ ~--~ • ,~ 0 0 U C/] Q CCU . ,..~ ^~~ ~L/ ~~ `~~ O ~--~ r--~ I--1 r ^^ ~L/ U U 0 0 v cn Q N N c~ . ,_., M • ,~, N 4.~ .,~ _II i -~~ ~ J .. 1 ~ p iTl / ~l P ~ i ~ \. _ ill ,^dl _ ~ , . : ss.n m a / l / e , O ~ p i l ... , . \ ~ ~ / \ \ ~ \ \ ~ ~ ~ 4 1 .. ~l ~ ® ~l l ~ ~1 ,1 ~\ , ~l. .e~ \ l:e Z..~ ~~~.. 1 +n m l • v ~ ~~ _ 1~ •` .I L ~ v ~~ \ ~\ ~ ~. O P \ \ J I~~ / n ~ O / \ /--/ ~ /\ ~ ' .. f Q' ~ / ~ / 2 a • \ _ 1 ~, ~ ~ I / I /,. ~ / a ,~ ~ ~ .oo as M ~ l ~ ~ ~ ' \ ~,y, ~ C f~J ^ / \ ,g ~ S ~ d \ / n = / a ~ ~ ^i _ ~~ l s ~ \ '4 ~ - ,Y ¢ ' \ i ~ ~ tip-.' ~ . i ~, :~ - ~ _ ~" ~ " _ /.. ~ \ •\ ~ ~ = l / ICI ~ ~~ •. E.~ ~l \, o A ', ~ , g xx p l n , 6 '_ I ~ N / _ 9.r F ' H r • ~l M Cr: o Ml q ~ a ~ ,~~ ~ _ '- a ,_ ' , l e c ~ ~• ~ ,- _ ~ a .J- ~ /~ .l a ~~ \ ~i ~ ~ .. ~ V ~ ' ~ FC ~ a m w ~I i ~ , r gb. j ° .~ /. , W m ~•+ ~ ~ ~ / ~_ .\ c, _ p ~ ~. ail a ;~; ~ 0 g ,p n $ ,-, / ~ ~ ~ 8 ~ (\ l ~. O ~J IZ V ^ a ; -Y ~\, ~ \ ~'S ~ f ` ~, ~ f ,,~,, 9 ~. I ~ 2 ~ / ~ ~ ` m , , -Cr_~, 1 ~ ~ . ~ ,~ 1 ~ ti, , ~~, _ A~,o \ l ~ t ~ J ' p; 1 ~ ~- ~ _{ •~ rv - .i= _ ~ W W ~ H ~ "s L .. .o . , M n c i ~ - J Cn C/1 O ~l 7 HUx W ~ -'- p "~ L F. / ~ SN ~~ ¢ ~ ~, ~ 1 i \ ,s13Y /•~~. ~ _, . > ~ ~~~ ~ ~ \ , ~ / ~~ ~~\ r I Q \ ~ h ~ _ /, ~l ^ 9 ^ pal al ~ ~ ~ ~l ~ ~ ~ ~ ~l ~ ~ ~ ~l ~ f f ~' m ti \ ~ l ~ ~ .3l ^ ~ ~ Rl vl ~ ~ ~ ~ h ~l ~ " ~ ~ / \ ~ Q~ ~(( ~ / 4 ~ S .. 15+PJPJ - 15+ (~PJ 2.5% ~ i i 14.50 i i -~- 14.50 CHECK DAMS SPACED AS REQUIRED i ~ i i i 14.00 i -+- i i i i 14.00 3.5 i i i i + .50 - TEMPORARY SILT FENCE i TEMPORARY SILT FENCE WITH ROCK BERM i i i i WITH ROCK BERM i 0 SITE 1. STA: 12.92 - - --=='- EXTEND 24' CMP 20' i 20X6X2 TYPE B V ~ 15X6X2 TYPE B TEMPORARY ROCK ~ TEMPORARY ROCK SEDIMENT DAM 12.5 -r- ~ 12.50 SEDIMENT DAM 2% i i i TEMPORARY SILT FENCE ~ WITH ROCK BERM i TEMPORARY SILT FENCE , WITH ROCK BERM ~ 12.00 T i i 12.00 CHECK DAMS SPACED AS REQUIRED i ~ i i 11.50 i T i i i i i 11.50 BEGIN PROJECT i BEGIN PROJECT STAB 11.08.90 11.00 ~ i i i i i 11.00 STA: 11.08.90 0.50 i i i -i- i 0.50 W t i i i HIWASSEE DAM HIGH SCHOOL i i HIWASSEE DAM HIGH SCHOOL 1(~+~QJ ~ 1~+ (~~ ~~ erosion control plan.dgn 03/23/2007 10:28:17 AM E-- TO DUCKTOWN TENN. NC 294 TO US - 64 WEST ~ ----------------------------------------------------------------------- END OF PROJECT END OF PROJECT STA.: 18.47.32 STA.. 18.47.32 8X3X2 TYPE B i 8X3X2 TYPE B TEMPORARY ROCK ~ ~ ~ TEMPORARY ROCK SEDIMENT DAM i SEDIMENT DAM 3% TEMPORARY SILT FENC i TEMPORARY SILT FENCE SITE 3. STAB 17.88 ADD 40'X137'X87' CMAP --J -- ~ ~ TEMPORARY SILT FENCE 17• SITE 2 WETLAND FILL -.009 ACRES 17.00 16.50 2.5% ~I 16.00 16X6X2 TYPE B ~ SILT BASIN 15.50 15+~~ i 31X6X2 TYPE B T 0 TEMPORARY ROCK ~ SEDIMENT DAM i i i i i -t- ~ 17.00 i i TEMPORARY SILT FENCE ~ WITH ROCK BERM i i i i 16.50 i i ~ CHECK DAMS SPACED AS REQUIRED i i i i ~ 16.00 i i i ~ TEMPORARY SILT FENCE i i WITH ROCK BERM i i -~- 15.50 i i i i i i erosion control plan.dgn 03/23/2007 10:31:05 AM a~ ~ ~ o . ~ ~ m ~ ~ N N r~ N ~ ~ ~ ~ 'i3 C ~ ~ ~ (~ O ~ O C ~ .~ O ~ d ~ ~ O a... N ~ ~ ~ Rf O ~ N .-. ~ 3•~~ .. O ov ~ r. ~ .+ L ~ ~ L ~ ~ N " O N *~ OC c ~ OC N ~ ~ ~ N ~ ' ~ O ' ~ O a ~ a? ~ ~ ~ O .C a ~ ~~~ -a -- c°a~i a~i~ ~J C RSJ O ~ O II O = O~ ~ II n ON u~ Rf ~~N X O ~ O ~ ~ X ~ O O i ~ O N +' ~ O O N C ~ N ~ ~ N to ~ _ ~¢ N ~`. ~ ~a O ~ Y 0 O O Z U O ~ ~ N >, ~ C0 -p +~ Q rt+ ~ ~ ~y ~ U ~ a ~ ~ ~ M a~ W d 'a M M CO ~ Cfl M N ~ tMA In 01 d N T T M L ~ ~ N C V ea f~ tc") ~fi O N N ~ o o o .- o o ~ o o o o o 0 Q RS ~y 0 0 0 0 ~ ~? ~ ~ M M N X 0 0 Q '~ O D N . - N N ~ ~ t "r N N O O M M ~ O d' ~ O ~ f~ J r r r- M d' d' d d ~~ ° : . ra N ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ s ~ O J ~ N J ~ O J d J N N O M M T r pp pp O O O O O O O O O ~ + ~ N _ ~ O O r T T T T T d ~ ~C `1 ~C ~C Y ~C d U c>s U c>s U c~ U c>s U c~ U c~ E 1= - f ~ ~ ~ ~ F- _' _~ xx W - -~x( W ~ ~yy W -yy W ~~ 3 3 3 3 3 3 ~ ~ ~ ~ ~ ~ .-. V ~ O C« X 0 Ln 0 O 0 O 0 O 0 O * '~j ~ r M M M M ~+ ~ Q c d ~~ o a a ~ o o N N M M M M ~~ a t ~ -~ ~ ~ s ~ J ~ J ~ J J N ~ O O INO M y T T r r W CO ~ p ~ p O r r ~p O O O O O T T r r T N N N C O N N Y v m L U .N O .i p 4~-~ N N N L C t ~_ X X w. a m O c .~ (~ CO X y 'a ~ V C m ~ X = W L ,_ » ~ C ~ J ~ O J m ~ X .N «S W m O W ~ m ... v. II ~ C ~ O ~ iC'C _U O O U y O ~ ~ (~~ L ;; O V Cn y O ~~ (0 m = m i~ U (LS U m ~ M ~ G O ~' O d0 N O N I~ ~ ~) ., y ,., O `~- N r r M O O C . ~ (~ m .p N OM Z < 00 M f0 I~ t0 OD N f~ ~ ~ - ~- N T T C9 p .=. ~~ N N NI N N NI O. O v ~ co co co col ~ d'I t 'a M~ ~ "- O ~n co T o0 001 ~ N T r- M C J N C . N M(d W T T T T TI TI p N O M M ~ ~ ~ ~ ~ c~ cj r + / ' O T O ~ T O T O T T (lS 0 0 0 0 O O ~ ~ ~ ~ ~ O O _ T T r T~ 00 T CO T