Loading...
HomeMy WebLinkAbout20190230 Ver 3_More Information Received_20200812 Staff Review Form NORFH CA.,i0:INA En vironmenfrr!QvoGry Updated April 10,2018 Staff Review Does this application have all the attachments needed to accept it into the review process?* 6. Yes r No ID#* Version* 3 20190230 Is this project a public transportation project?* (' Yes r No Is this a DOT ( Yes C No project?* Reviewer List:* Garcy Ward:eads\gpward Select Reviewing Office:* Washington Regional Office-(252)946-6481 Does this project require a request for payment to be sent?* Yes r No Project Submittal Form Please note:fields marked with a red asterisk *below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type:* r New Project r New Projectw Existing ID ✓ Pre-Application Submittal 6* More Information Response r Other Agency Comments r Stream or Buffer Appeal ✓ For the Record Only(Courtesy Copy) Is this supplemental information that needs to be sent to the Corps?* Yes r No New Project-Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre-Application Submittal-Please check the pre-application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response -Please check this type if you are responding to a request for information from staff and you have and ID#and version for this response. Other Agency Comments-Please check this if you are submitting comments on an existing project. Project Contact Information Name: Paul Williams Who is submitting the inforrration? Email Address: pcwilliams2@ncdot.gov Project Information Existing ID#: Existing Version: 20190230 3 20170001(no dashes) 1 Project Name: US 158 Widening/Improvements(R-2582A) Is this a public transportation project? r Yes ✓ No Is the project located within a NC DCM Area of Environmental Concern (AEC)? ✓ Yes r No r Unknown TIP#: WBS#: R-2582A 34472. 1.4 (Applies to DOT projects only) County(ies) Northampton Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document Site 8 from R2582A_Permit Drawings.pdf 517.59KB Only pdf or krrz files are accepted. Describe the attachments or comments: Due to the permitted realignment of the stream at Site 8 on the R-2582A project,additional riprap will be needed to provide bank stabilization downstream of the culvert replacement.Approximately 30 linear feet of Class B stone or larger will be placed on both sides of the stream,extending the bank stabilization to the ROW line.All as shown on the attached revised drawing. Stone will be placed on the streambanks and not in the stream, impacting no additional surface waters. Sign and Submit fJ By checking the box and signing box below, I certify that: o I have given true,accurate, and complete information on this form; o I agree that submission of this form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit the online form." Signature: cST.rcalCJ=Witld l f llrRm r.r'f. Submittal Date: Is filled in autorratically.