HomeMy WebLinkAbout20190230 Ver 3_More Information Received_20200812 Staff Review Form
NORFH CA.,i0:INA
En vironmenfrr!QvoGry
Updated April 10,2018
Staff Review
Does this application have all the attachments needed to accept it into the review process?*
6. Yes r No
ID#* Version* 3
20190230
Is this project a public transportation project?* (' Yes
r No
Is this a DOT ( Yes C No
project?*
Reviewer List:* Garcy Ward:eads\gpward
Select Reviewing Office:* Washington Regional Office-(252)946-6481
Does this project require a request for payment to be sent?*
Yes
r
No
Project Submittal Form
Please note:fields marked with a red asterisk *below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type:* r New Project r New Projectw Existing ID
✓ Pre-Application Submittal 6* More Information Response
r Other Agency Comments r Stream or Buffer Appeal
✓ For the Record Only(Courtesy
Copy)
Is this supplemental information that needs to be sent to the Corps?*
Yes r No
New Project-Please check the new project type if you are trying to submit a new project that needs an official approval
decision.
Pre-Application Submittal-Please check the pre-application submittal if you just want feedback on your submittal and
do not have the expectation that your submittal will be considered a complete application requiring a formal decision.
More Information Response -Please check this type if you are responding to a request for information from staff and
you have and ID#and version for this response.
Other Agency Comments-Please check this if you are submitting comments on an existing project.
Project Contact Information
Name: Paul Williams
Who is submitting the inforrration?
Email Address: pcwilliams2@ncdot.gov
Project Information
Existing ID#: Existing Version:
20190230 3
20170001(no dashes) 1
Project Name: US 158 Widening/Improvements(R-2582A)
Is this a public transportation project?
r Yes
✓ No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
✓ Yes r No r Unknown
TIP#: WBS#:
R-2582A 34472. 1.4
(Applies to DOT projects only)
County(ies)
Northampton
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach document
Site 8 from R2582A_Permit Drawings.pdf 517.59KB
Only pdf or krrz files are accepted.
Describe the attachments
or comments:
Due to the permitted realignment of the stream at Site 8 on the R-2582A project,additional riprap will be
needed to provide bank stabilization downstream of the culvert replacement.Approximately 30 linear feet of
Class B stone or larger will be placed on both sides of the stream,extending the bank stabilization to the
ROW line.All as shown on the attached revised drawing. Stone will be placed on the streambanks and not in
the stream, impacting no additional surface waters.
Sign and Submit
fJ By checking the box and signing box below, I certify that:
o I have given true,accurate, and complete information on this form;
o I agree that submission of this form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the
"Uniform Electronic Transactions Act")
o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes
(the"Uniform Electronic Transactions Act");
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature;AND
o I intend to electronically sign and submit the online form."
Signature:
cST.rcalCJ=Witld l f llrRm r.r'f.
Submittal Date: Is filled in autorratically.