Loading...
HomeMy WebLinkAbout20201038 Ver 1_401 Application_20200806 1 I DWR Division of Water Resources Pre-Construction Notification (PCN) Form April 11,2020 Ver 3.1 Initial Review Has this project met the requirements for acceptance in to the review process?* 6 Yes ✓ No Is this project a public transportation project?* 0 Yes r No Change only if needed. BIMS#Assigned* Version#* 20201038 1 Is a payment required for this project?* ✓ No payment required G Fee received Reviewing Office* ✓ Fee needed-send electronic notification Central Office-(919)707-9000 Select Project Reviewer* Rob Ridings:eads\rgridings Information for Initial Review 1a.Name of project: Broadband along 1-95(VA state line to SC state line)(1-5986C-Central) 1a.Who is the Primary Contact?* NCDOT lb.Primary Contact Email:* 1c.Primary Contact Phone:* jldilday@ncdot.gov (919)707-6111 Date Submitted 8/6/2020 Nearest Body of Water Roanoke River,Tar River,Neuse River,Cape Fear River Basin Chowan;Roanoke;Tar-Pamlico;Neuse;Cape Fear;Lumber Water Classification B,C,Sw,WS-Ill,WS-IV,WS-V,NSW,CA, Site Coordinates Latitude: Longitude: 35.913242 -77.919271 A. Processing Information County(or Counties)where the project is located: Northampton Halifax Nash Wilson Johnston Harnett Cumberland Robeson Is this a NCDMS Project r Yes r No Is this project a public transportation project?* G Yes r No Is this a NCDOT Project?* G Yes r No (NCDOT only)T.I.P.or state project number: I-5986C WBS#0) 47532.1.1 la.Type(s)of approval sought from the Corps: f7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) 17 Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) lb.What type(s)of permit(s)do you wish to seek authorization? f7 Nationwide Permit(NWP) ✓Regional General Permit(RGP) ✓Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? • Yes r No Nationwide Permit(NWP)Number: 12-Utility Lines NWP Numbers(for multiple NWPS): Id.Type(s)of approval sought from the DWR: 17 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: r Yes 6 No For the record only for Corps Permit: r Yes 6 No If.Is this an after-the-fact permit application?* ✓ Yes f No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes ( No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes rNo Acceptance Letter Attachment lh.Is the project located in any of NC's twenty coastal counties? ✓ Yes ( No 1j.Is the project located in a designated trout watershed? ✓ Yes r No B. Applicant Information Id.Who is applying for the permit? (7 Owner r Applicant(other than owner) le.Is there an Agent/Consultant for this project?* ✓ Yes allo 2.Owner Information 2a.Name(s)on recorded deed: NCDOT 2b.Deed book and page no.: 2c.Responsible party: 2d.Address Street Address 1000 Birch Ridge Drive Address Line 2 Criy State/Province/legion Raleigh NC Postal/Zip Code Country 27604 USA 2e.Telephone Number: 2f.Fax Number: (919)707-6000 2g.Email Address:* pharris@ncdot.gov C. Project Information and Prior Project History 1. Project Information lb.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Rocky Mount 2. Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 atY State/Rovince/legion Postal/Zip axle Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Roanoke River,Tar River,Neuse River,Cape Fear River 3b.Water Resources Classification of nearest receiving water:* B,C,Sw,WS-Ill,WS-IV,WS-V,NSW,CA, 3c. What river basin(s)is your project located in?* Chowan Roanoke Tar-Pamlico Neuse Cape Fear Lumber 3d.Please provide the 12-digit HUC in which the project is located. 030101070102,030101070103,030101070104,030102040704,030102040705,030201010504, 030201010605,030201010606,030201010607,030201010801,030201010803,030201010901, 030201010902,030201020401,030201020402,030201020404,030201020501,030201020502, 030201020503,030202011105,030202011203,030202011301,030202011302,030202011601, 030202011602,030202011701,030202011702,030202011703,030202030301,030202030303, 030202030401,030202030402,030300040611,030300040701,030300040705,030300040707, 030300060102,030300060103,030300060104,030300060105,030402030401,030402030602, 030402030604,030402030605,030402030701,030402031001,030402031003,030402031201, 030402031202,030402031203,030402040503 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Land use in the project vicinity is predominately maintained highway and right of way.Adjacent land use consists of forested,agricultural,residential,and commercial properties. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* r Yes F' Nor Unknown 4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR) 4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR) 4f.List the total estimated acreage of all existing wetlands on the property: 1.0 4g.List the total estimated linear feet of all existing streams on the property: 1000 4h.Explain the purpose of the proposed project:* Installation of conduit containing broadband fiber will be coupled with microcell towers and Intelligent Transportation Systems(ITS)equipment to provide variable message signs along I- 95 and to implement integrated corridor management. Additionally,installation of conduit maximizes the innovative contracting opportunities that can arise from allowing private sector to have access to the trunk line.Implementation will provide high speed internet access to under served communities closing the internet service gap between urban and rural households in eastern North Carolina. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The North Carolina Department of Transportation(NCDOT)proposes to install broadband fiber along the 1-95 from the Virginia state line to the South Carolina state line.The conduit used for the project will be installed entirely within the existing NCDOT right of way.Anticipated equipment to be used includes dump trucks,plows,dozers,trenchers,backhoes,and boring equipment. 4j.Please upload project drawings for the proposed project. 1-5986C 1-95 Drawing Package No Aerial.pdf 48.97MB 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* 6 Yes r No r Unknown Comments: field visits of corridor were conducted on 7/2 and 7/14 5b.If the Corps made a jurisdictional determination,what type of determination was made?* 6 Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Morgan Weatherford&others for previous delineations Agency/Consultant Company: NCDOT Other: 5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR Wetlands along the corridor were determined from a combination of previously delineated projects and model generated predictions.Ground truthing was conducted by RK&K to determine accuracy of the model predicted wetlands.A review of the wetlands was conducted with the USACE on July 2 and 14,2020.Data forms,mapping and waters upload submitted to USACE previously. 5d1.Jurisdictional determination upload 6. Future Project Plans 6a.Is this a phased project?* r Yes (7 No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la.Where are the impacts associated with your project?(check all that apply): fJ Wetlands 1 Streams-tributaries C Buffers r Open Waters 1 Pond Construction 2.Wetland Impacts 2a.Site#*(?) 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W.* 2d.W.name* 2e.Forested* 2f.Type of 2g.Impact Jurisdicition*(?) area* 1 Clearing and Grubbing T Unknown Multiple Yes Corps 0.244 (acres) 2 Trenching T Unknown Multiple No Corps 0.590 (acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.834 0.000 2g.Total Wetland Impact 0.834 2h.Comments: Impacts were estimated to have a 10 foot width in areas of clearing and grubbing.Areas of trenching were assumed to be 1 foot wide.See attached table(misc.section) E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: All work will occur within the existing NCDOT right of way.There will be no impacts to jurisdictional streams.When streams are encountered along corridor,conduit will either be attached to the existing structure or directionally bored under the stream.All wetlands with a length of 50 feet or greater will be directionally bored,resulting in no impact. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Where applicable,NCDOT"Design Standards in Sensitive Watersheds"will be adhered to.Once installed,the fiber optic lines will not require maintenance and the areas will be allowed to revert to the pre-installation state. 2. Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? ✓ Yes rNo 2b.If this project DOES NOT require Compensatory Mitigation,explain why: All impacts are considered temporary and do not require mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) u 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ( Yes rNo What type of SCM are you providing? n Level Spreader n Vegetated Conveyance(lower SHWT) r Wetland Swale(higher SHWT) r Other SCM that removes minimum 30%nitrogen I7 Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* ✓ Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* ( Yes rNo lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* ( Yes rNo 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* ✓ Yes ( No Comments:* Categorical Exclusions do not require submission to the State Clearing House. 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* r Yes 6' No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes f No 3b.If you answered"no,"provide a short narrative description. Due to broadband installation,this project will neither influence nearby land uses nor stimulate growth.Therefore,a detailed indirect or cumulative effects study will not be necessary. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes r No 6 N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* 6 Yes rNo 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* 6 Yes rNo 5c.If yes,indicate the USFWS Field Office you have contacted. Raleigh 5d.Is another Federal agency involved?* ✓ Yes F No r Unknown 5e.Is this a DOT project located within Division's 1-8? 6 Yes r No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? N.C.Natural Heritage Program database;USFWS-Raleigh Field Office website;biological surveys for protected species listed for the listed counties along the corridor.Concurrence from the USFWS was received on June 25,2020 for listed species. Consultation Documentation Upload 20200625_Itr_USFWS_NCDOT_I-5986C_R-5777D.pdf 180.38KB 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* rYes ( No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMFS county index 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* r Yes ( No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* NEPA documentation.Though several sites near the project are eligible for the NRHP,there should be no impacts as long as the fiber optic line remains within the existing DOT right of way. 7c.Historic or Prehistoric Information Upload 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* ( Yes r No 8b.If yes,explain how project meets FEMArequirements: 8c.What source(s)did you use to make the floodplain determination?* Crossing of multiple perennial waters Miscellaneous Comments Miscellaneous attachments not previously requested. 195June9_flag50huc8_stats.pdf 3.83KB Signature ®By checking the box and signing below,I certify that: • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a mitten signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Mack Christopher Rivenbark,III Signature 11fe¢C. diRi 4 M4,III Date 8/6/2020