Loading...
HomeMy WebLinkAboutNCG030063_March DMR_20200407 (2) I, ,I ,I "PIP Industrial Connections&Solutions LLC BUSINESS AREA Industrial Solutions 6801 Industrial Drive FROM Natalie L.Stennis,MS, FE Mebane,North Carolina 27302 PHONE DIRECT 919-563-7521 USA MOBILE DIRECT 336-554-4140 E-MAIL Natalie.stennis@us.abb.com CERTIFIED MAIL 7019 0700 0000 2723 5737 REr JEIVE April 7, 2020 APR 2 0 2020 NC DEQ/Division of Water Resources CENTRAL Attention: Central Files OWR FIIES 1617 Mail Service Center SECTION Raleigh,North Carolina 27699-1617 Re: NPDES Stormwater Permit Coverage Renewal COC#NCG030063 Industrial Connections& Solutions LLC—Stormwater General Permit NCG030000 Dear Sir or Madam: In accordance with our NPDES Stormwater Permit, Industrial Connections& Solutions LLC is notifying the Division of Energy,Mineral,and Land Resources(DEMLR)of benchmark value exceedance for Out- falls SDO-1, SDO-2, SDO-3 & SDO-6 for copper. We will continue to conduct monthly sampling while looking for solutions to the continuous benchmark exceedances. The following documents are enclosed: 1. Stormwater Discharge Monitoring Report 2. Lab Results from Sampling(Meritech,Inc.) 3. Qualitative Monitoring Reports(SDOs)—Blue Ridge Geological Services,Inc. If you have any questions about this report,please contact me at(919)563-7521. Sincerely, Natalie L. Stennis,MS,FE Lead HSE&S Specialist Attachments Industrial Solutions 6801 Industrial Drive Mebane,NC 27302 USA www.abb.com 1/1 Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted April 7,2020 CERTIFICATE OF COVERAGE NO. NCGO3 0 0 6 3 SAMPLE COLLECTION YEAR 2020 FACILITY NAME Industrial Connections&Solutions LLC SAMPLE PERIOD ❑Jan-June ❑July-Dec COUNTY Orange or 0 Monthly' (month) PERSON COLLECTING SAMPLES Jeff Gerlock DISCHARGING TO CLASS nORW fHQW I 'Trout PNA LABORATORY Meritech,Inc Lab Cert.# 165 I Zero-flow Water Supply , SA Comments on sample collection or analysis: nOther Measurable Rainfall Event PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -3 Part A: Stormwater Benchmarks and Monitoring Results _ No discharge this period?' Non-Polar O&G/ Date Sample 24-hour rainfall pH, Total Toxic Outfall No. Collected) amount, Total Suspended Solids Standard units Total Copper Total Lead Total Zinc Total Petroleum Organics (mo/dd/yr) Inches3 Hydrocarbons Benchmarks - - 100 mg/L or 50 mg/L4 6.0—9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code 46529 C0530 00400 01119 01051 01094 00552 78141 SDO-1 03/23/20 0.45 41 7.40 0.011 <0.010 0.104 <5 - SDO-2 03/23/20 0.45 24 7.31 0.011 <0.010 0.081 <5 - SDO-3 03/23/20 0.45 32 7.51 0.012 <0.010 0.109 <5 - SDO-6 03/23/20 0.45 12 7.19 0.011 <0.010 0.055 <5 - SDO-7 03/23/20 0.45 30 7.00 0.009 <0.010 0.035 <5 - ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. °See General Permit, Section B,Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Dominic A. Pitocco, Jr. Name(Print name) Plant Manager Title(Print title) (1/7/ Signature / Date Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non-detect, ND, or other similar non-numerical format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L",where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. I I No discharge this period?2 Outfall No. Date Sample Collected' 24-hour rainfall amount, New Motor Oil or Non-Polar O&G/Total Total Suspended (mo/dd/yr) Inches3 Hydraulic Oil Usage Petroleum Hydrocarbons Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L4 Parameter Code - 46529 NCOIL 00552 C0530 Footnotes from Part A also apply to Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES Q NO Q IF YES,HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES 0 NO❑ REGIONAL OFFICE CONTACT NAME: Thad Valentine Mail an original copy of this DMR, including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for itting false information, including the possibility of fines and imprisonment for knowing violations." V/7/T- e_D SignaPermittee Date Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 3 of 3 Meritech, Inc. Environmental Laboratory Laboratory Certification No.165 111.1 Page 1 Contact: Natalie L.Stennis Report Date: 4/3/2020 Client: ABB-Industrial Conn&Sol 6801 Industrial Dr. Project: ABB Mebane,NC 27302 Date Sample Rcvd: 3/24/2020 Meritech Work Order# 03242002 Sample: SDO-1 Grab 3/23/20 13:00 Parameters Results Analysis Date Ana yst Reporting Limit Method Total Suspended Solids 41 mg/L 3/25/20 BF 2.5 mg/L SM 2540 D Copper,total 0.011 mg/L 3/30/20 ED 0.002 mg/L EPA 200.7 Lead,total <0.010 mg/L 3/30/20 ED 0.010 mg/L EPA 200.7 Zinc,total 0.104 mg/L 3/30/20 ED 0.010 mg/L EPA 200.7 Oil&Grease(SGT/HEM) <5 mg/L 3/30/20 JM 5 mg/L EPA 1664 B Meritech Work Order# 03242003 Sample: SDO-2 Grab 3/23/20 13:30 Parameters Results Analysis Date Analyst Reporting Limit Method Total Suspended Solids 24 mg/L 3/25/20 BF 2.5 mg/L SM 2540 D Copper,total 0.011 mg/L 3/30/20 ED 0.002 mg/L EPA 200.7 Lead,total <0.010 mg/L 3/30/20 ED 0.010 mg/L EPA 200.7 Zinc,total 0.081 mg/L 3/30/20 ED 0.010 mg/L EPA 200.7 Oil&Grease(SGT/HEM) <5 mg/L 3/30/20 JM 5 mg/L EPA 1664 B Meritech Work Order# 03242004 Sample: SDO-3 Grab 3/23/20 13:25 Parameters Results Analysis Date Analyst Reporting Limit Method Total Suspended Solids 32 mg/L 3/25/20 BF 2.5 mg/L SM 2540 D Copper,total 0.012 mg/L 3/30/20 ED 0.002 mg/L EPA 200.7 Lead,total <0.010 mg/L 3/30/20 ED 0.010 mg/L EPA 200.7 Zinc,total 0.109 mg/L 3/30/20 ED 0.010 mg/L EPA 200.7 Oil&Grease(SGT/HEM) <5 mg/L 3/30/20 JM 5 mg/L EPA 1664 B Meritech Work Order# 03242005 Sample: SDO-6 Grab 3/23/20 13:10 Parameters Results Analysis Date Analyst Reporting Limit Method Total Suspended Solids 12 mg/L 3/25/20 BF 2.5 mg/L SM 2540 D Copper,total 0.011 mg/L 3/30/20 ED 0.002 mg/L EPA 200.7 Lead,total <0.010 mg/L 3/30/20 ED 0.010 mg/L EPA 200.7 Zinc,total 0.055 mg/L 3/30/20 ED 0.010 mg/L EPA 200.7 Oil&Grease(SGT/HEM) <5 mg/L 3/30/20 JM 5 mg/L EPA 1664 B 642 Tamco Road,Reidsville,North Carolina 27320 tel.(336)342-4748 fax.(336)342-1522 AlkMeritech, Inc. . Environmental Laboratory Laboratory Certification No. 165 1110 Page 2 Contact: Natalie L.Stennis Report Date: 4/3/2020 Client: ABB-Industrial Conn&Sol 6801 Industrial Dr. Project: ABB Mebane,NC 27302 Date Sample Rcvd: 3/24/2020 Meritech Work Order# 03242006 Sample: SDO-7 Grab 3/23/20 12:55 Parameters Results Analysis Date ,Analyst Reporting Limit Method Total Suspended Solids 30 mg/L 3/25/20 BF 2.5 mg/L SM 2540 D Copper,total 0.009 mg/L 3/30/20 ED 0.002 mg/L EPA 200.7 Lead,total <0.010 mg/L 3/30/20 ED 0.010 mg/L EPA 200.7 Zinc,total 0.035 mg/L 3/30/20 ED 0.010 mg/L EPA 200.7 Oil&Grease(SGT/HEM) <5 mg/L 3/30/20 JM 5 mg/L EPA 1664 B I hereby certify that I have reviewed and approve these data. 341)0kinak a 1 f1 )1U Laboratory Representative 642 Tamco Road,Reidsville,North Carolina 27320 tel.(336)342-4748 fax.(336)342-1522 3202013 Chain of Custody Record (COC) NPDES#: ME R I TE C H, INC. Client: ABB- Industrial Conn and Sol Phone: 207-376-6368 Address: 6801 Industrial Drive Fax: 919-563-7224 AENVIRONMENTAL LABORATORIES Mebane, NC 27302 Email: natalie.stennis@us.abb.com 642 Tamco Rd. Phone: 336-342-4748 Project:_ Abe:, Reidsville NC 27320 Fax:336-342-1522 P.O.#: Email: info@meritech-labs.com Attention:_Natalie L. Stennis Turn Around Time* *RUSH work needs prior approval. How would you like your report sent? W W W.m e ri to c h-labs.c o m Circle all that apply: Email(preferred),.1 Fax, Mail Std 10 da s) 3-5 Dais �z4—48 Jrs Sampling Dates & Times Person Taking Sample(Sign/Print): I�"�fr Lab Use Sample Location and/or ID # (.+�^� 2 P Date Start End Comp? #of Time Test(s) Required On Ice? pH OK? Time Date Grab? Cont. Yes. / No CI OK? SDO-1 1,tp 3/25/10 f 3� G 3 TSS;Total Cu, Pb, Zn; Oil and Grease (HEM) U a SDO-2 '1,3( G` I 33(l G 3 TSS;Total Cu, Pb, Zn;Oil and Grease(HEM) G . SDO-3 731 132. G 3 TSS;Total Cu, Pb, Zn;Oil and Grease(HEM) 0 i SDO-6 7•1 q /31-o G 3 TSS;Total Cu, Pb, Zn;Oil and Grease(HEM) Q' -' SDO-7 7,0 D 12 —* G 3 TSS;Total Cu, Pb, Zn;Oil and Grease(HEM) OC, r Temperature Upon Receift:rL Method of ***Dechlorination(<0.5 ppm)of Ammonia,Cyanide,Phenol and TKN samples must be done in the field prior to preservation.*** j,c1' Shipment: Compositor# Li uPS Jug# HH Fed Ex Are these results for regulatory purposes? Yes 111 No Li Report results in: mg/L II mg/kg LI, ug/L Li III Relinquished by: 3 p^ Time Rece' y: ate: Time: Hand Delivery `/[„r/ / .3� 2 U / 15 0 Relin ui e y: ` Da e[ Ti �j /�)� Other /c/� } 4 Rec@tvccd byA Dat : Time: Relinquished by: ��{' - 2 � qDa �: Time: R we b: 7 � .� c^� 1,/ .L G7Ti.8.3 7 ,. .. p 5 Y . . .. . +. e t • fa -11 r 1 .r ... t.4: 1. a - i LUL RIDGE GEOLOGICAL SERVICES,INC. March 26,2020 Ms.Natalie Stennis Industrial Connections&Solutions LLC/ABB 6801 Industrial Drive Mebane,North Carolina 27302 Subject: Report of Stormwater Outfall Inspection and Sampling-March 2020 Industrial Connections& Solutions/ABB 6801 Industrial Drive,Mebane,North Carolina Dear Ms.Stennis: As authorized by acceptance of our proposal dated September 2016 and your requests to continue sampling, Blue Ridge Geological Services, Inc. (Blue Ridge) personnel performed additional environmental services at the subject site. The work was performed in general accordance with the Stormwater Pollution Prevention Plan(SWPPP)prepared for the subject site as well as the requirements of NCDEQ NPDES General Permit. On March 23, 2020 Blue Ridge personnel performed a stormwater outfall inspection and sampling event at the subject site during a measureable rainfall event. Rainfall data was obtained from a nearby weather station. According to the website,the area in the vicinity of the subject site received approximately 0.45 inches of rain during the storm event. Blue Ridge personnel observed the stormwater discharge at outfalls SDO-1 through SDO-3, SDO-6, and SDO-7 and completed stormwater discharge outfall (SDO) qualitative monitoring report forms for each of these outfalls. The SDO forms are attached. The pH of the samples was measured in the field using an Oakton pH meter and recorded on the SDO forms. No environmental issues were observed at the outfalls during this inspection(except noticeable silty runoff from onsite construction activities enter the stormwater system and nearby creeks).Field personnel collected samples from each of the stormwater outfalls,placed the samples into labeled containers, completed a chain of custody (COC)form, and submitted the samples and COC form to Meritech personnel. This inspection report and the SDO forms should be placed in the SWPP Plan or a file on site and they do not need to be submitted to the NCDEQ. We will attempt to perform the next stormwater inspection/sampling event at the site before April 30, 2020. We appreciate the opportunity to continue to assist you on this project. Please contact the undersigned at if you have any questions regarding this report or if you need additional assistance. Sincerely, fz� Jeffrey L. Gerlock,L.G. Attachments—SDO Report Forms Blue Ridge Geological Services,Inc. *7356 Belmont Drive,Trinity,NC 27370*Phone:336-382-6849 /0i' - 7 qo 2. Color: Describe the color of the discharge usigg basiv cults(red,brown,blue,etc.)and tint (light,medium,dark)as descriptors: MI- lit/ fj/ptyA knvu71";741 Roomy Stormwater Discharge Outfall(SDO) 3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil,weak Qualitative Monitoring Report chlorine odor,etc.): 11te-• For guidance on filling out this tom,please visit https:Udeq.nc.gov/about/divisionsienergy-mineral-land-resources/ 4. Clarify: Choose the number which best describes the clarity of the discharge,where I is clear npdes-stormwater-gps and 5 is very cloudy: Permit No.: N/C/ / / / / / / / or Certificate of Coverage No.: N/C/G/0/3/0/0/6/3 / I 0 3 4 5 Facility Name: _Industrial Connections and Solutions/ABB 5. Floating Solids: Choose the number which best describes the amount of floating solids in the County:__Orange Phone No. 919-563-5561 stormwater discharge,where I is no solids and 5 is the surface covered with floating solids: Inspector: Jeff Gerlock ) �� Date of Inspection: 3/2 3 b I /=) 3 4 5 Time of Inspection: /;'SJDD 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in JJ�� the stonnwater discharge,where I issnno solids and 5 is extremely muddy: Total Event Precipitation(inches): a 4.S V 2 3 4 5 7. Is there any foam in the stormwater discharge?0 Yes X No. All permits require qualitative monitoring to be performed during a"measurable storm event." 8. Is there an oil sheen in the stonnwater discharge?0Yes )(No. A"measurable storm event"is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour stone 9. Is there evidence of erosion or deposition at the outfall? 0 Yes AINo. interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DEMI.R 10. Other Obvious Indicators of Stormwater Pollution: Regional Office. List and describe /11 & By this signature,I certify that this report is accu to and complete to the best of my knowledge: (Signature of P it r Designee) I. Outfan Description: Outfall No. SDO-1 Structure(pipe,ditch,etc.): Ditch below culvert ___ __ -_- Receiving Stream:Haw Creek Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be Describe the industrial activities that occur within the outfall drainage area: docks.AST.transformer.parking indicative of pollutant exposure. These conditions warrant further investigation. Page I of 2 I'agc 2 ut 2 Swill-24:.l.1 mad0-led 06 01,20I IS S\\'1424 2,I,a n,,I ijcA II(,01.2018 2. Color: Describe the color of the discharge using tit col#rs(red,brown,blue,etc.)and tint (light,medium,dark)as descriptors: Ve, Qu NNy Stormwater Discharge Outfall(SDO) 3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil,weak Qualitative Monitoring Report chlorine odor,etc.): For guidance oa fiNing out this form please visit hops://deq.nc.gov/about/divisions/energy-mineral-land-resources/ npdes-stormwater-gps 4. Clarity: Choose the number which best describes the clarity of the discharge,where I is clear and 5 is very cloudy: Permit No.: N/C/ / / / / / / / or Certificate of Coverage No.: N/C/G/D/3/0/0/6/3/ 1 0 3 4 5 Facility Name: Industrial Connections and Solutions/ABB 5. Floating Solids: Choose the number which best describes the amount of floating solids in the County: Orange Phone No. 919-563-5561 stormwater discharge,where I is no solids and 5 is the surface covered with floating solids: Inspector. Jeff Oarlock Date of Inspection: 1/2 3/22) I 3 4 5 Time of Inspection: ' 30 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stonnwater discharge,where I is no solids and 5 is extremely muddy: Total Event Precipitation(inches): 0, 4-:c V 2 3 4 5 ------- -- 7. Is there any foam in the stormwater discharge?0 Yes �1 No.as r_ '— _. Allpermits require qualitative monitoring to be performed during a"measurable storm event." 8. Is there an oil sheen in the stonnwater discharge?OYes KNo. "measurable storm event"is a storm event that results in an actual discharge from the permitted siteA ..JJ outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm 9. Is there evidence of erosion or deposition at the outfall? 0 Yes ,'No. interval does not apply if the permittee is able to document that a shorter interval is representative for — -- ---- -"- local storm events during the sampling period,and the pennittee obtains approval from the local DEM LR 10. Other Obvious Indicators of Stormwater Pollution: Regional Office. List and describe ! 4 r — — By this signature,I certify that this report is accurate and complete to the best of my knowledge: (Sigtuttu+e of Permittee e Atia) —_-- 1. Outfall Description: Outfall No. SDO-2 Structure(pipe,ditch,etc.): Culvert Receiving Stream:Haw Creek Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be Describe the industrial activities that occur within the outfall drainage area: loading docks,truck i trailer parking indicative of pollutant exposure. These conditions warrant further investigation. Page I of 2 Page 2 of t cot.242.Lew modified 06 n 1:20 r 8 SN 1,242.L44 modified 06.01 20I K 2. Color: Describe the color of the discharge usiig b+pr}•col° (red,brown,blue,etc.)and tint (light,medium,dark)as descriptors: v f ZiZi col Storinwater Discharge Outfall(SDO) 3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil,weak Qualitative Monitoring Report chlorine odor,etc.): /?0 For guidance on filling our this form please visit hugs://deg.nc.gav/abouvdivisionstenergy-mineral-land-resources/ npdes-stomlx-ater-gps 4. Clarity: Choose the number which best describes the clarity of the discharge,where I is clear and 5 is very cloudy: Permit No.: N/C/ / / / / / / / or Certificate of Coverage No.: 1V/C/G/0/3/010/6/3 / 1 0 3 4 5 Facility Name: Industrial Connections and Solutions/ABB County: Orange 5. Floating Solids: Choose the number which best describes the amount of floating solids in the Phone No. 919-563-5561 stonnwater discharge,where I is no solids and 5 is the surface covered with floating solids: Inspector. JeffGerlock Date of Inspection: S I 3 4 5 �, Time of Inspection: J �5'_ 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stonnwater discharge,where I is no solids and 5 is extremely muddy: Total Event Precipitation(inches): 0.45' 2 3 4 5yyy - -- -- --- ----- _.____ 7. Is there any foam in the stonnwater discharge?0 Yes i No. All pennits require qualitative monitoring to be performed during a`measurable storm event." 1 8. Is there an oil sheen in the stonnwater discharge?°Yes CNo. A"measurable storm event"is a storm event that results in an actual discharge from the permitted site — outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm 9. Is there evidence of erosion or deposition at the outfall? 0 Yes t!(No. interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the pennittee obtains approval from the local DEMLR 10. Other Obvious Indicators of Stormwater Pollution: Regional Office. List and describe By this signature,I certify that this report is accurate and complete to the best of my knowledge: - ---—" -- 4101 (Signature of Pennittee or D I. Ontfall Description: Outfall No. SDO-3 Structure(pipe,ditch,etc.): Culvert Receiving Stream:Haw Creek — — Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be Describe the industrial activities that occur within the outfall drainage area: truck/trailer parking.petroleum AST,outside storage indicative of pollutant exposure. These conditions warrant further investigation. Page I of 2 Page 2 of SWU-24`.Luu modified 06.01 MI6 S W t1.242,Lnl modified 0601001 x C. 2, Color: Describe the color of the discharge usfy$bgsif cuig/s(red,brown,blue,etc.)and tint (light,medium,dark)as descriptors: ✓e no /j�/./"40'Ak'Aka". rcrY.kd / • Stormwater Discharge Outfall(SDO) 3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil,weak Qualitative Monitoring Report chlorine odor,etc.): Ott For guidance on filling out this form.please visit ht(ps:"deq.nc.gov/aboutidivisionsienergy-mineral land-resources/ npdes-stomreater-gps 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: //�.�Permit No.: N/C/ / / / / / / / or Certificate of Coverage No.: N/C/G/0/3/0/0/6/3 / I (2/ 3 4 5 Facility Name: Industrial Connections and Solutions/ABB �/ 5. Floating Solids: Choose the number which best describes the amount of floating solids in the County Orange Phone No. 919-563-5561 stormwater discharge,where I is no solids and 5 is the surface covered with floating solids: Inspector JeffGerlock Date of Inspection: 3/2'VA) 1 0 3 4 5 Time of Inspection: 13 ro 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in (he stormwater discharge,where I is no solids and 5 is extremely muddy: Total Event Precipitation(inches): V,4'.S �''` 11 J 2 3 4 5 - -- - --- -- 7. Is there any foam in the stormwater discharge?0 Yes it(No. All permits require qualitative monitoring to be performed during a"measurable storm event." 8. Is there an oil sheen in the stormwater discharge?OYes 914o. A"measurable storm event"is a storm event that results in an actual discharge from the permitted site _ ----_-- - -- outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm 9. Is there evidence of erosion or deposition at the outfall? 0 Yes )(No. interval does not apply if the pennittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DEMLR 10. Other Obvious Indicators of Stormwater Pollution: Regional Office. List and describe N.El1se By this signature,I certify that this report is accurate and complete to the best of my knowledge: fJ� ' 41.A._____ (Signature of Pennittee o esi ) — — I. Dutton Description: - Outfall No. SDO-6 Structure(pipe,ditch,etc.): Culvert Receiving Stream:Haw Creek -- • Describe the industrial activities that occur within the outfall drainage area: Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. loading docks,transformers.driveways,outside storage(metal) Page 1 of 2 l'al,e 2 42 SWl:.242,Last mrddied 06111.2018 SW f 1.242,l.aet ntMiacd OW11I,2018 pig - Zoo 2. Color: Describe the color of the discha using sic colors(red,brown,blue,etc.)and tint (light,medium,dark)as descriptors: et✓ Stormwater a Dischar Outfall(SDO)� ) 3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil,weak Qualitative Monitoring Report chlorine odor,etc) �7Gryl� For guidance nn filling out this form,please visit hops://day.nc.gov/abuuvdivisions/enerpy-mineral-land-resources/ npdes-stormwater-gps 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: Permit No.: N/C/ / / / / / / / or Certificate of Coverage No.: N/C/O/0/3/0/0/6/3 / l0 2 3 4 5 Facility Name: Industrial Connections and Solutions/ABB County: Orange Phone O5. Floating Solids: Choose the number which best describes the amount of floating solids in the X No. 919-563-5561 -_- stormwater discharge,where I is no solids and 5 is the surface covered with floating solids: Inspector. JeffGerlock Date of Inspection: 2 V 2 3 4 5 Time of Inspection: 12 S3° _- _ 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in D /t / the stormwater discharge,where I is no solids and 5 is extremely muddy: Total Event Precipitation(inches): i 45 1 2 3 4 5 ---- --- - --- 7. Is there any foam in the stormwater discharge'!0 Yes ,'No.All permits require qualitative monitoringto be perforated during a"treasurable storm event" 8. Is there an oil sheen in the stonmwater discharge?OYes ,'No. A"measurable storm event"is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm 9. Is there evidence of erosion or deposition at the outfall? 0 Yes No. interval does not apply if the permittee is able to document that a shorter interval is representative for - -- -- -- - local storm events during the sampling period,and the pennittee obtains approval from the local DEMLR 10. Other Obvious Indicators of stormwater Pollution: Regional Office. N OICList and describe By this signature,I certify that this report is accurate and complete to the best of my knowledge: -- -- (Signature of Permittee es' e) — — — I. Outfall Description: Outfall No. SDO-7 Structure(pipe,ditch,etc.): Rocky/Paved Ditch — Receiving Strcam:Haw Creek -- -- ------ Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be Describe the industrial activities that occur within the outfall drainage arm: parkins.Transformers.sump at AST transfer area indicative of pollutant exposure. These conditions warrant further investigation. Page I aft Page.'-all Swt'-242.Last modified 06/01r2018 SV -242.l mod!tit,III,III 11,18