HomeMy WebLinkAbout20201034 Ver 1_Riparian Buffer Authorization Request_20200810Water ResourcesENTAL QUALITY
Original Submittal 8/10/2020
A. Owner/Applicant Information
.....................................................................................................................................................
General Information
...............................................................................
Primary Contact Email:* richard.harmon@v,00dplc.com
Please list the contact person's erreil for questions or payment on this project if needed.
Who is submitting the application?* r- Owner
r- Applicant other than Owner
rJ Agent
1. Property Owner Information:
........................................
la. Name on Recorded Deed:* Carolina Power and Light
1b. Responsible Party: Joyce Dishmon, Duke Energy
(for Corporations)
1c. Mailing Address:* Street Address
864 South Edgewood Road
Address Line 2
city
State / Rovince / Fbgion
Eden
NC
Postal / Zip Code
Country
27288
us
le. Email Address:* joyce.dishmon@duke-
1d. Telephone:* 3363945524 energy.com
3. Agent Information:
3a. Name:
3b. Company Affiliation:
3c. Mailing Address: Street Address
Address Line 2
aty State / Province / FL-gion
Fbstal / Zip Code Country
3d. Telephone: 3e. Email Address:
3f. Attach a signed and dated copy of the agent Qicktheupload button ordrag and drop files hereto attach docurrent
authorization form. pDFOnly
B. Project Information and Prior Project History
..........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
1. Project Information
1 a. Name of Project:* HF Lee Energy Complex Inactive Ash Basins Out -fall 005A and 005B
(Subdivision, facility, or establishrrent narre)
1b. Is this a publicly -funded transportation project?*
r,
c
1d. Subdivision Name: N/A
le. Nearest Goldsboro
Municipality:
1f. Property Size: 209.00
acres
1g. County (or Counties) where the project is located:*
1 h. Property ID#
2569528945
Tax RN or Parcel id
1 i. Deed Information
................................................
Deed E
Map F
Date of Purchase
1/1/1961
225
1j. Attach a copy of the recorded map that indicates when the lot was last platted.
nick the upload button or drag and drop files here to attach docunent
HF Lee IAB Parcel Map.pdf 130.59KB
FDF only
1k. Howwould you like to provide the Latitude and Longitude information?*
r Address Lookup
r Manually
Latitude * 35.37307 Longitude
11. Is the project located in any of North Carolina's twenty coastal counties?*
r Yes
r No
2. Surface Waters
-78.10476
2a. Name of the nearest bodyof water to proposed project:*
Neuse River
2b. Water Quality Classification of nearest receiving water:*
WS-IV, NSW
2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:*
h
1,987
(linear feet only)
3. Project Description:
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Site is the 3 inactive ash basins for the HF Lee Energy Complex Native vegetation
has volunteered in the inactive ash basins over time, but land use is coal ash
storage. Residential and agricultural land surrounds the plant.
3b. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site.
Click the upload button or drag and drop files here to attach docurrent
Figure 1 - USGS Topo Map.pdf 1.14MB
FDF only
3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the
project site.
Click the upload button or drag and drop files here to attach docurrent
Figure 2 - USDA NRCS Soils.pdf 3.08MB
FDF only
4. Proposed Activity
Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:*
To de -water the 3 inactive ash basins in order to remove the coal ash. 2 outfall
structures to drain the water from 3 inactive ash basins. Geotextile & Class A riprap
will diffuse water before entering the Neuse River.
Attach a site plan as applicable to the project:
Click the upload button or drag and drop files here to attach docurrent
HF Lee Outfalls Site Plan.pdf 1.47MB
P DF only
5. Jurisdictional Determinations
5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this
property/project (including all prior phases) in the past?*
t: Yes
f No
5b. Who did the determination on the jurisdictional areas?
Who did the determination? List name if knownIF Date F
Attach
Agent/Consultant (%rre if Inown) 10/16/2015
1 _JD_Reques... 4.07M.
pdt only
*** Please include the date of the determination and upload a copy of the determination.
Comments:
Field reviews by USACE personnel for jurisdictional determination for the entire HF
Lee Energy Complex were conducted on 04/04/2015, 04/21/2015, 03/22/2017,
07/20/2017, and 09120/2017. Even though the large site was confirmed over
multiple visits, it was going to fall under one JD. A JD request was initiated, but it has
not been issued.
6. Project History
...................................................................................
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?*
f Yes
r No
7. Future Project Plans
7a. Is this project a phased project?* 4 Yes
d No
C. Proposed Impacts Inventory
Buffer Impacts
Project is in which protected Basin?*
r Neuse River Basin (15A NCAC 02B.0233)
r Catawba River Basin (15A NCAC 02B.0243)
r Randleman Lake Watershed (15A NCAC 02B.0250)
r Tar -Pamlico River Basin (15A NCAC 02B.0259)
r Jordan Lake Watershed (15A NCAC 02B.0267)
f Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607)
Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form.
Site# - Reason Stream Name Buffer Impact*
Impact Type * Zone 1 Zone 2
Outfall 005A
Neuse
Permanent
Allowable w/
600.00
400.00
Nbp label (e.g. Finad
(P)
mitigation
Square
Square
Crossing1)
Perm orTerrp
Feet
Feet
Outfall 005B
Neuse
Permanent
Allowable w/
600.00
400.00
Nhp label (e.g. Fbad
(P)
mitigation
Square
Square
Grossing 1)
FbrmorTenp
Feet
Feet
Total Zone 1 Impacts: 1,200.00
Total Zone 2 Impacts: 800.00
Total Buffer Impacts: 2,000.00
Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.*
Design of the outfalls were made to avoid all wetland and stream features.
Vegetation cleared in the buffer zone will be re -planted with grass to provide access
to the outfall during the length of the project.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
The limit of disturbance (LOD) was designed to be only as wide as necessary to
give machinery access for construction and limit the need of clearing vegetation in
the buffer zone.
2. Buffer Mitigation
2a. The table below identifies the square footage of impact to each zone of the riparian buffer and the required mitigation.
h
Zone 1
Total Impact Multiplier Required Mitigation
1,200.00
3
3,600
Square Feet
Square Feet
Zone 2
Total Impact Multiplier Required Mitigation
800.00
1.50
1,200.00
Square Feet
Square Feet
2b. What is the mitigation plan proposed for R Payment to private mitigation bank
this project? * r] Payment to Division of Mitigation (DMS)
❑ Permittee responsible mitigation
2e. Attach statement of availability from mitigation provider.*
Click the upload button or drag and drop files here to attach docurrent
SOA_Duke Energy_HF Lee Energy Complex.pdf 174.16KB
FDF only
2g. Comments: If the credits from this mitigation bank get used before the permit is issued, there is
another mitigation bank with riparian buffer credits available.
E. Diffuse Flow Plan
1a. What type of SCM are you providing?*
r Level Spreader
❑ Vegetated Conveyance (lower SHWT)
❑ Wetland Swale (higher SHWT)
rJ Proposed project will not create concentrated stormwater flow through the
buffer
r Other SCM that removed minimum of 30% nitrogen
1c. Diffuse Flow Documentation*(lick the upload button ordrag and drop files here toattach docurrent
HF Lee Outfalls Site Plan.pdf 1.47MB
FDF only
F. Supplementary Information
Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
r Yes
r No
Violations
2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR
Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)?
r Yes
r No
2b. Is this an after -the -fact buffer authorization application?
r Yes
r No
G. Additional Information
Please upload any additional information you would like the Division to consider during application review.
Additional Attachments: (lick the upload button or drag and drop files here to attach docurrent
PDF only
Additional Comments:
The site plan document shows both the layout of the project and the diffuse plan of
having water flow over the rip rap in the buffer zone before entering the Neuse
River.
H. Sign and Submit
By digitally signing below, I certify that:
o I have given true, accurate, and complete information on this form;
o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act)
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act');
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
o I intend to electronically sign and submit the application form."
Print Name:* Matthew Williams
Signature
.eYr.�ari (�y�vctlicBiVi+d
Submission Date: 8/10/2020
(Auto populated field)
Initial Review
Is this accepted into the review process?*
Is this project a public transportation
project?*
ID#*
Version:*
Select Reviewer:
Select Reviewing Office*
Has payment been received?*
O Yes O No
O Yes
O No
20201034
Robert Tankard:eads\rbtankard
Washington Regional Office - (252) 946-6481
C No Payment Needed
r Fee Received
r Need Fee - send electronic notification
Statement of Mitigation Credit Availability
Weaver Farm Nutrient Mitigation Bank
Neuse River Basin 03020201 – Outside Falls Lake July 28, 2020
NC Division of Water Resources
Re: Availability of Riparian Buffer Mitigation Credits
Project: HF Lee Energy Complex Inactive Ash Basins Outfall 005A & 005B We are providing this letter to confirm that 10,345.50 sf of Riparian Buffer Mitigation
Credits (Credits) from the Weaver Farm Nutrient Mitigation Bank (Bank) are currently available and all or a portion may be used, once transferred, for compensatory mitigation relative to the HF Lee Energy Complex Inactive Ash Basins Outfall 005A & 005B project, and as proposed by Duke Energy (Applicant). The Applicant may ultimately purchase the Credits, if they are available, following Permit issuance. Should the Applicant purchase the Credits at that time, we will complete and execute the Mitigation Credit Transfer Certificate. We will additionally provide copies of the completed and executed Transfer Form to the Applicant and NC Division of Water Resources. Transaction information in the updated Bank Ledger will include relevant Permit and Applicant information as well as the number and resource type of the debited Credits. Should your office have any questions, please contact me at 919.334.9123. Sincerely, Tiffani Bylow Restoration Systems, LLC
Figure 1. USGS Topo Map
I 0 500250Feet
I 0 200100Miles
C:\Users\cory.pennington\Documents\Outfalls\Figure 1-1. Site Location Map.mxdSources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (HongKong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
HF Lee Energy ComplexInactive Ash Basins Outfall005A & 005BGoldsboro, NC
Job No. 7812200457
Drawn By: CSP
Reviewed By: MJW
The map shown here has beencreated with all due andreasonable care and is strictly foruse with Wood project number7812200457. Wood assumes noliability, direct or indirect,whatsoever for any such thirdparty or unintended use.Date: 7/28/2020
^_
Legend
005A
005B
Figure 2. USDA NRCS Soils
Le
Jo
Ch
Ch
W
Lv
KaA
RyB2
WhB
CrC2
KaA
Ra
Ke
M-W
RuA
WhB
Dr
GoA
W
KeI0500250Feet
I 0 200100Miles
C:\Users\cory.pennington\Documents\Outfalls\Figure 3 - NRCS Soils Map.mxdSources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (HongKong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
HF Lee Steam Electric PlantRiparian Buffer Mitigation PermitGoldsboro, NC
Job No. 7812200457
Drawn By: CSP
Reviewed By: MJW
The map shown here has beencreated with all due andreasonable care and is strictly foruse with Wood project number7812200457. Wood assumes noliability, direct or indirect,whatsoever for any such thirdparty or unintended use.Date: 7/28/2020
^_
Legend
005A
005B
Soils
Wayne
Printed August 10, 2020
See Below for Disclaimer
OBJECTID
19939
PIN
2569528945
Owner Name
CAROLINA POWER & LIGHT
Co-Owner Name
Owner Address 1
TAX DEPT CX1G/BILL KEITH
Owner Address 2
PO BOX 14042
Owner Address 3
Owner City
ST PETERSBURG
Owner State
FL
Owner Zip
33733-4042
Unit or Apt
Deed Date
1/1/1961 12:00:00 AM
REID
0033421
Deed Book
544
Deed Page
225
Sale Month
1
Sale Year
1961
Sale Price
0
Previous Deed Book
Previous Deed Page
Previous Sale Month
Previous Sales Year
Previous Sale Price
Property Use
50 - RURAL SINGLE FAMILY
RESIDENCE
Record Source
Owner
Property Address
FERRY BRIDGE RD
Legal Description
FERRY BRIDGE RD REAR
Acres
209
Neighborhood
07903
Account Number
75941180
Township Code
07
Building Value
0
Outbuilding Value
0
Land Value
322050
Total Market Value
322050
Total Assessed Value
322050
Vacant Or Improved
I
Vacant or Improved 2
Users of the GIS information/data contained in this web mapping application are hereby notified that the information was compiled from recorded deeds, plats and
other public records and data. Users are notified that the aforementioned public primary information sources should be consulted for verification of the data contained
in this information. The County of Wayne and the mapping companies or other entities assume no legal responsibility for the information contained herein. By accepting
this disclaimer you agree and understand the disclaimer.
7880
808278807680
78768080 857677787981828384868788 7574767778
75
74
767474747876767873747272737374 74807879817075697172737476777870756869717273747677787172737877797877
6869777879
75767778797068697172737479
837
9 81777
3
75790+001+
0
0
2+
0
0
3+00
4+00
4+92
0+001+002+00 3+00 4+00 5+005+33N
LEGENDEXISTING MAJOR CONTOURSEXISTING MINOR CONTOURSEXISTING GRAVEL ROADEXISTING WETLANDSEXISTING TREE LINEEXISTING SITE FENCEEXISTING ROAD100EXISTING JURISDICTIONAL STREAMAPPROXIMATE LIMIT OF WASTE102030TENTHSINCHES123DWG SIZEREVISIONFORDRAWING NO.TITLEFILENAME:DWG TYPE:JOB NO:DATE:SCALE:DES:DFTR:CHKD:ENGR:APPD:AFEDCB234578645789106AFCB22"x34"ANSI D05/19/20207812200457DWGAS SHOWNMMPNAPBBCTJKTJKCISSUED FOR REVIEW - NOT FOR CONSTRUCTIONHF LEE ENERGY COMPLEXHF LEE INACTIVE ASH BASIN OUTFALL005A AND 005B DESIGNREVDATEJOB NO.PROJECT TYPEDESDFTRCHKDENGRAPPDDESCRIPTION05/19/2020AISSUED FOR REVIEW - NOT FOR CONSTRUCTIONMMPNAPBBCTJKTJKCIVIL7812200457Environment & Infrastructure Solutions5710 OLEANDER DRIVE, SUITE 110WILMINGTON NC 28403TEL: (910) 452-1185FAX: (844) 648-9591LICENSURE:NC ENG: F-1253NC GEOLOGY: C-247NOT FORCONSTRUCTIONPRELIMINARY06/19/2020BISSUED FOR REVIEW - NOT FOR CONSTRUCTIONMMPNAPBBCTJKTJKCIVIL781220045707/16/2020CISSUED FOR REVIEW - NOT FOR CONSTRUCTIONMMPNAPBBCTJKTJKCIVIL7812200457OVERALL DESIGNSCALE:1" = 200'PROPERTY LINEINACTIVE ASH BASIN 1(WAYNE-031)INACTIVE ASH BASIN 2(WAYNE-032)FEMA ZONE AEFEMA FLOODWAY ZONE AEHALF MILEBRANCHSTREAMREFERENCES:1.EXISTING TOPOGRAPHY AND SURVEY PROVIDED BY WSP DATED JULY2015.2.EDGE OF WATER PROVIDED IN SURVEY BY WSP FOR DUKE ENERGYPROGRESS, LLC. TITLED "AERIAL TOPOGRAPHIC SURVEY HF LEEENERGY COMPLEX," REVISION 1, DATED 24 JULY 2015, FILE NAME: "HFLEE FINAL - REV 07-27-2015.DWG".3.EXISTING STREAMS AND WETLANDS PROVIDED BY MCKIM & CREEDDATED OCTOBER 9, 2017.4.LOCATION OF ANY AND ALL UTILITIES SHOWN IS BASED ONPHOTOGRAMMETRIC MAPPING AND IS APPROXIMATE. CONTRACTORSHALL VERIFY LOCATION OF UTILITIES PRIOR TO COMMENCEMENT OFCONSTRUCTION.5.EXISTING TOPOGRAPHY SHOWN WITHIN EXTENTS OF THE INACTIVE ASHBASINS DIKE CREST AND SLOPES PROVIDED BY WOOD, DATED MAY2019.6.APPROXIMATE LIMIT OF WASTE PROVIDED BY GEOSYNTEC DATED 2016FROM "HF LEE CLOSURE PLAN".7.ALL ELEVATIONS BASED ON NAVD 88 DATUM.8.EXISTING TOPOGRAPHY SHOWN WITHIN THE POLISHING POND ANDRELATIVE PROJECT LIMITS PROVIDED BY MCKIM & CREED DATED MAY07, 2020.SURVEY LIMITAPPROXIMATELIMIT OF WASTEDIVIDER DIKE BETWEENINACTIVE BASIN 1 AND 2HFL_C901.035.004 OVERALL DESIGN.dwgHFL_C901.035.004HFL_C901.035.004HFL_C901.035.004OVERALL DESIGNINACTIVE ASH BASIN 3(WAYNE-033)SEE SHEET HFL_C901.035.006SEE SHEET HFL_C901.035.005FERRY BRIDGEROADAPPROXIMATE LOCATIONOF ENTRANCE TOINACTIVE ASH BASINSNEUSE RIVEROUTFALL005AOUTFALL005BCLEARING LIMITPROPOSED PIPEALIGNMENTPROPOSED PIPEALIGNMENT
0+001+00 2+00 3+00 4+00 5+00 5+93 70756869717273747677757476757473727170696968747372717069 68 68 676869666768757473 727474 74767874 78787776787875PUT NAME HERE AND STATION BELOW5860657075805860657075800+000+501+001+502+002+503+003+504+004+505+005+505+93NLEGENDEXISTING MAJOR CONTOURSEXISTING MINOR CONTOURSEXISTING GRAVEL ROADEXISTING WETLANDSEXISTING TREE LINEEXISTING SITE FENCEEXISTING ROAD100EXISTING JURISDICTIONAL STREAMAPPROXIMATE LIMIT OF WASTE102030TENTHSINCHES123DWG SIZEREVISIONFORDRAWING NO.TITLEFILENAME:DWG TYPE:JOB NO:DATE:SCALE:DES:DFTR:CHKD:ENGR:APPD:AFEDCB234578645789106AFCB22"x34"ANSI D05/19/20207812200457DWGAS SHOWNMMPNAPBBCTJKTJKCISSUED FOR REVIEW - NOT FOR CONSTRUCTIONHF LEE ENERGY COMPLEXHF LEE INACTIVE ASH BASIN OUTFALL005A AND 005B DESIGNREVDATEJOB NO.PROJECT TYPEDESDFTRCHKDENGRAPPDDESCRIPTION05/19/2020AISSUED FOR REVIEW - NOT FOR CONSTRUCTIONMMPNAPBBCTJKTJKCIVIL7812200457Environment & Infrastructure Solutions5710 OLEANDER DRIVE, SUITE 110WILMINGTON NC 28403TEL: (910) 452-1185FAX: (844) 648-9591LICENSURE:NC ENG: F-1253NC GEOLOGY: C-247NOT FORCONSTRUCTIONPRELIMINARY06/19/2020BISSUED FOR REVIEW - NOT FOR CONSTRUCTIONMMPNAPBBCTJKTJKCIVIL781220045707/16/2020CISSUED FOR REVIEW - NOT FOR CONSTRUCTIONMMPNAPBBCTJKTJKCIVIL7812200457PROPOSED CONDITIONS:INACTIVE ASH BASIN 1 & 2SCALE:1" = 50'PROPERTY LINEINACTIVE ASH BASIN 2(WAYNE-032)REFERENCES:1.EXISTING TOPOGRAPHY AND SURVEY PROVIDED BY WSP DATED JULY 2015.2.EDGE OF WATER PROVIDED IN SURVEY BY WSP FOR DUKE ENERGY PROGRESS, LLC. TITLED"AERIAL TOPOGRAPHIC SURVEY HF LEE ENERGY COMPLEX," REVISION 1, DATED 24 JULY2015, FILE NAME: "HF LEE FINAL - REV 07-27-2015.DWG".3.EXISTING STREAMS AND WETLANDS PROVIDED BY MCKIM & CREED DATED OCTOBER 9, 2017.4.LOCATION OF ANY AND ALL UTILITIES SHOWN IS BASED ON PHOTOGRAMMETRIC MAPPINGAND IS APPROXIMATE. CONTRACTOR SHALL VERIFY LOCATION OF UTILITIES PRIOR TOCOMMENCEMENT OF CONSTRUCTION.5.EXISTING TOPOGRAPHY SHOWN WITHIN EXTENTS OF THE INACTIVE ASH BASINS DIKE CRESTAND SLOPES PROVIDED BY WOOD, DATED MAY 2019.6.APPROXIMATE LIMIT OF WASTE PROVIDED BY GEOSYNTEC DATED 2016 FROM "HF LEECLOSURE PLAN".7.ALL ELEVATIONS BASED ON NAVD 88 DATUM.8.EXISTING TOPOGRAPHY SHOWN WITHIN THE POLISHING POND AND RELATIVE PROJECTLIMITS PROVIDED BY MCKIM & CREED DATED MAY 07, 2020.SURVEY LIMITHFL_C901.035.009 OUTFALL 005A - PROPOSED DESIGN AND PROFILEHFL_C901.035.005HFL_C901.035.005HFL_C901.035.005OUTFALL 005A - PROPOSED DESIGN AND PROFILENEUSE RIVERHALF MILEBRANCHSTREAMCONSTRUCTION SEQUENCE:1.CONTRACTOR MOBILIZATION TO SITE.2.HOLD PRE-CONSTRUCTION MEETING WITH THE OWNER, ENGINEER OF RECORD, AND ALLCONTRACTORS AND SUBCONTRACTORS INVOLVED WITH PROJECT.3.PERFORM TREE CLEARING AS INDICATED ON THE DRAWINGS AND AS SHOWN IN THEDETAILS.4.INSTALL 6" SDR-17 HDPE FORCE MAIN, ANCHOR BLOCKS/EARTHEN ANCHORS, PIPE ROADCROSSING, VALVES AND OUTLETS SHOWN ON THE PLANS.4.1.FOR STEEP SLOPES (3:1 OR GREATER) OPTIONS C OR OPTION D CAN BE USED FOR PIPEPLACEMENTS)4.2.FOR OTHER SLOPES, OPTIONS A OR OPTION B CAN BE USED.5.INSTALL PROPOSED RIPRAP OUTLET STRUCTURE TO OUTFALLS AS SHOWN ON THE PLANS.UNDERLAIN WITH12 OZ/SY NON-WOVENGEOTEXTILE.005APROFILE PIPE 005AHORIZONTAL SCALE: 1" = 30'VERTICAL SCALE: 1" = 10'PROPOSED PIPE OUTLETSTA: 05+04.26HDPE SDR-17 6" FORCEMAININV. ELEV.: 69.97EXISTING GRADECLASS A RIPRAPAPRON1.009POLISHINGPONDOUTFALL 005ACLEARING LIMITAPPROX. 100YEAR FLOODELEV.: 82.7 FEETNEUSE RIVERORDINARY WATERMARK ELEV.: 60.51FEETCLASS A RIPRAP APRON1.009NOTES:1.PIPE ANCHOR PLACED AT MAXIMUM 50' SPACING (SEE DETAIL 1 SHEET .012)2.HIGH WATER MARK ELEVATION APPROXIMATELY DETERMINED ON EXISTING GROUND.3.FINAL PIPING LAYOUT SUBJECT TO MINOR ADJUSTMENTS AT THE DIRECTION OF THEOWNER.4.PIPE OUTLET LOCATED 168.91 FEET FROM CENTERLINE OF THE NEUSE RIVER.50-FOOT BUFFER ZONE(FROM TOP OF BANK)50-FOOT WETLANDBUFFER ZONECLEARING LIMITSRD17 6" FORCEMAIN1.007PROPOSED HDPEWITH PIPE ANCHORSIN-LINE SAMPLING PORT2.009PIPE ROAD CROSSING14-FT MIN.2.00820'25'SPEEDBUMP FORCONTAINMENTPIPE ROAD CROSSING1.008GABION BASKETAT OUTER EDGESTAPLE GEOTEXTILETO RIVER BANK6 TO 8 INCHCONCENTRICEXPANDER
70758068697172737476777879757374767778797
2
717069687473 72717170696873727170707172737376
77787976757677767979787575 7980 20'807978777681765+290+00 1+002+00 3+00 4+00 5+0080777879777879 5860657075805860657075800+000+501+001+502+002+503+003+504+004+505+005+506+007778797677787976757677807978777681760+00 1+0080777879777879SRD17 6" FORCEMAINNLEGENDEXISTING MAJOR CONTOURSEXISTING MINOR CONTOURSEXISTING GRAVEL ROADEXISTING WETLANDSEXISTING TREE LINEEXISTING SITE FENCEEXISTING ROAD100EXISTING JURISDICTIONAL STREAMAPPROXIMATE LIMIT OF WASTE102030TENTHSINCHES123DWG SIZEREVISIONFORDRAWING NO.TITLEFILENAME:DWG TYPE:JOB NO:DATE:SCALE:DES:DFTR:CHKD:ENGR:APPD:AFEDCB234578645789106AFCB22"x34"ANSI D05/19/20207812200457DWGAS SHOWNMMPNAPBBCTJKTJKCISSUED FOR REVIEW - NOT FOR CONSTRUCTIONHF LEE ENERGY COMPLEXHF LEE INACTIVE ASH BASIN OUTFALL005A AND 005B DESIGNREVDATEJOB NO.PROJECT TYPEDESDFTRCHKDENGRAPPDDESCRIPTION05/19/2020AISSUED FOR REVIEW - NOT FOR CONSTRUCTIONMMPNAPBBCTJKTJKCIVIL7812200457Environment & Infrastructure Solutions5710 OLEANDER DRIVE, SUITE 110WILMINGTON NC 28403TEL: (910) 452-1185FAX: (844) 648-9591LICENSURE:NC ENG: F-1253NC GEOLOGY: C-247NOT FORCONSTRUCTIONPRELIMINARY06/19/2020BISSUED FOR REVIEW - NOT FOR CONSTRUCTIONMMPNAPBBCTJKTJKCIVIL781220045707/16/2020CISSUED FOR REVIEW - NOT FOR CONSTRUCTIONMMPNAPBBCTJKTJKCIVIL7812200457PROPOSED CONDITIONS:INACTIVE ASH BASIN 3SCALE:1" = 40'PROPERTY LINEINACTIVE ASH BASIN 3(WAYNE-033)REFERENCES:1.EXISTING TOPOGRAPHY AND SURVEY PROVIDED BY WSP DATED JULY 2015.2.EDGE OF WATER PROVIDED IN SURVEY BY WSP FOR DUKE ENERGY PROGRESS, LLC. TITLED"AERIAL TOPOGRAPHIC SURVEY HF LEE ENERGY COMPLEX," REVISION 1, DATED 24 JULY2015, FILE NAME: "HF LEE FINAL - REV 07-27-2015.DWG".3.EXISTING STREAMS AND WETLANDS PROVIDED BY MCKIM & CREED DATED OCTOBER 9,2017.4.LOCATION OF ANY AND ALL UTILITIES SHOWN IS BASED ON PHOTOGRAMMETRIC MAPPINGAND IS APPROXIMATE. CONTRACTOR SHALL VERIFY LOCATION OF UTILITIES PRIOR TOCOMMENCEMENT OF CONSTRUCTION.5.EXISTING TOPOGRAPHY SHOWN WITHIN EXTENTS OF THE INACTIVE ASH BASINS DIKECREST AND SLOPES PROVIDED BY WOOD, DATED MAY 2019.6.APPROXIMATE LIMIT OF WASTE PROVIDED BY GEOSYNTEC DATED 2016 FROM "HF LEECLOSURE PLAN".7.ALL ELEVATIONS BASED ON NAVD 88 DATUM.8.EXISTING TOPOGRAPHY SHOWN WITHIN THE POLISHING POND AND RELATIVE PROJECTLIMITS PROVIDED BY MCKIM & CREED DATED MAY 07, 2020.SURVEY LIMITHFL_C901.035.006 OUTFALL 005B - PROPOSED DESIGN AND PROFILEHFL_C901.035.006HFL_C901.035.006HFL_C901.035.006OUTFALL 005B - PROPOSED DESIGN AND PROFILENEUSE RIVERPROPOSED TREATMENTPAD FACILITYCONSTRUCTION SEQUENCE:1.CONTRACTOR MOBILIZATION TO SITE.2.HOLD PRE-CONSTRUCTION MEETING WITH THE OWNER, ENGINEER OF RECORD, AND ALLCONTRACTORS AND SUBCONTRACTORS INVOLVED WITH PROJECT.3.PERFORM TREE CLEARING AS INDICATED ON THE DRAWINGS AND AS SHOWN IN THEDETAILS.4.INSTALL 6" SDR-17 HDPE FORCE MAIN, ANCHOR BLOCKS/EARTHEN ANCHORS, PIPE ROADCROSSING, VALVES AND OUTLETS SHOWN ON THE PLANS.4.1.FOR STEEP SLOPES (3:1 OR GREATER) OPTIONS C CAN BE USED FOR PIPEPLACEMENTS)4.2.FOR OTHER SLOPES, OPTIONS A OR OPTION B CAN BE USED.5.INSTALL PROPOSED RIPRAP OUTLET STRUCTURE TO OUTFALLS AS SHOWN ON THE PLANS..006APROFILE PIPE 005BHORIZONTAL SCALE: 1" = 30'VERTICAL SCALE: 1" = 10'SEE THIS SHEETPROPOSED TREATMENTPAD FACILITYSCALE:1" = 30'OUTFALL 005BNUNDERLAIN WITH12OZ/SY NON-WOVENGEOTEXTILEPROPOSED PIPE OUTLETSTA: 04+49.88HDPE SDR-17 6" FORCEMAININV. ELEV.: 71.17CLASS A RIPRAPAPRON1.009APPROX. 100YEAR FLOODELEV.: 82.7 FEETNEUSE RIVERORDINARYWATER MARKELEV.: 61.20 FEETCLEARING LIMIT1.007PROPOSED HDPEWITH PIPE ANCHORSCLASS A RIPRAP APRON1.009NOTES:1.PIPE ANCHOR PLACED AT MAXIMUM 50' SPACING (SEE DETAIL 1 SHEET .009)2.HIGH WATER MARK ELEVATION APPROXIMATELY DETERMINED ON EXISTING GROUND.3.FINAL PIPING LAYOUT SUBJECT TO MINOR ADJUSTMENTS AT THE DIRECTION OF THEOWNER.4.PIPE OUTLET LOCATED 146.76 FEET FROM CENTERLINE OF THE NEUSE RIVER.5.50' BUFFER ZONE FROM TOP OF BANK ONLY SHOWN WITHIN THE PROJECT EXTENTS.6.PIPE ROAD CROSSING SHALL BE 14-FEET MINIMUM WIDTH.7.DOUBLE WALL PIPE SHALL BE USED ON DIKE CREST AND EXTERIOR SLOPES.50-FOOT BUFFER ZONE(FROM TOP OF BANK)CLEARING LIMIT20'PROPOSED TREATMENTPAD FACILITYPOLISHING PONDEXISTING GRADESTAPLE GEOTEXTILETO RIVER BANKDIKE PIPE ROAD CROSSING14-FT MIN.1.008PIPE ROAD CROSSING1.008EXISTING DRIVE PATHPIPE ROAD CROSSING1.008GABION BASKETAT OUTER EDGE6 TO 8 INCHCONCENTRICEXPANDER