Loading...
HomeMy WebLinkAboutNCC203412_NOI Application_20200812Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 8/7/2020 8:24:29 AM (NCG01 NOI Submission) Approve by Gwinn, Matt 8/10/2020 8:35:42 AM (Review- Construction NOI 29606) • Georgoulias, Bethany reassigned the task to Gwinn, Matt 8/9/2020 2:28 PM * Hi, Matt - I'm reassigning some eNOls from Jim over to you. I've also put you on the rotation per Annette's request. Thanks! -Bg • The task was assigned to Farkas, Jim J by round robin distribution 8/7/2020 8:25 AM • The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: August 11, 2020 5:00 PM 8/7/2020 8:25 AM Submit by Selkane, Aziza 8/12/2020 9:11:36 AM (Payment Verification for NCC203412) * Michael S Repsch • Selkane, Aziza assigned the task to Selkane, Aziza 8/12/2020 9:10 AM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: September 21, 2020 5:00 PM 8/10/2020 8:35 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Cross Charlotte Trail 7th Street to 10th Street Connector 1 b. Specific Lot This field rrey be used to list specifc lot numbers. Numbers Tax Parcel ID Numbers: 080-131-03 080-131-04 080-151-16 080-151-17 080-151-42 080-152-01 080-152-02 080-152-03 080-152-11 080-153-01 080-153-02 080-153-03 080-154-02 080-154-03 080-154-05 080-154-06 080-173-01 Charlotte and NCDOT Right -Of -Way: E. 7th Street Central Avenue Prospect Street Jackson Avenue Independence Blvd/1-277 Ramp Seigle Avenue E. 10th Street 2. County* Mecklenburg 3. Highway or Street 601 Seigle Avenue (project covers multiple addresses, lot near Address* middle of project used) Street narre only is acceptable if no address number assigned yet 4. City or Township* Charlotte 5. State * NC 6. Zip Code* 28204 7. Latitude* Enter the latitude in decirral degrees 35.2230 8. Longitude* Enter the longitude in decirral degrees (M-ST be negative) -80.8280 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 08/13/2020 Estirreted Construction Project Start Rate 10. Date to End* 08/01 /2021 Estirrated Construction Project End Cate 11. SIC (Primary) * 0000 Standard Industrial aassification for Developrnent 12. Acres to be 1.92 disturbed* (including off -site borrow and waste areas) 13. Total site area 1.92 (acres) * 14. Post- 0.72 construction (Estirrated) impervious area (acres) * NCC Project NCC-MECKL-2020-Cross Charlotte Trail 7th Street to 10th Street Tracking ID Connector Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Little Sugar Creek Wate rbody* %rre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 11-137-8 Index No.* NCWaterbody Index Nunber Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * City of Charlotte It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. 2. First Name * Joe IF Corporation, enter Faegistered Agent First %rre 3. Last Name* Frey It Corporation, enter F;bgistered Agent Last %ne 3b. Title Senior Project Manager 4. Permitee E-mail jfrey@ci.charlotte.nc.us Address* 5. Permittee 980-219-3589 Telephone No.* 6. Permittee Mailing Street Address Address* 600 East 4th Street Address Line 2 City State / Rovince / F;bgion Charlotte NC Fbstal / Zip Code Country 28202 United States Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 600 East 4th Street Address Line 2 City State / Frovince / Region Charlotte NC Fbstal / Zip Code Country 28202 United States 8. Type of Government - Municipal Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Joe Contact - First Name * 2. Primary Site Frey Contact - Last Name * 3. Title Senior Project Manager 4. Site Contact E- jfrey@ci.charlotte.nc.us mail Address* 5. Site Contact 980-219-3589 Telephone No. 6. Organization City of Charlotte Name 7. Site Contact Street Address Mailing Address* 600 East 4th Street Address Line 2 city Charlotte Fbstal / Zip Code 28202 8. Consultant Name (Optional) Michael Repsch First and Last nacre 9. Consultant E-mail mikerepsch@altaplanning.com This person will be copied on all correspondence. 10. Consultant 919.484.8448 Telephone No. State / Rovince / Region NC Country United States D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ............................................................................................................................................................................................................................................................................................................................__ 1. Date E&SC Plan 04/02/2020 Approved * 2. E&SC Plan Project MECKL-2020-067 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Mooresville (MRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan MECKL-2020-067 CROSS TRAILS-04022020.pdf 1.64MB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Helpful for linear project review (Optional) 2020-03-31 - PM512-17-010 - Vicinity and Location 1.34MB Map.pdf Mast be RDF format. Rease do not upload entire set of E&SC plans. 7. Notes (Optional) Provide any additional information that night help the reviewer better understand how uploaded documents support the application. Include additional w aterbodies for linear projects if necessary. 8. NOI Certification NCG01-eNO1-Certification-Form-20190919-DEMLR- Form 531.22KB SW_SIGNED.pdf Wst be RDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Jennifer Smith Title City Engineer Organization Legally Responsible Entity City of Charlotte Date * 08/07/2020 F. Tracking and COC Info NOI Tracking No. 29606 NC Reference No. NCG01-2020-3412 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC203412 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 3412 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC203412-2020 Invoice Due Date 9/9/2020 Initial Fee $ 100.00 Invoice Status OPEN