HomeMy WebLinkAbout20081859 Ver 2_Information Letter_20090806V - i Rocky Mount Northern Connector C201917 R-2823 Permit Site Update i :.. . _ _ 8/6/09,:.. tirS? ,o o Site 7 e ,00A., ( 4o q For , L v?o 501 f?15 o Bridge Over Hornbea`f'i Branch Sta. 111+00 +/- o Installed erosion control and safety fence around the permitted area o Placed bridge fill into Permitted Buffer Zones o Formed and poured bridge end bent caps • Site 10 - 50(6- Cpylfy`l 0"V-45 40 Le ,I-wbV4;9. - o _ 78" and 24" Pipes at Sta. 169+00 +/-, o Installed Diversion Channel o Installed Safety Fence and erosion control devices o Installed 78" Pipe o Poured footing for headwall o Began backfilling pipe • Site 12 o Bridge Over Compass Creek Sta. 185+00 +/- o Installed erosion control and safety fence around the permitted area o Began placing bridge fill o Began Construction of Work Bridge • Site 13 0 78" Pipe at Sta. 190+00 +/- o Installed erosion control and safety fence around the permitted area o Installed Diversion Channel o Installed Pipe o Backfilled and stabilized area around pipe vt s "c.2 r t rrtk t?o?-. -P rhs /ir! !Ove,. i. ,- + vet Rocky Mount Northern Connector C201917 R-2823 Permit Site Update 9/3/2009 • Site 4 o Culvert at Sta. 49+00 +/- o Installed Safety fence around permitted areas. o Contractor began clearing. • Site 7 o Bridge Over Hornbeam Branch ta. 111+00 +/- o Set Girders e,' e? o Constructing Bridge Deck ,Ql/ 1V el is Site 10 o 78" and 24" Pipes at Sta. 169+00 +/ o Installed 78" Pipe and 24" Pipe ?F "ICV- o Headwall Completed ?'eS5 5 f (f? l? o Ditch installed o Area matted and seeded ? • Site 12 o Bridge Over Compass Creek Sta. 185+00 +/- o Began placing bridge fill at End Bent 1 o Continuing Construction of Work Bridge l L,IQ,p 1 rM . r? fi?/C fLrO?, • Site 13 0 78" Pipe at Sta. 190+00 +/- o Removed Temporary Rock Silt Check out of the stream. o Installed coir fiber matting where Reforestation is required. ?-