HomeMy WebLinkAboutNCC203299_ESC Approval Submitted_20200811ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Acting Director
NORTH CAROLINA
Environmental Quality
June 25, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
Hopewood Creek, LLC
ATTN: Elizabeth Dougherty, Manager
2220 Old NC 10
Hillsborough, NC 27278
RE: Project Name: Hopewood Creek Subdivision
Acres Approved: 27.3
Project ID: ALAMA-2020-034
County: Alamance
City: Newlin Township
Address: McBane Mill Rd.
River Basin: Cape Fear
Stream Classification: WS-V; NSW - Jordan Lake Watershed
Submitted By: The L.E.A.D.S. Group, P.A.
Date Received by LQS: June 15, 2020
Plan Type: Revised
Dear Ms. Dougherty,
This office has reviewed the subject erosion and sedimentation control plan and hereby issues
this Letter of Approval with Modifications. A list of the modifications is attached. This plan
approval shall expire three (3) years following the date of approval, if no land -disturbing activity
has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform
adequately, a revised plan will be required (G.S. 113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC
issued prior to the commencement of any land disturbing activity on the above -named project.
The NOI form maybe accessed at deq_nc.gov/NCG01. Please direct questions about the NOI form
to Annette Lucas at Annette.ILlcas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you
submit a complete and correct NOI Form, a COC will be emailed to you within three business
days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a
$100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central
Office staff in Raleigh.
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
J North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
['�/ f _EQ5 Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27105
NORTH CAROU
336.776.9800
Letter of Approval with Modifications
Hopewood Creek, LLC
June 25. 2020
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage
will be a violation of this permit and would require a revised plan and additional application
fee. You are requested to file an amended form if there is any change in the information included
on the form. In addition, it would be helpful if you notify this office of the proposed starting date
for this project. Please notify us if you plan to have a preconstruction conference. Your
cooperation is appreciated.
Sincerely,
ach` Lentz, EI
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCG01 Fact Sheet
cc: The L.E.A.D.S. Group, P.A.
ATTN: Chad Huffine
505 E. Davis St.
Burlington, NC 27215
WSRO file
Letter of Approval with Modifications
Hopewood Creek, LLC
June 25. 2020
Page 3 of 3
MODIFICATIONS
Project Name: Hopewood Creek Subdivision
Project ID: ALAMA-2020-034
County: Alamance
1. Approval by a representative of the Land Quality Section will be required prior to
removal of erosion control measures and/or conversion of the sediment basin(s) to
post -construction stormwater SCMs. [15A NCAC 4B .0106(a) (5)]
2. If it is found additional area will be required for stockpiling of topsoil, contractor
staging, temporary access, haul roads, erosion control measures or other land -
disturbing activities associated with this project, a revised erosion control plan
reflecting the additional area must be submitted to this office. [15A NCAC 413.0118]
3. Additional measures may be required - The applicant is responsible for the control of
sediment on -site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop
sediment from leaving this site. [15A NCAC 4B .0115]
4. In the event that a post -construction stormwater plan for this project is approved by
any regulatory authority, a copy of the approved plan must be submitted to this office.
[G.S. 113A-57(3)]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities