Loading...
HomeMy WebLinkAboutNCC203299_ESC Approval Submitted_20200811ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality June 25, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Hopewood Creek, LLC ATTN: Elizabeth Dougherty, Manager 2220 Old NC 10 Hillsborough, NC 27278 RE: Project Name: Hopewood Creek Subdivision Acres Approved: 27.3 Project ID: ALAMA-2020-034 County: Alamance City: Newlin Township Address: McBane Mill Rd. River Basin: Cape Fear Stream Classification: WS-V; NSW - Jordan Lake Watershed Submitted By: The L.E.A.D.S. Group, P.A. Date Received by LQS: June 15, 2020 Plan Type: Revised Dear Ms. Dougherty, This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications. A list of the modifications is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form maybe accessed at deq_nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.ILlcas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: J North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources ['�/ f _EQ5 Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27105 NORTH CAROU 336.776.9800 Letter of Approval with Modifications Hopewood Creek, LLC June 25. 2020 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, ach` Lentz, EI Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCG01 Fact Sheet cc: The L.E.A.D.S. Group, P.A. ATTN: Chad Huffine 505 E. Davis St. Burlington, NC 27215 WSRO file Letter of Approval with Modifications Hopewood Creek, LLC June 25. 2020 Page 3 of 3 MODIFICATIONS Project Name: Hopewood Creek Subdivision Project ID: ALAMA-2020-034 County: Alamance 1. Approval by a representative of the Land Quality Section will be required prior to removal of erosion control measures and/or conversion of the sediment basin(s) to post -construction stormwater SCMs. [15A NCAC 4B .0106(a) (5)] 2. If it is found additional area will be required for stockpiling of topsoil, contractor staging, temporary access, haul roads, erosion control measures or other land - disturbing activities associated with this project, a revised erosion control plan reflecting the additional area must be submitted to this office. [15A NCAC 413.0118] 3. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 4. In the event that a post -construction stormwater plan for this project is approved by any regulatory authority, a copy of the approved plan must be submitted to this office. [G.S. 113A-57(3)] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities