APPROVAL of 401 Water Quality Certification with Additional Conditions
Ms. Trish Simon, Division Environmental Officer
NCDOT Division 12
P.O. Box 1067
Aberdeen, NC 28315
Dear Ms. Simon:
You have our approval, in accordance with the attached conditions and those listed below, to
permanently impact 36 linear feet of an unnamed tributary to South Crowders Creek in order to
replace a pipe on SR 1102 (Unity Church Road) in Gaston County. The project should be constructed
in accordance with your application dated September 18, 2001 (received 24 September 2001). After
reviewing your application, we have decided that this fill is covered by General Water Quality
Certification No. 3289 corresponding to the U.S. Army Corps of Engineers Nationwide Permit
Number 14. In addition, you should acquire any other federal, state or local permits before you
proceed with your project including (but not limited to) Sediment and Erosion Control, Non-
Discharge and Water Supply Watershed regulations. This approval will expire with the
accompanying 404 permit unless otherwise specified in the Water Quality Certification.
This approval is only valid for the purpose and design that you described in your application except as
modified below. If you change your project, you must notify us, in writing, and send us a new
application. If the property is sold, the new owner must be given a copy of this Certification and
approval letter and is thereby responsible for complying with all conditions. If total wetland fills for
this project (now or in the future) exceed one acre, or if stream impacts exceed 150 linear feet,
compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). For
this approval to be valid, you must follow the conditions listed in the attached certification and any
additional conditions listed below.
1. All pipes required for this project shall be installed in such a manner that the original stream
profiles are not altered (i.e. the depth of the channel must not be reduced by a widening of the
streambed). Existing stream dimensions are to be maintained above and below locations of pipe
extensions. Pipes shall be installed one foot below the stream to allow for fish and other wildlife
movement.
2. All work shall be performed during low flow conditions.
3. Heavy equipment shall -be operated from the bank rather than in the stream channel in order to
minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream
4. Existing vegetated buffers shall not be mowed in order to utilize it for storm water sheet flow.
5. Stringent erosion control measures shall be installed where soil is disturbed. Erosion control shall
be maintained until the project is completed. Temporary or permanent herbaceous vegetation
North Carolina Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetiands/
shall be planted on all bare soil within 10 days of ground-disturbing activities to provide long
term erosion control. NCDOT is encouraged to use on-site vegetation and material for
streambank stabilization where practicable.
6. Use of rip-rap for bank stabilization is to be minimized; rather, native vegetation is to be planted
when practical. If necessary, rip-rap must be limited to the stream bank below the high water
mark, and vegetation must be used for stabilization above high water.
7. Rock silt screens at culvert outlets shall be removed at project completion.
Upon completion of the project, the NCDOT shall complete and return the enclosed
"Certificate of Completion" form to notify NCDWQ when all work included in the §401
Certification has been completed. The responsible party shall complete the attached form
and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon
completion of the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This
certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act. If you have any questions, please telephone Ms: Cynthia Van Der Wiele at 919-733-9646
or Mr. Pete Colwell of the Mooresville Regional Office at 704.663.1699.
Attachment
. Sincerely,
FILE COPY
TO: John Hendrix, USACOE
Asheville Field Office
FROM: Ron Linville, Regional Coordinator
Habitat Conservation Program
DATE: September 21, 2001
SUBJECT: North Carolina Department of Transportation (NCDOT), SRI 102, Unity
Church road, Unnamed Tributary to South Crowders Creek, Gaston
County
These comments are provided in accordance with the provisions of the Fish and
Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d) and the North
Carolina Environmental Policy Act (G.S. 113A-1 through 113A-10; NCAC 25). The
NCDOT proposes to improve and pave the referenced roadway.
The project will require pipe replacement of an existing 24-foot, 48" CMP at
Station 38+50. This pipe will be replaced with a 40-foot 112"x75" CMPA with concrete
headwalls. A small section of stream will be relocated away from the existing road to
facilitate widening to meet current safety standards.
We will not object to the project as proposed by Ms. Trish Simon in her
application of September 18, 2001 providing that the project construction follow the
design and methods indicated. The relocated channel will mimic existing channel
patterns and dimensions.
1. The CMPA should be designed and constructed large enough so that it can be
installed one foot below streambed grade so that all waters can flow through
uninterrupted and without freefalling or damming on either end during low
flow conditions to maintain fish passage. The dimension, pattern, and profile
of the stream and floodplain above and below the pipe should not be modified
by widening the stream channel or reducing the depth of the stream.
SR1102, NWP 14 2 September 21, 2001
2. If concrete will be used, work must be accomplished so that wet concrete does
not contact stream water. This will lessen the chance of altering the stream's
water chemistry and causing a fish kill.
3. Heavy equipment should be operated from the bank rather than in the stream
channel, i order to minimiap sedimentation and reduce the likelihood of
introducing other pollufantsinto the stream.
4. Stringent erosion control measures should be installed where soil is disturbed
and maintained until project completion.
5. Temporary or permanent herbaceous vegetation should be planted on all bare
soil within 10 days of ground disturbing activities to provide long-term erosion
control. We encourage NCDOT to utilize onsite vegetation and materials for
streambank stabilization when practicable.
Thank you for the opportunity to review and comment on this project during the
early planning stages. If you have any questions regarding these comments, please
contact me at 336/769-9453.
Cc: Trish Simon, NCDOT
Cynthia Van Der Wiele, DWQ
A
401 ISSUED
FILE COPY A.MSfATFo
01 1 4 0 6
STATE of NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY LYNDO TIPPETT
GOVERNOR SECRETARY
PO BOX 47, SHELBY, NC 28151
September 18, 2001
Mr. John Hendrix
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
Subject: Nationwide Permit #14
SR 1102, Unity Church Road
Gaston County, NC
Dear Mr. Hendrix:
11-11
The North Carolina Department of Transportation, Division of Highways, proposes the
following project for your issuance of a Section 404 Permit. We believe this project can
be accomplished under NWP # 14, Linear Transportation Crossing.
I have enclosed a straight line diagram with erosion control plan, a PCN application for
NWP #14, a sketch of planned activities, and a location map relative to the secondary
road paving project/pipe replacement project on SR 1102, Unity Church Road, Gaston
County, NC. The secondary road paving project consists of 9.1 acres of NC DOT right
of way and the pipe replacement project encompasses 0.20 acres of this acreage, also
within NCDOT right of way.
Unity Church Road is currently a partially unpaved 18-foot wide gravel road. NCDOT
plans to pave the road from SR 1104 to SR 1112 for a length of 1.3 miles. It will be
graded and paved to current standards and typical section using bulldozers, pans,
backhoes, rollers, and pavers. The majority of the work will consist of reshaping the
existing alignment with one area of new alignment to shift the road away from a
paralleling stream. The stream parallels the road (1-5 feet) for a distance of
approximately 90 feet south of an existing crosspipe at Station 38+50..x,
A
Mr. John Hendrix
Page 2- SRI 102, Gaston County
September 18, 2001
DOT also proposes to remove an existing 24-foot, 48" CMP and replace it with a 40-foot
long 112"05" CMPA with concrete headwalls at the inlet and outlet and a 5-foot riprap
apron at the pipe inlet. Ten feet of riprap will be used around the inlet and outlet of the
pipe for bank stabilization. DOT proposes to fill 60 feet of the existing channel and
relocate it approximately 10 feet west (still within NCDOT right of way). The shift of
the road alignment and the stream relocation is being done to provide an'increased buffer
area between the roadway and the tributary. An on-site field meeting was held on
8/29/01 between representatives of NCDOT, Wildlife Resources Commission (Ron
Linville & Mary Ellen Haggard) and the Division of Water Quality (Pete Colwell) to
determine an acceptable design for the stream relocation. The relocated stream will be
constructed in such a way as to mimic the existing stream channel's pattern and
dimensions. The existing large vegetation on the east streambank will remain
undisturbed and the streambank between the stream channel and roadway will be seeded
and mulched. The road alignment changes and the stream relocation are shown on the
enclosed sketches and maps.
The pipe will be placed one foot below the existing streambed elevation and existing
channel morphology will be maintained at the inlet and outlet. It is proposed that the
watercourse be blocked using sandbags and pumped around the construction area during
the pipe installation following NCDOT best management practices for pipe placement
activities. The diversion will extend approximately 5 feet upstream of the channel change
and 5 feet below the riprap at the pipe outlet.
The stream impacted by the proposed project is an unnamed tributary to South Crowders
Creek, which is classified Class C waters and is located in the Catawba River Basin.
There are no wetlands involved in the project. The stream is not located within a
watershed area nor is the road a rural or urban arterial; therefore, hazardous spill basins
are not required. Enclosed is the NCDOT hazardous spill basin checklist for this project.
The USGS Kings Mountain Quadrangle topographical map indicates a second unnamed
tributary crossing SR 1102; however, possibly due to the land use changes in the area,
this stream no longer exists. A USACE and DWQ stream classification form has been
completed for both tributaries shown on the USGS map.
A review of the Natural Heritage information for the threatened/endangered species listed
for Gaston County, the bog turtle (Clemmys muhlenbergii), the bald eagle (Haliaeetus
leucocephalus), and Schweinitz's sunflower (Helianthus schweinitzii), did not reveal any
known sites in the vicinity of the proposed project. I have conducted a surveys for the
bog turtle (Clemmys muhlenbergii), the bald eagle (Haliaeetus leucocephalus), and
Schweinitz's sunflower (Helianthus schweinitzii) in the project area on July 5 and July
26, 2001. None were observed. It was determined that none of these species or suitable
habitats were located in the proposed project area. No significant effect on this species is
At
Mr. John Hendrix
Page 3- SRI 102, Gaston County
September 19, 2001
anticipated. A review of the National Register of Historic Places was also conducted. It
is anticipated that no site listed on the National Register will be affected by the proposed
project. A concurrence form from the N.C. State Historic Preservation Office for this
project is enclosed.
By copy of this letter, we are asking Neil Trivette, Area Roadside Environmental
Engineer to comment on the above project. By copy of this letter, we are also
requesting concurrence from the Wildlife Resources Commission and the U.S. Fish &
Wildlife Service.
By copy of this letter, I am forwarding seven (7) copies of the application package to
John Dorney, NCDENR, Division of Water Quality, 401/Wetland Unit for review. A
$200.00 check is enclosed for application processing.
Your earliest consideration for this request would be greatly appreciated. Should you
have any questions, please call me at 704-480-9044.
Respectfully yours,
M. L. Holder, P.E.
Division Engineer
Twelfth Division
BY:
Trish Simon
Division 12 Environmental Officer
Enclosures
cc: Mr. Michael L. Holder, P.E., Division Engineer
Mr. Dan Holderman, P.E., Division Bridge Engineer
Mr. Johnny Murdock, P.E., Gaston County Maintenance Engineer
Mr. Neil Trivette, Area Roadside Environmental Engineer
Mr. Ron Linville, WRC
Mr. Brian Cole, USF & WS
Mr. John Dorney, DENR,DWQ,401/Wetlands Unit (7 copies)
File
t
Office Use Only: Form Version Apri12001
011406
USACE Action ID No. DWQ No.
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
I. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit
? Section 10 Permit
® 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 14
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NC)VRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
IL Applicant Information
Owner/Applicant Information
Name: Mike Holder, N.C. Department of Transportation
Mailing Address: P.O. Box 47
Shelby, North Carolina 28151
Telephone Number: 704-480-9020 Fax Number: 704-480-5401
E-mail Address:
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Trish Simon
Company Affiliation: N.C.Department of Transportation
Mailing Address: P.O. Box 47
Shelby, North Carolina 28151
Telephone Number: 704-480-9044 Fax Number: 704-480-5401
E-mail Address: tsimon@dot.state.nc.us
Page 3 of 12
M. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
Name of project: Unity Church Road (SR 1102) Secondary road pavin project/Pip
replacement at Station 38+50.
2. T.I.P. Project Number (NCDOT Only): N/A
3. Property Identification Numbers (Tax PINs): NCDOT Right of Way_
4. Location
County: Gaston Nearest Town: Kings Mountain
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): Take Hwy 161 South from I-85
for approximately 0.5 miles. Turn left onto SR 2292. This road will become SR 1104 at the
Gaston -County line. Proceed approximately 1.5 miles to SR 1102. Turn right onto SR 1102
5. Site coordinates, if available (UTM orLat/Long): 35°11'05N/81°82'28W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application: Piped
crossing on an unpaved secondary road. The area surrounding the outlet of the pipe has been
logged . Woody debris from clearcutting has been left in and around the stream channel at
the outlet area.
7. Property size (acres): Entire paving _project= 9.10 acres (NCDOT right of way): Bridge
project area = 0.20 acres (NCDOT right of way)
8. Nearest body of water (stream/river/sound/ocean/lake):Unnamed tributary to South Crowders
Creek Class C Waters.
9. River Basin: Catawba
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/mUs/.)
Page 4 of 12
10. Describe the purpose of the proposed work: The project consists of the upgrade of an
existing unpaved road to current paved road standards by secondary road construction
department for the safety of the travelling public. At Station 3 8+50, the bridge department will
remove an existing 24-foot, 48 CMP and replace it with a 40 foot long, 112"05" CMPA with
concrete headwalls at inlet and outlet and a 5 foot riprap apron at inlet. Ten feet of riprap will
be used around the inlet and outlet of pipe for bank stabilization. Due to the close proximity of
the stream and the existing road, the road will be reali ned slightly and 60 feet of stream will
be filled and relocated. The proposed relocated channel will also be 60 feet; therefore, there
will be no net loss of linear stream footage.
11. List the type of equipment to be used to construct the project: Secondary road construction
will be done using typical heavy construction: bulldozers, pans, backhoes rollers, and
pavers. The bridge department will use a trackhoe for excavation, pipe lag, and riprap
work.
12. Describe the land use in the vicinity of this project:The surrounding area is partially wooded,
however, has been heavily cutover recently. There are several parcels of land for sale along
the road. Due to the recent logging and land for sale signs, development in this area is
anticipated.
IV. Prior Project History
If jurisdictional determinations and/or permits have been,, requested and/or obtained for this
project (including all prior phases of the same subdivision,, the-past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules. N/A
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: The existing road is a partially unpaved road that is to be paved under this permit
request. There are no other stream crossings on this road. No additional permit request for this
project is anticipated.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
Page 5 of 12
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Wetland Impacts NO WETLAND RVIPACTS
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100 year Floodplain**
es/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at hgp://www.fema.Rov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property: 0
Total area of wetland impact proposed: 0
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number Length of Average Width of Perennial or
(indicate on Type of Impact* Impact Stream Name** Stream Before Intermittent?
map) (linear feet) Impact (please specify)
I CMPA placement/ 16 ft Unnamed tributary to 3 ft Perennial
headwalls South Crowders
Existing channel 60 ft (NO NET
1 filled & proposed LOSS OF
channel relocation CHANNEL)
Placement of riprap
around pipe inlet
and outlet for bank 10 ft each end
1 stabilization
(Total=20 ft)
(including 5 foot
riprap apron in front
of outlet of pipe)
5 ft upstream ,.
Temporary impact ofchannel
«
1
of stream diversion
thane & S ft
g «
downstream of
riprap at outlet
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
* * Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www,usgs.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.to_pozone.com,
www.manguest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: Extension of pipe &
construction of headwalls = Total of 16 ft. Placement of riprap on stream bank for
stabilization = Total of 20 feet. Temporary impact due to piped stream diversion = Total of
10 feet. Fill of existing channel & Channel relocation = 60 feet - NO NET LOSS OF
CHANNEL.
Page 6 of 12
0
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U. S. NO OPEN WATER IMPACTS.
Open Water Impact Area of Name of Waterbod
y Type of Waterbody
Site Number Type of Impact* Impact
( applicable) (lake, pond, estuary, sound,
(indicate on ma) (acres) bay, ocean, etc.
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation,. dredging,
flooding, drainage, bulkheads, etc.
4. Pond Creation NO POND CREATION
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
NCDOT will be ading and paving SR 1102 in order to improve safety and reduce maintenance
The creek parallels the road (1-5 feet) from for a distance of approximately 90 feet south of the
replaced and extended 16 ft. Sixty feet of the existing stream channel will be filled and sixty feet
of channel will be relocated approximately 10 feet to the west of the existing channel. The shift
of the road alignment and the stream relocation is to provide an increased buffer area between
the tributary and the roadway. The area along SR 1102 is being developed and the developers
have already platted lots to be sold. Due to the development that is occurring in this area, there
was concern that if the stream were relocated off of the DOT right of way, it would be more
difficult to prevent future impacts. NCDOT has chosen to replace pipe in existing location and
to relocate the stream on existing right of way. The new stream channel will be constructed in
such a way as to mimic the existing stream channel pattern and dimensions. The existing large
vegetation on the west streambank will remain undisturbed, the streambank between the stream
channel and the roadway will be seeded and mulched, as shown on the enclosed sketch. This
option was chosen to reduce the amount of fill in the stream and to maintain the existing
Page 7 of 12
meander that can be observed at this location. An on-site field meeting was conducted between
representatives of NCDOT. Wildlife Resources Commission (Ron Linville and Marv Ellen
Haggard), and Division of Water Quality (Pete Colwell) on 8/29/01 to determine an acceptable
design option.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/strrngide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
PERMANENT IMPACTS DUE TO FILL < 150 FEET. The impacts of the 60 feet of fill in
the existing stream is being mitigated by the relocating 60 feet of the stream channel. The
relocation is being done in such a way as to mimic the dimensions and pattern of the existing
channel and will remain on NCDOT right of way to prevent future impacts to the relocated
section.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
Page 8 of 12
0
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrD/index.htm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):_ .
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Page 9 of 12
Zone* (sImpact quare feet Multiplier Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260.
N/A
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
SR 1102 is a 1.3 mile unpaved road that is to be paved width under this hermit application.
Erosion and sedimentation control measures will be in place during construction.
XII. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
XM. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
N/A
//Ik / ? ' J,,/o1/
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 10 of 12
!? 4 # If F '4 \, - T?Y'+.._.? I r"?? ?,...1 ,f 'ya:N•"fi? `.•.., ~ 886-
.
t ,.... '? r{ '?. ,".'? Y f,. ...-,...•? f !!. !"?.",r",:.y^+„? 4 ti,,:i" "ham ,.,,f
Hi
TS v s v .I'' `` t} 4ttk ' t :`cti .t' ....-^.r-•°"" - 'F ?4 •1, ?N ?'•'?`°.`.
fem. .? ..-.
. ti
CIO
N '.4
? t x ET-.+:+.y,? s,i ? ..° E ? ?rw R,F 4 ?• ? .>.a`^.?'. ?pr? iJ r ??
}- ?•_:'d ? .,.:aF'''° ?'`2?'?.?+r?r?r ? Y?,? ``?-.":yf'°'}? ,f? f f ?? +y„?. ',:,?x.•? 0. # ?S ? } ` ? ? '.
"? ? e ? ? 4 o y rrf .•`«r v S ?? 6 ? t ??
_ ''+? t1? `•`; `'"5. a._.. k?..? ° kF?. ^w ?? "^--?• `nom. ?'Y,,\ t ?^* ? ?l ? '??'^? ? ? ?'1 ? d??. a
r l'"?, :'.?? { / ? fx {?j T_j i'ttr` ?..t ?'1 .. `s?a`+..?r•? "°'?f'Y?•"`jf ?T ?.? ?? }kt>???•.
r ? his 1
triter en`,'s r-eafrf r'
4 , s get p
71
CPO
o ? ' t ? ., y''?.w- ' ? i 4 '?4 .'4.. .,.r ? ! F ? - 1? f Y{ ? ? jfF )/J s? "^?i`>',4 ?ys, •I,*^ sx L..
4 ,
I '? ?a t +? ?., { rrf ?` ``•''• ? off r<r?? {?i' ?.• : «. 'I.3 ? 3' ?-+ ? i ,_ r '"?'-?,
?, ?• _ _?.,? - .r.???'P.?ace?,e nt( ? ..;? ? f -.ma=y" ? ??? t 4? ? ?"
?. ?}'.. :??3 " ? ,0. 's J f - ?• ? FT rf ??;.e ? i?. 1 P fa"r.??''"' °'n"s
?,,,? •+"-?„??1 ? \?? +?.t?"°J `i? ,"ti. ???'?a ?'.4 ?r ? ?. `? ?<?? ? ,?? f ??-???r"? ?''?j ?? !Y?1 ?'s:,,Y•
l 1?
x ..> # X 44` .. ] i-+4 1 51? -^ `?+. ..kR y. h „? 4 •J • 'R
\ y?
moo, Y
fz? •, . * ? i? ,r"'°" ;:, Y"n ` ? ? .....st''? . ?.• ?,? j ,,?zYtl ttti ? ? +"'? "a,,_.
KINGS MT Location: 035' 11' 10.2" N 081' 18'06.0" W
Date: 7/5/2001 Caption: Pipe replacement on SR 1102, Unnamed tributaryto South
Scale: 1 inch equals 1000 feet Crowders Creek, Class C Waters, Catawba River Basin
Copyright (C) 1997, Maptech, Inc
n? y
1LA ctt ,
1
t Jt: ,
ZI
r p ? . n.
? j
i
O ./ f
? c
%
a i
m
r
r
t
?F
i
r-A :1/ v
i try ?? Z
t41' ? ?
o
rQ
ro tA
? Z
o
r
Ts N o
•? lv
k
7 ? O T?
r -
r
1
f-A
0
0
Q
-
44
yi-
f
rl
c.W
w.OI
Upstream of pipe replacement project on SR 1102 on an unnamed tributary to South
Crowders Creek in Gaston County
Crowders Creek in Gaston County
Downstream of pipe replacement project on SR 1102 on an unnamed tributary to South
INTERMITTENT CHANNEL t ~'
EVALUATION FORM
ACTION ID APPLICANT NAME N.C. Department of Transportation DATE 9/18/01
PROPOSED CHANNEL WORK (i.e., culvert, relocation, etc.) Pipe replacement/extension and stream relocation
WATERBODY/RIVER BASIN Unnamed tributary to South Crowders Creek, Catawba River Basin COUNTY/CITY Gaston County
RECENT WEATHER CONDITIONS
P SP NP Observation Comments or Description
X Fish/Shellfrsh/Cnxstaceans Present Small fish present
X Benthic Macro Invertebrates None observed - are presumed present
X Amphibians Present/Breeding Frog observed
X Algae And/Or Fungus (water quality function)
X Wildlife Channel Use (i.e. tracks, feces, shells, others)
X Federally Protected Species Present (Discontinue)
X Riffle/Pool Structure
X Stable Streambanks
X Channel Substrate
i.e. gravel, cobble, rock, coarse sand Sand
X Riparian Canopy Present (SP =/> 50% closure) Stream is parallel to existing unpaved road/ Heavy clearcutting has
occurred in area/Lots are being developed
X Undercut Banks/Instream Habitat Structure
X Flow In Channel
X Wetlands Adjacent To/Comig. With Channel (Discontinue)
X Persistent Pools/Saturated Bottom
June through Sept)
Seeps/Groundwater Discharge (June through Sept.) Unknown
X Adjacent Floodplain Present Floodplain benches observed in stream channel
X Wrack Material or Drift Lines
X Hydrophytic Vegetation in/adjacent to channel
Important To Domestic Water Supply? Y / N NO
Does Channel Appear On A Quad Or Soils Map? Y / N Yes Approx. Drainage Area: 300 acres-
Determination:
X_ Perennial Channel (stop) B Important Channel: _X_ LF PROJECT MGR Initials
Intermittent Channel (proceed) Unimportant Channel: LF
Ephemeral Channel (no jd) (attach map indicating location of important/unimportant channel)
Ditch Through (no jd)
Upland
Evaluator's Signature:
(if other than C.O.E. project manager)
P--Present SP=Stongly Present NP=Not Present
11/4/98
t
{ kw
INTERMITTENT CHANNEL
EVALUATION FORM
ACTION ID APPLICANT NAME N.C. Department of Transportation DATE 9/18/01
PROPOSED CHANNEL WORK (i.e., culvert, relocation, etc.) Pipe
WATERBODY/RIVER BASIN Unnamed tributary to South Crowders Creek, Catawba River Basin COUNTY/CITY Gaston County
RECENT WEATHER CONDITIONS Dry
This second channel is shown on the enclosed topographical map as an intermittent stream north of the stream to be relocated. This
channel is no longer evident possibly due to the development that has previously occurred in this area.
P SP NP Observation Comments or Description
X Fish/Shellfish/Cnistaceans Present
X Benthic Macro Invertebrates
X Amphibians Present/Breeding
X Algae And/Or Fungus (water quality function)
X Wildlife Channel Use (i.e. tracks, feces, shells, others)
X Federally Protected Species Present (Discontinue)
X Riffle/Pool Structure
X Stable Streambanks
X Channel Substrate
(Le. veL cobble, rock, coarse sand
X Riparian Canopy Present (SP =h 50% closure)
X Undercut Banks/Instream Habitat Structure
X Flow In Channel
X Wetlands Adjacent To/Contig. With Channel (Discontinue)
X Persistent Pools/Saturated Bottom
(June through Sept)
X Seeps/Groundwater Discharge (June through Sept)
X Adjacent Floodplain Present
X Wrack Material or Drift Lines
X Hydrophytic Vegetation in/adjacent to channel
Important To Domestic Water Supply? Y / N NO
Does Channel Appear On A Quad Or Soils Map? Y / N Yes Approx. Drainage Area: 30 acres
-
lllll//ll//llllllll/llll/llllllllll?ll/Ill?//ll/llllllllllllllllll?llllll/lll?l?llllllllllllllllllll?lll???lllllllllllllll???????/?/ll?lll?lllll/?llllllll/llllllllll/lll/l?llll/ll?l??l???/????1/1???????/??///llll/lll////ll
Determination:
Evaluator's Signature:
(if other thanC.O.E. project manager)
Perennial Channel (gtOp) Important Channel: LF PROJECT MGR Initials
Intermittent Channel (Prod) Unimportant Channel: _X LF
X Ephemeral Channel (no jd) (attach map indicating location of important/unimportant channel)
Ditch Through (no jd)
Upland
of
P=Present SP=Stongly Present NP=Not Present
11/4/98
NCDWO Stream Classification Form
SPtojcciNamc: SR IIOZ River Basin: ('a4etok)L,. County: C-A' l01\1 ' Evaluator. I r' "sA .A'1 0h%
i
DWQ Project Number. Neatest Named Stream; 5 : Gr'0t.Idp ?Catitude: 5 %/ •Q 5-1V Signature:
er-e1 K
Date: q? 8/0 Uses QUAD: K -119S Longitude. $? °XZ o?g JA/ Location/Directions: 5 f? I I C 2 -1: O C
*PLEASE NOTE: I?ewm tar and /andawwn ogre. that th, f-ftere is a manmade ditch, then use ojthirlorw is not necessary.
A40, Win the best r 'o aI 'cad t th w1
p oral be rt / gemen , e e rmro ,the
raring syre.m shouldnot b /.arure a a man-mad. ditch and not a
used•
..dif d natures/
sneam-rho
1 Z-
S 1Z
Primarv Field Indicators: rCar40ne Namber Ter cage/
1. Geomorphology Absent Weak tllodent St-
1) Is There A Rile-Pool Sequence? 00 01 Q,Y 03
is The USDA Texture In St arnbed
2)
i 00 01 02 Ci
D
fferent From Surrounding Tem. in? s
3) Are Natural Levees Present? 01 02 03
4) Is The Channel Sinuous? 00 0 11 02 0-f
5) Is There An Active (Or Relic) Floodplain Present? 00 ,
l7 1 02 03
6) Is The Channel Braided? 0'T 01 02. 03
7) Are Recent Alluvial Deposits Present? 00 01 O 2 (DeS
8) Is There A Banktull Bench Present? 00 01 01T 03
Is A Continuous Bed & Bank Present? 9)I•NOM triled d Bank roared By Ditching And WITHOUT Sinrodry Thew Seere-0 0 01 02
10) Is A 2nd Order Or Greater Channel (As Indicated On Topo
Man And/Or In Field) Present? ?• /?-0 0 No-0
WY
PRIMARY GEOMORPHOLOGY INDICATOR POINTS.
11. Hydrology AD
Absent #VALUEI
Weak
Moderate
Strop
1) Is Thee A Groundwater
Flow/Discharge Present?
GY001
01
02
03
PRIMA R Y HYDROL OGY INDICA TOR POINTS.
?I. Biology
Absent #VALUEI
Weak
Moderate
Strong
1) Are Fibrous Roots Present In Streambed? ?7 3 02 01 00
2) Are Rooted Plants Present In Streambed? 03 ? 01 00
3) Is Periphyton Present? 00 01 . (F72
.
03
4) Arc Bivalves Present? awl 01 Oz 03
PRIAIAR Y BIOLOGY INDICA TOR POINTS.
Secondary Field Indicators: (clteleo.,maeb-pe une/
1. Geomo holo -7
/
Absent #VALUEI
Weak
Moderate
Strong
1) Is There A Head Cut Present In Channel? 00$ 0 1 01-5
2) Is Them A Grade Control Point In Channel? 00 0-6.15- 01 01.5
3) Does Topography Indicate A
Natural Drainage Way? 0 0 O 0.5 0 f 1$
SECONDARY GEOMORPHOLOGY INDICA TOR POINTS.
11. Hydrology 0--
Absent #VALUEI
Weak
Moderate
Strong
1) Is This Years (Or Last's) Leathtter
Present In Stmmbed? 0 1 0 0.5 0 0
I) Is Sediment On Plants (Or Debris) Present? 00 0.5 01 01-5
3) Are Wrack Lines Present? 00 ?$ 01 01.5
Is Water In Channel And >48 Hrs. Since (? p
4) Last Known Rain? (WOTE IIDitrh Indicated In a9 Ab-ski, 7his Step And.9 p.-,
b s
01 ,r?
01l 1/5
5) Is There Water In Channel During Dry
Conditions Or In Growing Season)? 0 0 O O$ 0 1 1.S
6) Ate Hydric Soils Present In Sides Of Channel (or in Head ..T: eles-1$ 0 No-0
SECONDAR Y HYDROLOGY INDICA TOR POINTS:
III. Biology •7
Absent/ #VALUEI
Weak
Moderate
Strop
1) Are Fish Present? 00 00.s erli, 01.5
2) Are Amphibians Present? 00 Q45 01 01.5
3) Are AquaticTunles Present? (bY5 0 0.s 01 01.s
4) Are Crayfish Present? 00 t1C 0.5 0
11 01.5
5) Are Macrobenthos Present? 00 00.s ,
,
V"1 01.5
6) Are Iron Oxidizing Bacteria/Fungus Present? 9< 00.s 01 01.5
7) Is Filamentous Algae Present? 00 &f5 01 01.s
8) Are Wetland Plants In Stmmbed? SAV Mostly .901. Mostly FACW Mostly FAC Mostly FACU Mostly UPL
(• NOTE: IlTotar,rbrenee Of All Ptana InStrca-bed Ar Nmed 02 1 00.75 00.s 00 OO
Aborr Skip This Step UNLESSSAYPxsrnr•J.
SECONDAR Y BIOLOGYINDICA TOR POINTS: 4 #VALUEI
r 7
TOTAL POI/VTS (Prinrnn•+Serondan•)= q? rS #VALUEI (IjGreaterThan OrEqual To 19 Points TheStream IsArLeast lntesmitrent)
NCDNVO Stream Classification Form
Project Name: •e'j? C Z River Basin: / ' n. + BUJ
10
G, County-. a6 fopi'
DWQ Project Number. Neatest Named Stream: S: GnJW Latitude: S 11 , .Z.? /`t
Cr ee K,
Due: I/ )7/C) 1 USGS QUAD: K i,35 IY)+:r4 Longitude: $ I o 1 'I C1 N/
'PLEASE NOTE: ljeraiaatar and landowner agree that the jeamre is a man-made ditch, then ase of ehls john it not necessary.
Also, ill. the bat professionaijudgement ojrhe emiaator, the feature is a man-made ditch and not a modified natural stream-ehis
rating system should not be used
Signature: 14,:?M ,,,,
Location/Directions: The SC CU,0( C k4zn..e
is Showt-l On 4+W fACIOSC ??Ph;
&IOL0 as an
Primary Field Indicators: rGrcteOneNamberre.Une? h6r'Hrf o,F J-L)e s fi('C Capr -6 be re to c
1. Geomornholomv Absent Weak Moder r Stron
1) Is There A Riffle-Pool Sequence? d 01 02 03
2
Is The USDA Texture in Strcantbed
Different From Surrounding Termin?
Gplo
01
02
03
3) Are Natural Levees Present? I10, 01 02 03
4) Is The Channel Sinuous? 00 Q 02 03
5) Is There An Active (Or Relic) Fioodplain Present? 01 02 03
6) Is The Channel Braided? - (o 01 02 03
7) Are Recent Alluvial Deposits Present? GIf 01 02 03
8) Is There A Bankfuli Bench Present? Vo _ 01 O 2 03
Is A Continuous Bed & Bank Present?
(?
q)(•NOTE-7fBrd& Bonk Caaeed By DiMkingAnd WTHOUT Si...hy Th. Scon?0 0
,_
ae
02
03
Is A 2nd Order Or Greater Channel (As Indicated On Topo
10) M.,=c
p And/Or In Field) Present? ,.,/
O Yes-3 'V. -O
PRIMA RYGEOMORPHOLOGY INDICATORPOINTS.
11. Hydrology 'Z
Absent #VALUE1
Weak
Moderate
Strong
1) Is There A Groundwater
Flow/Discharge Present?
0
01
02
03
PRIMAR Y HYDROLOGY INDICATOR POINTS.
111. Biology O
Absent #VALUEI
Weak
Moderate
Strong
9 Are Fibrous Roots Present in Streambed? 03 02 01
Qrlo
2) Ate Rooted Plants Present In Streambed7
03
02
01 9-01,
3) Is Periphyton Present? l?'6 01 ' 02 03
4) Are Bivalves Present? rN0 01 02 03
PRIMARY BIOLOGYINDICATORPOINTS.
Secondary Field Indicators: (eeteoneA4mberper2iw)
1. Geomorphology ^
Absent #VALUEI
Weak
Moderate
Strong
1) Is There A Head Cut Present In Channel? (94 00.s 01 01.5
2) Is There A Grade Control Point In Channel? d 00.s 01 01.5
3) Does Topography Indicate A
Natural Drainage Way? 00 O'S 01 01.5
SECONDARY GEONIORPHOLOGYINDICATOR POINTS:
Il. livdroln¢v
Absent #VALUEI
Weak
Moderate
Strong
1) Is This Years (Or Last's) Leatiitter _
Present In Streambed? O SS O i O 0.5 W?p
2) Is Sediment On Plants (Or Debris) Present? e o O 0.5 01 O i.S
3) Are Wrack Lines Present? C?10 O OS 01 01.5
4) Is Water In Channel And >48 His. Since 916, O OS 01 0
Last Known Rain? ('NOM- tfDilrh bdiroted nn e9AbrSkip Tis SrpAn
o
d e3 Bo.') 1.5
5) Is There Water In Channel During Dry I O OS O 1 01
s
Conditions Or In_Growing Season)? .
6) Are Hydric Soils Present In Sides Of Channel (0r L. HeWeuQr ,.,?
O Yes-15 lV No.O
SECONDARYHYDROLOGY GVDICATOR POINTS: O #VALUEI
111. Biology Absent Weak Moderate Strong
1) Arc Fish Present? Glir 00.5 01 O LS
2) Are Amphibians Present? IQ 00_5 01 01.5
3) Are AquaticTurtles Present? alo O OS 01 01.s
4) Are Crayfish Present? 00.5 01 01.5
5) Are Macrobenthos Present? 9?0 00.5 01 01.s
6) Arc Iron Oxidizing BacteriatFungus Present? 0 O OS 01 01.s
7) Is Filamentous Algae Present? G O OS 01 01.s
8) Are Wetland Plants In Stteambed? SAV Mostly OBL Mostly FACW Mostly FAC Mostly FACU Mostly UPL
(-NOTE: ffTomiAb,- 0f ttt Ptana to Saro,.bed A. M.,.d 02 01 00.7S O o.S 00 QA.?
Abmv Skip Thtr Sep UNLFSSSAYP.esrnr•1.
SECONDAR Y BIOLOGY INDICA TOR POINTS: f > #VALUEI
TOTAL POINTS fPriumn•+Secanrln zits #VALUEI (If Greater 77mn Or Equal To 19 Points 77te Stream Is At Least Intermittent)
EROSION AND SEDIMENTATION
CONTROL PLAN
GASTON COUN'TY
SR 1102 UNITY CHURCH ROAD
DATE JULY 3, 2001
DIVISION OF HIGHWAYS
DEPARTMENT OF TRANSPORTATION
STATE OF NORTH CAROLINA
W.O. # 6.812488
PURPOSE
The purpose of this Erosion and Sedimentation
Control Pro-o-ram of the Division of High-wars is to
control accelerated erosion and sedimentation resulting
from the construction and maintenance 0, roads and
high%vavs in 'N'o,-L1^i Carolina. This program is developed
pursuant to the requlremeiits corltc lned in the Rules anCl
Pte?ulations for Erosion and Sedinnentation Control_
v,-hich were adopted by the North Carolina Sedimentation
Control Commissioi-i on April 10; 10 i=' .
Narrative
This project, which is a road improvement/widening project, is located in
South Western Gaston County. It will consist of construction
approximately 6,600 feet of Unity Church Road to a 20-foot edge of
pavement to edge of pavement with a 6-foot shoulder section on each
side. The construction will take place with its intersection with SR 1104
Pinnacle Road and Lewis Road SR 1112.
Construction will consist of the installation of pavement and storm
drainage. The construction will be performed on new roadway; the
majority of the land adjacent to the proposed construction area is made
up of undeveloped wooded land. The total area to be denuded for the
project is 6.0 acres. The erosion control for this project will be in the
form of 35 checkdams. The dams will be placed at several locations
along the roadway. Silt fences will be placed along the toe of sloped
where sediment-laden runoff cannot be directed into sediment basins. In
addition, temporary diversion ridge will be used to contain run off, which
will be discharged periodically at various checkdams. Rock checkdams
shall also be used along the ditch sections. The plans shall show the
exact location, type and size of each erosion control device.
There are 7 points of discharge from cross lines with this project, which
discharge into an existing system, which will have outlet protection
installed at the outlets. Inlet protection will be placed at all inlets where
a sediment basin cannot be placed at the discharge points. Rock check
dams will be installed at all inlet headwalls. Silt fences will be installed
at the toe of all fills where there is potential for erosion.
The soil erosion and sedimentation control structures and devices should
be done in accordance with the specifications and designs as shown on
the plans. All devices should be maintained until vegetation has been
stabilized until the black base has been placed.
Other erosion control measures of field modifications maybe required as
site conditions dictate.
EROSION CONTROL
DETAILS AND
SPECIFICATIONS
6
-__ -- -
_ ---------------------------------
-
i
------
--- -- I 10
v
- _
' c .!: ---- - - ----- - - -- --
-? ''-
Tom
- 7,77 - -- j7 I?
,`
`
..
.? `.iii L.•1 ?C'. 1 vz[?_
--
=
-
-I
1?
c== -----
- F? --<r?. --------
-
--
---- -----
No - -------- --- -16
E -
I-
1.7 , - is
.01
- ---
"' .,
VI - :Z2
C, 4 ....................................
- -
----•------•- `
------------------ -
-----.--•--•-----.--•-
-- %. = - ............................... c
o
GRc_ U D CQti tR FOR SLOPES. FILLS PtiD =ER G'R-=-DE D AREAS
The angles for graded slopes and fills shy be no greater L2a.n the angle vvhich
can be recaLmed by vegeLar-fve corer or or-her adequate erosion control deg ices or
s tr`c Lures .
Sep rig should be done in. accorda_riCe wZLn Lyle !f,
) eCi lCaLons for thaL season Of
the veo r-
:.dd_zional erosion, control r_-?easu-res ma_v'oe required depending on Lie actual
field conditions.
'EEDIINCT
1. ' pp1L' a`ricu_LUra_' Li___ G:. L._ rat= Of 1 L:,ns
10-10- IG- COT'S _= Cla_ f=: aL tic r= C•i :r-,C r 1Ds/aCr=.
L: aCcon.-1 =_c= wi Lie iJLo?: ?-1o sch eOu - c_^:d a=' -Di_carion -
rate.
DATE
izrE
F L° N i II; G Fib r.
Nla.rch I-June 1
Ma.-ch 1-Apr-L 3,J
Marc h 1-June 3?J
June 1-Sept. 3r)
Sept. 1-tiIa_rch 1
Sericea Lesaedeza
A-DD Ta>1 fescue or,
.!?= `, eepir_o Love_ras =
Tail Fescue and
Erovmi Top tiliiler or
Soroha_-n Sudan H_vDr-ids
Sew ?cea Lesoedeza
Tall Fescue or
Cr SLTCcrl
50 lb/ac
50 lb/ac
5 lb/ac
60 lb/ac
35 lb/ac
30 lb/ac
70 lb/ac
150 1L/ac
?r,D lb/a_
'?- tiILCh ?iiLr L-ic SUG.. GDr'L=d aL L`1= race C•i 2
Lr i_s/an, re and,
a:cChOr ?? ?r
aspGa_L e :?uls.On L COc_ cL Lic rates J1D
-
Consz_ Marion ?eUl1P_nce
1. GradLrig Lo be SLaI'Ced by SLaC? force:. Install all necessazv Si1L fCi1CC5.
sc'diIlienC basins. acid check darns a:-id be?Ln cIe•?*tn Consz Harlon alrea.
2. Rou?h grade Lhe Cons` acClor_ arc2 arid be2iri liLstall_in an SLorlm dra:uia_?e
criQ?OC cross L-:-.Les. Insta?i 2.11 LnleL a:-id OLLei proLeCLOP_ as sLor= C"l-2 c^o? is
beLrl: L:st?.
J. As an. area is b'rou?ll_ Lo F_inisl-a grade a-id Lie black- base is laced for LL_c
road. 2-rid t_ne s.jou'lder fi "==ied. men seed. nu1C_ anti rack- Should be provided
for denuded areas.
Leave X11 Erosion, ccr:r of de--ces i-I L' L
?• c eLc_C•. S
laC° _ _ a- bee:1
established Su' Cienl V Lo wiL?ista=:^ e-C -on. DC ?.Ct r=^iOC'e c=/" e_JS_Gr_
CO L=vI Cc:iC•°? L:L dL"e`L=- t•t L=e cou'i Ei__=_ce_ .
Ntai c-:?nanc° F!21-
I • z`11 erosion a=id Sedimne- t con C_'oi Frac cgs be C_eC1C=' f r =Lati?Tr_v a=.r'
cFF=«on foLov,_-,z e; e:-_v
r L-loc F'roduc--_ ra__?ai buL i: no case Icss L_=r
cage .eve. e
ne` _ ? be r:iade i ___e:rTC e=z+ LO Iria_ =LG_1 ?!
2- f=be ind ce`fr1r_^,r fence wh- --, c
about 0.5 fe= - -1 it becoj--=-
L t'.
c?'cC L._ fe .C1!'ic Say';=:lt fc.1C= be re?rcd a5
I'i=Cess v LO Irlc'?L`Lrl c be ;=I- -
a'=cOr?''? - as L1 Li _?uC' S=C L CaL Gnc L.C r c_-- a ?i20rvL'S.
C.eaSe Z e? . ?cL : e CC1?-e r.
=. L,L set pr=r.^`or: ?: Ll t = i ,,
a'? _ Lc:c L'iz e -_ SLOre sr?Cst?r: c=_r' ??_il tr I= -?;--- r - -
Fi.
TO r=a•_._=_ I.!J f?OC tC!i;•C? C-''
!1 - -^•1 _ 5 L'i _ ! nc i_-=. sCCC = 15 CID _ - C:_?_
=n c. _ns Fr=: t? cr re_ -c- r. - tasL: _'O
- i'
SILT BASIN TYPE-B:
A silt basin type-B is a temporary basin built to collect sediment. flowing through a
drainage way. The silt basin is built at the base of the ditch with its length being at
least 2 times the width of the basin. The type-13 silt basin is generally built in
conjunction with temporary rock silt checks. and other devices that control or slow
down water flow. This device must be monitored closely and cleaned-out on a
regular basis until grass is established along the ditch line and sedimentation is no
longer a problem.
AREAS OF USE:
• In conjunction with temporary rock silt checks and other devices used in
drainage ditches.
DESIGN CRIM-RIA:
• Width - variable
• Length - 2 times width
• Depth : 2 ft. minimum storage - 1800 cubic feet/acre (equals L z W x D)
W
J
n
L
0
)J
ton ?o -,Z
e1A •VI'A
m W •-
Q
mm
IIIII C, li!'II
77-
?i -
III ? !;iI
II?Ill
ill it
__ 111111 __
IIIII =lllllll=i_
?, II I ll
Nil
--
_-- 9 II II I
Z
z IIIII
Illll
IIIII - LU
-- ? IIIII
IIIII
__ __ Illll . .
o IIIII 1111111111=
II
o III_il Dili
. $ _ ? IIIII
IIIII ? __-
a
Il:
W
O
z
v
a
7
F
VI-13 March, 1993
W t-
m u
U
t-
O
J
O 2
O F0-
N
W O
CL
Q W
lr
0 0
QQ
m m
L.,J
a -
C)
J
N
2
U
t-
p
11
0
CL.
0
J
W <r
z _ix
O J F-
F-JQz
cnOZOZZ
XL0000
W t- t
mZOW (n
OZ=OCO
JUQ?-WLC•
CZ^F-mW^
20- QWtr•
W -m UOm
(n . m -Li •
W O O m
ZxLnLLQ.W(n
o w cn Z cn
WF- QOF--OQ
F- LO X J - - F- J
O OUQZ( U
Z LL -- Q. :3.
0
z
m
v -
J
IIJ
a -
z Ill
II]
o. % z
W
> z
LL <[
J
Q.
J,\\\ Ln 0
?.' Ul W
% Ln W
1; O >
• tz
U
ill
Il]
U
H
C
Q
C
t
3
W
1 'i >
Z
io O
? t-
>
I W
? -} J
W
QN
y - ---
-i
1
,
li
LL
o U .
W (T-
O_ cn
"I IJ F -
J
? ID Q N
-
?m z
o
1 1J O
F-
It
O
Q
[D
LL-
° u
z-
\? 00
\
/ U J
z W Q
W
a
Cr
U
Cr_
J
I1J
11]
I z
a
M
710
ow
III-
O m
N m
m
,
w
f•-
W
U
(n L:>
Y VUj
oom
J
Cr Ls. o W
Q
Cr W?
CD
CL
:2:N
E--
Cr_
C)
Q
Cf)
Cv Q
ZC2I
o mi -
VI-17 March, 1993
t
?J
c-111
N
V?
_Rti ? 1
V
Li
it
L
El
V
Cf _ ?S
1 ?.. y
1I -?
z
0
g
N
H
O
d =
O 0 O
O Z
V
_ z XU
O d
N
N
K
QO
Z
Q
Lu
W
J
V,
I
f
I
f
f
AMTC
A
GASTON
COUNTY
O
S o
l n f '10+00
U
• 5+00
cl,
is
SE 1104 n e Road
0
. . ,
20+00
15+00
A
a{
Ak
30+90
4.
GrVs-?
25+00
v ,.
RLQ
VII
X?
0
w
- t?ti 4of7
M
a
-It? Cr%,x P pp I
?J be rClp?q?ccjl ?7 Dr??`G w?4?..?.
k
yc
1n
35+00
5
C kiok
j?
t
VI
< i
v
7I
50+00
Cres-?
45+00
v
f'
'v
60+00
Crab 1 •?? (..at
F•. her O r-E: ?
55+00
I I"R'- P
cr;
w
F-7 6+00 End Project
65+00
s
a
.
7
Crawford, Richard N. & Linda
1018-249
5
McPherson, Nancy Kimberly
2283-779
3
Deaton, Ralph Lee
1018-248
1
Goodson, Robin Leigh
2283-777
Page 1 of 3
U)
Z]
N
6
1110-504
980-408
C
C7
n
Z7
O
Q)
Q.
6
Hord, Walter A. Jr & Janice
1064-571
4
Johnson, William T. & Mary J.
1100-767
2
Reagan, Laddick & Jane M.
996-305
S R 1112 Lewis Road
w I r
raye3 Ul 3
Y:
S
-r
,ON
5
Zx huuBER 13
?S
:X NQUDEN O
CCRPORATIO?+ 1:U I?OLR
?O
a R
NCDOT
HAZARDOUS SPILL BASIN CHECKLIST
Division: County: Z/'Sraj Project ID: 6.151 Z4e,? B
River Basin: G4-r71zv84 Bridge No:
Rout : SZ //oZ Stream: tlz?,y,9, r c?? aigs. y 7:5;o, z--e Jce Goe.
Water Quality Criteria:
Yes No
Stream Crossing Blue Line On USGS rv/ r
ORW r r?
WSI r r?
WS II,III OR IV, Cro ssing Within 0.5mi of W.S. Critical Area F
Roadway Criteria:
Route Designation-
Yes No
Arterial Urban r rte'
Arterial Rural r r?
Additional Site Information:
Is a Hazardous Spill Basin Required?
Yes No
r r?
Criteria Based Upon NCDOT "Best Management Practices for the
Protection of Surface Waters" (March, 1997).
A
County V a, 7e? NCDOT Division # Ay District #
CONCURRENCE FORM FOR PROPERTIES NOT ELIGIBLE FOR THE NATIONAL
REGISTER OF HISTORIC PLACES,
FOR STATE FUNDED SECONDARY ROAD PROJECTS ONLY
Project Description:
On L l , ?(, ) 2001, representatives of the
orth Carolina Department of Transportation (NCDOT)
North Carolina State Historic Preservation Office (HPO)
F Other
Reviewed the subject project at
a scoping meeting
Q photograph review session/consultation
F-I other
All parties present agreed
There are no properties over fifty years old within the project's Federal Permit Site's (or Sites') area (or
areas) of potential effects (APE).
_??There are no properties less than fifty years old that are considered to meet Criterion Consideration G
within the project's Federal Permit Site's (or sites') area (or areas) of potential effects.
There are properties over fifty years old (list attached) within the project's Federal Permit Site's (or Sites')
area (or areas) of potential effects, but based on the historical information available and the photographs of
each property, properties identified as , are considered not eligible for
/----There the National Register and no further evaluation is necessary.
are no National Register or Study-Listed properties located within the secondary road project's area
of potential effects.
There are no historic properties affected by this project. (Attach any notes or documents as needed
Signed:
rZl- ,- -O
Representative, NCDOT
Representative, HPO
Date
EW
State
If a survey report is prepared, a final copy of this form and the attached list will be included.
. A
O?O? W AT ?9QG
r
CO
Michael F. Easley
Governor
William G. Ross,-Jr., Secretary
Department of Environment and Natural Resources
Gregory J. Thorpe, Ph.D.
Acting Director
Division of Water Quality
DWQ Project No.: 611"G, County:
Applicant: w ,:n T -- yi S/azJ
Project Name: Qxl 0
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the
--? 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC,
27699-1621.This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the
project engineer.It is not necessary to send certificates from all of these.
Applicant's Certification
I, . hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Date:
Agent's Certification
A . V-1d Z.?JEiG?sli.1 , hereby state that, to the best of my abilities, due care and .
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved pl? nd spe io , and supporting materials
/ 11 Signature: t li?/?y'a
If this project was designed by a Certified Professional
I, . as a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, ect.) in the State of North Carolina, having been authorized to observe
(periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance and intent of the 401 Water Quality
Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature Registration No. Date
" •?
i.a? 8 2
RIGQ
Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650
Wetlands/401 Unit: (919) 733-1786
Fax- 191 Al 733-6893
??O
WARRANT NO. 5i 84
INVOICE NUMBER
SR1102
IF INCORRECT RETURN TO
NC DEPARTMENT OF TRANSPORTATION
12 OF I ----?
7044805400
INVOICE DATE INVOICE AMOUNT
09/18/2001 $200.00
DATE
09/18/2001
NET AMOUNT
$200.00