Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG030500_DMR_20200615
current David R.Martin powered by GE Plant Manager 3010 Spartanburg Hwy East Flat Rock,NC 28726 USA T 828 693 2625 david.martin@ge.com June 15, 2020 Division of Water Quality RE(`,G NE D Attn: DWQ Central Files JUN 2 3 2020 1617 Mail Service Center Raleigh, North Carolina 27699-1617 CEN l"ic yL FILES DWR SECTION l General Permit NO. NCG030000 Certificate of Coverage NO. NCG030500 Attached is our non-storm water discharges report for the semi-annual January thru June 2020 storm water monitoring report the was conducted in May of 2020 for Current Lighting Solutions, LLC (formerly GE Lighting.) This document was inadvertently left out of the submitted report documentation sent out to you on 6/10/20. The five representative outfalls that were sampled are DA- 001, 002, 003, 004, and 011. Please contact site Plant Manager David Martin @ 828-693-2625, if you have any questions or contact my EHS Engineer at 828-712-2197. 4 Sincerel a,,419 IP_ David R. Martin Plant Manager GE Current Lighting Solutions, LLC Attachment: OM3010 Spartanburg Highway,East Flat Rock,NC 28726 General Electric Company www.currentbyge.com Non-Storm Water Discharges The discharge covered by the storm water permit has been tested or evaluated for the presence of non-storm water discharges and, if applicable, all non-storm water discharges from these outfalls are identified in the plan. The following is a description for the method used, the dates of any testing, and the on- site drainage points that were directly observed during the test: Site EHS Engineer conducted a property wide visual inspection of all storm water basins, c.uivert:., outfalls, impervious surfaces, yards & grounds. _ t,.t f J o Findings of Non-Storm Water Discharge Evaluation conducted on 05/07/20: r- U 1. No non-storm water discharge has occurred during the period between January Z ±w 2020 and May 7, 2020. UJ o 2. All outfalls inspected for signs of non-storm water discharge on 05/7/2020. Inspection consisted of visual observation of all storm water drains, basins, and culverts for each outfall. Work was conducted by grounds crew to clean out the grass growing up in the edge of the basins prior to sampling. Work was completed on 05/10/20. Findings of Non-Storm Water Discharge Sampling conducted on 05/18/2020: 1. Outfalls, DA-001, DA-002, DA-004, and DA-011 were sampled on 05/18/2020 and no detections were above our benchmark limit. There is no non-storm water discharge above our facilities permitted limit as sampled and reported to the DWQ on 06/10/2020. 2. No detections of any TTO's during this sampling. "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." (?)„,,e_,,,,( .. Plant Manager current David R.Martin powered by GE Plant Manager 3010 Spartanburg Hwy East Flat Rock,NC 28726 USA T 828 693 2625 david.martin@ge.com June 10, 2020 Division of Water Quality Attn: DWQ Central Files RE-cc r `� = -, 1617 Mail Service Center JUN 2 3 2020 Raleigh, North Carolina 27699-1617 Ct NT} DWG S=CTI p General Permit NO. NCG030000 Certificate of Coverage NO. NCG030500 Attached is our semi-annual January thru June 2020 storm water monitoring report for Current Lighting Solutions, LLC (formerly GE Lighting.) Current Lighting Solutions, LLC has documented 2.17" as the total event precipitation for the sampling date of 05-18-2020. Please note that www.accuweather.com lists the precipitation total for 05-18-2020 as 2.17" for the rain event. Accuweather's measured rain event is consistent with the rain gage that is located on the Current Lighting Solutions, LCC property. All sample results are below the benchmark limit for the facility. The facility had no TTO detections during this sampling event. The five representative outfalls that were sampled are DA- 001, 002, 003, 004, and 011. Please contact site Plant Manager David Martin @ 828-693-2625, if you have any questions. Sincerely, David R. Martin Plant Manager GE Lighting Attachment: S3010 Spartanburg Highway,East Flat Rock,NC 28726 General Electric Company www.currentbyge.com `` Stormwater Discharh Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 5- 2020 CERTIFICATE OF COVERAGE O.. NCGO3 D 0�D;; SAMPLE COLLECTION EAR FACILITY NAME e u ri'4u U�' R` 5t)Jcmcwj /L L-c-- SAMPLE PERIOD IJ' n-June Q July-Dec COUNTY t4 c"...derc/11 or ❑ Monthly' (month) PERSON COLLECTING SAMPLES - -e-HC. �c/c/ DISCHARGING TO CLASS EIORW EIHQW Trout ( PNA LABORATORY S4 l' e -,'c4 Lab Cert.# 2.V! R u_..P nZ,ro-flow I 'Water Supply I ISA p analysis: 3uN 2 3 2d�0 I , Other C//iSS i,G' Comments on sample collection or cEI`i7"F �l.I `t- .., PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 --) DWR SECTIOI,: Part A: Stormwater Benchmarks and Monitoring Results [l No discharge this period?2 Date Sample 24-hour rainfall Non-Polar O&G/ outfall No. P Total Suspended Solids I H' Total Copper Total Lead Total Zinc Total Petroleum Total Toxic Collected' amount, Standard units Organics' (mo/dd/yr) Inches' Hydrocarbons Benchmarks - - 100 mg/L or 50 mg/L4 6.0-9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 /--�,�� zc,l ,5fig/2c v 2. g I7"f I R,00 41c3, ' ky i- i.,os r 'it,(' L.Doe '°Lf02 Dig' 4- z.& /W< -ov°'° 1 Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for.a waiver of the rain gauge requirement. See General Permit, Section B,Table 1 to �r,entify the especially sensitive receiving water classifications where the more protective benchmark applies. 'Total Toxic Organics sampling is applicaLle only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathod,l ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 FacihtiE,,....nat incorporate a solvent management plan into the Stormwater 46tion Prevention Plan may so certify, and the requirement for FT nitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name(Print name) P1 NlV G 2. Titl ri6//b/zo i�title) Signature Date Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL,<PQL, Non-detect, ND,or other similar non-numerical format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L",where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging> 55 gal of new oil per month. n No discharge this period?2 Outfall No. Date Sample Collected' 24-hour rainfall amount, New Motor Oil or Non-Polar O&G/Total Total Suspended (mo/dd/yr) Inches3 Hydraulic Oil Usage Petroleum Hydrocarbons Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L° Parameter Code - 46529 NCOIL 00552 C0530 Footnotes from Part A also apply to Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: /2018-O5/31/2021 SWU-245,last revised 111i' 018 Ppr 7 nr FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES,HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES Ei NO REGIONAL OFFICE CONTACT NAME: Mail an original copy of this DMR,including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate, and complete. I am aw e the there are significant penal 'es for submitting false information, including the possibility of fines and imprisonment for knowing violations." (7i2 0/2-6 Signature of Permittee Date Permit Date: 11/1/2018-05/31/2021 SWU 245, last revised 11/1/2018 Page 3 of 3 k. 11 Environmental Quality Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form,please visit https://deq.nc.goviabout/divisions/energy-mineral-land-resources/ npdes-stormwater-gps Permit No.: N/C/6/0/3/0/ O/0 D/ or Certificate of Coverage No.: _N/C/G/D/,3/09/S/a Facility Name: Cldr^ 1..i- ,w� So4U%4 c j LLC County: )4V,�„r�?ci"xhi / Phone No. g2 g --(a 93 - 2gj.3 Inspector: 6jJ,r 'c - i�.y d Date of Inspection: it/2D20 R FC E I\/E D Time of Inspection: // :I7.fM JUN 2 3 2020 CENTRAL FILES Total Event Precipitation(inches): 2. /7 if DWR SECTION All permits require qualitative monitoring to be performed during a"measurable storm event." 0 A"measurable storm event"is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DEMLR Regional Office. By this signa I certify that this report is accurate and complete to the best of my knowledge: co:it V (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. DA"till Structure (pipe, ditch, etc.): ed5/V Receiving Stream: Ea+" F--K Cr< Describe the industrial activities that occur within the outfall drainage area: 6Mpkyef- i,Nj 6o1-- Page 1 of 2 SWU-242.Last modified 06/01/2018 2. Color: Describe the color of the discharge using basic colors(red,brown,blue, etc.)and tint (light,medium, dark)as descriptors: L[9`' &f'y 3. Odor: Describe any distinct odors that the discharge may have(i.e., smells strongly of oil,weak chlorine odor, etc.): O 1>o4 4. Clarity: Choose the number which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: CO2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: 1 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 1 �►� 3 4 5 iJ7. Is there any foam in the stormwater discharge? Q Yes �{•..� 8. Is there an oil sheen in the stormwater discharge? QYesILIyp! 9. Is there evidence of erosion or deposition at the outfall? Q Yes O. 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity,high solids, and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 A -002 C Environrnentai ) Quality Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form,please visit https://deq.nc.gov/about/divisions/energy-mineral-land-resources/ npdes-stormwater-gps Permit No.: N_/C/(7/O/3 0/ 6/O/ fl or Certificate of Coverage No.: N_/C/G/©/3/O/S/ 0/0/ Facility Name: f t✓r7"c14 ;A 6o/uhays. ) L,1,,G County: ew 8e. cw Phone No. gig.—493-- 24'/3 Inspector: -j ,t-- r7erel Date of Inspection: 5 ligfrO240 Time of Inspection: //: 2/1 vl Total Event Precipitation(inches): 2• / /) All permits require qualitative monitoring to be performed during a"measurable storm event." A "measurable storm event"is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DEMLR Regional Office. By this sign l.. - certify that this report is accurate and complete to the best of my knowledge: E A cA.g.........„..............„_._ (Signature of Permittee or esignee) 1. Outfall Description: Outfall No. Z W-—c Z_ Structure(pipe, ditch, etc.): v6rY 5//13 f/ ei.leA Receiving Stream: B 1- 2(-1 reg. Describe the industrial activities that occur within the outfall drainage area: piaye e- /",.-A L c 71' Page 1 of 2 SWU-242,Last modified 06/01/2018 2. Color: Describe the color of the discharge usin basic colors(red, brown, blue, etc.) and tint (light, medium, dark)as descriptors: be- y 3. Odor: Describe any distinct odors that the discharge may have(i.e., smells strongly of oil,weak chlorine odor, etc.): At O1Y .. 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 1 C 3 4 5 7. Is there any foam in the stormwater discharge? Q Yes ,. ► .. 8. Is there an oil sheen in the stormwater discharge? QYes *� •. 9. Is there evidence of erosion or deposition at the outfall? Q Yes (• •. 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam,oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 cyan, -i„ r . c:.,.,Ili.(11',III 4 D4-o®3 NIC: 10 Environmental Quality Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form,please visit https://deq.nc.gov/about/divisions/energy-mineral-land-resources/ npdes-stonnwater-gps Permit No.: N_/C/6/0/3/0/0/0/O/ or Certificate1. of Coverage No.: N_/C/G/O/3//0/5/o/O/ Facility Name: v!`r — L44j Sd4,r70,,us , LLG . County: 11elvier c ., Phone No. Zg '1'93 -2V/3 Inspector: e d{ F7cyd Date of Inspection: S I i g/0 f,7ZQ Time of Inspection: II : 25 AIM Total Event Precipitation(inches): 2 • ` 7 4 All permits require qualitative monitoring to be performed during a"measurable storm event." I �� A"measurable storm event"is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DEMLR LRegional Office. By this si , certify that this report is accurate d complete to the best of my knowledge: ada 44,...„ (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. 1)4 "QO 3 Structure (pipe,ditch,etc.): s:0v Receiving Stream: + o,lt-14 Gre41&- Describe the industrial activities that curwithin the outfall drainage area: Z'np1oye e_ Go- Page 1 of 2 SWU-242,Last modified 06/01/2018 2. Color: Describe the color of the discharge using basic colors(red,brown,blue,etc.)and tint (light,medium,dark)as descriptors: Vexy 01-o eke,- S red/ 3. Odor: Describe any distinct odors that the discharge may have(i.e., smells strongly of oil,weak chlorine odor,etc.): ND Odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: 1 P 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 63 2 3 4 5 7. Is there any foam in the stormwater discharge? Q Yes 8. Is there an oil sheen in the stormwater discharge? (;)Yes •• o 9. Is there evidence of erosion or deposition at the outfall? 0 Yes (t . 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242.Last modified 06/01/2018 0 Environmental Quality Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form,please visit https://deq.nc.gov/about/divisions/energy-mineral-land-resources/ npdes-stormwater-gps Permit No.: N_/C/6/0/3/e/0/ 0/ 0/ or Certificate of Coverage No.: N/C/G/O/3/D/S/D/O/ Facility Name: ar e7tJ/ L L)1/ �)o-k, I [,L,C L.L.C. County: 14 &So../ I Phone No. 2g' �j 03- 2 2r/ Inspector: S' eve Floyd Date of Inspection: 5 i) I20ze Time of Inspection: i i . 2.9/QM Total Event Precipitation(inches): - • 1 7 " All permits require qualitative monitoring to be performed during a"measurable storm event." 411 A"measurable storm event"is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DEMLR Regional Office. By this s'ai• -, I certify that this report is accurate and complete to the best of my knowledge: 4 4,,,,,,,:( e_4.,(0-4„,_ (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. D '044 Structure (pipe, ditch, etc.): 845/4/ Receiving Stream: 8a - Fork Creel_ Describe the industrial activities that occur within the outfall drainage area: r(Ivs6 — 4-ruck- toad,/ cio(J . 6,10 Page 1 of 2 SWU-242.Last modified 06/01/2018 2. Color: Describe the color of the discharge using basic co ors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Geer' 4,0 /ice' ore, 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil,weak chlorine odor, etc.): C)ck.' " 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 4� 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 1 (� 3 4 5 7. Is there any foam in the stormwater discharge? Q Yes or el 8. Is there an oil sheen in the stormwater discharge? QYes tr, 9. Is there evidence of erosion or deposition at the outfall? Q Yes . 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWTJ-242.Last modified 06/01/2018 Environmental Quality Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form,please visit https://deq.nc.gov/about/divisions/energy-mineral-land-resources/ npdes-stormwater-gps Permit No.: N/C/6/0/3/0/ 4/ Q'C or Certificate of Coverage No.: N/C/G/0/3/0/5/0/Dl Facility Name: Corr,* L.Jrkildo County: 14-c,ik]ecso►v Phone No. g2 F3—&093 —2 4t/3 Inspector: cS'f-e✓e 00>ii Date of Inspection: 5//8/ZO20 Time of Inspection: 1/ Total Event Precipitation(inches): 711 All permits require qualitative monitoring to be performed during a"measurable storm event." A"measurable storm event"is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DEMLR Regional Office. By this signature I certify that this report is accurate and complete to the best of my knowledge: coLt (Signature of Permittee or Designee) 1. Outfall Description: �, / Outfall No. bit-'OCR I Structure (pipe, ditch, etc.): 641arrr7 I-� T�Teu!;t , Receiving Stream: a.. FvrIL Lrtef_k.. Describe the industrial activitie that occur within the outfall drainage area: �i„0 e;l;�y 7i'd '4</ L=, S ,3 Page 1 of 2 SWU-242,Last modified 06/01/2018 2. Color: Describe the color of the discharge using baseCC colors(red, brown, blue, etc.) and tint (light,medium, dark) as descriptors: / 44- V-a Mel/a GI rrcitl 3. Odor: Describe any distinct odors that the discharge may have(i.e., smells strongly of oil, weak chlorine odor, etc.): 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 'i is the surface covered with floating solids: 1 2 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 1 2 / 4 5 7. Is there any foam in the stormwater discharge? 0 Yes No. 8. Is there an oil sheen in the stormwater discharge? QYes 9. Is there evidence of erosion or deposition at the outfall? Q Yes COI 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242,Last modified 06/01/2018