Loading...
HomeMy WebLinkAboutNCC203430_ESC Approval Submitted_202008118/6/2020 LETTER OF APPROVAL James B. O'Malley 890 Elm Grove Rd. Ste. 207A Elm Grove, Wl. 53058 RE: Project Name: Tree Removal Tyler's Ridge Acres Approved: 1.5 Project ID: 20-3387 County: Moore City: Southern Pines Address: 3139 Airport Rd. River Basin: Cape Fear Stream Classification: WS-III-HQW Submitted By: Jeffrey Barczak, Barczak Engineering Date Received by: Town of Southern Pines, 8/5/2020 Plan Type: Erosion Control Dear Mr. O'Malley, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO 10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc..vov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette. lucasc&nedenr.aov or Paul Clark at Paul.clark(r4�nedenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days.. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Letter of Approval James B. O'Malley 8/6/2020 Page 2 of 2 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 1 l 3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Prior to start of any construction, the NPDES NCGO1 Construction Stormwater permit must be acquired from NCDEQ and a Preconstruction Conference must be held with Town Staff. The NCG01 permit must be obtained prior to scheduling the Preconstruction Conference. Once the NCGO1 is obtained, please notify Jay Hough, the Town's Construction Inspector, 910-692-1983, to schedule the Preconstruction Conference. Your cooperation is appreciated. Sincerely, James Michel, PE Town Engineer Town of Southern Pines Enclosures: Certificate of Approval NCGO1 Fact Sheet ec: Jeffrey Barczak, Barczak Engineering