Loading...
HomeMy WebLinkAbout19970856 Ver 1_Complete File_19991203DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO Regulatory Division Action ID No. 1995 Mr. John Dorney NCDENR ,R November 30, 1999 `4 t North Carolina Division of Water Quality Wetlands Section 1621 Mail Service Center Raleigh, North Carolina 27699-1621 Dear Mr. Domey: Enclosed is a permit modification request by the North Carolina Department of Transportation (NCDOT) for Department of the Army (DA) authorization and a State Water Quality Certification to: 1. Pile jetting, temporary fill, and associated cleanup in an additional 2.325 acres of Section 10 and 404 Wetlands adjacent to the Croatan Sound, within a sediment containment area at 19 bent locations in a black needle rush marsh community on the eastern side of the permitted project. An additional 0.524 acres of impact will be associated with 1,903 linear feet of matting to access the containment areas, for a total of 2.849 acres. NCDOT proposes to contain the jetted sediment using silt fence and hay bales. A lightweight Caterpillar 307 excavator will then remove the material to a low ground pressure tracked loader. The material will be ultimately transported to an offsite upland sediment containment area via wooden mats (10 feet wide) placed on the marsh. Attached to the public notice is a monitoring plan for the recovery of the disturbed marsh area impacted by the matted construction access road. 2. Extend the permitted Tee road in Croatan Sound by 60 feet. The results of a test pile program indicated the permitted proposal was not sufficient for all the bent construction activities on the eastern side of the permitted project. The test pile program revealed that longer, heavier piles would be needed on the east side. 3. Construct a temporary floating moorage facility within Croatan Sound at load-out trestle bent number four. The temporary facility will be used to dock construction vessels as well as on and off load construction equipment and workers. The proposed facility will be 20 x 20 feet and require the installation of six 12" steel cylinder pipes. 4. Install mooring piles and temporary stabilization measures within Croatan Sound at load-out trestle bents 6, 8, 11, 12 and 13. The 36 inch steel mooring piles will be located at bents 10 and 13 and will be used while loading and unloading construction equipment and supplies. "H" beam stabilizers at bents 6, 8, 10, 11, 12 and 13 are requested for safety. This activity is associated with the Department of the Army permit issued on March 5, 1998, for the proposed widening of approximately 10 miles of US 64-264, including constructing a new bridge over the Croatan Sound and adjacent marshes, from US 64-264 west of Manns Harbor to NC 345 south of Manteo, in Dare County, North Carolina (TIP No. R-2551, Federal Aid Project No. NHF-64(6), State Project No. 8T051401). Your receipt of this letter verifies your acceptance of a valid request for certification in accordance with Section 325.2(b)(ii) of our administrative regulations. We are considering authorizing the proposed activity pursuant to Section 404 of the Clean Water Act, and we have determined that a water quality certification is required under the provisions of Section 401 of the same law. A Department of the Army permit will not be granted until the certification has been obtained or waived. In accordance with our administrative regulations, in most cases, 60 days after receipt of a request for certification is a reasonable time for State action. Therefore, if you have not acted on the request, or asked for an extension of time, by January 28, 2000, the District Engineer will deem that waiver has occurred. Thank you for your time and cooperation. Questions or comments may be addressed to Mr. Michael F. Bell at the Washington Regulatory Field Office, telephone (919) 975-1616, extension 26. Sincerely, E. David Franklin Special Projects Manager Enclosure 2 Copies Furnished (without enclosure): Mr. Doug Huggett Division of Coastal Management 1638 Mail Service Center Raleigh, North Carolina 27699-1638 / C, 5 54 Nov 1 6 1999 STATE OF NORTH CAROLINA REGULATORY 3RAKH DEPARTTYMNT OF TRANT SPORTATION JANIES 3. HUNT JR. DAVID McCOY GOVENOR SECRETARY November 12, 1999 Michael F. Bell,-P.W.S., Regulatory Project Manager U. S. Army Corps of Engineers Washington Regulatory Field Office P.O. Box 1000 Washington, North Carolina 28779 Dear Mr. Bell: SUBJECT: Proposed Minor Modification to Department of the Army Permit No. 199502334: Irnprovements to US 64-264, Including the construction of a new Croatan Sound bridge, from west of Manns Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. N11F-64 (6); State Project No. 8.T051401; TIP No. R-2551. The Department of Transportation requests that the existing DOA Permit be modified to (1) authorize pile jetting and cleanup; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out trestle; 5) authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides. ylodification #1: Authorize pile jetting and cleanup The North Carolina Department of Transportation (NCDOT) is currently constructing a new bridge over the Croatan Sound. As you are aware, the piles are being placed by the construction method known as jetting. Jetting`produces a mixture of sediment and water that is dispersed into the marsh adjacent to the bridge-bents. You will also recall that the NCDOT has attempted to institute several_methods of capturing the material and removing it from the marsh during the jetting process. This was an attempt at instantaneous cleanup to prevent the sediment from a prolonged stay"within the jurisdictional area. These methods included driving 54" cassions around each pile-to capture the material and then pumping the material to a settling basin. Total cost for this method for two bride bents was approximately $1,800,000. AdditionaIIy,:this method failed to remove the material satisfactorily. A-tempts at r movinog the materiak-immediately after deposition failed repeatedly. Subsequently, he Department elected to contain the material and remove it after the piles were in place. The getting sediment an the west side of the bridge was eventually removed using a wooden mat road, C'aterpillar 3t)7 lightweight excavator and a standard front end loader. The vCDOT has evaluated several options for dealing with the jetting sediment on the east side. First, an alternative method of installing the piles was investigated. This foundation redesign was not found to be feasible due to time and financial constraints. Preliminary estimates indicate that changing the method of construction would result in a 26-week delay for redesign, retooling, equipment acquisition, etc. It would also result in an increased cost of approximately S 10,000,000. Therefore, this option! was not considered feasible. Second, the NCDOT evaluated using the temporary work trestle and a crane to clean up and remove the sediment. This method is described as follows: -Clean up approximately 200 CY at each bent, 19 bents involved. -Sediment removal with a crane with clamshell bucket -Train will haul material in "dumpsters" or in modified rail cars to a barge at waters edge. -Material will be placed on the barge by a barge-mounted crane. -Material barge will be pushed by tugboat to the Load Out Trestle on the Mann's Harbor side. -Material will be offloaded at the Load Out Trestle by the straddle crane and placed into awaiting trucks for disposal. -Straddle crane will load empty containers back onto material barge. -Barge will be pushed back to the Roanoke Island side for the next bent(s) cleanup. -Bent clean, up estimated at 2 days per bent, 38 days, another 2 to 12 days for equipment acquisition and fabrication, (i.e. clamshell bucket, dumpsters, rail cars, etc) The assignment of dollar costs to the clean up could be in the range of $7,000 to more than S 10,000 per day. There is the possibility that the rail and crane trestle system could be extended to non- jurisdictional-areas (i.e. near the end bent) much later in the course of construction of the bents in the affected wetlands. The material could be transferred to the end bent as opposed to a barge and pushed across the sound. The ,cost of any extension would be borne by the DOT; the contractor's original submittal/plan did not extend the trestle to the end bent. The contractor's intention all-along has been to 'service' construction of the bridge in these east side wetlands by the trestle whereby supplies are brought in from awaiting barges and the like. The construction of the trestle is designed to take place in a staged sequence. In this sequence each section of trestle is completed only as needed. This process will start in at the farthest bent from shore (working from barges) and work towards land. Therefore, it would take several months to reach the point where it would be feasible to extend the trestle to non jurisdictional area. It is estimated that-direct cost (labor, materials, equipment) associated with trestle extension would be approximately $50,000 to extend another 160 feet. This would also trigger additional indirect costs of approximately $100,000 associated with manipulating the contractors scheduling and labor force allocations. DIRECT UVIPACTS Trestle C1ean7Up $500,000 to $1,000,00.0. 2 (NDIRECT,'NIPAC"TS nestle Ciea: o -2,000,000 to x=;000,000 Lidirect impacts are v?!:v difficult measure at this time. It is estimated that 40 to 50 days will be required for,the clean up. This timmeframe takes resources away from bridge construction. These resources would not be earning "the contractor the anticipated revenues within his earnings schedule. This timefrarne has the- high potential to disrupt operations following pile installation. Pile cap construction could be idled/delayed, thereby effecting girder erection and deck construction. These impacts cari-include idled equipment and manpower and increased storage and transportation costs for soon to be fabricated items such as girders and bearings. The idled condition may force the contractor to take measures not originally planned for to maintain or recover his construction schedule. The vernacular for these impacts are disruption of works, loss of productivity, accelerative measures, extended overhead, loss of profit and loss of interest on earnings. TOTXL. IMPACT for Trestle Cleanup: Direct + Indirect 52 500 000 to $4,000,000 The Department feels that this method is unacceptable; at even the most conservative estimate of 52,500,000-the extended delays and extravagant costs make this alternative non-feasible. Therefore, the NCDOT proposes to contain the sediment using silt fence and hay bales as was allowed on the west side. The material will then be removed by a lightweight Caterpillar 307 excavator and a low ground pressure tracked loader. These lightweight pieces of equipment will be transported to the sediment containment area via wooden mats placed on the ground. The wooden mats will be ten feet wide. The total length of matting will be 1,903.0 feet from bridge bent 249 to the end bent (high ground) with an additional 20.0 feet of perpendicular matting per bent to access the containment area Cleanup methodology will consist of utilizing the lightweight- excavator to recover the material and place it in a small pile within the containment area. The low ground pressure tracked loader will then transport the material across the mat road to high ground to be disposed of. Total area involved in sediment containment and cleanup will be 2.325 acres. The amount of pressure exerted on the mat road is expected to be significantly less than was exerted on the mat road during sediment clean up on the west side. This is due to the utilization of a low ground pressure tracked loader as opposed to a standard front end loader. Therefore, it is reasonable to conclude that these will be less settling associated with the use of matting. The total area affected by matting will be 0.524 acres. The NCDOT is committed to a full monitorin-d of the affected area tc insure that the marsh recovers. Monitoring will be conducted in accordance with attached monitoring plan. Additionally, the NCDOT has acquired a property that is currently being developed ,as a mitigation site. The site is near Stumpy Point, NC and will involve the restoration of a black needle rush (Juncus roemerianus) salt marsh community. The NCDOT fully expects the a.ffectedmatting area to recover. However, the development of the Stumpy Point mitigation site is intended to serve as a "safety net" should monitoring of the cleanup area reveal that the recovery is not successful. 3 Modification # 2: authorize therrPn?t?? ?f thee currently ttertni_tted Tee road by 60.0 feet l you recall the Tee road is a section of temporary work trestle perpendicular to the bridge ahariment which allows the contractor to get as close as possible to the bent for pile installation. The current design for the Tee road is a 60.0-foot long section of Tee road extending perpendicularly from the temporary work trestle to the bridge bents. The trestle was proposed the minimum-practical safe distance from the bridge with the 60.0 foot Tee road extending out to the bridge to. allow a crane to stretch from the Tee road to the bridge bent. However, after a test pile program -conducted at the beginning of project construction, it was found that the 60.0 foot Tee road was not sufficient for all of the bent construction activities on the east side. The test pile program revealed that longer, heavier piles would be needed on the east side than were utilized-on the west side. Pile lengths were changed from an average of 35 meters (115.0 feet) to an average of 42 (138.0 feet) meters in length. The distance that has to be stretched by the crane, coupled with the heavier and larger load, produces a situation that may cause equipment failures and compromise personal safety of workers. Therefore, the Department requests that.the authorization be granted to extend the Tee road an additional 60.0 feet. The proposed extension will require:four additional 24" pipe piles. Please note that these piles are temporary at.each location. They will be in place only as long as pile driving activities are taking place at that bent. The Tee road will then be dismantled and moved to the next bent. Please see the attached construction drawings for reference. Modification 43• Authorize a temporary floating dock The contractor has requested permission to build a temporary floating dock at load-out trestle bent number-four. The temporary floating dock will be used to dock construction vessels as well as on and off load construction equipment and workers. The dock will be approximately 6.096 meters x 6.096 meters (20.0 feet x 20.0 feet). This will require the installation of six 0.304-meter (12.0-inch) steel cylinder piles. Please see the attached construction drawings for reference. Modification #4: Authorize mooring piles and temporary rary trestle stabilization measures The contractor has requested permission to construct four 0.919-meter (36.0-inch) steel mooring piles at bent-thirteen of the load-out trestle. The-mooring piles will be used for construction barges. The barges will tie to the mooring piles while loading or unloading construction equipment and supplies. This will-result in an increased demand and stress on the temporary trestle. Therefore, we are also requesting authorization to install H-beams for stabilization at load-out trestle bents 6, 8, 10, 11; '12, and 13. Additionally, two 0.6096-meter (24.0-inch) steel cylinder piles'will be installed at load-out trestle bent number 10. Designs for the stabilization is included in the construction drawings. 4 Modification #5: Authorize minimum use of to loosen iftry trestle 11ii s The original plan for the utilization of this trestle called for the temporary support piles to be vibrated out and for the trestle to be moved to the east side of the Croatan Sound. However, recent attempts to remove thetemporary piles by vibration have been unsuccessful. The NCDOT has determined that the piles can be loosened and removed with a minimal use of "jetting": A very minor amount of material may surface from the pile loosening. Any material produced?by this operation will be raked into the void left by the removed piling. If there is not enough material to fill the void, the hole will be filled to the elevation of the adjacent ground with clean sand. Per our telephone conversation of September 14, 1999, the NCDOT will utilize the above-described technique to remove one piling. After removal, the USACE and the NCDCM will be consulted on site to determine if this method of piling removal is satisfactory. Your consideration is requested in processing this proposal as a "minor" modification. An expedited approval is essential to meeting critical project scheduling. Please call me if I can provide any additional information. Sincerely, D. R. Conner, P. E. Division Enginner T. Linds ddick, Jr. Division Environmental Officer-Division One CC: Mr. R. E. Capehart, P. E. Mr. R. W. Midgett, P. E. Mr. Frank Jennings, NCDCM Mr.-David Cox, NCWRC Ms. Sarah Winslow, NCDMF Mr. John Hennessy, NCDWQ Mir. Ron Sechler, NNE Mr. Doug Huggett, NCDCM Mr. Randy K. Wise, P. E. s 5 c 1,3 U W 72 n ? a_ 0 "? • ?' 4 - of ? - - - -- ? "" Z I E f s f ! t_ - ` I fat _ 01 Illy -wI - - -- -- ?- ?' 41 Tq-i 11j] U T \j . _ -- ••--?-?--}? ---= - .. ? ? A! ' ' elf' v Q? INORTH CAROLINA OE?AR-. ME.VTOF ' ' i 1 j --- - ?• ?? ?OLs TRANSPORTA-ncN 90-0 1 I S DMSICN OF HIGRWAYS OfVISION ONE TEE ROAD ?XrtnlS= 0nJ DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER T'E CROATAN P got 1?os M PT o{? SOUND ' R-2551 -rr_tP, ?1c?E,?,a?? .? ?aAa SHEET- OF +4T r Nc -rYPIC^L PER 6?NT" I QST-,It.L?T?v?r 1(71) J ?. «y*) ? ? i , .3c5 E n f cv) ?. . 1 7-CMPLATE rt n -. CM16 tatAt. s P a ` o , Z-tas--? JILT Fr'?1fc IS ;j CE CGA3SIZ't1cTv'? WIT?* ?noGO SILT STtrp ' ? wwrfr NORTH CAROLINA DEPARTMENT OF 04 Env t v/? c CNj' ?' TRANSPORTATION w OMSION OF HIGHWAYS DMSION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 Tl_ A / . _ _ _ w . SHEET r2 OF °gOi'OSED 0.9:?? EA&A Ai :;0,:25 3AttEp .JZAr:p.N "M- CYL on-c5 .s J ,s : SEE ory- ln4 7-4 /-/ z 1,4 ' DirM C? NORTH CAROLINA DEPARTMENT OF TRANS?ORTATiCN t IO DNISICN OF HIGHWAYS \?_ a u ONISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CR_ OATAN SOUND R-2551 r? l2 SHEET ?3 OF S I've E 2 , 1'9 9 '1 J W N ? 2 a e. ` C? O N a? ?s O 2 a• A O ' O 3< t N W ? ao i _ i owl - - ? WW N J_ CL ? QQ O A . m W ? . 1 In N _ O WW as °x -- z a° s z o =' J w? G s n n 0 0 0 m r ?°f "O" cy? NORTH CAROLINA DEPARTMENT OF TRANS?ORTA=N OMSION OF HIGHWAYS DMSION CNE ar ?y DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 • TL !z ?? Z ,g SHED S OF S i Monitoring Plan for theLfecovery of the disturbed marsh area adjacent to the new Croatan Sound Bridge The plan;consists of monitoring the disturbed site to determine the success of vegetative recovery occurring within it. The existing undisturbed marsh, dominated b,. black needle rush (Juncos roemerianus), adjacent to the-disturbed site will be evaluated in January, 2000, and will be used as a reference marsh to determine the degree of recovery. Three plots measuring 1 meter by 1 meter will be selected randomly and the percent aerial vegetative coverage will be evaluated and used as a baseline reference.. The disturbed area will be allowed to recover naturally from existing plant material and seed source present. Vegetative monitoring will be conducted annuall% beginning in January of 2000. The monitoring will consist of randomly selecting 12 plots in the disturbed area, measuring 1 meter by 1 meter, and comparing the level of regeneration to the reference marsh. The area will be evaluated after one full growing season in September of 2000 to determine if replanting with black needle rush will be necessary. If replanting is deemed necessary, NCDOT will prepare a planting plan and submit it to the USACE and the NCDCM for approval. All efforts will be made to utilize a local seed source if plantings are required. If there are any areas where compaction has prevented natural regeneration from occurring, hand labor will be used to scarify the area to remediate the compaction. Areas that require scarification will be planted with black needle rush and monitored accordingly. As required, there will be a zero tolerance for phragmites (Phragmites communis). If the presence of this species is detected, measures will be taken immediately to eradicate this species from the site. Monitoring reports will be submitted by December 31St of each year for a period of five years. The disturbed area will be considered recovered when aerial vegetative coverage has been determined to meet or exceed 90% of the coverage found in the reference marsh. If after a period of three years, it is determined that recovery efforts are not succeeding, the North Carolina Department of Transportation will consult with the U. S. Army Corps of Engineers and the North Carolina Division'6,f Coastal Management to discuss necessary remedial action. a: DEPARTMENT OF THE ARMY Wilmington District, Corps of Engineers Post Office Box 1890 Wilmington, North Carolina 28402-1890 ACTION ID No. 199502334 PUBLIC NOTICE PERMIT MODIFICATION December 2, 1999 THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT), DIVISION OF HIGHWAYS, Post Office Box 25201, Raleigh, North Carolina 27611-5201, was issued, on March 5, 1998, a Department of the Army (DA) permit TO FILL 13.22 ACRES OF SECTION 404 WETLANDS, MECHANIZE LAND CLEAR 3.83 ACRES OF SECTION 404 WETLANDS, DRAIN 2.79 ACRES OF SECTION 404 WETLANDS, AND FILL 0.05 ACRES OF OPEN WATERS OF THE UNITED STATES ADJACENT TO THE CROATAN SOUND, SPENCER'S CREEK AND UNNAMED TRIBUTARIES. THE NCDOT PROPOSES TO WIDEN APPROXIMATELY 10 MILES OF U.S. 64-264, INCLUDING CONSTRUCTING A NEW BRIDGE OVER THE CROATAN SOUND AND ADJACENT MARSHES, FROM US 64-264 WEST OF MANNS HARBOR TO NC 345 SOUTH OF MANTEO, IN DARE C G UNTY, NORTH CAROLINA, TIP NO. R-2551, FEDERAL AID PROJECT NO. NHF-64(6), STATE PROJECT NO. 8.T051401. The permittee has applied for a modification to the permit to: 1. Pile jetting, temporary fill, and associated cleanup in an additional 2.325 acres of Section 10 and 404 Wetlands adjacent to the Croatan Sound, within a sediment containment area at 19 bent locations in a black needle rush marsh community on the eastern side of the permitted project. An additional 0.524 acres of impact will be associated with 1,903 linear feet of matting to access the containment areas, for a total of 2.849 acres. NCDOT proposes to contain the jetted sediment using silt fence and hay bales. A lightweight Caterpillar 307 excavator will then remove the material to a low ground pressure tracked loader. The material will be ultimately transported to an offsite upland sediment containment area via wooden mats (10 feet wide) placed on the marsh. Attached to this public notice is a monitoring plan for the recovery of the disturbed marsh area impacted by the matted construction access road. 2. Extend the permitted Tee road in Croatan Sound by 60 feet. The results of a test pile program indicated the permitted proposal was not sufficient for all the bent construction activities on the eastern side of the permitted project. The test pile program revealed that longer, heavier piles would be needed on the east side. 2 3. Construct a temporary floating moorage facility within Croatan Sound at load-out trestle bent number four. The temporary facility will be used to dock construction vessels as well as on and off load construction equipment and workers. The proposed facility will be 20 x 20 feet and require the installation of six 12" steel cylinder pipes. 4. Install mooring piles and temporary stabilization measures within Croatan Sound at load-out trestle bents 6, 8, 11, 12 and 13. The 36 inch steel mooring piles will be located at bents 10 and 13 and will be used while loading and unloading construction equipment and supplies. "H" beam stabilizers at bents 6, 8, 10, 11, 12 and 13 are requested for safety. Construction plans are included with this public notice along with the applicant's modification request that includes an analysis of alternatives for the pile jetting and associated cleanup. The State of North Carolina will review this public notice to determine the need for the applicant to obtain any required State authorization. No Department of the Army (DA) permit will be modified until the coordinated State viewpoint on the proposal has been received and reviewed by this agency, nor will a DA permit be modified until the North Carolina Division of Environmental management (NCDEM) has determined the applicability of a Water Quality Certification as required by PL 92-500. This modification is being considered pursuant to Section 404 of the Clean Water Act (33 U.S.C. 1344). Any person may request, in writing within the comment period specified in the notice, that a public hearing be held to consider this application. Requests for public hearing shall state, with particularity, the reasons for holding a public hearing. The District Engineer has consulted the latest published version of the National Register of Historic Places for the presence or absence of registered properties, or properties listed as being eligible for inclusion therein, and this worksite is not a registered property or property listed as being eligible for inclusion in the Register. Consultation of the National Register constitutes the extent of cultural resource investigations by the District Engineer, and he is otherwise unaware of the presence of such resources. Presently, unknown archeological, scientific, prehistorical, or historical data may be lost or destroyed by work under the requested permit modification. The District Engineer is not aware, based on available information, that the proposed activity will affect species, or their critical habitat, designated as endangered or threatened pursuant to the Endangered Species Act of 1973. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The DE's initial determination is that the proposed project would not adversely impact EFH or associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Councils or the NMFS. 3 The decision whether to issue a permit modification will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity and its intended use on the public interest. Evaluation of the probable impacts which the proposed activity may have on the public interest requires a careful weighing of all those factors which become relevant in each particular case. The benefits which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. The decision whether to authorize a proposal, and if so the conditions under which it will be allowed to occur, are therefore determined by the outcome of the general balancing process. That decision should reflect the national concern for both protection and utilization of important resources. All factors which may be relevant to the proposal must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards and flood plain values (in accordance with Executive Order 11988), land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving the placement of dredged or fill materials in waters of the United States, a permit modification will be denied if the discharge that would be authorized by such modification would not comply with the Environmental Protection Agencies' 404(b)(1) guidelines. Subject to the preceding sentence and any other applicable guidelines or criteria, a permit modification will be granted unless the District Engineer determines that it would be contrary to the public interest. Generally, the decision whether to issue this Department of the Army (DA) permit modification will not be made until the North Carolina Division of Water Quality (NCDWQ) issues, denies, or waives State certification required by Section 401 of the Clean Water Act. The NCDWQ considers whether or not the proposed activity will comply with Sections 301, 302, 306, and 307 of the Clean Water Act. The application and this public notice for the DA permit serves as application to the NCDWQ for certification. Additional information regarding the Clean Water Act certification may be reviewed at the offices of the North Carolina Division of Water Quality (NCDWQ), Wetland/401 Unit, 4401 Reedy Creek Road, Raleigh, North Carolina 27607. Copies of such materials will be furnished to any person requesting copies upon payment of reproduction costs. All persons desiring to make comments regarding the application for Clean Water Act certification should do so in writing delivered to the North Carolina Division of Water Quality (NCDWQ), Wetland/401 Unit, 1621 Mail Service Center, Raleigh, North Carolina 27699-1621, on or before December 27,1999, Attention: Mr. John Dorney. Written comments pertinent to the proposed work, as outlined above, will be received in this office, Attn: Michael F. Bell, Washington Regulatory Field Office, Post Office Box 1000, Washington, North Carolina 27889-1000, until 4:15 p.m., January 3, 2000, or telephone (919)975-1616, extension 26. -... 7Z? 0. 'Ic STATE OF NORTH CAROLINA c!S?r?SOv a DEPARTMENT OF TRANSPORTATION JA2vfES B. HUNT JR. GovENOR November 12, 1999 Michael F. Bell, P.W.S., Regulatory Project Manager U. S. Army Corps of Engineers Washington Regulatory Field Office P.O. Box 1000 Washington, North Carolina 28779 Dear Mr. Bell: DAVID McCOY SECRETARY SUBJECT: Proposed Minor Modification to Department of the Army Permit No. 199502334: Improvements to US 64-264, Including the construction of a new Croatan Sound bridge, from west of Mans Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. NBI-64 (6); State Project No. 8.T051401; TIP No. R-2551. The Department of Transportation requests that the existing DOA Permit be modified to (1) authorize pile jetting and cleanup; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out trestle; 5) authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides. Modification 1,1: Authorize pile jetting and cleanup The North Carolina Department of Transportation (NCDOT) is currently constructing a new bridge over the Croatan Sound. As you are aware, the piles are being placed by the construction method known as jetting. Jetting produces a mixture of sediment and water that is dispersed into the marsh adjacent to the bridge bents. You will also recall that the NCDOT has attempted to institute several methods of capturing the material and removing it from the marsh during the jetting process. This was an attempt at instantaneous cleanup to prevent the sediment from a prolonged stay within the jurisdictional area. These methods included driving 54" cassions around each pile to capture the material and then pumping the material to a settling basin. Total cost for this method for two bridge bents was approximately $1,800,000. AdditionalIy,'this method failed to remove the material satisfactorily. Attempts at removing the material immediately after deposition failed repeatedly. Subsequently, the Department elected to contain the material and remove it after the piles were in place. The jetting sediment on the west side of the bridge was eventually removed using a wooden mat road, a Caterpillar 307 lightweight excavator and a standard front end loader. The NCDOT has evaluated several options for dealing with the jetting sediment on the east side. First, an alternative method of installing the piles was investigated. This foundation redesign was not found to be feasible due to time and financial constraints. Preliminary estimates indicate that changing the method of construction would result in a 26-week delay for redesign, retooling, equipment acquisition, etc. It would also result in an increased cost of approximately $10,000,000. Therefore, this option was not considered feasible. Second, the NCDOT evaluated using the temporary work trestle and a crane to clean up and remove the sediment. This method is described as follows: -Clean up approximately 200 CY at each bent, 19 bents involved. -Sediment removal with a crane with clamshell bucket -Train will haul material in "dumpsters" or in modified rail cars to a barge at waters edge. -Material will be placed on the barge by a barge-mounted crane. -Material barge will be pushed by tugboat to the Load Out Trestle on the Mann's Harbor side. -'Material will be offloaded at the Load Out Trestle by the straddle crane and placed into awaiting trucks for disposal. -Straddle crane will load empty containers back onto material barge. -Barge will be pushed back to the Roanoke Island side for the next bent(s) cleanup. -Bent clean up estimated at 2 days per bent, 38 days, another 2 to 12 days for equipment acquisition and fabrication, (i.e. clamshell bucket, dumpsters, rail cars, etc) The assignment of dollar costs to the clean up could be in the range of $7,000 to more than $10,000 per day. There is the possibility that the rail and crane trestle system could be extended to non- jurisdictional areas (i.e. near the end bent) much later in the course of construction of the bents in the affected wetlands. The material could be transferred to the end bent as opposed to a barge and pushed across the sound. The cost of any extension would be borne by the DOT; the contractor's original submittal/plan did not extend the trestle to the end bent. The contractor's intention all along has been to 'service' construction of the bridge in these east side wetlands by the trestle whereby supplies are brought in from awaiting barges and the like. The construction of the trestle is designed to take place in a staged sequence. In this sequence each section of trestle is completed only as needed. This process will start in at the farthest bent from shore (working from barges) and work towards land. Therefore, it would take several months to reach the point where it would be feasible to extend the trestle to non jurisdictional area. It is estimated that direct cost (labor, materials, equipment) associated with trestle extension would be approximately $50,000 to extend another 160 feet. This would also trigger additional indirect costs of approximately $100,000 associated with manipulating the contractors scheduling and labor force allocations. DIRECT TMPACTS Trestle Clean Up $500,000 to $1,000,000. 2 INDIRECT ni TPA T Trestle Clean Up 52,000,000 to S3,000,000 Indirect impacts are very difficult measure at this time. It is estimated that 40 to 50 days will be required for the clean up. This timeframe takes resources away from bridge construction. These resources would not be earning the contractor the anticipated revenues within his earnings schedule. This timeframe has the high potential to disrupt operations following pile installation. Pile cap construction could be idled/delayed, thereby effecting girder erection and deck construction. These impacts can include idled equipment and manpower and increased storage and transportation costs for soon to be fabricated items such as girders and bearings. The idled condition may force the contractor to take measures not originally planned for to maintain or recover his construction schedule. The vernacular for these impacts are disruption of works, loss of productivity, accelerative measures, extended overhead, loss of profit and loss of interest on earnings. TOTAL IMPACT for Trestle Cleanup: Direct + Indirect S2,500,000 to $4,000,000 The Department feels that this method is unacceptable; at even the most conservative estimate of 52,500,000 the extended delays and extravagant costs make this alternative non-feasible. Therefore, the NCDOT proposes to contain the sediment using silt fence and hay bales as was allowed on the west side. The material will then be removed by a lightweight Caterpillar 307 excavator and a low ground pressure tracked loader. These lightweight pieces of equipment will be transported to the sediment containment area via wooden mats placed on the ground. The wooden mats will be ten feet wide. The total length of matting will be 1,903.0 feet from bridge bent 249 to the end bent (high ground) with an additional 20.0 feet of perpendicular matting per bent to access the containment area. Cleanup methodology will consist of utilizing the lightweight excavator to recover the material and place it in a small pile within the containment area. The low ground pressure tracked loader will then transport the material across the mat road to high ground to be disposed of. Total area involved in sediment containment and cleanup will be 2.325 acres. The amount of pressure exerted on the mat road is expected to be significantly less than was exerted on the mat road during sediment clean up on the west side. This is due to the utilization of a low ground pressure tracked loader as opposed to a standard front end loader. Therefore, it is reasonable to conclude that there will be less settling associated with the use of matting. The total area affected by matting will be 0.524 acres. The NCDOT is committed to a full monitoring of the affected area to insure that the marsh recovers. Monitoring will be conducted in accordance with attached monitoring plan. Additionally, the NCDOT has acquired a property that is currently being developed as a mitigation site. The site is near Stumpy Point, NC and will involve the restoration of a black needle rush (Juncus roemerianus) salt marsh community. The NCDOT fully expects the affected matting area to recover. However, the development of the Stumpy Point mitigation site is intended to serve as a "safety net" should monitoring of the cleanup area reveal that the recovery is not successful. 3 Modification # 2: Authorize the extension 'of the currently permitted Tee road by 60.0 feet If you recall the Tee road is a section of temporary work trestle perpendicular to the bridge alignment which allows the contractor to get as close as possible to the bent for pile installation. The current design for the Tee road is a 60.0-foot long section of Tee road extending perpendicularly from the temporary work trestle to the bridge bents. The trestle was proposed the minimum practical safe distance from the bridge with the -60.0 foot Tee road extending out to the bridge to allow a crane to stretch from the Tee road to the bridge bent. However, after a test pile program conducted at the beginning of project construction, it was found that the 60.0 foot Tee road was not sufficient for all of the bent construction activities on the east side. The test pile program revealed that longer, heavier piles would be needed on the east side than were utilized on the west side. Pile lengths were changed from an average of 35 meters (115.0 feet) to an average of 42 (138.0 feet) meters in length. The distance that has to be stretched by the crane, coupled with the heavier and larger load, produces a situation that may cause equipment failures and compromise personal safety of workers. Therefore, the Department requests that the authorization be granted to extend the Tee road an additional 60.0 feet. The proposed extension will require four additional 24" pipe piles. Please note that these piles are temporary at each location. They will be in place only as long as pile driving activities are taking place at that bent. The Tee road will then be dismantled and moved to the next bent. Please see the attached construction drawings for reference. Modification 43: Authorize a temporarv floating dock The contractor has requested permission to build a temporary floating dock at load-out trestle bent number four. The temporary floating dock will be used to dock construction vessels as well as on and off load construction equipment and workers. The dock will be approximately 6.096 meters x 6.096 meters (20.0 feet x 20.0 feet). This will require the installation of six 0.304-meter (12.0-inch) steel cylinder piles. Please see the attached construction drawings for reference. Modification 44: Authorize mooring piles and temporary trestle stabilization measures The contractor has requested permission to construct four 0.919-meter (36.0-inch) steel mooring piles at bent thirteen of the load-out trestle. The-mooring piles will be used for construction barges. The barges will tie to the mooring piles while loading or unloading construction equipment and supplies. This will result in an increased demand and stress on the temporary trestle. Therefore, we are also requesting authorization to install H-beams for stabilization at load-out trestle bents 6, 8, 10, 11, 12, and 13. Additionally, two 0.6096-meter (24.0-inch) steel cylinder piles will be installed at load-out trestle bent number 10. Designs for the stabilization is included in the construction drawings. 4 Modification #5: Authorize minimum use of jettingto loosen temporary trestle piles The original plan for the utilization of this trestle called for the temporary support piles to be vibrated out and for the trestle to be moved to the east side of the Croatan Sound. However, recent attempts to remove the temporary piles by vibration have been unsuccessful. The NCDOT has determined that the piles can be loosened and removed with a minimal use of "jetting A very minor amount of material may surface from the pile loosening. Any material produced by this operation will be raked into the void left by the removed piling. If there is not enough material to fill the void, the hole will be filled to the elevation of the adjacent ground with clean sand. Per our telephone conversation of September 14, 1999, the NCDOT will utilize the above described technique to remove one piling. After removal, the USACE and the NCDCM will be consulted on site to determine if this method of piling removal is satisfactory. Your consideration is requested in processing this proposal as a "minor" modification. An expedited approval is essential to meeting critical project scheduling. Please call me if I can provide any additional information. Sincerely, D. R. Conner, P. E. Division Enginner T. Linds ddick, Jr. Division Environmental Officer-Division One CC: Mr. R. E. Capehart, P. E. Mr. R. W. Midgett, P. E. Mr. Frank Jennings, NCDCM Mr. David Cox, NCWRC Ms. Sarah Winslow, NCDMF Mr. John Hennessy, NCDWQ Mr. Ron Sechler, NNE Mr. Doug Huggett, NCDCM Mr. Randy K. Wise, P. E. I r4 t -- ? -- ?, -• of-- ....? i i ? I ?.: - -- - - - - k of --- - -- - ..__.. -- ??- 4 ! M TO- _ . __... _?,' . -fir - _. ?_ x: • _. QLUJ w v low t4lt , _ 1 ?-. ! G ??• I ?--ass.- ? - 4 I L {- i C3 Z + ? i 3 w I cs s ! ? i ? i ! Zj s. ,-- ?--'i i - ?- 4 4V V. L4 -_ Of aoR Ct NORTH CAROLINA DEPARTMENT OF TRANSPORTATION N ' 1 I ? I i ? I I ? SO-OI ?T DIVISION OF HIGHWAYS L? -??OFTpDIVISION ONE I / / [?J TAE ROAM tXTENS=p? DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN m 4T 'koA D SOUND R-2551 • T?12 itJovamil.ciz .i. Igqci SHEET OF j Sj?T r uc - YPICAtL ' " PER ?EN+ ;?SrAC.C_?Tiou ice ?k-ti S F417 - 2 G 7 2• t ? .. SC---? 1 C80?? ?IC.?S ? . Cl?rr) t' I E:J ? El Ll I Ct') \s 'G x?C 3G5 ... 13 5 (7') A 1, 0 i L7 FF?tC? i ? ? SE CG to 5T1`uc.Tr ? .. W17l±. ?noCO SILT STCp , woe Norm, ?y NORTH CAROLINA DEPARTMENT OF Oil EGvtvA??NT /q ?L? TRANSPORTATION ?o = DIVISION OF HIGHWAYS OFTR?NS?P DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN - SOUND R-2551 Tt12 SHFFr nI= i /-_ SEE orr" w H O PROPOSED 0.919" '£AM AT 1;0.125 BATTER LIZATIQN ;-.E--L CYL. PISS OF M°RTk C,NORTH CAROLINA DEPARTMENT OF TRANSPORTATION s !T o= DIVISION OF HIGHWAYS `7 ~ O? PC? DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 /tIo?EM Z c SHEET OF S .1 mP-cH L r.?E 11,4 " PERMITTED TEMPORARY ,EMPORARY -LOATINO 0= TYP, ill ?f "Caik C?QO NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ?q 7 I IO DIVISION OF HIGHWAYS P ?raF?+rse° DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 rL- iz AVCV61" SHEET OF D M p-rGN LrN E ''?}'' Z a 0 0 N a a O O N a 0 r n _n 6 <o < N W ? m O H O WW N -+ da C a° m QW m h O ao' ?a < rr W ? m Q N a°a a° N F ? O O m m is "OR Coq NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ?o = ? DIVISION OF HIGHWAYS 7 4T: °rrase°P DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 TL >Z /?J ??? ?Z /9 SHEET s OF S Monitoring Plan for the recovery of the disturbed marsh area adjacent to the new Croatan Sound Bridge The plan consists of monitoring the disturbed site to determine the success of vegetative recovery occurring within it. The existing undisturbed marsh, dominated by black needle rush (Juncus roemerianus), adjacent to the disturbed site will be evaluated in January, 2000, and will be used as a reference marsh to determine the degree of recover-. Three plots measuring 1 meter by 1 meter will be selected randomly and the percent aerial vegetative coverage will be evaluated and used as a baseline reference. The disturbed area will be allowed to recover naturally from existing plant material and seed source present. Vegetative monitoring will be conducted annually beginning in January of 2000. The monitoring will consist of randomly selecting 12 plots in the disturbed area, measuring 1 meter by 1 meter, and comparing the level of regeneration to the reference marsh. The area will be evaluated after one full growing season in September of 2000 to determine if replanting with black needle rush will be necessary. If replanting is deemed necessary, NCDOT will prepare a planting plan and submit it to the USACE and the NCDCM for approval. All efforts will be made to utilize a local seed source if plantings are required. If there are any areas where compaction has prevented natural regeneration from occurring, hand labor will be used to scarify the area to remediate the compaction. Areas that require scarification will be planted with black needle rush and monitored accordingly. As required, there will be a zero tolerance for phragmites (Phragmites communis). If the presence of this species is detected, measures will be taken immediately to eradicate this species from the site. Monitoring reports will be submitted by December 31ST of each year for a period of five years. The disturbed area will be considered recovered when aerial vegetative coverage has been determined to meet or exceed 90% of the coverage found in the reference marsh. If after a period of three years, it is determined that recovery efforts are not succeeding, the North Carolina Department of Transportation will consult with the U. S. Army Corps of Engineers and the North Carolina Division of Coastal Management to discuss necessary remedial action. [Fwd: R-2551 Bridge over Croatan Sound] Subject: [Fwd: R-2551 Bridge over Croatan Sound] Date: Tue, 11 Apr 2000 15:18:36 -0400 From: Cathy Brittingham <Cathy.Brittingham@ncmail.net> Organization: NC DENR DCM To: John Hennessy <John.Hennessy@ncmail.net>, Coxdr@mail.wildlife.state.nc.us John and David - FYI, attached is an e-mail I sent to Lindsey Riddick this morning requesting revised permit drawings for the DOT modification request to R-2551. Lindsey questioned whether revised drawings are really necessary since the only change to the original modification request is the location of the mat road, which will no longer extend through coastal marsh. After talking with Lindsey and John today, it was determined that revised drawing(s) are required that show the jurisdictional areas, coastal marsh vs. freshwater marsh. I requested that the revised drawing(s) be drawn to scale. I also requested a vicinity map. Lindsey will have a plat prepared that ties the location of jurisdictional areas to a Station Number. Lindsey expects he can submit the revised permit drawing(s) by the end of this week or early next week. John, I told Lindsey that you would also need revised drawing(s). David, as soon as DCM receives the revised drawing(s) from DOT, we would like to take final action on the CAMA permit modification (issue?). Are you in agreement with DOT's modification request as outlined in Lindsey's April 6th e-mail and attached letter? Do you have any recommended conditions for the CAMA permit modification? Thanks, Cathy Subject: Re: R-2551 Bridge over Croatan Sound Date: Tue, 11 Apr 2000 12:06:49 -0400 From: Cathy Brittingham <Cathy.Brittingham@ncmail.net> Organization: NC DENR DCM To: "T. Lindsey Riddick" <lriddick@dot.state.nc.us> CC: Frank Jennings <Frank.Jennings@ncmail.net>, Michael.f.bell@usace.army.mil Lindsey, The only permit drawings DCM has received for DOT's modification request to CAMA Permit No. 7-98 were dated November 12th. In order for DCM to process the most recent modification request to CAMA Permit No. 7-98 per DOT letter dated April 6th, we will need a full set of revised permit drawings reflecting DOT's current request. As soon as the revised permit drawings are received, DCM will circulate the modification request to relevant state reviewing agencies for comment. Also, FYI, I called Mike Bell yesterday and left a message on his voicemail letting him know that DCM will not be preparing a separate consistency determination for this DOT modification request. DCM's final action on DOT's request to modify CAMA Permit No. 7-98 will serve as DCM's consistency determination. Thanks, Cathy 1 of 2 04/11/2000 3:58 P1V [Fwd: R-2551 Bridge over Croatan Sound] "T. Lindsey Riddick" wrote: > Regulatory and Commenting Agency Representatives, > As most of you know the NCDOT has requested that the existing > authorizations for this project be modified to allow the > construction method known as jetting, along with various other > minor items. The main issue has been the cleanup method employed > to remove the spoil material after jetting. The USACE has > requested that the NCDOT submit a cleanup plan. The attached > document serves as that cleanup plan. Mr. Mike Bell of the USACE > will be out of the office for three weeks beginning on April 11, > 2000. if at all possible, please provide any verbal or written > comments to him by 4110100. His telephone number is (252) > 975-1616 x26. If you are unable to comment before April 10, 2000, > plaese send your comments to Ms. Jean Manuel in the USACE Raleigh > field office. Her telephone number is (919) 876-8441. Her > mailing address is: USACE Raleigh Feild office, 6508 Falls of > the Neuse Road, Raleigh, NC 27615. I will be available to answer > any questions you may have. My office telephone number is (252) > 482-7977. You may also reach me on my mobile phone 0 (252) > 339-0112. The NCDOT sincerely appreciates all of your efforts. > Any assistance you may be able to provide in resolving this issue > quickly will be greatly appreciated. > T. Lindsey Riddick, Jr. > Division One Environmental Officer > (252) 482-7977 > FAX: (252) 482-8722 > ------------------------------------------------------------------------ > Name: cleanupproposalsmod.doc > cleanupproposalsmod.doc Type: WINWORD File (application/msword) > Encoding: base64 > Download Status: Not downloaded with message 2 of 2 04/11/2000 3:58 PM u Zu00 V&TLANDS GROUP ?flJATER QUA,,,e,_, L?CTIOH .. r' STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DAVID McCOY GOVENOR SECRETARY April 6, 2000 Michael F. Bell, Regulatory Project Manager U.S. Army Corps of Engineers Washington Regulatory Field Office P.O. BOX 1000 Washington, North Carolina 27889 Dear Mr. Bell: SUBJECT: Proposed Minor Modification to Department of the Army Permit No. 199502334: Improvements to US 64-264, Including the construction of a new Croatan Sound bridge, from west of Manns Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. NHF-64 (6); State Project No. 8.T051401; TIP No. R-2551. As you are aware, the NCDOT has requested that Department of the Army Permit No. 199502334 be modified to (1) authorize pile jetting and cleanup; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out trestle; and 5) authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides. Modification request 1 is discussed below. Modification requests 2-4 have not changed since the original request. Due to the successful removal of piles without utilizing jetting, modification request 5 (authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides) is no longer necessary and is hereby rescinded. Please reference the March 14, 2000 letter from the NCDOT requesting authorization to jet piles conditioned upon the NCDOT providing the USACE with an approved cleanup plan before jetting operations were initiated. This letter is a response to the subsequent request from the USACE that a plan be provided for cleanup before any authorization is granted. Also please reference the January 28, 2000 letter from the NCDOT detailing cost P. O. Box 850 Edenton, NC 27932 (252) 482-7977 FAX: (252) 482-8722 estimates for jetting spoil cleanup as well as the original modification request of November 12, 1999. The NCDOT proposes to cleanup all spoil material associated with jetting operations in jurisdictional areas. As noted in the referenced correspondence, jetting is proposed at 19 bent locations. Of these 19 bents, 9 bents occur within freshwater wetlands and 10 bents occur within coastal wetlands. Currently, the NCDOT has two options that are considered feasible: 1) (Preferred) Remove all material within the coastal marsh with a crane fitted with a clamshell bucket from the existing work trestle and utilize mats and lightweight tracked equipment to remove material from the freshwater wetlands; 2) Extend the temporary trestle all the way to high ground and remove all material from the trestle via the crane and clamshell bucket. OPTION ONE (Preferred): Utilize a combination of cleanup from mats and trestle The NCDOT proposes to utilize the existing temporary construction trestle as access to remove all material deposited within coastal marsh. A crane with a smooth clam bucket will be operated from the trestle. The material will be picked up with the crane and offloaded into bins on the trestle. The material will then be transported to,high ground for disposal. At no time will any tracked or wheeled equipment be operated in the coastal marsh. As described in the referenced January 28, 2000 correspondence, the cost for utilizing the existing work trestle to cleanup the affected area around 10 bents will be $1,782,721. All material deposited within the freshwater wetlands will be removed utilizing a mat road as described in the referenced correspondence from November 12, 1999. As described in the referenced January 28, 2000 correspondence, the cost for utilizing mats to cleanup, monitor, and mitigate (if necessary) is $206,173. Please note that the NCDOT will, under no circumstances, use more than one layer of mats. If the soil below the mats subsides to the point that additional mats need to be stacked on the initial mat road, the NCDOT will abort the matting cleanup operation. If it is determined that one layer of mats will not support the removal operation, the existing work trestle will be extended and all cleanup will be conducted via the trestle/crane system. Total cost for combination option is $1,988,894 OPTION TWO: Remove material from both the coastal marsh and freshwater wetlands from the existing work trestle using a crane and clamshell bucket. As described in the referenced January 28, 2000 correspondence, the total cost for extending the existing temporary work trestle and cleaning up the entire affected area from the trestle with a crane and clamshell bucket is $3,382,773. Cost savings by using the combination option Vs. trestle only= $1,393,878. The NCDOT hereby requests that the existing permit be modified to authorize (1) authorize pile jetting and cleanup utilizing a combination of mats and the temporary work trestle; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out. There will be no use of matting or tracked or wheeled vehicles within any portions of coastal wetlands. Furthermore, should it be discovered that the ground will not adequately support matting, all operations in freshwater wetlands using mats will be suspended and all material will be removed from the trestle. Thank you for your time and consideration. The Department respectfully requests that processing of this modification request proceed as soon as possible. By copy of this letter, the Department also requests that the Division of Water Quality and the Division of Coastal Management also modify the 401 Water Quality Certification and the CAMA Major Development Permit respectively. If you have any further questions or would like additional information, please don't hesitate to call. Sincerely, D. R. Conner, P. E. Division Engineer T. Lind ddick, Jr. Division Environmental Officer CC: Mr. John Hennessy, DWQ Mr. David Cox, WRC Mr. Tom McCartney, FWS Mr. Ron Sechler, NMFS Ms. Sara Winslow, DMF Mr. Bill Gilmore, P.E., DOT Mr. Frank Jennings, NCDCM Mr. R. W. Midgett, P. E. Mr. R. E. Capehart, P. E. Mr. Steve DeWitt, P. E. Mr. Ted Bisterfield, EPA Ms. Cathy Brittingham, NCDCM DAMy Documents\R-2551\cleanupproposalsmod.doc AT 0 2000 !r _ ? `tea „~,.? WETLANDS GROUP WATER QUALITY SECTION STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. GOVENOR April 6, 2000 Michael F. Bell, Regulatory Project Manager U.S. Army Corps of Engineers Washington Regulatory Field Office P.O. BOX 1000 Washington, North Carolina 27889 Dear Mr. Bell: DAVID McCOY SECRETARY SUBJECT: Proposed Minor Modification to Department of the Army Permit No. 199502334: Improvements to US 64-264, including the construction of a new Croatan Sound bridge, from west of Manns Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. NHF-64 (6); State Project No. 8.T051401; TIP No. R-2551. As you are aware, the NCDOT has requested that Department of the Army Permit No. 199502334 be modified to (1) authorize pile jetting and cleanup; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out trestle; and 5) authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides. Modification request 1 is discussed below. Modification requests 2-4 have not changed since the original request. Due to the successful removal of piles without utilizing jetting, modification request 5 (authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides) is no longer necessary and is hereby rescinded. Please reference the March 14, 2000 letter from the NCDOT requesting authorization to jet piles conditioned upon the NCDOT providing the USAGE with an approved cleanup plan before jetting operations were initiated. This letter is a response to the subsequent request from the USAGE that a plan be provided for cleanup before any authorization is granted. Also please reference the January 28, 2000 letter from the NCDOT detailing cost P. O. Box 850 Edenton, NC 27932 (252) 482-7977 FAX: (252) 482-8722 estimates for jetting spoil cleanup as well as the original modification request of November 12, 1999. The NCDOT proposes to cleanup all spoil material associated with jetting operations in jurisdictional areas. As noted in the referenced correspondence, jetting is proposed at 19 bent locations. Of these 19 bents, 9 bents occur within freshwater wetlands and 10 bents occur within coastal wetlands. Currently, the NCDOT has two options that are considered feasible: 1) (Preferred) Remove all material within the coastal marsh with a crane fitted with a clamshell bucket from the existing work trestle and utilize mats and lightweight tracked equipment to remove material from the freshwater wetlands; 2) Extend the temporary trestle all the way to high ground and remove all material from the trestle via the crane and clamshell bucket. OPTION ONE (Preferred): Utilize a combination of cleanup from mats and trestle The NCDOT proposes to utilize the existing temporary construction trestle as access to remove all material deposited within coastal marsh. A crane with a smooth clam bucket will be operated from the trestle. The material will be picked up with the crane and offloaded into bins on the trestle. The material will then be transported to high ground for disposal. At no time will any tracked or wheeled equipment be operated in the coastal marsh. As described in the referenced January 28, 2000 correspondence, the cost for utilizing the existing work trestle to cleanup the affected area around 10 bents will be $1,782,721. All material deposited within the freshwater wetlands will be removed utilizing a mat road as described in the referenced correspondence from November 12, 1999. As described in the referenced January 28, 2000 correspondence, the cost for utilizing mats to cleanup, monitor, and mitigate (if necessary) is $206,173. Please note that the NCDOT will, under no circumstances, use more than one layer of mats. If the soil below the mats subsides to the point that additional mats need to be stacked on the initial mat road, the NCDOT will abort the matting cleanup operation. if it is determined that one layer of mats will not support the removal operation, the existing work trestle will be extended and all cleanup will be conducted via the trestle/crane system. Total cost for combination option is $1,988,894 OPTION TWO: Remove material from both the coastal marsh and freshwater wetlands from the existing work trestle using a crane and clamshell bucket. As described in the referenced January 28, 2000 correspondence, the total cost for extending the existing temporary work trestle and cleaning up the entire affected area from the trestle with a crane and clamshell bucket is $3,382,773. Cost savings by using the combination option Vs. trestle only= $1,393,878. The NCDOT hereby requests that the existing permit be modified to authorize (1) authorize pile jetting and cleanup utilizing a combination of mats and the temporary work trestle; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out. There will be no use of matting or tracked or wheeled vehicles within any portions of coastal wetlands. Furthermore, should it be discovered that the ground will not adequately support matting, all operations in freshwater wetlands using mats will be suspended and all material will be removed from the trestle. Thank you for your time and consideration. The Department respectfully requests that processing of this modification request proceed as soon as possible. By copy of this letter, the Department also requests that the Division of Water Quality and the Division of Coastal Management also modify the 401 Water Quality Certification and the CAMA Major Development Permit respectively. If you have any further questions or would like additional information, please don't hesitate to call. Sincerely, D. R. Conner, P. E. Division Engineer T. Lin ddick, Jr. Division Environmental Officer CC: Mr. John Hennessy, DWQ Mr. David Cox, WRC Mr. Tom McCartney, FWS Mr. Ron Sechler, NMFS Ms. Sara Winslow, DMF Mr. Bill Gilmore, P.E., DOT Mr. Frank Jennings, NCDCM Mr. R. W. Midgett, P. E. Mr. R. E. Capehart, P. E. Mr. Steve DeWitt, P. E. Mr. Ted Bisterfield, EPA Ms. Cathy Brittingham, NCDCM DAMy Documents\R-255 1\cleanupproposalsmod.doc _ fro y d y'q f 0 2000 - NE WETLANDS GROU ATER UALITY SECTION STATE OF NORTH CAROLLVA DEPARTMENT OF TRANSPORTATION JA.S B. HUNT JR. GOVENOR April 6, 2000 Michael F. Bell, Regulatory Project Manager U.S. Army Corps of Engineers Washington Regulatory Field Office P.O. Box 1000 Washington, North Carolina 27889 Dear Mr. Bell: DAVID McCOY SECRETARY SUBJECT: Proposed Minor Modification to Department of the Army Permit No. 199502334: Improvements to US 64-264, Including the construction of a new Croatan Sound bridge, from west of Manns Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. NHF-64 (6); State Project No. 8.T051401; TIP No. R-2551. As you are aware, the NCDOT has requested that Department of the Army Permit No. 199502334 be modified to (1) authorize pile jetting and cleanup; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out trestle; and 5) authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides. Modification request 1 is discussed below. Modification requests 2-4 have not changed since the original request. Due to the successful removal of piles without utilizing jetting, modification request 5 (authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides) is no longer necessary and is hereby rescinded. Please reference the March 14, 2000 letter from the NCDOT requesting authorization to jet piles conditioned upon the NCDOT providing the USACE with an approved cleanup plan before jetting operations were initiated. This letter is a response to the subsequent request from the USACE that a plan be provided for cleanup before any authorization is granted. Also please reference the January 28, 2000 letter from the NCDOT detailing cost P. O. Box 850 Edenton, NC 27932 (252) 482-797 FAX: (25=) 482-8722 estimates for jetting spoil cleanup as well as the original modification request of November 12, 1999. The NCDOT proposes to cleanup all spoil material associated with jetting operations in jurisdictional areas. As noted in the referenced correspondence, jetting is proposed at 19 bent locations. Of these 19 bents, 9 bents occur within freshwater wetlands and 10 bents occur within coastal wetlands. Currently, the NCDOT has two options that are considered feasible: 1) (Preferred) Remove all material within the coastal marsh with a crane fitted with a clamshell bucket from the existing work trestle and utilize mats and lightweight tracked equipment to remove material from the freshwater wetlands; 2) Extend the temporary trestle all the way to high ground and remove all material from the trestle via the crane and clamshell bucket. OPTION ONE (Preferred): Utilize a combination of cleanup from mats and trestle The NCDOT proposes to utilize the existing temporary construction trestle as access to remove all material deposited within coastal marsh. A crane with a smooth clam bucket will be operated from the trestle. The material will be picked up with the crane and offloaded into bins on the trestle. The material will then be transported to high ground for disposal. At no time will any tracked or wheeled equipment be operated in the coastal marsh. As described in the referenced January 28, 2000 correspondence, the cost for utilizing the existing work trestle to cleanup the affected area around 10 bents will be $1,782,721. All material deposited within the freshwater wetlands will be removed utilizing a mat road as described in the referenced correspondence from November 12, 1999. As described in the referenced January 28, 2000 correspondence, the cost for utilizing mats to cleanup, monitor, and mitigate (if necessary) is $206,173. Please note that the NCDOT will, under no circumstances, use more than one layer of mats. If the soil below the mats subsides to the point that additional mats need to be stacked on the initial mat road, the NCDOT will abort the matting cleanup operation. If it is determined that one layer of mats will not support the removal operation, the existing work trestle will be extended and all cleanup will be conducted via the trestle/crane system. Total cost for combination option is $1,988,894 OPTION TWO: Remove material from both the coastal marsh and freshwater wetlands from the existing work trestle using a crane and clamshell bucket. As described in the referenced January 28, 2000 correspondence, the total cost for extending the existing temporary work trestle and cleaning up the entire affected area from the trestle with a crane and clamshell bucket is $3,382,773. Cost savings by using the combination option Vs. trestle only=$1,393,878. The NCDOT hereby requests that the existing permit be modified to authorize (1) authorize pile jetting and cleanup utilizing a combination of mats and the temporary work trestle; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out. There will be no use of matting or tracked or wheeled vehicles within any portions of coastal wetlands. Furthermore, should it be discovered that the ground will not adequately-support matting, all operations in freshwater wetlands using mats will be suspended and all material will be removed from the trestle. Thank you for your time and consideration. The Department respectfully requests that processing of this modification request proceed as soon as possible. By copy of this letter, the Department also requests that the Division of Water Quality and the Division of Coastal Management also modify the 401 Water Quality Certification and the CAMA Major Development Permit respectively. If you have any further questions or would like additional information, please don't hesitate to call. Sincerely, D. R. Conner, P. E. Division Engineer l T. Lind iddick, Jr. Division Environmental Officer CC: Mr. John Hennessy, DWQ Mr. David Cox, WRC Mr. Tom McCartney, FWS Mr. Ron Sechler, NMFS Ms. Sara Winslow, DMF Mr. Bill Gilmore, P.E., DOT Mr. Frank Jennings, NCDCM Mr. R. W. Midgett, P. E. Mr. R. E. Capehart, P. E. Mr. Steve DeWitt, P. E. Mr. Ted Bisterfield, EPA Ms. Cathy Brittingham, NCDCM DAMy Documents\R-2551 \cleanupproposalsmod.doc ei,. STAipo APR I l_ ?000 is 1 - VIATER WETLANDS GPOUa- ?'•?a : ? UALiT'? S?CT!G?! STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. GOVENOR April 6, 2000 Michael F. Bell, Regulatory Project Manager U.S. Army Corps of Engineers Washington Regulatory Field Office P.O. BOX 1000 Washington, North Carolina 27889 Dear Mr. Bell: DAVID McCOY SECRETARY SUBJECT: Proposed Minor Modification to Department of the Army Permit No. 199502334: Improvements to US 64-264, Including the construction of a new Croatan sound bridge, from west of Manns Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. NHF-64 (6); State Project No. 83051401; TIP No. R-2551. As you are aware, the NCDOT has requested that Department of the Army Permit No. 199502334 be modified to (1) authorize pile jetting and cleanup; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out trestle; and 5) authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides. Modification request 1 is discussed below. Modification requests 2-4 have not changed since the original request. Due to the successful removal of piles without utilizing jetting, modification request 5 (authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides) is no longer necessary and is hereby rescinded. Please reference the March 14, 2000 letter from the NCDOT requesting authorization to jet piles conditioned upon the NCDOT providing the USACE with an approved cleanup plan before jetting operations were initiated. This letter is a response to the subsequent request from the USACE that a plan be provided for cleanup before any authorization is granted. Also please reference the January 28, 2000 letter from the NCDOT detailing cost P. O. Box 850 Edenton, NC 27932 (252) 482-7977 FAX: (252) 482-8722 y estimates for jetting spoil cleanup as well as the original modification request of November 12, 1999. The NCDOT proposes to cleanup all spoil material associated with jetting operations in jurisdictional areas. As noted in the referenced correspondence, jetting is proposed at 19 bent locations. Of these 19 bents, 9 bents occur within freshwater wetlands and 10 bents occur within coastal wetlands. Currently, the NCDOT has two options that are considered feasible: 1) (Preferred) Remove all material within the coastal marsh with a crane fitted with a clamshell bucket from the existing work trestle and utilize mats and lightweight tracked equipment to remove material from the freshwater wetlands; 2) Extend the temporary trestle all the way to high ground and remove all material from the trestle via the crane and clamshell bucket. OPTION ONE (Preferred): Utilize a combination of cleanup from mats and trestle The NCDOT proposes to utilize the existing temporary construction trestle as access to remove all material deposited within coastal marsh. A crane with a smooth clam bucket will be operated from the trestle. The material will be picked up with the crane and offloaded into bins on the trestle. The material will then be transported to high ground for disposal. At no time will any tracked or wheeled equipment be operated in the coastal marsh. As described in the referenced January 28, 2000 correspondence, the cost for utilizing the existing work trestle to cleanup the affected area around 10 bents will be $1,782,721. All material deposited within the freshwater wetlands will be removed utilizing a mat road as described in the referenced correspondence from November 12, 1999. As described in the referenced January 28, 2000 correspondence, the cost for utilizing mats to cleanup, monitor, and mitigate (if necessary) is $206,173. Please note that the NCDOT will, under no circumstances, use more than one layer of mats. If the soil below the mats subsides to the point that additional mats need to be stacked on the initial mat road, the NCDOT will abort the matting cleanup operation. If it is determined that one layer of mats will not support the removal operation, the existing. work trestle will be extended and all cleanup will be conducted via the trestle/crane system. Total cost for combination option is $1,988,894 OPTION TWO: Remove material from both the coastal marsh and freshwater wetlands from the existing work trestle using a crane and clamshell bucket. As described in the referenced January 28, 2000 correspondence, the total cost for extending the existing temporary work trestle and cleaning up the entire affected area from the trestle with a crane and clamshell bucket is $3,382,773. Cost savings by using the combination option Vs. trestle only= $1,393,878. The NCDOT hereby requests that the existing permit be modified to authorize (1) authorize pile jetting and cleanup utilizing a combination of mats and the temporary work trestle; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out. There will be no use of matting or tracked or wheeled vehicles within any portions of coastal wetlands. Furthermore, should it be discovered that the ground will not adequately support matting, all operations in freshwater wetlands using mats will be suspended and all material will be removed from the trestle. Thank you for your time and consideration. The Department respectfully requests that processing of this modification request proceed as soon as possible. By copy of this letter, the Department also requests that the Division of Water Quality and the Division of Coastal Management also modify the 401 Water Quality Certification and the CAMA Major Development Permit respectively. If you have any further questions or would like additional information, please don't hesitate to call. Sincerely, D. R. Conner, P. E. Division Engineer T. Lind ddick, Jr. Division Environmental Officer CC: Mr. John Hennessy, DWQ Mr.. David Cox, WRC Mr. Tom McCartney, FWS Mr. Ron Sechler, NMFS Ms. Sara Winslow, DMF Mr. Bill Gilmore, P.E., DOT Mr. Frank Jennings, NCDCM Mr. R. W. Midgett, P. E. Mr. R. E. Capehart, P. E. Mr. Steve DeWitt, P. E. Mr. Ted Bisterfield, EPA Ms. Cathy Brittingham, NCDCM D:\.My Documents\R-255:`cleanupproposalsmod.doc - . 0 12 010 0 i VW?qVET LASduS Cup ??lATER QUALITY'SECF?'v'i? FaS?333yyy??.???.YYY «• ?, t7 d ?a? STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DAVID McCOY GOVENOR SECRETARY April 6, 2000 Michael F. Bell, Regulatory Project Manager U.S. Army Corps of Engineers Washington Regulatory Field Office P.O. BOX 1000 Washington, North Carolina 27889 Dear Mr. Bell: SUBJECT: Proposed Minor Modification to Department of the Army Permit No. 199502334: Improvements to US 64-264, Including the construction of a new Croatan Sound bridge, from west of Manns Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. NHF-64 (6); State Project No. 8.T051401; TIP No. R-2551. As you are aware, the NCDOT has requested that Department of the Army Permit No. 199502334 be modified to (1) authorize pile jetting and cleanup; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out trestle; and 5) authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides. Modification request 1 is discussed below. Modification requests 2-4 have not changed since the original request. Due to the successful removal of piles without utilizing jetting, modification request 5 (authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides) is no longer necessary and is hereby rescinded. Please reference the March 14, 2000 letter from the NCDOT requesting authorization to jet piles conditioned upon the NCDOT providing the USACE with an approved cleanup plan before jetting operations were initiated. This letter is a response to the subsequent request from the USACE that a plan be provided for cleanup before any authorization is granted. Also please reference the January 28, 2000 letter from the NCDOT detailing cost P. O. Box 850 Edenton, NC 27932 (252) 482-7977 FAX: (252) 482-8722 estimates for jetting spoil cleanup as well as the original modification request of November 12, 1999. The NCDOT proposes to cleanup all spoil material associated with jetting operations in jurisdictional areas. As noted in the referenced correspondence, jetting is proposed at 19 bent locations. Of these 19 bents, 9 bents occur within freshwater wetlands and 10 bents occur within coastal wetlands. Currently, the NCDOT has two options that are considered feasible: 1) (Preferred) Remove all material within the coastal marsh with a crane fitted with a clamshell bucket from the existing work trestle and utilize mats and lightweight tracked equipment to remove material from the freshwater wetlands; 2) Extend the temporary trestle all the way to high ground and remove all material from the trestle via the crane and clamshell bucket. OPTION ONE (Preferred): Utilize a combination of cleanup from mats and trestle The NCDOT proposes to utilize the existing temporary construction trestle as access to remove all material deposited within coastal marsh. A crane with a smooth clam bucket will be operated from the trestle. The material will be picked up with the crane and offloaded into bins on the trestle. The material will then be transported to high ground for disposal. At no time will any tracked or wheeled equipment be operated in the coastal marsh. As described in the referenced January 28, 2000 correspondence, the cost for utilizing the existing work trestle to cleanup the affected area around 10 bents will be $1,782,721. All material deposited within the freshwater wetlands will be removed utilizing a mat road as described in the referenced correspondence from November 12,1999. As described in the referenced January 28, 2000 correspondence, the cost for utilizing mats to cleanup, monitor, and mitigate (if necessary) is $206,173. Please note that the NCDOT will, under no circumstances, use more than one layer of mats. If the soil below the mats subsides to the point that additional mats need to be stacked on the initial mat road, the NCDOT will abort the matting cleanup operation. If it is determined that one layer of mats will not support the removal operation, the existing work trestle will be extended and all cleanup will be conducted via the trestle/crane system. Total cost for combination option is $1,988,894 OPTION TWO: Remove material from both the coastal marsh and freshwater wetlands from the existing work trestle using a crane and clamshell bucket. As described in the referenced January 28, 2000 correspondence, the total cost for extending the existing temporary work trestle and cleaning up the entire affected area from the trestle with a crane and clamshell bucket is $3,382,773. Cost savings by using the combination option Vs. trestle only= $1,393,878. The NCDOT hereby requests that the existing permit be modified to authorize (1) authorize pile jetting and cleanup utilizing a combination of mats and the temporary work trestle; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out. There will be no use of matting or tracked or wheeled vehicles within any portions of coastal wetlands. Furthermore, should it be discovered that the ground will not adequately support matting, all operations in freshwater wetlands using mats will be suspended and all material will be removed from the trestle. Thank you for your time and consideration. The Department respectfully requests that processing of this modification request proceed as soon as possible. By copy of this letter, the Department also requests that the Division of Water Quality and the Division of Coastal Management also modify the 401 Water Quality Certification and the CAMA Major Development Permit respectively. If you have any further questions or would like additional information, please don't hesitate to call. Sincerely, D. R. Conner, P. E. Division Engineer T. Lind ddick, Jr. Division Environmental Officer CC: Mr. John Hennessy, DWQ Mr. David Cox, WRC Mr. Tom McCartney, FWS Mr. Ron Sechler, NMFS Ms. Sara Winslow, DMF Mr. Bill Gilmore, P.E., DOT Mr. Frank Jennings, NCDCM Mr. R. W. Midgett, P. E. Mr. R. E. Capehart, P. E. Mr. Steve DeWitt, P. E. Mr. Ted Bisterfield, EPA Ms. Cathy Brittingham, NCDCM D:\My Documents\R-2551\ cleanupproposalsmod.doc App t1 rrm C_. W ?i?idJJ Np7Et0i.in MQNFo? STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HLN°T JR DAVID McCOY GOVENOR SECRETARY April 6, 2000 Michael F. Bell, Regulatory Project Manager U.S. Army Corps of Engineers Washington Regulatory Field Office P.O. Box 1000 Washington, North Carolina 27889 Dear Mr. Bell: SUBJECT: Proposed Minor Modification to Department of the Army Permit No. 199502334: Improvements.to US 64-264, Including the construction of a new Croatan Sound bridge, from west of Manns Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. NHF-64 (6); State Project No. 8.T051401; TIP No. R-2551. As you are aware, the NCDOT has requested that Department of the Army Permit No. 199502334 be modified to (1) authorize pile jetting and cleanup; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out trestle; and 5) authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides. Modification request 1 is discussed below. Modification requests 2-4 have not changed since the original request. Due to the successful removal of piles without utilizing jetting, modification request 5 (authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides) is no longer necessary and is hereby rescinded. Please reference the March 14, 2000 letter from the NCDOT requesting authorization to jet piles conditioned upon the NCDOT providing the USACE with an approved cleanup plan before jetting operations were initiated. This letter is a response to the subsequent request from the USACE that a plan be provided for cleanup before any authorization is granted. Also please reference the January 28, 2000 letter from the NCDOT detailing cost P. O. Box 850 Edenton, NC 27932 (252) 482-7977 FAX: (252) 482-8722 estimates for jetting spoil cleanup as well as the original modification request of November 12, 1999. The NCDOT proposes to cleanup ail spoil material associated with jetting operations in jurisdictional areas. As noted in the referenced correspondence, jetting is proposed at 19 bent locations. Of these 19 bents, 9 bents occur within freshwater wetlands and 10 bents occur within coastal wetlands. Currently, the NCDOT has two options that are considered feasible: 1) (Preferred) Remove all material within the coastal marsh with a crane fitted with a clamshell bucket from the existing work trestle and utilize mats and lightweight tracked equipment to remove material from the freshwater wetlands; 2) Extend the temporary trestle all the way to high ground and remove all material from the trestle via the crane and clamshell bucket. OPTION ONE (Preferred): Utilize a combination of cleanup from mats and trestle The NCDOT proposes to utilize the existing temporary construction trestle as access to remove all material deposited within coastal marsh. A crane with a smooth clam bucket will be operated from the trestle. The material will be picked up with the crane and offloaded into bins on the trestle. The material will then be transported to high ground for disposal. At no time will any tracked or wheeled equipment be operated in the coastal marsh. As described in the referenced January 28, 2000 correspondence, the cost for utilizing the existing work trestle to cleanup the affected area around 10 bents will be $1,782,721. All material deposited within the freshwater wetlands will be removed utilizing a mat road as described in the referenced correspondence from November 12,1999. As described in the referenced January 28, 2000 correspondence, the cost for utilizing mats to cleanup, monitor, and mitigate (if necessary) is $206,173. Please note that the NCDOT will, under no circumstances, use more than one layer of mats. If the soil below the mats subsides to the point that additional mats need to be stacked on the initial mat road, the NCDOT will abort the matting cleanup operation. If it is determined that one layer of mats will not support the removal operation, the existing work trestle will be extended and all cleanup will be conducted via the trestle/crane system. Total cost for combination option is $1,988,894 OPTION TWO: Remove material from both the coastal marsh and freshwater wetlands from the existing work trestle using a crane and clamshell bucket. As described in the referenced January 28, 2000 correspondence, the total cost for extending the existing temporary work trestle and cleaning up the entire affected area from the trestle with a crane and clamshell bucket is $3,382,773. Cost savings by using the combination option Vs. trestle only= $1,393,878. The NCDOT hereby requests that the existing permit be modified to authorize (1) authorize pile jetting and cleanup utilizing a combination of mats and the temporary work trestle; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out. There will be no use of matting or tracked or wheeled vehicles within any portions of coastal wetlands. Furthermore, should it be discovered that the ground will not adequately support matting, all operations in freshwater wetlands using mats will be suspended and all material will be removed from the trestle. Thank you for your time and consideration. The Department respectfully requests that processing of this modification request proceed as soon as possible. By copy of this letter, the Department also requests that the Division of Water Quality and the Division of Coastal Management also modify the 401 Water Quality Certification and the CAMA Major Development Permit respectively. If you have any further questions or would like additional information, please don't hesitate to call.. Sincerely, D. R. Conner, P. E. Division Engineer T. Lind iddick, Jr. Division Environmental Officer CC: Mr. John Hennessy, DWQ Mr. David Cox, WRC Mr. Tom McCartney, FWS Mr. Ron Sechler, NMFS Ms. Sara Winslow, DMF Mr. Bill Gilmore, P.E., DOT Mr. Frank Jennings, NCDCM Mr. R. W. Midgett, P. E. Mr. R. E. Capehart, P. E. Mr. Steve DeWitt, P. E. Mr. Ted Bisterfield, EPA Ms. Cathy Brittingham, NCDCM DAMy Documents\R-255 1\cleanupproposalsmod.doc d wyauy o 991 2 5 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. GOVENOR November 12, 1999 Michael F. Bell, P.W.S., Regulatory Project Manager U. S. Army Corps of Engineers Washington Regulatory Field Office PAYMENT P.O. Box looo RECEIVED Washington, North Carolina 28779 Dear Mr. Bell: DAVID McCOY SECRETARY SUBJECT: Proposed Minor Modification to Department of the Army Permit No. 199502334: Improvements to US 64-264, Including the construction of a new Croatan Sound bridge, from west of Manns Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. NBF-64 (6); State Project No. 8.T051401; TIP No. R-2551. The Department of Transportation requests that the existing DOA Permit be modified to (1) authorize pile jetting and cleanup; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out trestle; 5) authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides. Modification #1: Authorize pile jetting and cleanup, The North Carolina Department of Transportation (NCDOT) is currently constructing a new bridge over the Croatan Sound. As you are aware, the piles are being placed by the construction method known as jetting. Jetting produces a mixture of sediment and water that is dispersed into the marsh adjacent to the bridge bents. You will also recall that the NCDOT has attempted to institute several methods of capturing the material and removing it from the marsh during the jetting process. This was an attempt at instantaneous cleanup to prevent the sediment from a prolonged stay within the jurisdictional area. These methods included driving 54" cassions around each pile to capture the material and then pumping the material to a settling basin. Total cost for this method for two bridge bents was approximately $1,800,000. Additionally, this method failed to remove the material satisfactorily. Attempts at removing the material immediately after deposition failed repeatedly. Subsequently, the Department elected to contain the material and remove it after the piles were in place. The jetting sediment on the west side of the bridge was eventually removed using a wooden mat road, a Caterpillar 307 lightweight excavator and a standard front end loader. The NCDOT has evaluated several options for dealing with the jetting sediment on the east side. First, an alternative method of installing the piles was investigated. This foundation redesign was not found to be feasible due to time and financial constraints. Preliminary estimates indicate that changing the method of construction would result in a 26-week delay for redesign, retooling, equipment acquisition, etc. It would also result in an increased cost of approximately $10,000,000. Therefore, this option was not considered feasible. Second, the NCDOT evaluated using the temporary work trestle and a crane to clean up and remove the sediment. This method is described as follows: -Clean up approximately 200 CY at each bent, 19 bents involved. -Sediment removal with a crane with clamshell bucket -Train will haul material in "dumpsters" or in modified rail cars to a barge at waters edge. -Material will be placed on the barge by a barge-mounted crane. -Material barge will be pushed by tugboat to the Load Out Trestle on the Mann's Harbor side. -Material will be offloaded at the Load Out Trestle by the straddle crane and placed into awaiting trucks for disposal. -Straddle crane will load empty containers back onto material barge. -Barge will be pushed back to the Roanoke Island side for the next bent(s) cleanup. -Bent clean up estimated at 2 days per bent, 38 days, another 2 to 12 days for equipment acquisition and fabrication, (i.e. clamshell bucket, dumpsters, rail cars, etc) The assignment of dollar costs to the clean up could be in the range of $7,000 to more than $10,000 per day. There is the possibility that the rail and crane trestle system could be extended to non- jurisdictional areas (i.e. near the end bent) much later in the course of construction of the bents in the affected wetlands. The material could be transferred to the end bent as opposed to a barge and pushed across the sound. The cost of any extension would be borne by the DOT; the contractor's original submittal/plan did not extend the trestle to the end bent. The contractor's intention all along has been to 'service' construction of the bridge in these east side wetlands by. the trestle whereby supplies are brought in from awaiting barges and the like. The construction of the trestle is designed to take place in a staged sequence. In this sequence each section of trestle is completed only as needed. This process will start in at the farthest bent from shore (working from barges) and work towards land. Therefore, it would take several months to reach the point where it would be feasible to extend the trestle to non jurisdictional area. It is estimated that direct cost (labor, materials, equipment) associated with trestle extension would be approximately $50,000 to extend another 160 feet. This would also trigger additional indirect costs of approximately $100,000 associated with manipulating the contractors scheduling and labor force allocations. DIRECT IMPACTS Trestle Clean Up $500,000 to $1,000,000. 2 INDIRECT IMPACTS Trestle Clean Up $2,000,000 to $3,000,000 Indirect impacts are very difficult measure at this time. It is estimated that 40 to 50 days will be required for the clean up. This timeframe takes resources away from bridge construction. These resources would not be earning the contractor the anticipated revenues within his earnings schedule. This timeframe has the high potential to disrupt operations following pile installation. Pile cap construction could be idled/delayed, thereby effecting girder erection and deck construction. These impacts can include idled equipment and manpower and increased storage and transportation costs for soon to be fabricated items such as girders and bearings. The idled condition may force the contractor to take measures not originally planned for to maintain or recover his construction schedule. The vernacular for these impacts are disruption of works, loss of productivity, accelerative measures, extended overhead, loss of profit and loss of interest on earnings. TOTAL IMPACT for Trestle Cleanup: Direct + Indirect $2,500,000 to $4,000,000 The Department feels that this method is unacceptable; at even the most conservative estimate of $2,500,000 the extended delays and extravagant costs make this alternative non-feasible. Therefore, the NCDOT proposes to contain the sediment using silt fence and hay bales as was allowed on the west side. The material will then be removed by a lightweight Caterpillar 307 excavator and a low ground pressure tracked loader. These lightweight pieces of equipment will be transported to the sediment containment area via wooden mats placed on the ground. The wooden mats will be ten feet wide. The total length of matting will be 1,903.0 feet from bridge bent 249 to the end bent (high ground) with an additional 20.0 feet of perpendicular matting per bent to access the containment area. Cleanup methodology will consist of utilizing the lightweight excavator to recover the material and place it in a small pile within the containment area. The low ground pressure tracked loader will then transport the material across the mat road to high ground to be disposed of. Total area involved in sediment containment and cleanup will be 2.325 acres. The amount of pressure exerted on the mat road is expected to be significantly less than was exerted on the mat road during sediment clean up on the west side. This is due to the utilization of a low ground pressure tracked loader as opposed to a standard front end loader. Therefore, it is reasonable to conclude that there will be less settling associated with the use of matting. The total area affected by matting will be 0.524 acres. The NCDOT is committed to a full monitoring of the affected area to insure that the marsh recovers. Monitoring will be conducted in accordance with attached monitoring plan. Additionally, the NCDOT has acquired a property that is currently being developed as a mitigation site. The site is near Stumpy Point, NC and will involve the restoration of a black needle rush (Juncus roemerianus) salt marsh community. The NCDOT fully expects the affected matting area to recover. However, the development of the Stumpy Point mitigation site is intended to serve as a "safety net" should monitoring of the cleanup area reveal that the recovery is not successful. Modification # 2: Authorize the extension 'of the currently permitted Tee road by 60.0 feet If you recall the Tee road is a section of temporary work trestle perpendicular to the bridge alignment which allows the contractor to get as close as possible to the bent for pile installation. The current design for the Tee road is a 60.0-foot long section of Tee road extending perpendicularly from the temporary work trestle to the bridge bents. The trestle was proposed the minimum practical safe distance from the bridge with the 60.0 foot Tee road extending out to the bridge to allow a crane to stretch from the Tee road to the bridge bent. However, after a test pile program conducted at the beginning of project construction, it was found that the 60.0 foot Tee road was not sufficient for all of the bent construction activities on the east side. The test pile program revealed that longer, heavier piles would be needed on the east side than were utilized on the west side. Pile lengths were changed from an average of 35 meters (115.0 feet) to an average of 42 (138.0 feet) meters in length. The distance that has to be stretched by the crane, coupled with the heavier and larger load, produces a situation that may cause equipment failures and compromise personal safety of workers. Therefore, the Department requests that the authorization be granted to extend the Tee road an additional 60.0 feet. The proposed extension will require four additional 24" pipe piles. Please note that these piles are temporary at each location. They will be in place only as long as pile driving activities are taking place at that bent. The Tee road will then be dismantled and moved to the next bent. Please see the attached construction drawings for reference. Modification #3: Authorize a temporary floating dock The contractor has requested permission to build a temporary floating dock at load-out trestle bent number four. The temporary floating dock will be used to dock construction vessels as well as on and off load construction equipment and workers. The dock will be approximately 6.096 meters x 6.096 meters (20.0 feet x 20.0 feet). This will require the installation of six 0.304-meter (12.0-inch) steel cylinder piles. Please see the attached construction drawings for reference. Modification #4: Authorize mooring piles and temporary trestle stabilization measures The contractor has requested permission to construct four 0.919-meter (36.0-inch) steel mooring piles at bent thirteen of the load-out trestle. The mooring piles will be used for construction barges. The barges will tie to the mooring piles while loading or unloading construction equipment and supplies. This will result in an increased demand and stress on the temporary trestle. Therefore, we are also requesting authorization to install H-beams for stabilization at load-out trestle bents 6, 8, 10, 11, 12, and 13. Additionally, two 0.6096-meter (24.0-inch) steel cylinder piles will be installed at load-out trestle bent number 10. Designs for the stabilization is included in the construction drawings. Modification #5: Authorize minimum use of jetting to loosen temporary trestle piles The original plan for the utilization of this trestle called for the temporary support piles to be vibrated out and for the trestle to be moved to the east side of the Croatan Sound. However, recent attempts to remove the temporary piles by vibration have been unsuccessful. The NCDOT has determined that the piles can be loosened and removed with a minimal use of "jetting". A very minor amount of material may surface from the pile loosening. Any material produced by this operation will be raked into the void left by the removed piling. If there is not enough material to fill the void, the hole will be filled to the elevation of the adjacent ground with clean sand. Per our telephone conversation of September 14, 1999, the NCDOT will utilize the above described technique to remove one piling. After removal, the USACE and the NCDCM will be consulted on site to determine if this method of piling removal is satisfactory. Your consideration is requested in processing this proposal as a "minor" modification. An expedited approval is essential to meeting critical project scheduling. Please call me if I can provide any additional information. Sincerely, D. R. Conner, P. E. Division Enginn/er T. Linds ddick, Jr. Division Environmental Officer-Division One CC: Mr. R. E. Capehart, P. E. Mr. R. W. Midgett, P. E. Mr. Frank Jennings, NCDCM Mr. David Cox, NCWRC Ms. Sarah Winslow, NCDMF Mr. John Hennessy, NCDWQ Mr. Ron Sechler, NMF Mr. Doug Huggett, NCDCM Mr. Randy K. Wise, P. E. I ,. i I . ! - ' I ,7 _4 tU i TD- ---- - ? ? I I ! YI• p; ? ? F d1 W ? 717 I ?- ' TO— AE I t? r'4 -- - A _6, ? ' I 1^? ° o e °P"'? 4 0 •ole4 o I?• I i ? - -'-- -!-- l-` I --- I LLii ff^ffWWW?}Ilj VV1I/?. I ? Z I l EI ! .! (? W. ?? ll CAI ?? yr -- - - - - -- ar ?'. : t I _ r - : I I I X?l I 1 1 1 1 t? ? ? I t , ? I ! l i l l t I I ? 80-01 I TEE ROAD ExTENsyoni RT ?,ofl D °f Norm, c?qO NORTH CAROLINA DEPARTMENT OF TRANSPORTATION N 7 Im = DIVISION OF HIGHWAYS OF TAPNSQ° DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 `, P10VF-Al U R I Z 699 SHEET OF SALT r >?c TYPIC^c. 5 PER ??Nr l t.sSTq(rC_,9 rlor? . ?417 - ZG7 2• t,?3 .. {?? !C?`) 2.F35 F-1 El f 305 N CIS) ?. E .. L._ I Z'135 (7') .t, to CZ') I AL a JIL( FFCE 15 -.Z) Be CGNS1PU<lr? I S v,41 T M. n o C- .o 5) t_7 S TDF . 02 ..Eav 1 Vr? l_?NT of ,1ONTH NORTH CAROLINA DEPARTMENT OF 9 TRANSPORTATION m = DIVISION OF HIGHWAYS OFT 'p DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 ?wcv6m,36R /2 . /9A SHEET o2 OF -5- n? SFF n"AM M PROPOSEO 0.9191, TEAM AT 1;0,12S BATTER LIZATION >TEEL CtL. PILES OF N°RTH C?9 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION !° = DIVISION OF HIGHWAYS °FTT%.'e ° DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 1VoVE 17 SHEET OF S .1990 ln4 6 N Lr,?E ''y " PERMfTTEO TEMPORARY TEMPORARY FLOATING OOCX i TYP. OR rif .44 V4 NORTH CAROLINA DEPARTMENT OF '` TRANSPORTATION ?c z DIVISION OF HIGHWAYS F?OF ip AN`'Q°P DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 TL R i10?6Mf SHEET OF M AtGH LsN E "/':Tr I 2 rc O O 3 J W W N °l 0 O W N O a 0 _r C <O <N W? mm I N O WW NJ a o. o? a° s W F- m h N O r2 QO 3Q <N O) N WW NJ a. 00: a° I ? yy? 52 y O N x n n 0 m W • m m, ry zW of µOR7k O,A NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ?v z DIVISION OF HIGHWAYS \, FNr°Fm?NSf°P DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 TLS IVO 17, SHEET S OF S Monitoring Plan for the recovery of the disturbed marsh area adjacent to the new Croatan Sound Bridge The plan consists of monitoring the disturbed site to determine the success of vegetative recovery occurring within it. The existing undisturbed marsh, dominated by black needle rush (Juncus roemerianus), adjacent to the disturbed site will be evaluated in January, 2000, and will be used as a reference marsh to determine the degree of recovery. Three plots measuring 1 meter by 1 meter will be selected randomly and the percent aerial vegetative coverage will be evaluated and used as a baseline reference. The disturbed area will be allowed to recover naturally from existing plant material and seed source present. Vegetative monitoring will be conducted annually beginning in January of 2000. The monitoring will consist of randomly selecting 12 plots in the disturbed area, measuring 1 meter by 1 meter, and comparing the level of regeneration to the reference marsh. The area will be evaluated after one full growing season in September of 2000 to determine if replanting with black needle rush will be necessary. If replanting is deemed necessary, NCDOT will prepare a planting plan and submit it to the USACE and the NCDCM for approval. All efforts will be made to utilize a local seed source if plantings are required. If there are any areas where compaction has prevented natural regeneration from occurring, hand labor will be used to scarify the area to remediate the compaction. Areas that require scarification will be planted with black needle rush and monitored accordingly. As required, there will be a zero tolerance for phragmites (Phragmites communis). If the presence of this species is detected, measures will be taken immediately to eradicate this species from the site. Monitoring reports will be submitted by December 31St of each year for a period of five years. The disturbed area will be considered recovered when aerial vegetative coverage has been determined to meet or exceed 90% of the coverage found in the reference marsh. If after a period of three years, it is determined that recovery efforts are not succeeding, the North Carolina Department of Transportation will consult with the U. S. Army Corps of Engineers and the North Carolina Division of Coastal Management to discuss necessary remedial action. JAMES B. HUNT JR. GovENOR STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION d?a S7ATFp ?. November 12, 1999 DAVID McCOY SECRETARY Michael F. Bell, P.W.S., Regulatory Project Manager U. S. Army Corps of Engineers Washington Regulatory Field Office P.O. Box 1000 PAYMENT Washington, North Carolina 28779 Dear Mr. Bell: RECEIVED SUBJECT: Proposed Minor Modification to Department of the Army Permit No. 199502334: Improvements to US 64-264, Including the construction of a new Croatan Sound bridge, from west of Manns Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. NHF-64 (6); State Project No. 8.T051401; TIP No. R-2551. The Department of Transportation requests that the existing DOA Permit be modified to (1) authorize pile jetting and cleanup; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out trestle; 5) authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides. Modification #1: Authorize pile jetting and cleanup The North Carolina Department of Transportation (NCDOT) is currently constructing a new bridge over the Croatan Sound. As you are aware, the piles are being placed by the construction method known as jetting. Jetting produces a mixture of sediment and water that is dispersed into the marsh adjacent to the bridge bents. You will also recall that the NCDOT has attempted to institute several methods of capturing the material and removing it from the marsh during the jetting process. This was an attempt at instantaneous cleanup to prevent the sediment from a prolonged stay within the jurisdictional area. These methods included driving 54" cassions around each pile to capture the material and then pumping the material to a settling basin. Total cost for this method for two bridge bents was approximately $1,800,000. Additionally, this method failed to remove the material satisfactorily. Attempts at removing the material immediately after deposition failed repeatedly. Subsequently, the Department elected to contain the material and remove it after the piles were in place. The jetting sediment on the west side of the bridge was eventually removed using a wooden mat road, a Caterpillar 307 lightweight excavator and a standard front end loader. The NCDOT has evaluated several options for dealing with the jetting sediment on the east side. First, an alternative method of installing the piles was investigated. This foundation redesign was not found to be feasible due to time and financial constraints. Preliminary estimates indicate that changing the method of construction would result in a 26-week delay for redesign, retooling, equipment acquisition, etc. It would also result in an increased cost of approximately $10,000,000. Therefore, this option was not considered feasible. Second, the NCDOT evaluated using the temporary work trestle and a crane to clean up and remove the sediment. This method is described as follows: -Clean up approximately 200 CY at each bent, 19 bents involved. -Sediment removal with a crane with clamshell bucket -Train will haul material in "dumpsters" or in modified rail cars to a barge at waters edge. -Material will be placed on the barge by a barge-mounted crane. -Material barge will be pushed by tugboat to the Load Out Trestle on the Mann's Harbor side. -Material will be offloaded at the Load Out Trestle by the straddle crane and placed into awaiting trucks for disposal. -Straddle crane will load empty containers back onto material barge. -Barge will be pushed back to the Roanoke Island side for the next bent(s) cleanup. -Bent clean up estimated at 2 days per bent, 38 days, another 2 to 12 days for equipment acquisition and fabrication, (i.e. clamshell bucket, dumpsters, rail cars, etc) The assignment of dollar costs to the clean up could be in the range of $7,000 to more than $10,000 per day. There is the possibility that the rail and crane trestle system could be extended to non- jurisdictional areas (i.e. near the end bent) much later in the course of construction of the bents in the affected wetlands. The material could be transferred to the end bent as opposed to a barge and pushed across the sound. The cost of any extension would be borne by the DOT; the contractor's original submittal/plan did not extend the trestle to the end bent. The contractor's intention all along has been to 'service' construction of the bridge in these east side wetlands by the trestle whereby supplies are brought in from awaiting barges and the like. The construction of the trestle is designed to take place in a staged sequence. In this sequence each section of trestle is completed only as needed. This process will start in at the farthest bent from shore (working from barges) and work towards land. Therefore, it would take several months to reach the point where it would be feasible to extend the trestle to non jurisdictional area. It is estimated that direct cost (labor, materials, equipment) associated with trestle extension would be approximately $50,000 to extend another 160 feet. This would also trigger additional indirect costs of approximately $100,000 associated with manipulating the contractors scheduling and labor force allocations. DIRECT IMPACTS Trestle Clean Up $500,000 to $1,000,000. INDIRECT IMPACTS Trestle Clean Up $2,000,000 to $3,000,000 Indirect impacts are very difficult measure at this time. It is estimated that 40 to 50 days will be required for the clean up. This timeframe takes resources away from bridge construction. These resources would not be earning the contractor the anticipated revenues within his earnings schedule. This timeframe has the high potential to disrupt operations following pile installation. Pile cap construction could be idled/delayed, thereby effecting girder erection and deck construction. These impacts can include idled equipment and manpower and increased storage and transportation costs for soon to be fabricated items such as girders and bearings. The idled condition may force the contractor to take measures not originally planned for to maintain or recover his construction schedule. The vernacular for these impacts are disruption of works, loss of productivity, accelerative measures, extended overhead, loss of profit and loss of interest on earnings. TOTAL IMPACT for Trestle Cleanup: Direct + Indirect $2,500,000 to $4,000,000 The Department feels that this method is unacceptable; at even the most conservative estimate of $2,500,000 the extended delays and extravagant costs make this alternative non-feasible. Therefore, the NCDOT proposes to contain the sediment using silt fence and hay bales as was allowed on the west side. The material will then be removed by a lightweight Caterpillar 307 excavator and a low ground pressure tracked loader. These lightweight pieces of equipment will be transported to the sediment containment area via wooden mats placed on the ground. The wooden mats will be ten feet wide. The total length of matting will be 1,903.0 feet from bridge bent 249 to the end bent (high ground) with an additional 20.0 feet of perpendicular matting per bent to access the containment area. Cleanup methodology will consist of utilizing the lightweight excavator to recover the material and place it in a small pile within the containment area. The low ground pressure tracked loader will then transport the material across the mat road to high ground to be disposed of. Total area involved in sediment containment and cleanup will be 2.325 acres. The amount of pressure exerted on the mat road is expected to be significantly less than was exerted on the mat road during sediment clean up on the west side. This is due to the utilization of a low ground pressure tracked loader as opposed to a standard front end loader. Therefore, it is reasonable to conclude that there will be less settling associated with the use of matting. The total area affected by matting will be 0.524 acres. The NCDOT is committed to a full monitoring of the affected area to insure that the marsh recovers. Monitoring will be conducted in accordance with attached monitoring plan. Additionally, the NCDOT has acquired a property that is currently being developed as a mitigation site. The site is near Stumpy Point, NC and will involve the restoration of a black needle rush (Juncus roemerianus) salt marsh community. The NCDOT fully expects the affected matting area to recover. However, the development of the Stumpy Point mitigation site is intended to serve as a "safety net" should monitoring of the cleanup area reveal that the recovery is not successful. Modification # 2• Authorize the extension 'of the currently permitted Tee road by 60.0 feet If you recall the Tee road is a section of temporary work trestle perpendicular to the bridge alignment which allows the contractor to get as close as possible to the bent for pile installation. The current design for the Tee road is a 60.0-foot long section of Tee road extending perpendicularly from the temporary work trestle to the bridge bents. The trestle was proposed the minimum practical safe distance from the bridge with the 60.0 foot Tee road extending out to the bridge to allow a crane to stretch from the Tee road to the bridge bent. However, after a test pile program conducted at the beginning of project construction, it was found that the 60.0 foot Tee road was not sufficient for all of the bent construction activities on the east side. The test pile program revealed that longer, heavier piles would be needed on the east side than were utilized on the west side. Pile lengths were changed from an average of 35 meters (115.0 feet) to an average of 42 (138.0 feet) meters in length. The distance that has to be stretched by the crane, coupled with the heavier and larger load, produces a situation that may cause equipment failures and compromise personal safety of workers. Therefore, the Department requests that the authorization be granted to extend the Tee road an additional 60.0 feet. The proposed extension will require four additional 24" pipe piles. Please note that these piles are temporary at each location. They will be in place only as long as pile driving activities are taking place at that bent. The Tee road will then be dismantled and moved to the next bent. Please see the attached construction drawings for reference. Modification #3: Authorize a temporary floating dock The contractor has requested permission to build a temporary floating dock at load-out trestle bent number four. The temporary floating dock will be used to dock construction vessels as well as on and off load construction equipment and workers. The dock will be approximately 6.096 meters x 6.096 meters (20.0 feet x 20.0 feet). This will require the installation of six 0.304-meter (12.0-inch) steel cylinder piles. Please see the attached construction drawings for reference. Modification #4: Authorize mooring piles and temporary trestle stabilization measures The contractor has requested permission to construct four 0.919-meter (36.0-inch) steel mooring piles at bent thirteen of the load-out trestle. The mooring piles will be used for construction barges. The barges will tie to the mooring piles while loading or unloading construction equipment and supplies. This will result in an increased demand and stress on the temporary trestle. Therefore, we are also requesting authorization to install H-beams for stabilization at load-out trestle bents 6, 8, 10, 11, 12, and 13. Additionally, two 0.6096-meter (24.0-inch) steel cylinder piles will be installed at load-out trestle bent number 10. Designs for the stabilization is included in the construction drawings. 4 Modification #5: Authorize minimum use of jetting to loosen temporary trestle piles The original plan for the utilization of this trestle called for the temporary support piles to be vibrated out and for the trestle to be moved to the east side of the Croatan Sound. However, recent attempts to remove the temporary piles by vibration have been unsuccessful. The NCDOT has determined that the piles can be loosened and removed with a minimal use of "jetting". A very minor amount of material may surface from the pile loosening. Any material produced by this operation will be raked into the void left by the removed piling. If there is not enough material to fill the void, the hole will be filled to the elevation of the adjacent ground with clean sand. Per our telephone conversation of September 14, 1999, the NCDOT will utilize the above described technique to remove one piling. After removal, the USACE and the NCDCM will be consulted on site to determine if this method of piling removal is satisfactory. Your consideration is requested in processing this proposal as a "minor" modification. An expedited approval is essential to meeting critical project scheduling. Please call me if I can provide any additional information. Sincerely, D. R. Conner, P. E. Division Enginner T. Linds -ddick, Jr. Division Environmental Officer-Division One CC: Mr. R. E. Capehart, P. E. Mr. R. W. Midgett, P. E. Mr. Frank Jennings, NCDCM Mr. David Cox, NCWRC Ms. Sarah Winslow, NCDMF Mr. John Hennessy, NCDWQ Mr. Ron Sechler, NMF r Mr. Doug Huggett, NCDCM Mr, Randy K. Wise, P. E. r i _ 71 - -- - - - 17 i i ,? i I Y' p• ? u b W' t Li I , TO -- .. - _r --x Qp i -- -. - m:. _.FO -- - cc- s I 51 W? i I o,. . l^e ° ` p C ^° P" 4 p •alea o ? o I,. ? ,? j?--t-?1-1?.._? _ I-. ??! .. , 1 i ? -•lU' ? ? I 1 Q• ? ?? O-?' ' I I ? ^I 4 I i I _ _ I I : I I ' - - ud _JL r i I I I I ? ? ! I I ?? 1 I I -- s ? j , ?I ! , I I . I ? I I ? i i ! I i i i i I 80-0 I l1 TEE ROAD ?XTENS=On1 P90PO. S 0 M PM ?,oA l) Of. "OR771 c?9 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (5 1 I° z DIVISION OF HIGHWAYS OFTRDIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE :CROATAN SOUND R-2551 R tjovF-M u R Z Ig95 SHEET OF 54e<T Nc "r`fPICAL PER gar la3ST?LL?}rrou 2417 - 2 G 7 2- ? 3 5 C 7' } ? ? ? -` L:l El • 3c5 i • ?l,? vl ?I C -305 I 1.... n . cv) I I . Z' 1 35 (79 .4kfl CZ') t AL SILT FF:tCE 15 ''b Be CblJS-j-2u<7ro W k T n. /--? r1 o C- .o 51 LT 5-MR. 02 EQv I VA LENT OR %40R77f a NORTH CAROLINA DEPARTMENT OF TRANSPORTATION m s DIVISION OF HIGHWAYS OF TRQ° DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 Tl_ IZ Jfo?6in E /2 .19/i SHEET a OF -5- SEE orrwn A M PROPOSED 0.919" TEAM AT 1:0.125 BATTER LIZATION ;TEEL CYL. PILES ?Of N°nTN C?9 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION r ' im = DIVISION OF HIGHWAYS R. P ?rOFTn?NSe° DIVISION ONE 166oVE 2 17 SHEET 'L OF 71 - 19 171.97-6 N Z r 5 I `.9 P DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 -T-1- 12 PERMITTED TEMPORARY TEMPORARY FLOATING OOCX i TYP, t ° NORTH CAROLINA DEPARTMENT OF tN G?\ TRANSPORTATION DIVISION OF HIGHWAYS °cttt?e`Se°P DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 ?1/C?EMi SHEET OF M,4TCH LsN E ''J-i U Z C O O 3 W W VI 0 H a 0 r _h O tit <O WJ I O WW N _W 0. om a° cc w FQQm N N O ?- 2 QO ?a QN m N O WW N? as a° Z O n n 0 m H m m J ? O ?Oa ?`0"T'? coq NORTH CAROLINA DEPARTMENT OF °Gy TRANSPORTATION DIVISION OF HIGHWAYS Im = QyrOF NSY°P DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 TL tZ i1voy,5mane Z 19 SHEET S 0 F S Monitoring Plan for the recovery of the disturbed marsh area adjacent to the new Croatan Sound Bridge The plan consists of monitoring the disturbed site to determine the success of vegetative recovery occurring within it. The existing undisturbed marsh, dominated by black needle rush (Juncus roemerianus), adjacent to the disturbed site will be evaluated in January, 2000, and will be used as a reference marsh to determine the degree of recovery. Three plots measuring 1 meter by 1 meter will be selected randomly and the percent aerial vegetative coverage will be evaluated and used as a baseline reference. The disturbed area will be allowed to recover naturally from existing plant material and seed source present. Vegetative monitoring will be conducted annually beginning in January of 2000. The monitoring will consist of randomly selecting 12 plots in the disturbed area, measuring 1 meter by 1 meter, and comparing the level of regeneration to the reference marsh. The area will be evaluated after one full growing season in September of 2000 to determine if replanting with black needle rush will be necessary. If replanting is deemed necessary, NCDOT will prepare a planting plan and submit it to the USACE and the NCDCM for approval. All efforts will be made to utilize a local seed source if plantings are required. If there are any areas where compaction has prevented natural regeneration from occurring, hand labor will be used to scarify the area to remediate the compaction. Areas that require scarification will be planted with black needle rush and monitored accordingly. As required, there will be a zero tolerance for phragmites (Phragmites communis). If the presence of this species is detected, measures will be taken immediately to eradicate this species from the site. Monitoring reports will be submitted by December 31" of each year for a period of five years. The disturbed area will be considered recovered when aerial vegetative coverage has been determined to meet or exceed 90% of the coverage found in the reference marsh. If after a period of three years, it is determined that recovery efforts are not succeeding, the North Carolina Department of Transportation will consult with the U. S. Army Corps of Engineers and the North Carolina Division of Coastal Management to discuss necessary remedial action. - NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES MEMORANDUM 12/21/99 DIVISION OF COASTAL MANAGEMENT WAYNE MCDEVITT SECRETARY TO: Division of Community Assistance Division of Land Resources, Land Quality Section / Division of Water Quality, 401 Certification Program Division of Water Quality, Storm Water Management Program State Property Office Division of Archives & History Division of Environmental Health ` Division of Highways Wildlife Resources Commission Division of Water Resources Wis.. . Division of Marine Fisheries Division of Marine Fisheries, Submerged Lands CC: Mike Bell, USACE Washington Regulatory Field Office FROM: Cathy Brittingham, Transportation Project Coordinator SUBJECT: Public Notice for Department of the Army Permit Modification Request from the N.C. Department of Transportation PROJECT: Improvements to US 64-264, including the construction of a new Croatan Sound bridge, from west of Manns Harbor to NC 345 South of Manteo, in Dare County; Federal Aid Project No. NHF-64(6); State Project No. 8.T051401; T.I.P. NO. R-2551. The above listed document is being circulated to you for review and comment. Written comments regarding the application for Clean Water Act certification should be delivered to the NC Division of Water Quality, Wetland/401 Unit, on or before December 27, 1999, attention: Mr. John Dorney. Written comments pertinent to the proposed work should be delivered to the U.S. Army Corps of Engineers, Washington Regulatory Field Office, until 4:15 pm, January 3, 2000, attention: Mr. Michael F. Bell, or telephone (919) 975-1616, extension 26. Please send a copy of any written comments to the NC Division of Coastal Management at the address listed below. Thank you for your consideration. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. Signed This agency approves of the project, only if the recommended changes are incorporated. See attached. - This agency objects to the project for reasons described in the attached memo. Date 1638 MAIL SERVICE CENTER, RALEIGH, NC 27699-1638 2728 CAPITAL BLVD., RALEIGH, NC 27604 PHONE 919-733-2293 FAX 919-733-1495 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/10% POST-CONSUMER PAPER DEPARTMENT OF THE ARMY Wilmington District, Corps of Engineers Post Office Box 1890 Wilmington, North Carolina 28402-1890 ACTION ID No. 199502334 PUBLIC NOTICE PERMIT MODIFICATION M" IV DEC 0 6 1999 COASTAL MANAGEMENT December 2, 1999 THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT), DIVISION OF HIGHWAYS, Post Office Box 25201, Raleigh, North Carolina 27611-5201, was issued, on March 5, 1998, a Department of the Army (DA) permit TO FILL 13.22 ACRES OF SECTION 404 WETLANDS, MECHANIZE LAND CLEAR 3.83 ACRES OF SECTION 404 WETLANDS, DRAIN 2.79 ACRES OF SECTION 404 WETLANDS, AND FILL 0.05 ACRES OF OPEN WATERS OF THE UNITED STATES ADJACENT TO THE CROATAN SOUND, SPENCER'S CREEK AND UNNAMED TRIBUTARIES. THE NCDOT PROPOSES TO WIDEN APPROXIMATELY 10 MILES OF U.S. 64-264, INCLUDING CONSTRUCTING A NEW BRIDGE OVER THE CROATAN SOUND AND ADJACENT MARSHES, FROM US, 64-264 WEST OF MANNS HARBOR TO NC 345 SOUTH OF MANTEO, IN DARE COUNTY, NORTH CAROLINA, TIP NO. R-2551, FEDERAL AID PROJECT NO. NHF-64(6), STATE PROJECT NO. 8.T051401. The permittee has applied for a modification to the permit to: 1. Pile jetting, temporary fill, and associated cleanup in an additional 2.325 acres of Section 10 and 404 Wetlands adjacent to the Croatan Sound, within a sediment containment area at 19 bent locations in a black needle rush marsh community on the eastern side of the permitted project. An additional 0.524 acres of impact will be associated with 1,903 linear feet of matting to access the containment areas, for a total of 2.849 acres. NCDOT proposes to contain the jetted sediment using silt fence and hay bales. A lightweight Caterpillar 307 excavator will then remove the material to a low ground pressure tracked loader. The material will be ultimately transported to an offsite upland sediment containment area via wooden mats (10 feet wide) placed on the marsh. Attached to this public notice is a monitoring plan for the recovery of the disturbed marsh area impacted by the matted construction access road. 2. Extend the permitted Tee road in Croatan Sound by 60 feet. The results of a test pile program indicated the permitted proposal was not sufficient for all the bent construction activities on the eastern side of the permitted project. The test pile program revealed that longer, heavier piles would be needed on the east side. 2 3. Construct a temporary floating moorage facility within Croatan Sound at load-out trestle bent number four. The temporary facility will be used to dock construction vessels as well as on and off load construction equipment and workers. The proposed facility will be 20 x 20 feet and require the installation of six 12" steel cylinder pipes. 4. Install mooring piles and temporary stabilization measures within Croatan Sound at load-out trestle bents 6, 8, 11, 12 and 13. The 36 inch steel mooring piles will be located at bents 10 and 13 and will be used while loading and unloading construction equipment and supplies. "H" beam stabilizers at bents 6, 8, 10, 11, 12 and 13 are requested for safety. Construction plans are included with this public notice along with the applicant's modification request that includes an analysis of alternatives for the pile jetting and associated cleanup. The State of North Carolina will review this public notice to determine the need for the applicant to obtain any required State authorization. No Department of the Army (DA) permit will be modified until the coordinated State viewpoint on the proposal has been received and reviewed by this agency, nor will a DA permit -be modified until the North Carolina Division of Environmental management (NCDEM) has determined the applicability of a Water Quality Certification as required by PL 92-500. This modification is being considered pursuant to Section 404 of the Clean Water Act (33 U.S.C. 1344). Any person may request, in writing within the comment period specified in the notice, that a public hearing be held to consider this application. Requests for public hearing shall state, with particularity, the reasons for holding a public hearing. The District Engineer has consulted the latest published version of the National Register of Historic Places for the presence or absence of registered properties, or properties listed as being eligible for inclusion therein, and this worksite is not a registered property or property listed as being eligible for inclusion in the Register. Consultation of the National Register constitutes the extent of cultural resource investigations by the District Engineer, and he is otherwise unaware of the presence of such resources. Presently, unknown archeological, scientific, prehistorical, or historical data may be lost or destroyed by work under the requested permit modification. The District Engineer is not aware, based on available information, that the proposed activity will affect species, or their critical habitat, designated as endangered or threatened pursuant to the Endangered Species Act of 1973. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The DE's initial determination is that the proposed project would not adversely impact EFH or associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Councils or the NMFS. 3 The decision whether to issue a permit modification will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity and its intended use on the public interest. Evaluation of the probable impacts which the proposed activity may have on the public interest requires a careful weighing of all those factors which become relevant in each particular case. The benefits which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. The decision whether to authorize a proposal, and if so the conditions under which it will be allowed to occur, are therefore determined by the outcome of the general balancing process. That decision should reflect the national concern for both protection and utilization of important resources. All factors which may be relevant to the proposal must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards and flood plain values (in accordance with Executive Order 11988), land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving the placement of dredged or fill materials in waters of the United States, a permit modification will be denied if the discharge that would be authorized by such modification would not comply with the Environmental Protection Agencies' 404(b)(1) guidelines. Subject to the preceding sentence and any other applicable guidelines or criteria, a permit modification will be granted unless the District Engineer determines that it would be contrary to the public interest. Generally, the decision whether to issue this Department of the Army (DA) permit modification will not be made until the North Carolina Division of Water Quality (NCDWQ) issues, denies, or waives State certification required by Section 401 of the Clean Water Act. The NCDWQ considers whether or not the proposed activity will comply with Sections 301, 302, 306, and 307 of the Clean Water Act. The application and this public notice for the DA permit serves as application to the NCDWQ for certification. Additional information regarding the Clean Water Act certification may be reviewed at the offices of the North Carolina Division of Water Quality (NCDWQ), Wetland/401 Unit, 4401 Reedy Creek Road, Raleigh, North Carolina 27607. Copies of such materials will be furnished to any person requesting copies upon payment of reproduction costs. All persons desiring to make comments regarding the application for Crean Water Act certification should do so in writing delivered to the North Carolina Division of Water Quality (NCDWQ), Wetland/401 Unit, 1621 Mail Service Center, Raleigh, North Carolina 27699-1621, on or before December 27, 1999, Attention: Mr. John Dorney. Written comments pertinent to the proposed work, as outlined above, will be received in this office, Attn: Michael F. Bell, Washington Regulatory Field Office, Post Office Box 1000, Washington, North Carolina 27889-1000, until 4:15 p.m., January 3, 2000, or telephone (919)975-1616, extension 26. Mme. a-v STATE of NORTH CAROLINA ?r " OF TRANSPORTATION JAMES B. HL-+-I' JR. GOVENOR November 12, 1999 Michael F. Bell, P.W.S., Regulatory Project Manager U. S. Army Corps of Engineers Washington Regulatory Field Office P.O. Box 1000 Washington, North Carolina 28779 Dear Mr. Bell: DAVID McCOY SECRETARY SUBJECT: Proposed Minor Modification to Department of the Army Permit No. 199502334: Improvements to US 64-264, Including the construction of a new Croatan Sound bride, from west of Manns Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. NEF-64 (6); State Project No. 8.T051401; TIP No. R-2551. The Department of Transportation requests that the existing DOA Permit be modified to (1) authorize pile jetting and cleanup; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out trestle; 5) authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides. Modification #1: Authorize pile jetting and cleanup The North Carolina Department of Transportation (NCDOT) is currently constructing a new bridge over the Croatan Sound. As you are aware, the piles are being placed by the construction method known as jetting. Jetting produces a mixture of sediment and water that is dispersed into the marsh adjacent to the bridge bents. You will also recall that the NCDOT has attempted to institute several methods of capturing the material and removing it from the marsh during the jetting process. This was an attempt at instantaneous cleanup to prevent the sediment from a prolonged stay within the jurisdictional area. These methods included driving 54" cassions around each pile to capture the material and then pumping the material to a settling basin. Total cost for this method for two bridge bents was approximately $1,800,000. Additionally,'this method failed to remove the material satisfactorily. Attempts at removing the material immediately after deposition failed repeatedly. Subsequently, the Department elected to contain the material and remove it after the piles were in place. The jetting sediment on the west side of the bridge was eventually removed using a wooden mat road, a Caterpillar 307 lightweight excavator and a standard front end loader. The NCDOT has evaluated several options for dealing with the jetting sediment on the east side. First, an alternative method of installing the piles was investigated. This foundation redesign was not found to be feasible due to time and financial constraints. Preliminary estimates indicate that changing the method of construction would result in a 26-week delay for redesign, retooling, equipment acquisition, etc. It would also result in an increased cost of approximately $10,000,000. Therefore, this option was not considered feasible. Second, the NCDOT evaluated using the temporary work trestle and a crane to clean up and remove the sediment. This method is described as follows: -Clean up approximately 200 CY at each bent, 19 bents involved. -Sediment removal with a crane with clamshell bucket -Train will haul material in "dumpsters" or in modified rail cars to a barge at waters edge. -Material will be placed on the barge by a barge-mounted crane. -Material barge will be pushed by tugboat to the Load Out Trestle on the Mann's Harbor side. -Material will be offloaded at the Load Out Trestle by the straddle crane and placed into awaiting trucks for disposal. -Straddle crane will load empty containers back onto material barge. -Barge will be pushed back to the Roanoke Island side for the next bent(s) cleanup. -Bent clean up estimated at 2 days per bent, 38 days, another 2 to 12 days for equipment acquisition and fabrication, (i.e. clamshell bucket, dumpsters, rail cars, etc) The assignment of dollar costs to the clean up could be in the range of $7,000 to more than $10,000 per day. There is the possibility that the rail and crane trestle system could be extended to non- jurisdictional areas (i.e. near the end bent) much later in the course of construction of the bents in the affected wetlands. The material could be transferred to the end bent as opposed to a barge and pushed across the sound. The cost of any extension would be borne by the DOT; the contractor's original submittal/plan did not extend the trestle to the end bent. The contractor's intention all along has been to 'service' construction of the bridge in these east side wetlands by the trestle whereby supplies are brought in from awaiting barges and the like. The construction of the trestle is designed to take place in a staged sequence. In this sequence each section of trestle is completed only as needed. This process will start in at the farthest bent from shore (working from barges) and work towards land. Therefore, it would take several months to reach the point where it would be feasible to extend the trestle to non jurisdictional area. It is estimated that direct cost (labor, materials, equipment) associated with trestle extension would be approximately $50,000 to extend another 160 feet. This would also trigger additional indirect costs of approximately $100,000 associated with manipulating the contractors scheduling and labor force allocations. DIRECT IMPACTS Trestle Clean Up $500,000 to $1,000,000. 2 INDIRECT IMPACT Trestle Clean Up 52,000,000 to S3,000,000 Indirect impacts are very difficult measure at this time. It is estimated that 40 to 50 days will be required for the clean up. This timeframe takes resources away from bridge construction. These resources would not be earnina the contractor the anticipated revenues within his earnings schedule. This timeframe has the high potential to disrupt operations following pile installation. Pile cap construction could be idled/delayed, thereby effecting girder erection and deck construction. These impacts can include idled equipment and manpower and increased storage and transportation costs for soon to be fabricated items such as girders and bearings. The idled condition may force the contractor to take measures not originally planned for to maintain or recover his construction schedule. The vernacular for these impacts are disruption of works, loss of productivity, accelerative measures, extended overhead, loss of profit and loss of interest on earnings. TOTAL IMPACT for Trestle Cleanup: Direct + Indirect S2,500,000 to $4,000,000 The Department feels that this method is unacceptable; at even the most conservative estimate of 52,500,000 the extended delays and extravagant costs make this alternative non-feasible. Therefore, the NCDOT proposes to contain the sediment using silt fence and hay bales as was allowed on the west side. The material will then be removed by a lightweight Caterpillar 307 excavator and a low ground pressure tracked loader. These lightweight pieces of equipment will be transported to the sediment containment area via wooden mats placed on the ground. The wooden mats will be ten feet wide. The total length of matting will be 1,903.0 feet from bridge bent 249 to the end bent (high ground) with an additional 20.0 feet of perpendicular matting per bent to access the containment area. Cleanup methodology will consist of utilizing the lightweight excavator to recover the material and place it in a small pile within the containment area. The low ground pressure tracked loader will then transport the material across the mat road to high ground to be disposed of. Total area involved in sediment containment and cleanup will be 2.325 acres. The amount of pressure exerted on the mat road is expected to be significantly less than was exerted on the mat road during sediment clean up on the west side. This is due to the utilization of a low ground pressure tracked loader as opposed to a standard front end loader. Therefore, it is reasonable to conclude that there will be less settling associated with the use of matting. The total area affected by matting will be 0.524 acres. The NCDOT is committed to a full monitoring of the affected area to insure that the marsh recovers. Monitoring will be conducted in accordance with attached monitoring plan. Additionally, the NCDOT has acquired a property that is currently being developed as a mitigation site. The site is near Stumpy Point, NC and will involve the restoration of a black needle rush (Juncus roemerianus) salt marsh community. The NCDOT fully expects the affected matting area to recover. However, the development of the Stumpy Point mitigation site is intended to serve as a "safety net" should monitoring of the cleanup area reveal that the recovery is not successful. Modification # 2: Authorize the extension'of the currently permitted Tee road by 60.0 feet If you recall the Tee road is a section of temporary work trestle perpendicular to the bridge alignment which allows the contractor to get as close as possible to the bent for pile installation. The current design for the Tee road is a 60.0-foot long section of Tee road extending perpendicularly from the temporary work trestle to the bridge bents. The trestle was proposed the minimum practical safe distance from the bridge with the 60.0 foot Tee road extending out to the bridge to allow a crane to stretch from the Tee road to the bridge bent. However, after a test pile program conducted at the beginning of project construction, it was found that the 60.0 foot Tee road was not sufficient for all of the bent construction activities on the east side. The test pile program revealed that longer, heavier piles would be needed on the east side than were utilized on the west side. Pile lengths were changed from an average of 35 meters (115.0 feet) to an average of 42 (138.0 feet) meters in length. The distance that has to be stretched by the crane, coupled with the heavier and larger load, produces a situation that may cause equipment failures and compromise personal safety of workers. Therefore, the Department requests that the authorization be granted to extend the Tee road an additional 60.0 feet. The proposed extension will require four additional 24" pipe piles. Please note that these piles are temporary at each location. They will be in place only as long as pile driving activities are taking place at that bent. The Tee road will then be dismantled and moved to the next bent. Please see the attached construction drawings for reference. Modification #3: Authorize a temporary floating dock The contractor has requested permission to build a temporary floating dock at load-out trestle bent number four. The temporary floating dock will be used to dock construction vessels as well as on and off load construction equipment and workers. The dock will be approximately 6.096 meters x 6.096 meters (20.0 feet x 20.0 feet). This will require the installation of six 0.304-meter (12.0-inch) steel cylinder piles. Please see the attached construction drawings for reference. Modification 44: Authorize mooring piles and temporary trestle stabilization measures The contractor has requested permission to congruct four 0.919-meter (36.0-inch) steel mooring piles at bent thirteen of the load-out trestle. The mooring piles will be used for construction barges. The barges will tie to the mooring piles while loading or unloading construction equipment and supplies. This will result in an increased demand and stress on the temporary trestle. Therefore, we are also requesting authorization to install H-beams for stabilization at load-out trestle bents 6, 8, 10, 11, 12, and 13. Additionally, two 0.6096-meter (24.0-inch) steel cylinder piles will be installed at load-out trestle bent number 10. Designs for the stabilization is included in the construction drawings. 4 Modification #5: Authorize minimum use of jetting to loosen temporary trestle piles The original plan for the utilization of this trestle called for the temporary support piles to be vibrated out and for the trestle to be moved to the east side of the Croatan Sound. However, recent attempts to remove the temporary piles by vibration have been unsuccessful. The NCDOT has determined that the piles can be loosened and removed with a minimal use of "jetting". A very minor amount of material may surface from the pile loosening. Any material produced by this operation will be raked into the void left by the removed piling. If there is not enough material to fill the void, the hole will be filled to the elevation of the adjacent ground with clean sand. Per our telephone conversation of September 14, 1999, the NCDOT will utilize the above described technique to remove one piling. After removal, the USACE and the NCDCM will be consulted on site to determine if this method of piling removal is satisfactory. Your consideration is requested in processing this proposal as a "minor" modification. An expedited approval is essential to meeting critical project scheduling. Please call me if I can provide any additional information. Sincerely, D. R. Conner, P. E. Division Enginner T. Linds ddick, Jr. Division Environmental Officer-Division One CC: Mr. R. E. Capehart, P. E. Mr. R. W. Midgett, P. E. Mr. Frank Jennings, NCDCM Mr. David Cox, NCWRC Ms. Sarah Winslow, NCDMF Mr. John Hennessy, NCDWQ Mr. Ron Sechler, NMF Mr. Doug Huggett, NCDCM Mr. Randy K. Wise, P. E. ------------ -- i © - i i I--- -- ' -. - ' --- -- - i _ r_ ' -I - - - - -- - -- ' I y! I I X W u f1_..._ __ I -- ' - f -- - _ _? u' - r I ! G'? z V -Z- A 4 iW -44. W. _- - 7- _ - [E?.,...t_ C T. 7:L C e - p ?e i 3T' ? T L I- -I - I . T • -._-_ •?`_ .L_ _ -. -?. ZI - - i--..I ?• i? ; - - ; - - .... -- - - - ---??- 41- r 7' f I t? 17- - 1. j ! (?89?? I ' ? Iti {'? •? , I ? ? `?J tY ?I I pf "OR7J+p?9O NORTH CAROLINA DEPARTMENT OF TRANSPORTATION • ? I i ? i I I I ?? I SO-OI '?" ' IO ) Dr1SION OF HIGHWAYS yrOFTRANSQ°p DIVISION ONE I? TAE P?oAt? ?XTENS=Onl DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN f IZot'a1 c il M PT 'koA D SOUND R-2551 h1oJEM BE R I Z • Iq9 ?1 SHEET OF SALT C roc ? .JPIC,'%L PER BEN i 3 ?.3S f -----, . . ?LLF-?Ttp1?1 241' - -Z 4. 7 j-ILCS f n Cl*) i _ l - 135 (7') rr 'Wwr... ?. .4k0 C2') t 1- V a 0 5'L7 F .tCE I SE CG?JS I?i.'U<Tr(? W17r,. ?I"IOGO SILT 5'TC}? - ...• - . °f µp RD/ ry NORTH CAROLINA DEPARTMENT OF OQ Env i V? LCn?7' , 9OG? TRANSPORTATION DIVISION OF HIGHWAYS 7 OFTR?esc° DIVISION ONE DARE COUNTY _• .... . _. CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN - SOUND R-2551 ./ .- - - SHEET Q nF: -?, /\ SEE OETA4 A N O aROcOSED 0.9191, EAU AT 1v0.125 3ATTER .RATION TEEL CYL. aiL°_S °f "°nTq C?9 NORTH CAROLINA DEPARTMENT OF (? s °TRANSPORTATION s IO = DIVISION OF HIGHWAYS \?? 401 °M °F??isf°P DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 ilvovs,"tm? 2 SHEET OF S m"' -6 N L?,?? ' t, PERMITTED TEMPORARY ,EWPORARY iLOATINC 0= TYP. /pf jCp7hC?9 NORTH. CAROLINA DEPARTMENT OF TRANSPORTATION ?N 7 1O DIVISION OF HIGHWAYS DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2559 SLR F A10 ?e5m SHEET ? 0 Mnre,H L.rNE "/9-" U C O 0 W N O O 4 O r c n _n 0 I N W ? (D ? I ? V1 O W W CLs o? a° c w N O Q O t N W ? m r N O WW as ?o a? o `^ N jr O m W 90 m J ? R Ln ?p4 N°NTN C?9 NORTH CAROLINA DEPARTMENT OF °Gy TRANSPORTATION DIVISION OF HIGHWAYS pFT;tl% p DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 TL IZ /?v E?i z /S SHEET s OF S Monitoring Plan for the recovery of the disturbed marsh area adjacent to the new Croatan Sound Bridge The plan consists of monitoring the disturbed site to determine the success of vegetative recovery occurring within it. The existing undisturbed marsh, dominated by black needle rush (Juncus roemerianus), adjacent to the disturbed site will be evaluated in January, 2000, and will be used as a reference marsh to determine the degree of recover-. Three plots measuring 1 meter by 1 meter will be selected randomly and the percent aerial vegetative coverage will be evaluated and used as a baseline reference. The disturbed area will be allowed to recover naturally from existing plant material and seed source present. Vegetative monitoring will be conducted annuall%- beginning in January of 2000. The monitoring will consist of randomly selecting 12 plots in the disturbed area, measuring 1 meter by 1 meter, and comparing the level of regeneration to the reference marsh. The area will be evaluated after one full growing season in September of 2000 to determine if replanting with black needle rush will be necessary. If replanting is deemed necessary, NCDOT will prepare a planting plan and submit it to the USACE and the NCDCM for approval. All efforts will be made to utilize a local seed source if plantings are required. If there are any areas where compaction has prevented natural regeneration from occurring, hand labor will be used to scarify the area to remediate the compaction. Areas that require scarification will be planted with black needle rush and monitored accordingly. As required, there will be a zero tolerance for phragmites (Phragmites communis). If the presence of this species is detected, measures will be taken immediately to eradicate this species from the site. Monitoring reports will be submitted by December 31" of each year for a period of five years. The disturbed area will be considered recovered when aerial vegetative coverage has been determined to meet or exceed 90% of the coverage found in the reference marsh. If after a period of three years, it is determined that recovery efforts are not succeeding, the North Carolina Department of Transportation will consult with the U. S. Army Corps of Engineers and the North Carolina Division of Coastal Management to discuss necessary remedial action. State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Mr. Bill Gilmore, P.E., Manager Planning & Environmental Branch N.C. Department of Transportation PO Box 25201 Raleigh, NC 27611-5201 Dear Mr. Gilmore 11kFA'h';WAA NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES April 28, 2000 Re: Certification Pursuant to Section 401 of the Federal Clean Water Act, Modification to the improvements to the New Croatan Bridge/Manteo Bypass, TIP R-2551, Original WQC Project No. 970856, Dare County Attached hereto is a modification to Certification No. 3167 issued to the North Carolina Department of Transportation on this date April 28, 2000. The attached modification authorizes: 1) the pile jetting and cleanup for 19 bridge bents for the referenced project, 2) the extension of the currently permitted Tee Road by an additional 60 feet, and 3) a temporary floating dock. Access to clean up material loaded to all jurisdictional wetlands from the jetting process shall be removed from the previously authorizes work bridge. No mats or file material shall be placed in either the freshwater or saltwater marshes during the clean up of the jetted material. All other authorized activities shall be conducted as described in your permit application submitted on April 28, 2000. It should be noted the modification is applicable only to the additional proposed activities. All the authorized activities and conditions of certification associated with the original Water Quality Certification and all other corresponding modifications still apply except where superceded by this certification. If we can be of further assistance, do not hesitate to contact us. Attachments: Modif.cation t^ WQC Ni. 3167 cc: Wilmington District Corps of Engineers Corps of Engineers Washington Field Office Deborah Sawyer. DWQ Regional Office Mr. John Dorney Cathy Brittingham, Division of Coastal Management Central Files ,Si el Steve i i lv Division of Water Quality . 401 Wetlands Unit 1621 Mail Service Center, Raleigh, NC 27699-1621 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Emp!oyer - 50% recycled/10% post consumer paper NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements ci Section 401 Public Laws 92- 500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 211, Section .0500. This certification authorizes: 1) the pile jetting and cleanup for 19 bridge bents for the referenced project, 2) the extension of the currently permitted Tee Road by an additional 60 feet, and 3) a temporary floating dock. Access to clean up material loaded to all jurisdictional wetlands from the jetting process shall be removed from the previously authorizes work bridge. No mats or file material shall be placed in either the freshwater or saltwater marshes during the clean up of the jetted material. All other authorized activities shall be conducted as described in your permit application submitted on April 28, 2000. It should be noted the modification is applicable only to the additional proposed activities. All the authorized activities and conditions of certification associated with the original Water Quality Certification and all other corresponding modifications to construct the Manteo Bypass and Croatan Sound Bridge still apply except where superceded by this certification. The application provides adequate assurance that the discharge of fill material into the proposed wetlands in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. This approval is only valid for the purpose and design that you submitted in your application, as described in the Public Notice. Should your project change, you are required to notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you are required to comply with all the conditions listed below. In addition, you should obtain all other federal, state or local permits before proceeding with'your project including (but not limited to) Sediment and Erosion control, Coastal Stormwater, Non-discharge and Water Supply watershed regulations. Condition(s) of Certification: Appropriate sediment and erosion control practices which equal or exceed those outlined in the most recent version of two manuals. Either the "North Carolina Sediment and Erosion Control Planning and Design Manual" or the "North Carolina Surface Mining Manual" (available from the Division of Land Resources in the DEHNR Regional or Central Offices). The control practices shall be utilized to prevent exceedances of the appropriate turbidity water quality standard (50 NTUs in all fresh water streams and rivers not designated as trout waters; 25 NTUs in all lakes and reservoirs, and all saltwater classes; and 10 NTUs in trout waters); 2. All sediment and erosion control measures placed in wetlands or waters shall be removed and the natural grade restored after the Division of Land Resources has released the project; 3. Measures shall be taken to prevent live or fresh concrete from coming into contact with waters of the state until the concrete has hardened; 4. There shall be no excavation from or waste disposal into jurisdictional wetlands or waters associated with this permit without appropriate modification of this permit. Should waste or borrow sites be located in wetlands or stream, compensatory mitigation will be required since it is a direct impact from road construction activities; 5. No additional compensatory mitigation shall be done in accordance with this modification. 6. All other conditions written into previous Water Quality Certifications for this project still apply. Violations of any condition herein set forth shall result in revocation of this Certification and may result in criminal and/or civil penalties. This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and/or coastal Area Management Act Permit. This Certification shall expire upon expiration of the 404 or CAMA permit. If this Certification is unacceptable to you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. This the 28th day of April 2000 DIVISION OF WATER QUALITY Modification to WQC No. 3167 +rrStevens j Lk I c:\ncdot\R-255 1\wqc\wqc modification 042800.doc State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Mr. Bill Gilmore, P.E., Manager Planning & Environmental Branch N.C. Department of Transportation PO Box 25201 Raleigh, NC 27611-5201 Dear Mr. Gilmore 1 • • A 00% 001M NC ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES April 28, 2000 Re: Certification Pursuant to Section 401 of the Federal Clean Water Act, ± Modification to the improvements to the New Croatan Bridge/Manteo Bypass, TIP R-2551, Original WQC Project No. 970856, Dare County Attached hereto is a modification to Certification No. 3167 issued to the North Carolina Department of Transportation on this date April 28, 2000. The attached modification authorizes: 1) the pile jetting and cleanup for 19 bridge bents for the referenced project, 2) the extension of the currently permitted Tee Road by an additional 60 feet, and 3) a temporary floating dock. Access to clean up material loaded to all jurisdictional wetlands from the jetting process shall be removed from the previously authorizes work bridge. No mats or file material shall be placed in either the freshwater or saltwater marshes during the clean up of the jetted material. All other authorized activities shall be conducted as described in your permit application submitted on April 28, 2000. It should be noted the modification is applicable only to the additional proposed activities. All the authorized activities and conditions of certification associated with the original Water Quality Certification and all other corresponding modifications still apply except where superceded by this certification. If we can be of further assistance, do not hesitate to contact us. Attachments: `Modification to WQC No. 3167 cc: Wilmington District Corps of Engineers Corps of Engineers Washington Field Office Deborah Sawyer, DWQ Regional Office Mr. John Dorney Cathy Brittingham, Division of Coastal Management Central Files ,?Si el I Steve ' i Division of Water Quality • 401 Wetlands Unit 1621 Mail Service Center, Raleigh, NC 27699-1621 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer . 50% recycled/10% post consumer paper NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92- 500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section .0500. This certification authorizes: 1) the pile jetting and cleanup for 19 bridge bents for the referenced project, 2) the extension of the currently permitted Tee Road by an additional 60 feet, and 3) a temporary floating dock. Access to clean up material loaded to all jurisdictional wetlands from the jetting process shall be removed from the previously authorizes work bridge. No mats or file material shall be placed in either the freshwater or saltwater marshes during the clean up of the jetted material. All other authorized activities shall be conducted as described in your permit application submitted on April 28, 2000. It should be noted the modification is applicable only to the additional proposed activities. All the authorized activities and conditions of certification associated with the original Water Quality Certification and all other corresponding modifications to construct the Manteo Bypass and Croatan Sound Bridge still apply except where superseded by this certification. The application provides adequate assurance that the discharge of fill material into the proposed wetlands in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. This approval is only valid for the purpose and design that you submitted in your application, as described in the Public Notice. Should your project change, you are required to notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future exceed one acre, compensatory mitigation may be required as described in 15A NCAC 211.0506 (h) (6) and (7). For this approval to remain valid, you are required to comply with all the conditions listed below. In addition, you should obtain all other federal, state or local permits before proceeding with'your project including (but not limited to) Sediment and Erosion control, Coastal Stormwater, Non-discharge and Water Supply watershed regulations. Condition(s) of Certification: Appropriate sediment and erosion control practices which equal or exceed those outlined in the most recent version of two manuals. Either the "North Carolina Sediment and Erosion Control Planning and Design Manual" or the "North Carolina Surface Mining Manual" (available from the Division of Land Resources in the DEHNR Regional or Central Offices). The control practices shall be utilized to prevent exceedances of the appropriate turbidity water quality standard (50 NTUs in all fresh water streams and rivers not designated as trout waters; 25 NTUs in all lakes and reservoirs, and all saltwater classes; and 10 NTUs in trout waters); 2. All sediment and erosion control measures placed in wetlands or waters shall be removed and the natural grade restored after the Division of Land Resources has released the project; 3. Measures shall be taken to prevent live or fresh concrete from coming into contact with waters of the state until the concrete has hardened; 4. There shall be no excavation from or waste disposal into jurisdictional wetlands or waters associated with this permit without appropriate modification of this permit. Should waste or borrow sites be located in wetlands or stream. compensatory mitigation will be required since it is a direct impact from road construction activities; 5. No additional compensatory mitigation shall be done in accordance with this modification. 6. All other conditions written into previous Water Quality Certifications for this project still apply. Violations of any condition herein set forth shall result in revocation of this Certification and may result in criminal and/or civil penalties. This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and/or coastal Area Management Act Permit. This Certification shall expire upon expiration of the 404 or CAMA permit. If this Certification is unacceptable to you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. This the 28th day of April 2000 DIVISION OF WATER QUALITY Modification to WQC No. 3167 Stevens c:\ncdot\R-2551\wqc\wqc modification 042800.doc APR 1 0 2000 r Scws? ..0 d y, ?2 WETLANDS GftUJ; LATER (QUALITY SECTIvN STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. GOVENOR April 6, 2000 Michael F. Bell, Regulatory Project Manager U.S. Army Corps of Engineers Washington Regulatory Field Office P.O. BOX 1000 Washington, North Carolina 27889 Dear Mr. Bell: DAVID McCOY SECRETARY SUBJECT: Proposed minor modification to Department of the Army Permit No. 199502334: Improvements to US 64-264, Including the construction of a new Croatan Sound bridge, from west of Manns Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. NHF-64 (6); State Project No. 8.T051401; TIP No. R-2551. As you are aware, the NCDOT has requested that Department of the Army Permit No. 199502334 be modified to (1) authorize pile jetting and cleanup; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out trestle; and 5) authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides. Modification request 1 is discussed below. Modification requests 2-4 have not changed since the original request. Due to the successful removal of piles without utilizing jetting, modification request 5 (authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides) is no longer necessary and is hereby rescinded. Please reference the March 14, 2000 letter from the NCDOT requesting authorization to jet piles conditioned upon the NCDOT providing the USACE with an approved cleanup plan before jetting operations were initiated. This letter is a response to the subsequent request from the USACE that a plan be provided for cleanup before any authorization is granted. Also please reference the January 28, 2000 letter from the NCDOT detailing cost P. O. Box 850 Edenton, NC 27932 (252) 482-7977 FAX: (252) 482-8722 estimates for jetting spoil cleanup as well as the original modification request of November 12, 1999. The NCDOT proposes to cleanup all spoil material associated with jetting operations in jurisdictional areas. As noted in the referenced correspondence, jetting is proposed at 19 bent locations. Of these 19 bents, 9 bents occur within freshwater wetlands and 10 bents occur within coastal wetlands. Currently, the NCDOT has two options that are considered feasible: 1) (Preferred) Remove all material within the coastal marsh with a crane fitted with a clamshell bucket from the existing work trestle and utilize mats and lightweight tracked equipment to remove material from the freshwater wetlands; 2) Extend the temporary trestle all the way to high ground and remove all material from the trestle via the crane and clamshell bucket. OPTION ONE (Preferred): Utilize a combination of cleanup from mats and trestle The NCDOT proposes to utilize the existing temporary construction trestle as access to remove all material deposited within coastal marsh. A crane with a smooth clam bucket will be operated from the trestle. The material will be picked up with the crane and offloaded into bins on the trestle. The material will then be transported to high ground for disposal. At no time will any tracked or wheeled equipment be operated in the coastal marsh. As described in the referenced January 28, 2000 correspondence, the cost for utilizing the existing work trestle to cleanup the affected area around 10 bents will be $1,782,721. All material deposited within the freshwater wetlands will be removed utilizing a mat road as described in the referenced correspondence from November 12,1999. As described in the referenced January 28, 2000 correspondence, the cost for utilizing mats to cleanup, monitor, and mitigate (if necessary) is $206,173. Please note that the NCDOT will, under no circumstances, use more than one layer of mats. If the soil below the mats subsides to the point that additional mats need to be stacked on the initial mat road, the NCDOT will abort the matting cleanup operation. If it is determined that one layer of mats will not support the removal operation, the existing work trestle will be extended and all cleanup will be conducted via the trestle/crane system. Total cost for combination option is $1,988,894 OPTION TWO: Remove material from both the coastal marsh and freshwater wetlands from the existing work trestle using a crane and clamshell bucket. As described in the referenced January 28, 2000 correspondence, the total cost for extending the existing temporary work trestle and cleaning up the entire affected area from the trestle with a crane and clamshell bucket is $3,382,773. Cost savings by using the combination option Vs. trestle only= $1,393,878. The NCDOT hereby requests that the existing permit be modified to authorize (1) authorize pile jetting and cleanup utilizing a combination of mats and the temporary work trestle; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out. There will be no use of matting or tracked or wheeled vehicles within any portions of coastal wetlands. Furthermore, should it be discovered that the ground will not adequately support matting, all operations in freshwater wetlands using mats will be suspended and all material will be removed from the trestle. Thank you for your time and consideration. The Department respectfully requests that processing of this modification request proceed as soon as possible. By copy of this letter, the Department also requests that the Division of Water Quality and the Division of Coastal Management also modify the 401 Water Quality Certification and the CAMA Major Development Permit respectively. If you have any further questions or would like additional information, please don't hesitate to call. Sincerely, D. R. Conner, P. E. Division Engineer 77 Z T. Lin Iddick, Jr. Division Environmental Officer CC: Mr. John Hennessy, DWQ Mr. David Cox, WRC Mr. Tom McCartney, FWS Mr. Ron Sechler, NMFS Ms. Sara Winslow, DMF Mr. Bill Gilmore, P.E., DOT Mr. Frank Jennings, NCDCM Mr. R. W. Midgett, P. E. Mr. R. E. Capehart, P. E. Mr. Steve DeWitt, P. E. Mr. Ted Bisterfield, EPA Ms. Cathy Brittingham, NCDCM D:\My Documents\R-2551\cleanupproposalsmod.doc Re: R-2551 Bridge over Croatan Sound A Subject: Re: R-2551 Bridge over Croatan Sound Date: Tue, 11 Apr 2000 14:59:09 -0700 From: John Hennessy <john.hennessy@ncmail.net> To: "T. Lindsey Riddick" <lriddick@dot.state.nc.us>, Jean Manuele <Jean.B.Manuele@saw02.usace.anny.mil>, Mike Bell <michael.f.bell@saw02.usace.anny.mil> CC: Cathy Brittingham <Cathy.Brittingham@ncmail.net> The DWQ is comfortable with the proposed preferred option. The alternative would all for placement of mats in the freshwater wetlands only, and would require their removal should the subside. Moreover, the mats will be removed and the original elevation contours restored after their removal. However, the proposal failed to include appropriate permit drawings. The DOT is requested to submit permit drawings that show the location of the freshwater and saltwater wetlands, the already permitted work bridge, and the location of the proposed mats in freshwater wetlands. The maps should be of sufficient accuracy and detail to allow for their use in finding the impact sites in the field. If you have any questions or require additional information, please contact me at 919-733-5694. Sincerely, John Hennessy "T. Lindsey Riddick" wrote: > Regulatory and Commenting Agency Representatives, > As most of you know the NCDOT has requested that the existing > authorizations for this project be modified to allow the > construction method known as jetting, along with various other > minor items. The main issue has been the cleanup method employed > to remove the spoil material after jetting. The USACE has > requested that the NCDOT submit a cleanup plan. The attached > document serves as that cleanup plan. Mr. Mike Bell of the USACE > will be out of the office for three weeks beginning on April 11, > 2000. If at all possible, please provide any verbal or written > comments to him by 4110100. His telephone number is (252) > 975-1616 x26. If you are unable to comment before April 10, 2000, > plaese send your comments to Ms. Jean Manuel in the USACE Raleigh > field office. Her telephone number is (919) 876-8441. Her > mailing address is: USACE Raleigh Feild Office, 6508 Falls of > the Neuse Road, Raleigh, NC 27615. I will be available to answer > any questions you may have. My office telephone number is (252) > 482-7977. You may also reach me on my mobile phone @ (252) > 339-0112. The NCDOT sincerely appreciates all of your efforts. > Any assistance you may be able to provide in resolving this issue > quickly will be greatly appreciated. > > T. Lindsey Riddick, Jr. > Division One Environmental Officer > (252) 482-7977 > FAX: (252) 482-8722 > ------------------------------------------------------------------------ > Name: cleanupproposalsmod.doc 1 of 2 04/11/2000 2:59 PM .,w. STA7E' o s? pevn ?? STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. GOVENOR April 6, 2000 Michael F. Bell, Regulatory Project Manager U.S. Army Corps of Engineers Washington Regulatory Field Office P.O. Box 1000 Washington, North Carolina 27889 Dear Mr. Bell: DAVID McCOY SECRETARY SUBJECT: Proposed Minor Modification to Department of the Army Permit No. 199502334: Improvements to US 64-264, Including the construction of a new Croatan Sound bridge, from west of Manns Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. NHF-64 (6); State Project No. 8.T051401; TIP No. R-2551. As you are aware, the NCDOT has requested that Department of the Army Permit No. 199502334 be modified to (1) authorize pile jetting and cleanup; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out trestle; and 5) authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides. Modification request 1 is discussed below. Modification requests 2-4 have not changed since the original request. Due to the successful removal of piles without utilizing jetting, modification request 5 (authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides) is no longer necessary and is hereby rescinded. Please reference the March 14, 2000 letter from the NCDOT requesting authorization to jet piles conditioned upon the NCDOT providing the USACE with an approved cleanup plan before jetting operations were initiated. This letter is a response to the subsequent request from the USACE that a plan be provided for cleanup before any authorization is granted. Also please reference the January 28, 2000 letter from the NCDOT detailing cost P. O. Box 850 Edenton, NC 27932 (252) 482-7977 FAX: (252) 482-8722 estimates for jetting spoil cleanup as well as the original modification request of November 12, 1999. The NCDOT proposes to cleanup all spoil material associated with jetting operations in jurisdictional areas. As noted in the referenced correspondence, jetting is proposed at 19 bent locations. Of these 19 bents, 9 bents occur within freshwater wetlands and 10 bents occur within coastal wetlands. Currently, the NCDOT has two options that are considered feasible: 1) (Preferred) Remove all material within the coastal marsh with a crane fitted with a clamshell bucket from the existing work trestle and utilize mats and lightweight tracked equipment to remove material from the freshwater wetlands; 2) Extend the temporary trestle all the way to high ground and remove all material from the trestle via the crane and clamshell bucket. OPTION ONE (Preferred): Utilize a combination of cleanup from mats and trestle The NCDOT proposes to utilize the existing temporary construction trestle as access to remove all material deposited within coastal marsh. A crane with a smooth clam bucket will be operated from the trestle. The material will be picked up with the crane and offloaded into bins on the trestle. The material will then be transported to high ground for disposal. At no time will any tracked or wheeled equipment be operated in the coastal marsh. As described in the referenced January 28, 2000 correspondence, the cost for utilizing the existing work trestle to cleanup the affected area around 10 bents will be $1,782,721. All material deposited within the freshwater wetlands will be removed utilizing a mat road as described in the referenced correspondence from November 12, 1999. As described in the referenced January 28, 2000 correspondence, the cost for utilizing mats to cleanup, monitor, and mitigate (if necessary) is $206,173. Please note that the NCDOT will, under no circumstances, use more than one layer of mats. If the soil below the mats subsides to the point that additional mats need to be stacked on the initial mat road, the NCDOT will abort the matting cleanup operation. If it is determined that one layer of mats will not support the removal operation, the existing work trestle will be extended and all cleanup will be conducted via the trestle/crane system. Total cost for combination option is $1,988,894 OPTION TWO: Remove material from both the coastal marsh and freshwater wetlands from the existing work trestle using a crane and clamshell bucket. As described in the referenced January 28, 2000 correspondence, the total cost for extending the existing temporary work trestle and cleaning up the entire affected area from the trestle with a crane and clamshell bucket is $3,382,773. Cost savings by using the combination option Vs. trestle only=$1,393,878. The NCDOT hereby requests that the existing permit be modified to authorize (1) authorize pile jetting and cleanup utilizing a combination of mats and the temporary work trestle; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out. There will be no use of matting or tracked or wheeled vehicles within any portions of coastal wetlands. Furthermore, should it be discovered that the ground will not adequately support matting, all operations in freshwater wetlands using mats will be suspended and all material will be removed from the trestle. Thank you for your time and consideration. The Department respectfully requests that processing of this modification request proceed as soon as possible. By copy of this letter, the Department also requests that the Division of Water Quality and the Division of Coastal Management also modify the 401 Water Quality Certification and the CAMA Major Development Permit respectively. If you have any further questions or would like additional information, please don't hesitate to call. Sincerely, D. R. Conner, P. E. Division Engineer T. Lindsey Riddick, Jr. Division Environmental Officer cc: Mr. John Hennessy, DWQ Mr. David Cox, W RC Mr. Tom McCartney, FWS Mr. Ron Sechler, NMFS Ms. Sara Winslow, DMF Mr. Bill Gilmore, P.E., DOT Mr. Frank Jennings, NCDCM Mr. R. W. Midgett, P. E. Mr. R. E. Capehart, P. E. Mr. Steve DeWitt, P. E. Mr. Ted Bisterfield, EPA Ms. Cathy Brittingham, NCDCM C:\TEMP\cleanupproposalsmodl.doc State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor NCDENR Bill Holman, Secretary Kerr T. Stevens, Director January 14, 2000 Mr. Bill Gilmore, P.E., Manager Planning and Environmental Branch North Carolina Department of Transportation P.O. Box 25201 Raleigh, North Carolina, 27611 Dear Mr. Gilmore: Re: Proposed permit modification for the improvements to US 64-264 including the construction of the new Croatan Sound Bridge, from west of Manns Harbor to NC 345 south of Manteo in dare County; Federal Aid Project No. NHF-64(6); State Project No. 8.T051401; TIP No. R-2551; COE Actiion ID 199502334. The Division of Water Quality has reviewed your submittal for a 401 Water Quality Certification for the aforementioned project. Review of your application revealed it lacking necessary information required for making an informed permit decision. The permit application was deficient in the following areas: • The economic analysis used to determine the cost estimates presented in the permit application needs to be submitted to the NCDWQ. The permit modification requests permission to employ construction techniques that both parties previously agreed would not be used. Furthermore, an economic justification is presented for the selection of the preferred construction techniques. Therefore, it seems reasonable that a more thorough explanation as to the methods used in developing the costs is needed to make an informed permitting decision. Therefore, pursuant to 15A NCAC 2h .0507(a), we will have to place the permit application on hold until we are supplied the necessary information. Furthermore, until the information is received by the NC Division of Water Quality, we request (by copy of this letter) that the US Army Corps of Engineers place the permit application on hold. Hopefully, we can work together to expedite the processing of your permit application. If you have any questions or require additional information, please contact John Hennessy at 919-733-5694. Joh R. Dorney Wa r Quality Certific do rogram cc: Deborah Sawyer DWQ Regional Office Mike Bell, USACE Central Files C:\ncdot\R-2551 \correspondence\991265hld.doc Wetlands/401 Unit 1621 Mail Service Center Raleigh, North Carolina 27699-1621 Telephone 919-733-1786 FAX 733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post consumer paper ? G(/LL ??11rLNLQ? S i „a S(A7g o STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. GovENOR November 12, 1999 Michael F. Bell, P.W.S., Regulatory Project Manager U. S. Army Corps of Engineers Washington Regulatory Field Office P.O. Box 1000 Washington, North Carolina 28779 Dear Mr. Bell: DAVID McCOY SECRETARY` F" SUBJECT: Proposed Minor Modification to Department of the Army Permit No. 199502334: Improvements to US 64-264, Including the construction of a new Croatan Sound bridge, from west of Manns Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. NHF-64 (6); State Project No. 8.T051401; TIP No. R-2551. The Department of Transportation requests that the existing DOA Permit be modified to (1) authorize pile jetting and cleanup; and (2) authorize an extension of the currently permitted Tee road by 60.0 feet; and 3) authorize a temporary floating dock; and 4) authorize mooring piles and stabilization measures for the temporary load-out trestle; 5) authorize a minimal use of jetting to loosen temporary trestle piles for removal on both the west and east sides. Modification #1: Authorize pile jetting and cleanup The North Carolina Department of Transportation (NCDOT) is currently constructing a new bridge over the Croatan Sound. As you are aware, the piles are being placed by the construction method known as jetting. Jetting produces a mixture of sediment and water that is dispersed into the marsh adjacent to the bridge bents. You will also recall that the NCDOT has attempted to institute several methods of capturing the material and removing it from the marsh during the jetting process. This was an attempt at instantaneous cleanup to prevent the sediment from a prolonged stay within the jurisdictional area. These methods included driving 54" cassions around each pile to capture the material and then pumping the material to a settling basin. Total cost for this method for two bridge bents was approximately $1,800,000. Additionally, this method failed to remove the material satisfactorily. 7. Attempts at removing the material immediately after deposition failed repeatedly. Subsequently, the Department elected to contain the material and remove it after the piles were in place. The jetting sediment on the west side of the bridge was eventually removed using a wooden mat road, a Caterpillar 307 lightweight excavator and a standard front end loader. The NCDOT has evaluated several options for dealing with the jetting sediment on the east side. First, an alternative method of installing the piles was investigated. This foundation redesign was not found to be feasible due to time and financial constraints. Preliminary estimates indicate that changing the method of construction would result in a 26-week delay for redesign, retooling, equipment acquisition, etc. It would also result in an increased cost of approximately $10,000,000. Therefore, this option was not considered feasible. Second, the NCDOT evaluated using the temporary work trestle and a crane to clean up and remove the sediment. This method is described as follows: -Clean up approximately 200 CY at each bent, 19 bents involved. -Sediment removal with a crane with clamshell bucket -Train will haul material in "dumpsters" or in modified rail cars to a barge at waters edge. -Material will be placed on the barge by a barge-mounted crane. -Material barge will be pushed by tugboat to the Load Out Trestle on the Mann's Harbor side. -Material will be offloaded at the Load Out Trestle by the straddle crane and placed into awaiting trucks for disposal. -Straddle crane will load empty containers back onto material barge. -Barge will be pushed back to the Roanoke Island side for the next bent(s) cleanup. -Bent clean up estimated at 2 days per bent, 38 days, another 2 to 12 days for equipment acquisition and fabrication, (i.e. clamshell bucket, dumpsters, rail cars, etc) The assignment of dollar costs to the clean up could be in the range of $7,000 to more than $10,000 per day. There is the possibility that the rail and crane trestle system could be extended to non- jurisdictional areas (i.e. near the end bent) much later in the course of construction of the bents in the affected wetlands. The material could be transferred to the end bent as opposed to a barge and pushed across the sound. The cost of any extension would be borne by the DOT; the contractor's original submittal/plan did not extend the trestle to the end bent. The contractor's intention all along has been to 'service' construction of the bridge in these east side wetlands by the trestle whereby supplies are brought in from awaiting barges and the like. The construction of the trestle is designed to take place in a staged sequence. In this sequence each section of trestle is completed only as needed. This process will start in at the farthest bent from shore (working from barges) and work towards land. Therefore, it would take several months to reach the point where it would be feasible to extend the trestle to non jurisdictional area. It is estimated that direct cost (labor, materials, equipment) associated with trestle extension would be approximately $50,000 to extend another 160 feet. This would also trigger additional indirect costs of approximately $100,000 associated with manipulating the contractors scheduling and labor force allocations. DIRECT IMPACTS Trestle Clean Up $500,000 to $1,000,000. INDIRECT IMPACTS Trestle Clean Up $2,000,000 to $3,000,000 Indirect impacts are very difficult measure at this time. It is estimated that 40 to 50 days will be required for the clean up. This timeframe takes resources away from bridge construction. These resources would not be earning the contractor the anticipated revenues within his earnings schedule. This timeframe has the high potential to disrupt operations following pile installation. Pile cap construction could be idled/delayed, thereby effecting girder erection and deck construction. These impacts can include idled equipment and manpower and increased storage and transportation costs for soon to be fabricated items such as girders and bearings. The idled condition may force the contractor to take measures not originally planned for to maintain or recover his construction schedule. The vernacular for these impacts are disruption of works, loss of productivity, accelerative measures, extended overhead, loss of profit and loss of interest on earnings. TOTAL IMPACT for Trestle Cleanup: Direct + Indirect $2,500,000 to $4,000,000 The Department feels that this method is unacceptable; at even the most conservative estimate of $2,500,000 the extended delays and extravagant costs make this alternative non-feasible. Therefore, the NCDOT proposes to contain the sediment using silt fence and hay bales as was allowed on the west side. The material will then be removed by a lightweight Caterpillar 307 excavator and a low ground pressure tracked loader. These lightweight pieces of equipment will be transported to the sediment containment area via wooden mats placed on the ground. The wooden mats will be ten feet wide. The total length of matting will be 1,903.0 feet from bridge bent 249 to the end bent (high ground) with an additional 20.0 feet of perpendicular matting per bent to access the containment area. Cleanup methodology will consist of utilizing the lightweight excavator to recover the material and place it in a small pile within the containment area. The low ground pressure tracked loader will then transport the material across the mat road to high ground to be disposed of. Total area involved in sediment containment and cleanup will be 2.325 acres. The amount of pressure exerted on the mat road is expected to be significantly less than was exerted on the mat road during sediment clean up on the west side. This is due to the utilization of a low ground pressure tracked loader as opposed to a standard front end loader. Therefore, it is reasonable to conclude that there will be less settling associated with the use of matting. The total area affected by matting will be 0.524 acres. The NCDOT is committed to a full monitoring of the affected area to insure that the marsh recovers. Monitoring will be conducted in accordance with attached monitoring plan. Additionally, the NCDOT has acquired a property that is currently being developed as a mitigation site. The site is near Stumpy Point, NC and will involve the restoration of a black needle rush (Juncus roemerianus) salt marsh community. The NCDOT fully expects the affected matting area to recover. However, the development of the Stumpy Point mitigation site is intended to serve as a "safety net" should monitoring of the cleanup area reveal that the recovery is not successful. Modification # 2• Authorize the extension 'of the currently permitted Tee road by 60.0 feet If you recall the Tee road is a section of temporary work trestle perpendicular to the bridge alignment which allows the contractor to get as close as possible to the bent for pile installation. The current design for the Tee road is a 60.0-foot long section of Tee road extending perpendicularly from the temporary work trestle to the bridge bents. The trestle was proposed the minimum practical safe distance from the bridge with the 60.0 foot Tee road extending out to the bridge to allow a crane to stretch from the Tee road to the bridge bent. However, after a test pile program conducted at the beginning of project construction, it was found that the 60.0 foot Tee road was not sufficient for all of the bent construction activities on the east side. The test pile program revealed that longer, heavier piles would be needed on the east side than were utilized on the west side. Pile lengths were changed from an average of 35 meters (115.0 feet) to an average of 42 (138.0 feet) meters in length. The distance that has to be stretched by the crane, coupled with the heavier and larger load, produces a situation that may cause equipment failures and compromise personal safety of workers. Therefore, the Department requests that the authorization be granted to extend the Tee road an additional 60.0 feet. The proposed extension will require four additional 24" pipe piles. Please note that these piles are temporary at each location. They will be in place only as long as pile driving activities are taking place at that bent. The Tee road will then be dismantled and moved to the next bent. Please see the attached construction drawings for reference. Modification #3: Authorize a temporary floating dock The contractor has requested permission to build a temporary floating dock at load-out trestle bent number four. The temporary floating dock will be used to dock construction vessels as well as on and off load construction equipment and workers. The dock will be approximately 6.096 meters x 6.096 meters (20.0 feet x 20.0 feet). This will require the installation of six 0.304-meter (12.0-inch) steel cylinder piles. Please see the attached construction drawings for reference. Modification #4• Authorize mooring piles and temporary trestle stabilization measures The contractor has requested permission to construct four 0.919-meter (36.0-inch) steel mooring piles at bent thirteen of the load-out trestle. The mooring piles will be used for construction barges. The barges will tie to the mooring piles while loading or unloading construction equipment and supplies. This will result in an increased demand and stress on the temporary trestle. Therefore, we are also requesting authorization to install H-beams for stabilization at load-out trestle bents 6, 8, 10, 11, 12, and 13. Additionally, two 0.6096-meter (24.0-inch) steel cylinder piles will be installed at load-out trestle bent number 10. Designs for the stabilization is included in the construction drawings. Modification #5: Authorize minimum use of jetting to loosen temporary trestle piles The original plan for the utilization of this trestle called for the temporary support piles to be vibrated out and for the trestle to be moved to the east side of the Croatan Sound. However, recent attempts to remove the temporary piles by vibration have been unsuccessful. The NCDOT has determined that the piles can be loosened and removed with a minimal use of "jetting". A very minor amount of material may surface from the pile loosening. Any material produced by this operation will be raked into the void left by the removed piling. If there is not enough material to fill the void, the hole will be filled to the elevation of the adjacent ground with clean sand. Per our telephone conversation of September 14, 1999, the NCDOT will utilize the above described technique to remove one piling. After removal, the USACE and the NCDCM will be consulted on site to determine if this method of piling removal is satisfactory. Your consideration is requested in processing this proposal as a "minor" modification. An expedited approval is essential to meeting critical project scheduling. Please call me if I can provide any additional information. Sincerely, D. R. Conner, P. E. Division Enginner T. Linds ddick, Jr. Division Environmental Officer-Division One CC: Mr. R. E. Capehart, P. E. Mr. R. W. Midgett, P. E. Mr. Frank Jennings, NCDCM Mr. David Cox, NCWRC Ms. Sarah Winslow, NCDMF Mr. John Hennessy, NCDWQ Mr. Ron Sechler, NMF Mr. Doug Huggett, NCDCM Mr. Randy K. Wise, P. E. _4_ - • • I Z -? ! JU; ! I c; -r - ! - -? f Q kl Q \I I } 2 z; z w N ,h r -- -- I - -- a ? I - ?-. - - - - New! ..L_. .. _.?•- o , C ° ° P 4 O ,°I?a .? o I,? ? a _ ..? -!1"?_C'.. ..I `!r•tT_+j _.. all X7 I - 21 -L ?Ji t r i Q- t I ? i ? - r ._f - --, • - _ _ ?? , -tom 71 . 111\ I I ?- r- -- - I - - -- _ . . I I i I ! ( I ` I ? I ' 80.0, l 1 _.y I ! I ! I TI-E ROAD tXtENS?p? P?opasEo M PT _?,o,a D of NORrh C_ NORTH CAROLINA DEPARTMENT OF Ly TRANSPORTATION 1y s Im = DIVISION OF HIGHWAYS tiv/ P OF TAANSQO DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 •TLR /J0VFm3FR 12- Ilg9 SHEET ?OF 51 LT r AtC 'T"Y?IGA?c PErz ?ENr 7 rpr?J 2.4? - 2 G 7 ?--?' -- "' - - •-- - - ? . ...: CIO Cz') ? .?., - 2. t . jCy1> I 2.135 TZ-71L?e?S j) D Imo. 1 • 3C5 I - --- -- - 1 35 (7•) c,IC cz) 1 AL SILT FEr.1CE 15 Be CO?JS 1?'U<l ? W 17 M. /? n o C -.o 51 1-7 5-Icp ' 02 EQ??v/?r_CNT 0 Of NOAik ?, NORTH CAROLINA DEPARTMENT OF 9?Gy TRANSPORTATION o DIVISION OF HIGHWAYS OF TmRDIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 TL- IZ lfc?EM E /2 . /99 SHEET R 0 F S i? SFF nC AN 860 H PROPOSED O.gtgr H-9EAM AT 1:0.125 6ATTER TA81LIZATION 8 {M STEEL CYL. PILES 1? f MORTk C?qO NORTH CAROLINA DEPARTMENT OF ?J G1 TRANSPORTATION y ? im = DIVISION OF HIGHWAYS 0 OF TpANSQ? DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 -f'L 12 /COVE 2 SHEET OF S 11,9 rc N L s,?E ?'? '' PERMITTED TEMPORARY TEMPORARY FLOATING DOCK i TYP, SORT;, c ` ° NORTH CAROLINA DEPARTMENT OF T + y RANSPORTATION a ? DIVISION OF HIGHWAYS ?'?'T°F7pAH5Q°p DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 il/C?Emi SHEET OF M,41-cH LsN E /,9- V Z O O 3 W W N _rn O O O a 0 r N O r Z <O N W ? ? OJ I ? ?N O W W a°a z? If QW m N O rZ <O t N W M N N as GO: a° n t pp?,, O N Z rW- O n n 0 m u m J V Of SORTh C?9 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ray ? I° z DIVISION OF HIGHWAYS ?a F'7OFnyANSe°Q DIVISION ONE DARE COUNTY CONSTRUCTION OF NEW BRIDGE OVER THE CROATAN SOUND R-2551 Tl,l? /?v EiN /z, 19 SHEET s 0 F S Monitoring Plan for the recovery of the disturbed marsh area adjacent to the new Croatan Sound Bridge The plan consists of monitoring the disturbed site to determine the success of vegetative recovery occurring within it. The existing undisturbed marsh, dominated by black needle rush (Juncus roemerianus), adjacent to the disturbed site will be evaluated in January, 2000, and will be used as a reference marsh to determine the degree of recovery. Three plots measuring 1 meter by 1 meter will be selected randomly and the percent aerial vegetative coverage will be evaluated and used as a baseline reference. The disturbed area will be allowed to recover naturally from existing plant material and seed source present. Vegetative monitoring will be conducted annually beginning in January of 2000. The monitoring will consist of randomly selecting 12 plots in the disturbed area, measuring 1 meter by 1 meter, and comparing the level of regeneration to the reference marsh. The area will be evaluated after one full growing season in September of 2000 to determine if replanting with black needle rush will be necessary. If replanting is deemed necessary, NCDOT will prepare a planting plan and submit it to the USACE and the NCDCM for approval. All efforts will be made to utilize a local seed source if plantings are required. If there are any areas where compaction has prevented natural regeneration from occurring, hand labor will be used to scarify the area to remediate the compaction. Areas that require scarification will be planted with black needle rush and monitored accordingly. As required, there will be a zero tolerance for phragmites (Phragmites communis). If the presence of this species is detected, measures will be taken immediately to eradicate this species from the site. Monitoring reports will be submitted by December 31St of each year for a period of five years. The disturbed area will be considered recovered when aerial vegetative coverage has been determined to meet or exceed 90% of the coverage found in the reference marsh. If after a period of three years, it is determined that recovery efforts are not succeeding, the North Carolina Department of Transportation will consult with the U. S. Army Corps of Engineers and the North Carolina Division of Coastal Management to discuss necessary remedial action. t ANNUAL REPORT FOR 2001 Manteo Bypass Bridge Mitigation Site Dare County Project No. 8.T051403 TIP No. R-2551 A Prepared By: Natural Systems Unit & Roadside Environmental Unit North Carolina Department of Transportation December 2001 TABLE OF CONTENTS SUMMARY 1 1.0 INTRODUCTION 2 1.1 Project Description 2 1.2 Purpose 2 1.3 Project History 2 2.0 VEGETATION 4 2.1 Success Criteria 4 2.2 Description of Species 4 2.3 Results of Vegetation Monitoring 5 2.4 Conclusions 5 3.0 OVERALL CONCLUSIONS/ RECOMMENDATIONS 6 FIGURES FIGURE 1 - SITE LOCATION MAP APPENDICES 3 APPENDIX A -ORIGINAL MONITORING PLAN 7 APPENDIX B - SITE PHOTOS 10 ii SUMMARY The following report summarizes the monitoring activities that have occurred in the past year at the Manteo Bypass Bridge Restoration Site. The purpose of the site is to restore a brackish marsh system that was impacted in relation to the Manteo Bypass Bridge construction (permit violation). The site was restored in August and September 1999. Monitoring activities for 2001 include the second year of vegetation monitoring for the site. The mitigation encompasses approximately 0.128 acres total. The site consists of brackish marsh restoration. The restoration effort involves removing spoil deposited by the jetting of piles and monitoring the spoil removal area to ensure that natural regeneration of Juncus roemerianus (blackneedle rush). No hydrologic monitoring is required for this project; however, vegetation monitoring is required for five years. Due to the lack of rapidly recovering/regenerating blackneedle rush, the Department planted the entire restoration area in May 2001 in an effort to "jump-start" the vegetation. In August of 2001, the vegetative cover did not meet the success criteria, but is on track for the first year of planting. 1.0 INTRODUCTION: MANTEO BYPASS BRIDGE MITIGATION SITE 1.1 Project Description The Manteo Bypass Bridge Restoration Site is located immediately adjacent to the western terminus of the new bridge over the Croatan Sound associated with the Manteo Bypass (TIP R-2551A), as is shown in figure 1. The site consists of approximately 0.128 acres and provides for the following types of mitigation: Brackish Marsh Restoration 1.2 Purpose The purpose of this report is to detail the vegetation monitoring in 2001 at the Manteo Bypass Bridge Restoration Site. No hydrologic monitoring is required for this particular site. 1.3 Project History October 2000 Vegetation Monitoring (1 yr.) May 2001 Site planted August 2001 Vegetation Monitoring (1 yr. after replant) 2 gS i 33 3 1 f Figure 1: Manteo Bypass Bridge Mitigation Site 3 2.0 VEGETATION: MANTEO BYPASS BRIDGE 2.1 Success Criteria The success criteria set forth by the permit violation is outlined in Appendix A. However, it is the request of the Department to revise the success criteria for this site to the current marsh mitigation criteria that has evolved in coordination with the US Army Corps of Engineers and the National Marine Fisheries Service. The new success criteria is reflected in the following description The vegetative marsh success of the wetland site will be determined in accordance with NMFS Guidelines. Monitoring plots found to be located within the open water channel will not be evaluated, and will not count to the final count of plots. The vegetation component of the wetland site will be deemed successful if the following criteria are met. 1. At year five, the average of all plots should have a scale value of 5 (75% vegetative cover) consisting of wetland herbaceous species, not including any invasive species. 2. A minimum of 70% of the plots shall contain the target (planted) species. Due to the bridge interference with the GPS system, we are unable to GPS to computer generated random plots; therefore, visual monitoring will be utilized for the monitoring of this 0.128 acre site. Success Criteria will remain 75% vegetative cover of wetland herbaceous species, not including any invasive species in the fifth year and 70% of the site shall contain the target (planted) species. Fifteen, one meter square random plots were evaluated for this monitoring period. 2.2 Description of Species Juncus roemerianus, Blackneedle Rush, is the primary target marsh grass specie that is to be present in the Wetland Restoration Area. 2.3 Results of Vegetation Monitoring (1 Year) _ Mme. A-, ,? w '??` a'"'3 CAO a L GL E 0 cap 3.0 ? ? Cattail 2 1.0 ? ? 3 5.0 ? ? 4 Open water 5 1.0 ? ? 6 5.0 ? ? Juncus s p. 7 5.0 ? ? Juncus s p. 8 1.0 ? ? 9 4.0 ? ? Juncus s p. 10 2.0 ? ? 11 1.0 ? ? Juncus s p. 12 Open water 13 2.0 ? ? Juncus s p. 14 4.0 ? ? Juncus s p. 15 2.0 ? ? Frequency Percenta a of Plots with 100% 100% Desired Species) Sum Scale Value 36 Total Number of Plots 13 Ve etative Cover Scale Value) 1 2.8 2.4 Conclusions Percent Frequency of Target Species (Black Needle Rush) 100% Frequency of 70% required. Vegetative Cover Scale Value 2.8 Required Scale Value after 5 years 5.0 This marsh grass site is approximately 0.128 acres. The frequency requirement meets requirements for this year. The vegetative cover did not meet the requirement but is on track for the first year of planting. 6 3.0 OVERALL CONCLUSIONS/RECOMENDATIONS Based on the vegetation data provided in this report, the Department proposes to continue vegetation monitoring for this site. 7 APPENDIX A ORIGINAL MONITORING PLAN SUBMITTED TO USACE ?d y, a o„ ?e "..nm• l2C STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. P.O. BOX 25201, RALEIGH, N.C. 27611-5201 DAVID MCCOY GOVERNOR SECRETARY August 11, 1999 U. S. Army Corps of Engineers Washington Regulatory Field Office P. O. Box 1000 Washington, NC, 27889-1000 ATTENTION: Michael F. Bell, PWS Regulatory Project Manager SUBJECT: Monitoring plan for the disturbed area adjacent to the new bridge over the Croatan Sound associated with TIP Project R-2551. Dear Sir: Please find attached the proposed monitoring plan for the recovery of the disturbed black needle rush marsh adjacent to the new bridge over the Croatan Sound. If you have any questions please don't hesitate to call me at (252) 482-7977. Sincerely, Lindsey Riddick Division Environmental Officer-Division One CC: D. R. Conner, P. E. Randy Midgett, P. E. Randy K. Wise, P. E. Frank Jennings, DCM 9 Monitoring Plan for the recovery of the disturbed marsh area adjacent to the new Croatan Sound Bridge The plan consists of monitoring the disturbed site to determine the success of vegetative recovery occurring within it. The existing undisturbed marsh, dominated by black needle rush (Juncus roemerianus), adjacent to the disturbed site will be evaluated in September, 1999, and will be used as a reference marsh to determine the degree of recovery. Three plots measuring 1 meter by 1 meter will be selected randomly and the percent aerial vegetative coverage will be evaluated and used as a baseline reference. The disturbed area will be allowed to recover naturally from existing plant material and seed source present. Vegetative monitoring will be conducted annually beginning in September of 1999. The monitoring will consist of randomly selecting 12 plots in the disturbed area, measuring 1 meter by 1 meter, and comparing the level of regeneration to the reference marsh. The area will be evaluated after one full growing season in September of 2000 to determine if replanting with black needle rush will be necessary. If replanting is deemed necessary, NCDOT will prepare a planting plan and submit it to the USACE and the NCDCM for approval. All efforts will be made to utilize a local seed source if plantings are required. If there are any areas where compaction has prevented natural regeneration from occurring, hand labor will be used to scarify the area to remediate the compaction. Areas that require scarification will be planted with black needle rush and monitored accordingly. As required, there will be a zero tolerance for phragmites (Phragmites communis). If the presence of this species is detected, measures will be taken immediately to eradicate this species from the site. Monitoring reports will be submitted by December 31St of each year for a period of five years. The disturbed area will be considered recovered when aerial vegetative coverage has been determined to meet or exceed 90% of the coverage found in the reference marsh. If after a period of three years, it is determined that recovery efforts are not succeeding, the North Carolina Department of Transportation will consult with the U. S. Army Corps of Engineers and the North Carolina Division of Coastal Management to discuss necessary remedial action. 10 APPENDIX B SITE PHOTOS & PHOTO LOCATION MAP Manteo Bypass Bridge 2000 Photo 1 Photo 3 Photo 2 I; z z z ?rWWr V v?` CO 0 CL- 0 UJ z I li r i a z L 0 8 4"" s } 44 .'c r. i dpt $fA7go? aS1 ,wra..,` J STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DAVID McCOY GovENOR SECRETARY July 28, 1999 North Carolina Department of Environment AUG - 3 Po'm And Natural Resources Division of Coastal Management WETLY i?DS GROUP 1367 U. S. 17 South WATER QUALITY SECTION! Elizabeth City, NC 27909 Attention: Mr. Frank Jennings, Coastal Management Field Representative Subject: Proposed Refinement to CAMA Major Development Permit No 7-98: Improvements to US 64-264, Including the construction of a new Croatan Sound bridge, from west of Manns Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. NBF-64 (6); State Project No. 8.T051401; TIP No. R- 2551. The North Carolina Department of Transportation (NCDOT), in response to the request for Right-of-Way on property belonging to the Alligator River National Wildlife Refuge, has been asked to investigate increasing the diameter of the proposed crosspipes at two locations. In a letter addressed to the NCDOT Right-of-Way Branch, the U. S. Fish and Wildlife Service asked the NCDCIT to increase the diameter of the pipes from 36-inch (1000 mm) to 72-inch (1800) to allow for better passage of aquatic fauna. The pipes will also be countersunk 6.0 inches to allow for better passage of aquatic fauna. The proposed pipes are located near Stations 13+00 and 15+00. A copy of the letter from the U. S. Fish and Wildlife Service is attached. In accordance with the request from the FWS, the NCDOT has changed the proposed pipe crossings from 2 @ 36-inch (1000 mm) to 1 @ 72-inch (1800 mm). Please find attached a copy of the revised permit drawings detailing the proposed changes. Impact quantities remain unchanged from the original plans. Your consideration is requested in processing this proposal P. O. Box 850, Edenton, NC 27932 (252) 482-7977 FAX: (252) 482-8722 Page 2 July 28, 1999 Frank Jennings as a refinement of the referenced permit. If you have any questions or would like additional information, please don't hesitate to call me. Thank you for your time and consideration. Sincerely, D. R. Conner, P. E. Division Engineer-Division One T. Lindsey Riddick Division Environmental Officer-Division One Enclosures CC: Michael F. Bell, PWS, USACE David R. Cox, NCWRC Mike Bryant, USFWS John Hennessy, NCDWQ Sara Winslow, NCDMF Ron Sechler, NMFS COPY United States Department of the Interior FISH AND WILDLIFE SERVICE Alligator River National Wildlife Refuge P. O. Box 1969 Manteo, NC 27954 Ms. Betty C. Yancey Senior Right of Way Agent N. C. Department of Transportation P. 0. Box 25201 Raleigh, NC 27611-5201 SUBJECT: Right-of-Way Request for U. S. 64/264, TIP Project R-2551, State Project 6.059005T, Dare County, Federal Land Transfer in the Alligator River National Wildlife Refuge Dear Ms. Yancey: This letter is to advise you that we received the requested environmental documentation and have been preparing a Compatibility Determination for the right-of- way easement package for our Regional Office. During the course of our review, we have identified some areas where there is a need for additional information or clarification. Please consider the following: The project Environmental Assessment (EA) and Finding of No Significant Impact (FONSI), both dated August 12, 1997 state that the proposed right-of-way is 80 feet. This appears to be the basis for impact assessment and mitigation development. The EA states that the existing right-of-way is approximately 60 feet, but it is not clear if this includes the adjacent canal or not. Preliminary project plans, dated May 15, 1998, show a typical cross section right-of-way of 120 feet for the new roadway and this does not appear to include the canal. Was this matter addressed in an addendum to the EA or FONSI? If not, we need to know the following: a. Accurate and detailed information on right-of-way width from the beginning of the project from Station 8+89 through Station 32+00. Right- of-way width should be minimized to only that width necessary for maintaining the road after construction. b. Information regarding the fate of the old right-of-way. Will this right- of-way be abandoned and transferred to the U. S. Fish & Wildlife Service (USFWS)? c. We understand that the old pavement will be removed in those areas where relocation occurs. Will the old road bed be returned to wetland elevation and wetland plant communities restored in these areas? If so, how does this fit into the Mitigation Plan Mashoes Road Mitigation Site document? 2. What will be the fate of the two parcels of private land, shown on the May 18, 1998 drawings as the M. L. Daniels Oil Company Property (Sheet 4), after being transected by the new road alignment at the intersection of US 64 and US 264? Has this land been acquired or will it be acquired in fee title by the N. C. Department of Transportation for eventual transfer to the USFWS? Will this property be available for mitigation? 3. What is the most up-to-date cross sectional view of the road? Will there be a center line divider or other type of barrier to prevent vehicles moving in opposite directions from colliding? If so, what are the specifications for these barriers? 4. What is the basic construction technique proposed for this project where it crosses refuge property? 5. Will "mucking out' the road bed and backfilling be required? If so, where will the muck be stockpiled or disposed? What is the source for borrow material to be used for backfill? 6. In areas shown as temporary easement for construction, please provide detailed informaticn regarding the reed for fill in these areas. Given the nature of project area soils and, if temporary fill is proposed in these areas, subsidence is likely as result of the weight of fill and equipment. Upon removal of temporary fill, how will the subsidence problem and habitat restoration be dealt with? 7. Where will construction equipment storage areas and staging areas be located? Should we expect future requests for additional encroachment onto refuge lands for these purposes? 8. There is some question with regards to use of the highway easement by utility interests. Nell your agency accommodate and/or facilitate utility company needs? 9. On Sheet 5 of the Preliminary Plans dated May 18, 1998, use of two 1000 mm corrugated aluminum pipes at two locations is shown. Would your agency be receptive to increasing the diameter of these pipes to about 1800 mm or larger? Increasing the size would allow better passage by fish and other aquatic fauna. The information we are requesting is necessary for us to continue our Compatibility Determination and subsequent referral to the Regional Office. Please provided this information as soon as possible. Some of the requested information could possibly be resolved with an onsite meeting. In order to expedite this process, we would be most willing to meet with appropriate NCDOT staff. We look forward to hearing from you. Sincerely, Mike Bryant Refuge Manager cc: Ms. Jackie Compton, USFWS Mr. John Hefner, USFWS Mr. Randy Turner, NCDOT Ey m ? W n O Z ?" Z W -A321 ?- 00-b1 'diS 3N1-1 3iVi o 0 O w O .I I? 1' I ? j a -? ?? ? z w ?? m a o I ?o F;• `? I J I W ?x ?` O Fu w oEa I I _° °-' o z Lei Z I 1 ,. .I i ?t ? I - ? LLNO tl I „ p.S t O 1 ?' ?W 'sY?? ?-, o N uo v z sl ,? ? G3 S W Z ? C7 FE. mz °za zw I <I i H / /I, p I I / i` Cf ??- a ® N 0 ? 0X2/ •b "'? ? . ?I 1S .. -21 o 1 bey o E-0 .. p ? N 1 W Oz w 'TAO H? id a (Yi 1_ 00 X91 •d ?S ' z z a E xW F, O .n fs. O y F p E<v F N ?- 2u /rW p w ow A F:; M IW u c U E? ' .... ? D C ti ? Z czl I ?, ? U m o w x O ? z z '? a F a as a a wV wz O r. O a .? z9 z al ? :?' a? a3 co I I =' =11-; '? N .I / I (D I Uo Uz I .I 1= ? wF ?z II F w F d z z w I W I ??_ '? W w z G U V W 2 ' W N -A3, ?- OO+bI 'd1S 3NI? HOiM ? o 0 ,?o klv,. HzA,"--% zy A y'^ P STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT HL GOVENOR July 27, 1999 Michael F. Bell, P.W.S., Regulatory Project Manager U. S. Army Corps of Engineers Washington Regulatory Field Office P.O. Box 1000 Washington, North Carolina 28779 Dear Mr. Bell: DAVID McCOY SECRETARY 7 i HU ?IUG-3 SUBJECT: Proposed Minor Modification to Department of the Army Permit No. 199502334: Improvements to US 64-264, Including the construction of a new Croatan Sound bridge, from west of Manns Harbor to NC 345, south of Manteo, in Dare County; Federal Aid Project No. NBF-64 (6); State Project No. 8.T051401; TIP No. R-2551. The North Carolina Department of Transportation (NCDOT) has been asked by the U. S. Fish and Wildlife Service (FWS) to investigate increasing the diameter of the proposed crosspipes at two locations. In a letter addressed to the NCDOT Right-of-Way Branch, the Alligator River National Wildlife Refuge (ARNWR) manager asked NCDOT to consider increasing the diameter of the pipes from 36-inch (1000 mm) to 72-inch (1800) to allow for better passage of aquatic fauna. The proposed pipes are located near Stations 13+00 and 15+00. A copy of the letter from the U. S. Fish and Wildlife Service is attached. In accordance with the request from the FWS, the NCDOT has. changed the proposed pipe crossings from 2 @ 36-inch (1000 mm) to 1 @ 72-inch (1800 mm). The pipes will also be countersunk 6.0 inches to allow for better passage of aquatic fauna. Please find attached a copy of the revised permit drawings detailing the proposed changes. Impact quantities remain unchanged from the original plans. Your consideration is requested in processing this proposal P. O. Box 850, Edenton, NC 27932 (252) 482-7977 FAX: (252) 482-8722 Page 2 July 27, 1999 Mike Bell as a modification of the referenced permit. If you have any questions or would like additional information, please don't hesitate to call me. Thank you for your time and consideration. Sincerely, D. R. Conner, P. E. Division Engineer-Division One T. Lindse ddick Division Environmental Officer-Division One Enclosures Cc: David R. Cox, NCWRC Tom McCartney, USFWS John Hennessey, NCDWQ Sara Winslow, NCDMF Charles Jones, NCDCM Ron Sechler, NMFS O a III I? Ij I II I; II I; II , , \v? ,f z ' /I ? II J I; ? . II ' O a F Oz w F ® F oho CT. U n Gt. O w ° O Gr z F. va E-F O G E? ?" ? "? ?` ? GULL c U F c A ? ?z w C, G ? O c?i? z ? zap z F 0 Z d E• z5 z J w aN a 3 a z C N J b ez U z w d ? ? 05 W z zz zw oz av GLl U o ? N O O -A3d ?- 00+bI 'd1S 3NI-I HOiVV4 E? a 0? 1-4 c4 F z w ?N1, NO Ld W ? ,? F ? CL o 1' 00 ?g1 • d ?S ? z ? z ? ? c '? / rzl O w I I a, , °EO u F.; O A M { ` c w C4 ? ti ?z w z a z { I? ?, ? w a w Q z a CL. E3 ? °i a ? a 3 I o co A N ? I? I. ;, ,% z oz - Na j I I I zw c? I ? ca I L ? ?' oZ= ?/ ,? W w z w?a P-4 -Ald -I- OO+bI 'ti1S 3NI? HOldW o 0 COPY United States Department of the Interior FISH AND WILDLIFE SERVICE Alligator River National Wildlife Refuge P. 0. Box 1969 Manteo, NC 27954 Ms. Betty C. Yancey Senior Right of Way Agent N. C. Department of Transportation P. 0. Box 25201 Raleigh, NC 27611-5201 SUBJECT: Right-of-Way Request for U. S. 641264, TIP Project R-2551, State Project 6.059005T, Dare County, Federal Land Transfer in the Alligator River National Wildlife Refuge Dear Ms. Yancey: This letter is to advise you that we received the requested environmental documentation and have been preparing a Compatibility Determination for the right-of- way easement package for our Regional Office. During the course of our review, we have identified some areas where there is a need for additional information or clarification. Please consider the following: The project Environmental Assessment (EA) and Finding of No Significant Impact (FONSI), both dated August 12, 1997 state that the proposed right-of-way is 80 feet. This appears to be the basis for impact assessment and mitigation development. The EA states that the existing right-of-way is approximately 60 feet, but it is not clear if this includes the adjacent canal or not. Preliminary project plans, dated May 15, 1998, show a typical cross section right-of-way of 120 feet for the new roadway and this does not appear to include the canal. Was this matter addressed in an addendum to the EA or FONSI? If not, we need to know the following: a. Accurate and detailed information on right-of-way width from the beginning of the project from Station 8+89 through Station 32+00. Right- of-way width should be minimized to only that width necessary for maintaining the road after construction. b. Information regarding the fate of the old right-of-way. Will this right- of-way be abandoned and transferred to the U. S. Fish & Wildlife Service (USFWS)? c. We understand that the old pavement will be removed in those areas where relocation occurs. Will the old road bed be returned to wetland elevation and wetland plant communities restored in these areas? If so, how does this fit into the Mitigation Plan Mashoes Road Mitigation Site document? 2. What will be the fate of the two parcels of private land, shown on the May 18, 1998 drawings as the M. L. Daniels Oil Company Property (Sheet 4), after being transected by the new road alignment at the intersection of US 64 and US 264? Has this land been acquired or will it be acquired in fee title by the N. C. Department of Transportation for eventual transfer to the USFWS? Will this property be available for mitigation? 3. What is the most up-to-date cross sectional view of the road? Will there be a center line divider or other type of barrier to prevent vehicles moving in opposite directions from colliding? If so, what are the specifications for these barriers? 4. What is the basic construction technique proposed for this project where it crosses refuge property? 5. Will "mucking out" the road bed and backfilling be required? If so, where will the muck be stockpiled or disposed? What is the source for borrow material to be used for back-fill? 6. In areas shown as temporary easement for construction, please provide detailed information regarding the need for fill in these areas. Given the nature of project area soils and, if temporary fill is proposed in these areas, subsidence is likely as result of the weight of fill and equipment. Upon removal of temporary fill, how will the subsidence problem and habitat restoration he dealt with? 7. Where will construction equipment storage areas and staging areas be located? Should we expect future requests for additional encroachment onto refuge lands fcr these purposes? 8. There is some question with regards to use of the highway easement by utility interests. Will your agency accommodate and/or facilitate utility company needs? 9. On Sheet 5 of the Preliminary Plans dated May 18, 1998, use of two 1000 mm corrugated aluminum pipes at two locations is shown. Would your r .. agency be receptive to increasing the diameter of these pipes to about 1800 mm or larger? Increasing the size would allow better passage by fish and other aquatic fauna. The information we are requesting is necessary for us to continue our Compatibility Determination and subsequent referral to the Regional Office. Please provided this information as soon as possible. Some of the requested information could possibly be resolved with an onsite meeting. In order to expedite this process, we would be most willing to meet with appropriate NCDOT stag. We lock forward to hearing from you. Sincerely, Mike Bryant Refuge Manager cc: Ms. Jackie Compton, USFWS Mr. John Hefner, USFWS Mr. Randy Turner, NCDOT DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO Regulatory Division Action ID No. 199502334 William D. Gilmore, P.E., Manager Project Development and Environmental Analysis Branch June 10, 1999 North Carolina Department of Transportation Division of Highways Post Office Box 25201 Raleigh, North Carolina 27611-5201 Dear Mr. Gilmore: This correspondence confirms that on May 17, 1999, I conducted an inspection of the Mashoes Road Mitigation Site located approximately 1 mile north of Manns Harbor in Dare County, North Carolina. This site is being utilized by the North Carolina Department of Transportation (NCDOT) as compensatory mitigation for the authorized filling of jurisdictional wetlands for the purpose of widening approximately 10 miles of U.S. 64/264, including a new bridge over the Croatan Sound, in Dare County, North Carolina (TIP No. R-2551, Federal Aid Project No. NHF-64(6), State Project No. 8.T051401). Mr. Randall Turner of your staff was in attendance at this inspection. As discussed at this meeting, several items were noted that may cause the project to fail. We are very concerned that the trees planted on the western side of Mashoes Road are planted too high in the soil profile. It appears that many of the seedlings have exposed roots and almost all trees have exposed root collars. We are also concerned about excess stockpiled sand as well as oil drums and other construction debris that were found within the mitigation site on the eastern side of Mashoes Road. Additionally, barriers placed to preclude public access have blown down and are not adequate to stop dumping and other potential human impacts. Several solutions to these matters were discussed onsite and later by telephone with Mr. Turner. Within the tree planting area, on the west side of Mashoes Road, organic mulch could be placed around the exposed trees to insulate them from the desiccating effects of sun -2- and wind. However, seedling mortality is expected and remedial action will be required if success criteria are not met. The oil drums, construction debris and excess sand material should be removed from the mitigation site for appropriate high ground disposal. Additionally, permanent measures should be taken to prevent public access to the mitigation site. I request that you develop a remediation plan to address these problems that commonly effect the success of mitigation projects. This plan should be submitted within two weeks of your receipt of this correspondence. I will review the plan and coordinate with your staff regarding appropriate implementation. Thank you for your time and cooperation. If you have any questions, please contact me at the Washington Regulatory Field Office, telephone (252) 975-1616, extension 26. Sincerely, Michael F. Bell. P.W.S. Regulatory Project Manager Copies Furnished: Mr. Randall Turner Division 1 Environmental Officer Planning and Environmental Branch Post Office Box 850 Edenton, North Carolina 27932 Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611 t -3- Mr. John Hefner, Field Supervisor U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries Service Pivers Island Beaufort, North Carolina 28516 Mr. William L. Cox, Chief Wetlands Section - Region IV Water Management Division U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303 Mr. John Hennessy Dom' 'ision of Water Quality ,-/North Carolina Department of Environment and Natural Resources Environmental Services Branch 4401 Reedy Creek Road Raleigh, North Carolina 27607 Mr. David Cox North Carolina Wildlife Resources Commission 1142 185 Service Road Creedmoor, North Carolina 27522 District Manager Division of Coastal Management North Carolina Department of Environment and Natural Resources 1367 U.S. 17 South Elizabeth City, North Carolina 27909 DEPARTMENT OF THE ARF WILMINGTON DISTRICT, CORPS OF P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 284( IN REPLY REFER TO May 14, 1999 Regulatory Division Action-ID-No. 199502334 Mr. William D. Gilmore, P.E., ManageF Planning and Environmental Branch North Carolina Department of Transportation Post Office Box 25201 Raleigh, North Carolina 27611-5201 Dear Mr. Gilmore: Reference the Department of the Army (DA) permit issued to you on March 5, 1998 associated with the widening of approximately 10 miles of U.S. 64-264, including constructing a new bridge over the Croatan Sound and adjacent marshes, from US 64-264 West of Manns Harbor to NC 345 South of Manteo, in Dare County, North Carolina (TIP No. R-2551, Federal Aid,Project No. NHF-64(6), State Project No. 8.T051401). Also reference yeur subsequent written request dated April 7, 1999 for a permit modification to: a. Fill an additional 0.09 acres of Section 404 Wetlands and excavate 0.12 acres of Section 404 Wetlands adjacent to the Croatan.Sound for a drainage system to collect surface water at discrete drop inlets along the right of way and to convey the effluent to a small drainage ditch to be constructed immediately north of the proposed roadway fill between Stations (+/-) 32+80 and 34+40 (See Attached Figures 6-8). b. Restore 1.4 acres of sawgrass marsh ( 1 dium jamaicense) wetlands by converting`a section of roadway (including roadside shoulders and fill slopes) to marsh by removing the underlying pavement and aggregate base, and grading to natural wetland elevation. This section of roadway was constructed in marsh and will be abandoned by the permittee after the new road is constructed (See Attached Figures 2-5). The proposed restoration area is located north and west of the permitted roadway between Stations (+/-) 12+00 and 16+00. This wetland restoration is provided to compensate for the wetland losses described in (a.) above. 2 According to the permittee, the original proposal would have required a permanent drainage easement through private properties, and since the properties to be affected by the discharges are relatively small parcels, the drainage encroachment was considered to be overly intrusive. This modification request was coordinated at the April 15, 1999 Corps/NCDOT meeting with the North Carolina Division of Water Quality, and other appropriate State and Federal agencies. This coordination revealed no objections to this modification request. In addition, I have determined that the proposed mitigation compensates for the wetland impacts. Therefore, the permit is hereby modified in accordance with the specific work activities described above and in accordance with the mitigation commitments in the April 7, 1999 modification request. It is understood that all conditions of the original permit remain applicable and that the expiration date is unchanged. In addition, the permittee will comply with the following special permit conditions: kk. The restoration work associated with this permit modification will be undertaken pursuant to the "Compensatory Mitigation Proposal" in the permit modification request dated April 7, 1999, and implemented concurrently with the final phases of construction activities authorized by the permit to the extent. necessary to construct; monitor and maintain 1.4 acres of riverine marsh wetlands to the satisfaction of the Corps of Engineers. 11. The mitigation property will be maintained by the permittee in its natural condition, as altered by the implementation of the April 7, 1999 mitigation proposal, in perpetuity. Prohibited activities within the mitigation areas specifically include, but are not limited to, the construction or placement of buildings, signs, or any debris, waste or garbage; excavation, grading; dredging; leveling or other earth moving activity; cutting, removal or damage of any vegetation; any activity which would impact the drainage or water quality on the site; except as required by the implementation of the mitigation plan or subsequent modifications which are approved by the Corps of Engineers. mm. Condition (11.) above runs with the land. The permittee shall not sell, lease, or otherwise convey any interest in the property making up the mitigation site without first providing 60 days written notice to the Corps of Engineers. The instrument effecting such conveyance shall include legally binding restrictions on the use of the mitigation property as described in conditions above, to be enforceable by the permittee as well as the U.S. Army Corps of Engineers, Wilmington District. The instrument establishing such restrictions shall be subject to the approval of the Corps of Engineers. The permittee shall enforce the terms of the required restrictions. nn. The permittee shall make every effort to convey the 1.4 acres of the April 7, 1999 wetland restoration property to a nonprofit conservation organization or a natural resource agency, which is willing to hold the areas in perpetuity for conservation purposes, and is acceptable to the Corps of Engineers. The annual monitoring reports will include the statues of the conveyance efforts. 3 oo. The permittee shall contact the Corps of Engineers, Washington Regulatory Field Office NCDOT Regulatory Project Manager and provide him with the opportunity to attend the yearly mitigation monitoring efforts. pp. The permittee will submit the yearly mitigation monitoring reports by December 31 of each monitoring year. qq. Hydrology in the restoration areas will be monitored through the use of monitoring wells during each growing season for the first five years of the vegetative monitoring. A minimum of two wells will be placed within the 1.4 acre wetland restoration area. rr. To meet the hydrology success criteria, the monitoring data must show that for each normal precipitation year within the monitoring period, the site has been inundated or saturated within the upper 12 inches of soil for a minimum of 25 % of the growing season. WET tables for Dare County will be utilized to determine normal precipitation years. ss. Phragmites (Phragmites australis) will be killed or removed from the restoration area. The annual monitoring report will address all Phragmites removal activities. tt. Prior to the commencement of any drainage work associated with this modification request, the permittee shall conduct a soils boring test within the restoration area to determine the depth of undercut and the type and amount of fill material used for road construction. A report summarizing the findings from the soils boring test will be submitted to the Corps of Engineers for review and comment. The amount of fill material to be removed prior to restoration efforts will be coordinated with the Corps of Engineers. Any questions regarding this correspondence may be directed to Mr. Michael Bell, NCDOT Coordinator/Regulatory Project Manager at the Washington Regulatory Field Office, telephone (919) 975-1616, extension 26. Sincerely, Terry R. Youngbluth Colonel, U.S. Army District Engineer Enclosures Copies Furnished: Mr. Randall Turner N.C. Department of Transportation Division I Environmental Officer 113 Airport Drive, Suite 100 Post Office Box 850 Edenton, North Carolina 27932 Mr. John Parker Division of Coastal Management N.C. Department of Environment and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. John Dorney D' ision of Water C. Department of Environment and Natural Resources Wetlands and Aquatic Plants 4401 Reedy Creek Road Raleigh, North Carolina 27607 4 Mr. Larry Hardy National Marine Fisheries Service Pivers Island Beaufort, North Carolina 28516 Mr. John M. Hefner U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. William L. Cox, Chief Wetlands Protection Section - Region IV Water Management Division U.S. Environmental Protection Agency 61 Forsyth Street Atlanta, Georgia 30303 - FEW -04'99(THU) 13:08 USACOE TEL:2529751399 FAOSiMjU TAANSIIAITTAL HEADER SHEET mm" a QCISCA COMMANOI ap7r cs WASHINGTON REGULATORY PI-OLD 014:1c$ TO: CC5'AVV--C0-RW CLASSIFICATION I PRECEOEyCzl RENIAAKS t4 ? DtF M PAGES DATE-TIME idlnq MO To: Mr. Ikon Secliler, NwS Ms. Cyndi Bell, NCDEM Mr. Dennis Hawthorne, CAMA Mr. David Cox, NCWRC .As. Kathey Matthews, EPA Mr. Toni McCartney, USFWS Ms, Sarah Winslow, NCDMF CC: Mr. David Lekson., USACE From; Mr. Michael F. Bell, USACE Subject: Permit Modification Request No. VONltr 2mm.) (979) 97,5-1416 FAX NO. W U70VONlGn=J (919) 97S-ISS9 P. 001 OL0j-13'6-17It tc1-jt-73'S-q9 C9 YEAR RELEASER'S SIGNATURE NCDOT has requested a permit modification concerning Tip No, R.-2551, WIDFNING APPROXIMATELY 10 MILES OF U,S, 64-264, INCLUDING CONSTRUCTING A NEW BRIDGE OVER. THE CROATAN SOUND AND ADJACENT MARSHES, FROM US 64-264 'IyiTEST OF MANNS HARBOR TO NC 345 SOUT I OF MANTEO, TN DARE COUNTY. NORTH CAROLINA, TIP NO. R-2551, FEDERAL AID PROJECT NO. NHF-64(6), STATE PROJECT NO. 87051401, Action ID No. 199502334. The permittee has applied for a modification to the permit (SEE FOLLOWING Ll~TTER DATED JANUARY 14, 1999). Please respond to this modification request to: Mr. Michael F. Bell, Washington Regulatory L+ield Office, Peat Office 13011000, Washington, North Carolina 27889-1000, or E-mail Michael.F.Bell@$AW02.USACE.ARMY.MIL by February 16,1999, or telephone (919)975- 1616, extension 26. FE9. -04' 99 (THU) 13:08 USAGOE TEL:2529751399 u7ffd4.5 3y e~ d JAMES B. HUNT JR. GOVERNOR January 14, 1999 Mr. Mike Bell U.S. Army Corps of Engineers Post Office Box 1000 Washington, North Carolina 27889 Dear Mr, Bell. E. NORRTS TOLSON SWim -rARV SUBJECT: Mashoes Road Mitigation Site, Dare County, TIP Project R-2551 WM The grading for this mitigation site is approximately 95% complete. The portion of the site located on the west We of Mashoes Road and the southern portion of the site east of Mashoes Road have been graded and are ready for planting. However, a problem has occurred with one small area on the north side. This soil has become a soupy, thick muck that will not respond to further grading- The contractor, Higgerson-Buchanan, has completed all grading that is possible at this time. The contractor created a bo-m around this rnuclc to separate it from the rest of the site. It is our determination that the area cannot be properly graded until it has been given adequate time to dry. To prevent detaining the contractor, NCDOT had the final inspection sad closed the construction contract on January 5, 1999. The Division determined that it would prefer to initiate a new contract once the area has improved. We are committed to completing this mitigation site in a timely manner; however, extraordinary site conditions preclude 100% completion of the grading work at this time. Therefore. our current action plan follows: 1. Plant the western section of the site with trees thi s winter. On the eastern side, Phragmites colonization is still a problem. Because the removal of Phragmites is a permit requirement, we would like to delay planting until the next year. This will give NCDOT two additional opportunities (spring 1999 and fall 1999) to eliminate the Phragmites on site prior to planting tine site with marsh grasses. If the USAGE is not agreeable, then the majority of the eastern area can be planted in spring 1999, but it will be much more difficult to control the Phragmites. STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P. 002 JAN 2 5 1999 REGULATORY I RANCH Y FED. -04'99(THU) 13:08 USAGOE TEL:2529751399 -'. Mashoas Road Mitigation Site 2 r 2. Wait several months to give the muck area time to dry and consolidate naturally, 3. Initiate a new grading contract to complete the work, It is anticipated that there is adequate material in this muck area to complete the job. The muck area is also directly accessible from Mashoes Road so that no impacts should occur to the planted portion of the site. This work should be accomplished this summer. 4. Plant the muck area during spring 2000 to complete the job. Since this mitigation site will provide the accessary mitigation for Projects R-2551A (under construction) and R-2551B (to be, let in July 1999), the NCDOT requests assurances from the USA.CE that our action plan is acceptable to your agency and will not negatively affect the existing,Depargment of the Army pennit for the R-2551 projects. if you have questions or concerns, please contact Mr. M. Randall Tumor 41 252/482-7977. Sincerely, 4 William D. Gilmore, P.E., Manager Project Development and Environmental Analysis Branch 'tiV'DCY/cc Cc: Bob Capehart, P.E., Division 1 Construction M. Randall Turner, Division 1 Randy Wise, P.E., Roadside Environmental Unit V.C. Bruton, Ph.D., Project Development and Environmental Analysis Branch a'R U S??c s, P. 003 a. V, -, J_ V_ t r? -' I E r k, IN REPLY Regulatory Division t ENT OF THE ARMY IICT, CORPS OF ENGINEERS V W.O. BOX 1890 WILMINGT?R,, RTH CAROLINA 28402-1890 MAY 2 5'-Y?-J a,y 17, 1999 TO Action ID: 199502334 Mr. E. Norris Tolson Secretary of Transportation State of North Carolina Post Office Box 25201 Raleigh, North Carolina 27611-5201 Dear Secretary Tolson: This correspondence confirms that on May 12, 1999, Messrs. David d Tom Walker of my Regulatory Division staff conducted an inspection of a b ow and w sit associated with the North Carolina Department of Transportation's (NCD T) Manteo B s project, TIP R-2551, in Dare County, North Carolina. This project was autho ' ed by D artment of the Army (DA) permit No. 199502334 on March 5, 1998. Also in attendance was Mr. Pablo Hernandez of your staff. The subject borrow and waste site belongs to Mr. Rex Tillet, Coastal Contractors, and is located approximately 3 miles south of the intersection of N.C. 345 and U.S. 64/264, adjacent to the Croatan Sound, north of Wanchese, in Dare County, North Carolina. Condition (b.) of your DA permit states, "The permittee and its contractors and/or agents shall not excavate, fill, or perform landclearing at any time in the construction or maintenance of this project within waters and/or wetlands, except as authorized by this permit or any modification to this permit. There shall be no excavation from or waste disposal into jurisdictional wetlands or waters associated with this permit without appropriate modification of the permit." My staff's inspection revealed that unauthorized spoil material generated from NCDOT's construction work associated with the Manteo Bypass project was actively being placed within wetlands at the Tillet Borrow and Waste Site. Therefore, the North Carolina Department of Transportation is now in non-compliance with its Department of the Army permit and, consequently, in violation of Section 404 of the Clean Water Act (33 USC 1344). The contractor has been ordered to immediately restore pre-project wetland elevations and contours to the effected areas. Since the contractor's actions have placed NCDOT in non-compliance with its DA permit and may jeopardize the timely continuation of the Manteo Bypass project, I encourage you to do everything within your power to facilitate the restoration of this site. r 2 I am very concerned that this violation occurred after my staff, on several occasions, met onsite with your staff and the contractors and informed them of our concerns and cautioned them to avoid impacting these very wetland areas. I encourage you to institute all appropriate and necessary measures to prevent violations such as this from occurring in the future. I trust that your efforts to resolve this matter and prevent future such actions from occurring will preclude the need for me to pursue other courses of action. My staff is available to assist you in identifying the appropriate restoration requirements for this site. Any questions regarding this matter may be addressed to Mr. David Franklin in my Regulatory. Division, telephone (910) 251-4952. Sincerely, Terry R. Youngbluth Colonel, U.S. Army District Engineer Copies Furnished: Mr. William D. Gilmore, P.E., Manager Planning and Environmental Branch N.C. Department of Transportation Post Office Box 25201 Raleigh, North Carolina 27611-5201 United States Attorney Eastern District of North Carolina 310 New B ern Avenue Suite 800, Federal Building Raleigh, North Carolina 27601 Mr. John Hefner U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. William L. Cox, Chief Wetlands Section - Region IV Water Management Division U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303, Mr. Larry Hardy National Marine Fisheries, NOAA Habitat Conservation Division Pivers Island Beaufort, North Carolina 28516 Regional Director National Marine Fisheries Services, NOAA Southeast Regional Office 9721 Executive Center Drive NORTH Saint Petersburg, Florida 33702 r 3 Mr. Doug Huggett Mr. John Dorney Division of Coastal Management Division of Water Quality N.C. Department of Environment, N.C. Department of Environment and Natural Resources and Natural Resources Post Office Box 27687 V,wetlands and Aquatic Plants Raleigh, North Carolina 27611-7687 4401 Reedy Creek Road Raleigh, North Carolina. 27607 District Manager Division of Coastal Management N.C. Department of Environment and Natural Resources 1367 U& 17 South Elizabeth City, North Carolina 27909 Mr. Floyd Williams Division of Land Quality N.C. Department of Environment and Natural Resources 943 Washington Square Mall Washington, North Carolina 27889 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO Regulatory Division Action ID No. 199502334 Mr. William D. Gilmore, P.E., Manager Planning and Environmental Branch North Carolina Department of Transportation Post Office Box 25201 Raleigh, North Carolina 27611-5201 Dear Mr. Gilmore: Reference the Department of the Army (DA) permit issued to you on March 5, 1998, associated with the widening of approximately 10 miles of U.S. 64-264, including constructing a new bridge over the Croatan Sound and adjacent marshes, from US 64-264 West of Manns Harbor to NC 345 South of Manteo, in Dare County, North Carolina (TIP No. R-2551, Federal Aid Project No. NHF-64(6), State Project No. 8.T051401). Also reference your subsequent written request dated January 14, 1999, for a permit modification to: a. Plant the western section of the site with trees as scheduled. On the eastern side of the site, Phragmites australis colonization is still a problem. Because the removal of Phragmites australis is a permit condition, NCDOT proposes to delay planting one year to allow NCDOT two additional opportunities (spring 1999 and fall 1999) to eliminate the Phragmites australis on the site prior to planting the site with marsh grass. This delay would also allow the wet, mucky previous pit area time to dry and stabilize. The entire marsh area would have to be planted during spring 2000. According to the permittee, this action would still run concurrently with the construction of the road project and would provide better opportunity to eliminate Phragmites australis. This modification request has been coordinated by facsimile dated February 4, 1999, with the North Carolina Division of Water Quality, and other appropriate State and Federal agencies. This coordination revealed no objections to this modification request. Therefore, the permit is hereby modified in accordance with the specific work activities described above. It is understood that all conditions of the original permit remain applicable and that the expiration date is unchanged. February 26, 1999 1 !' 2 Any questions regarding this correspondence may be directed to Mr. Michael Bell, NCDOT Coordinator/Regulatory Project Manager at the Washington Regulatory Field Office, telephone (252) 975-1616, extension 26. Sincerely, Terry R. Youngbluth Colonel, U.S. Army District Engineer Copies Furnished: Mr. Randall Turner N.C. Department of Transportation Division I Environmental Officer 113 Airport Drive, Suite 100 Post Office Box 850 Edenton, North Carolina 27932 Mr. John Parker Division of Coastal Management North Carolina Department of Environment and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. John Domey Division of Water North Carolina Department of Environment d Natural Resources etlands and Aquatic Plants 4401 Reedy Creek Road Raleigh, North Carolina 27607 Mr. Larry Hardy National Marine Fisheries Service Pivers Island Beaufort, North Carolina 28516 Mr. John M. Hefner U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. William L. Cox, Chief Wetlands Section-Region IV Wetlands Management Division, U.S. Environmental Protection Agency 61 Forsyth Street Southwest Atlanta, Georgia 30303 ANNUAL REPORT FOR 2001 Mashoes Road Mitigation Site Dare County Project No. 8.T051402 TIP No. R-2551WM Prepared By: Natural Systems Unit & Roadside Environmental Unit North Carolina Department of Transportation December 2001 TABLE OF CONTENTS EXECUTIVE SUMMARY .................................................................... 1 1.0 INTRODUCTION ........................................................................ 1.1 Project 2 Description ........................................................... 1.2 Purpose ........................................................................ 1.3 Project History ................................................................ 1.4 Debit Ledger .................................................................. 1.5 Permit Related Requirements ............................................ 4 2.0 HYDROLOGY ............................................................................ 2.1 Success Criteria .............................................................. 6 2.2 Hydrologic Description ..................................................... 2.3 Results of Hydrologic Monitoring ........................................ 9 2.3.1 Site Data ............................................................. 2.3.2 Climatic Data ........................................................ 13 2.4 Conclusions ..................................................................... 13 3.0 VEGETATION ........................................................................... 15 3.1 Success Criteria .............................................................. 15 3.1.1 Success Criteria (Trees / West Side) ................................. 15 3.1.2 Success Criteria (Marsh Grass / East Side) ........................ 15 3.2 Description of 15 Species ...................................................... 3.3 Results of Vegetation Monitoring ........................................ 16 3.4 Conclusions ................................................. :.................. 21 4.0 OVERALL CONCLUSIONS/ RECOMMENDATIONS ......................... 22 TABLES TABLE 1 - MASHOES ROAD DEBIT LEDGER ...................................... 3 TABLE 2 - 2001 HYDROLOGIC MONITORING RESULTS ....................... 10 TABLE 3 - 2001 VEGETATIVE MONITORING RESULTS (WEST SIDE).... 16 TABLE 4 - 2001 VEGETATIVE MONITORING RESULTS (EAST SIDE)...... 17 FIGURES FIGURE 1 - SITE LOCATION MAP ...................................................... 5 FIGURE 2 - MONITORING GAUGE LOCATION MAP ............................. 8 FIGURE 3 - 2001 HYDROLOGIC MONITORING RESULTS ..................... 12 FIGURE 4 - 30-70 PERCENTILE GRAPH ............................................. 14 APPENDICES APPENDIX A - DEPTH TO GROUNDWATER GRAPHS APPENDIX B - PHOTO AND VEGETATION PLOT LOCATIONS, SITE PHOTOS MASHOES ROAD MITIGATION SITE 2001 REPORT - EXECUTIVE SUMMARY The following report summarizes the monitoring activities that have occurred in the past year at the Mashoes Road Mitigation Site. Construction began on this site in 1998. The west side of Mashoes Road was completed in early 1999 and was planted with trees; this area was replanted in the Winter of 2000-01. The east side of Mashoes Road was completed in the fall of 1999 but was not planted due to Phragmites control. The site was planted with marsh grass in the spring of 2001. Monitoring activities in 2001 represent the first year of monitoring at the mitigation site. The site must demonstrate hydrologic and vegetation success for a minimum of five years or until the project is deemed successful. The site contains nine groundwater monitoring gauges on the west side, ten surface gauges on the east side and one rain gauge. On the east side, there are a total of 167 random vegetation plots, while the west side has five permanent vegetation plots. This year, rainfall data has been acquired primarily from an onsite gauge. Also, daily rainfall was used for comparison from the Manteo Airport, maintained by the NC State Climate Office. Hydrologic monitoring indicated that the site is continuing toward success. Under normal conditions for 2001, all nine of the groundwater gauges met the jurisdictional hydrologic success for at least 12.5% of the growing season. All ten of the surface gauges showed steady tidal influence that maintained a water elevation above zero under normal conditions for at least 25% of the growing season. Vegetation monitoring on the west side of the restoration area yielded 649 trees per acre, above the 320 tree requirement. On the east side, a frequency of 46.4% for the targeted vegetative species was found. A frequency of 70% is required. A vegetative scale value of 3.2 was recorded. A scale value of 5 is required by year 5. Based on the monitoring results for this growing season, NCDOT proposes to continue hydrologic and vegetation monitoring. 1.0 INTRODUCTION 1.1 Project Description The Mashoes Road Wetland Mitigation Site is located north of Manns Harbor in Dare County (Figure 1). It is bounded by US 64-264 to the south, the Alligator River National Wildlife Refuge to the west, the Croatan Sound to the east, and is bisected into east/west by SR 1113 (Mashoes Road). A significant portion of the site (254 acres) was classified as a coastal marsh and fell under the jurisdiction of the N.C. Division of Coastal Management. Another portion (107 acres) was classified as forested wetlands. The remainder of the site was comprised of a 15-acre pond, borrow pits and cleared uplands from a sand mining operation, and some forested uplands. The site encompasses approximately 399 acres and is designed as a mitigation site primarily for the new Croatan Sound Bridge between Manns Harbor and Manteo , TIP Projects R-2551 and K-4003 (USACE Action ID No. 199502334). 1.2 Purpose In order to demonstrate successful mitigation, hydrologic and vegetative monitoring must be conducted for a minimum of five years or until success criteria are fulfilled. Success criteria are based on federal guidelines for wetland mitigation. These guidelines stipulate criteria for both hydrologic conditions and vegetation survival. The following report details the results of hydrologic and vegetative monitoring during 2001 at the Mashoes Road Mitigation Site. Activities in 2001 reflect the first year of monitoring at the mitigation site. Included in this report are analyses of both hydrologic and vegetative monitoring results as well as local climate conditions throughout the growing season. 1.3 Project History Winter 1999 Spring 1999 Spring 1999 March 1999 March - November 1999 October 1999 March - November 2000 October 2000 March - November 2001 April 2001 May 2001 August 2001 August 2001 1.4 Debit Ledger West Side Construction Complete Wetland Trees Planted (West Side) East Side Construction Complete Monitoring Gauges Installed (Entire Site) Hydrologic Monitoring (Entire Site, Year 1) Vegetation Monitoring (West Side, Year 1) Hydrologic Monitoring (Entire Site, Year 2) Vegetation Monitoring (West Side, Year 2) Hydrologic Monitoring (Entire Site, Restart Year 1) Phragmites Treated Marsh Grasses Planted Tree Vegetation Monitoring (Restart Year 1) Marsh Vegetation Monitoring (Year 1) Because of its size, Mashoes Road will provide mitigation for several highway projects. Table 1 shows the projects that this site is providing mitigation for through November 2001. Table 1 Mashoes Road Debit Ledger Habitat Acres at Start Acres Remaining TIP Debit R-2551 TIP Debit K-4003 SVM Restoration 13.1 0 13.1 0 Forest Wetlands Restoration 8 0 8 0 SVM Preservation 253.86 130.96 122.9 0 Forest Wetland Preservation 106.88 29.32 76.2 1.36 Open Water 15.53 15.53 0 0 Upland Hummocks 1.48 1.48 0 0 Total: 398.85 177.29 220.2 1.36 3 1.5 Permit Requirements The Mashoes Road Mitigation Site was constructed primarily to compensate for impacts to TIP Project R-2551 (USACE Action ID No. 199502334). Permit commitments stated that Phragmites australis would be totally controlled in the marsh area. The permit was modified in 2000, which allowed for marsh planting to be extended to the spring of 2001. This gave NCDOT additional time to further treat for phragmites. The site was treated for Phragmites in 2000. The planting of marsh grass at the site was completed in spring 2001. 4 71 0 U? 0 U Oa Q (a C O V Of J c O O s m N . 2y) Z> 2 b LL s N 2.0 HYDROLOGY 2.1 Success Criteria In accordance with federal guidelines for wetland mitigation, the success criteria for hydrology in the forested wetland (west side) states that the area must be inundated or saturated (within 12 inches of the surface) by surface or ground water for at least 12.5% of the growing season. Areas inundated less than 5% of the growing season are always classified as non-wetlands. Areas inundated between 5% - 12.5% of the growing season can be classified as wetlands depending upon other factors, such as the presence of hydrophytic vegetation and hydric soils. In the coastal marsh wetland (east side), success criteria include saturation or inundation within 12 inches of the surface for at least 25% of the growing season, or statistically the same as the reference ecosystem. The growing season in Dare County begins March 13 and ends November 25. The dates correspond to a 50% probability that temperatures will drop to 28° F or lower after March 13 and before November 25.1 The growing season is 258 days; therefore the optimum duration for wetland hydrology is 32 days. Also, local climate must represent average conditions for the area. 2.2 Hydrologic Description Historically, the wetlands on this tract were part of the coastal marsh of the surrounding area. The primary sources of hydrology are tidal flushing of the system and groundwater. After an extensive study of the site's hydrology, it was concluded that filling of the ponds, and grading down of the upland areas would elevate soils to a level that would saturate the soil stratum within the required twelve inches or even flood the area during high tides. It was predicted that this would be sufficient to restore wetland hydrology. Six groundwater monitoring gauges, eight surface gauges, and one rain gauge were installed in 1999 (Figure 2). Three more groundwater monitoring gauges were installed during 2001 to evaluate potential drainage by the side canal. Also, two additional surface gauges were added to the coastal marsh wetland area. The rain gauges and monitoring gauges recorded daily readings of rainfall and depth to groundwater, respectively. The surface gauges record tidal conditions eight times daily; however, only one representative reading was used for graphing and statistical purposes in this report. 1 Natural Resources Conservation Service, Soil Survey of Dare County. North Carolina, p.69. 6 This year, rainfall data has been primarily from an onsite gauge. Also, daily rainfall was used for comparison from the Manteo Airport, maintained by the NC State Climate Office. 7 r CJ Cl Lao - i poll lit i I ED] 0 on* 00 2.3 Results of Hydrologic Monitoring 2.3.1 Site Data For groundwater monitoring gauges on the west side of the mitigation site, the maximum number of consecutive days that the groundwater was within twelve inches of the surface was determined for each gauge. For surface gauges, the ground surface was used (elevation zero) to give a better representation that the east side of Mashoes Road was receiving daily tidal flooding. This number was converted into a percentage of the 256-day growing season. Table 2 presents the 2001 results. In the table, "MR" refers to Mashoes Road Mitigation Site, "S" refers to surface gauges, and "G" refers to groundwater gauges. Reference gauges and new gauges are indicated. In order to meet the success criteria for hydrology, the surface water gauges needed to show groundwater levels within 12 inches of the surface for at least 25% of the growing season. Since the criteria in the mitigation plan were unclear whether hydrology should be met in consecutive days or total days, the table shows both sets of data. Appendix A contains a plot of the groundwater depth for each monitoring gauge. The maximum number of consecutive days that the gauge met success above this 12-inch depth is noted on each graph. Data determined to be erroneous was omitted;. therefore, some gaps appear in the plots. Precipitation events are included on each graph as bars. Table 2 2001 HYDROLOGIC MONITORING RESULTS (MARCH 13 - NOVEMBER 25) Monitoring Gauge < 5% (<13 dy) 5-8% (13-20 dy)' 8-12.5% (21-32 dy) > 12.5% (>32 dy) Actual Consecutive % Actual Cumulative % Dates` Meeting. Success MR-S1 (ref) ? 20.9% 79.8% 3/13-5/5 MR-S2 ? 76.7% 94.1% 5/12-11/25 MR-S3 ref ? 100% 100% 3/13-11/25 MR-S4 re ? 100% 100% 3/13-11/25 MR-S5 ? 14.7% 64.7% 5/29-7/5, 7/29-9/2 (both 38 days) MR-S6 ? 100% 100% 3/13-11/25 MR-S7 re ? 100% 100% 3/13-11/25 MR-S8 ? 100% 100% 3/13-11/25 MR-G9 re ? 48.4% -- 3/13-7/15 MR-G10 ref ? 100% -- 3/13-11/25 MR-G11 ? 21.3% -- 3/13-5/6 MR-G12 ? 100% -- 3/13-4/28 MR-G13 ref ? 63.6% -- 3/13-8/23 MR-G14 ? 22.0% -- 5/12-7/7 MR-G15 ? 13.6% -- 7/30-9/2 MR-G16 ? 14.3% -- 7/26-9/4 MR-G17 ? 18.2% -- 7/24-9/14 MS-S18 ? 99.2% -- 3/28-11/25 MS-S19 ? 99.2% -- 3/28-9/21 Notes: "MR" denotes Mashoes Road site gauges. "S" denotes surface gauges. "G" denotes groundwater gauges. "ref" denotes gauges in reference wetlands. Figure 3 is a graphical representation of the hydrologic monitoring results for this year. A blue dot (or square) represents wetland hydrology for more than 12.5% of the season; a red dot/square indicates hydrology between 8% and 12.5%; a green dot/square represents hydrology between 5% and 8%. For this time period from March to November, all nine groundwater gauges met the jurisdictional hydrologic success of at least 12.5% during the growing. season. It is unclear whether the surface gauge criteria should be met in consecutive days or total days, so the table shows both sets of data. When considering the total consecutive days, eight of the ten surface gauges recorded that flooding occurred at least 25% of the growing season. However, if the cumulative days are considered, all ten gauges met the hydrologic requirements. 10 ? 6I F 90 :F !?r tj ,j Q M Aj ` t5000 w I. -st E ? ooze 2.3.2 Climatic Data Figure 4 represents an examination of the local climate in comparison with historical data in order to determine whether 2001 was "average" in terms of climate conditions. The figure compares the rainfall from 2001 with that of historical rainfall (data collected between 1931 and 1999). All rainfall data was collected from the NC State Climate Office. The graph shows 2000 rainfall totals recorded at the Manteo Airport from September through December; the graphs also shows 2001 rainfall totals recorded at the Manteo Airport through July. Information from the Manteo Airport for the months of August through December was not available at this writing of this report. Rainfall data for August through December 2001 will be presented in the 2002 Annual Monitoring Report. On-site rain gauge information is also shown for the duration of the growing season (March through November). According to the on-site rain gauge, 2001 has been a dry year overall. Most readings fall below or barely within the 30th percentile. However, the rainfall data obtained form the Manteo airport shows that rainfall was average to above average for 2001. Figure 5 shows a discrepancy between monthly totals on site versus the data from the Manteo airport. For 2001, March was below normal, whereas, May and June were higher than normal. Overall so far, 2001 has been an average year in terms of precipitation. 2.4 Conclusions 2001 represents the third full growing season (but the first.official season) that the hydrologic data has been examined. All nine groundwater monitoring gauges met the jurisdictional wetland hydrology for 12.5% of the growing season; when considering cumulative days, all ten surface gauges met the 25% requirement of daily flooding the site during this same period. The overall monitoring results show that the site performed adequately from a hydrological standpoint. 12 t Q R L d d V L d a o c M C ? i N d C t U) CR G W u To v N 0 O Z U C O Q.' N U) Q. _ N O U O O N 0) ' Q W N U O a ::3 C) 0 NC) (0 (U L N C Q = N L ? a os C)} 6c L N C'. co ? I Q N LL C CQ O O O O O O O O O O O O O O N Co 00 to d N O r r M (•ui) uoi;elid!DOJd 3.0 VEGETATION (YEAR 1 OF 5) 3.1 Success Criteria The following section discusses the vegetative success criteria outlined in the mitigation plan for Mashoes Road mitigation site. 3.1.1 Success Criteria (Trees/ West Side) NCDOT will monitor the site for five years or until success criteria is met. A 320 stems per acre survival criterion for planted seedlings will be used to determine success for the first three years. The required survival criterion will decrease by 10% per year after the third year of vegetation monitoring (i.e., for an expected 290 stems per acre for year 4, and 260 stems per acre for year 5). The number of plants of one species will not exceed 20% of the total number of plants of all species planted. 3.1.2 Success Criteria (Marsh Grasses / East Side) The vegetative marsh success of the wetland site will be determined in accordance with NMFS Guidelines. Monitoring plots found to be located within the open water channel will not count to the final count of plots. The vegetation component of the wetland site will be deemed successful if the following criteria are met. 1. At year five, the average of all plots should have a scale value of 5 (75% vegetative cover) consisting of wetland herbaceous species, not including any invasive species. 2. A minimum of 70% of the plots shall contain the target (planted) species. 3.2 Description of Species The following species were planted in the Wetland Restoration Area: Zone 1: Wetland Tree Reforestation (2.7 acres) Taxodium distichum, Bald Cypress Quercus phellos, Willow Oak Nyssa sylvatica, Black Gum Fraxinus pennsylvanica, Green Ash Quercus nigra, Water Oak Zone 2: Wetland Tree Reforestation ( 4.3 acres) Taxodium distichum, Bald Cypress Fraxinus pennsylvanica, Green Ash 14 Quercus nigra, Water Oak Quercus phellos, Willow Oak The following plant communities were planted in the Marsh Grass Area: Zone 1: (approximately 11.92 acres) Cladium jamaicense, Sawgrass Zone 2: (approximately 0.42 acres) Juncus roemerianus, Black Needle Rush 3.3 Results of Vegetative Monitoring Table 3 shows the results of vegetative monitoring on the west side of Mashoes Road for the year 2001. Table 4 shows similar results for the vegetative monitoring on the east side of Mashoes Road. Table 3 2001 VEGETATIVE MONITORING RESULTS (WEST SIDE) c Q + o w ` ? ZONE K m 1 1 17 3 5 4 3 32 40 544 2 18 7 9 4 2 40 40 680 ZONE 1 AVE RAGE 612 1 2 1 3 1 8 1 1 1 36 1 1 4 1 49 1 49 680 1 5 1 5 1 15 1 10 1 1. 5 1 35 1 35 1 680 1 TOTAL AVERAGE 649 15 Table 4 2001 VEGETATIVE MONITORING RESULTS (EAST SIDE) W _ . s w d u rA a d d z Y oa A ?, d w tes ? ? ? ? 5 5-o ? ? Rarnyard grass ? ? J ? ? ? 9 10 ? ? Barnyard grass. Phragmites 10 5.0 Rarnyard grass H 2.0 ? ? Barnyard 2rass 12 5.0 R -ri-us- Barnyard 2rass. 2" water 13 1 50 S am?ricanu Barnyard grass 14 5.0 Barnyard grass 15 i-o Rarnyard grass- 2" water 16 4.0 Barnyard grass, 2" water 17 20 Rarnyard grass 5.0 Barnyard 2rass. 7" water 19 3.0 ? ? Barnyard rass r' 4.0 Rarnyard grass 4.0 ? J Barnyard zrass.,hincus s 22 4.0 J J S americanus 4" water ? ? 5.0 Barnyard grass, Sicklenod- Smartweed 2-0 Barnyard grass 27 400 Barnyard grass, 2" water 28 50 s americanus 9 ? ? 31 30 S americanus. Barnyard grass ? ? 3.0 S americanus. Barnyard grass 2.0 Rarrivard grass. Phragmites J J 38 2O J ? D snicataThragmites 39 2.0 1) vnicata 4"Water 40 5-0 v 41 5.0 ? ? Barnvard grass 42 3.0 J J Rarrivard gmq 43 .0 ? J Cattail 0 Barnyard -rass. 2" water 4" 46 5.0 Barnyard grass. 1" water 16 Table 4 continued... 2 C Lr'. Notes 4 48 .0 Barnyard urasq. Cattail 49 0.0 Rare ground 50 4" water 51 1 0 ? ? - 2O ? ? Cattail- Phra2mites 53 0.0 Ijare ground 54 5.0 S americanus. Barnyard grass 55 3.0 S. mericanus 56 3.0 J ? S mericanus - Barnyard grass 57 5.0 americanus. Barnyard rass r 59 2.0 americanus 60 - 3O S americanus. Barnyard grass 61 0 S- americanus J ? 63 5,0 americanus. Barnyard rass 4" water 65 5.0 ? ? Barn rd grass 66 4.0 ? ? lBarnvard grass 67 0.0 Bare around 70 2.0 J ? 7 72 3.0 ? ? S americanus. Barnyard grass 7 74 5O ? ? Barnyard grass 75 - 2O 1) snirata- Barnyard gra-s- Phramites ? J 78 Phragmites 79 4-0 Is americanus- Flencharis sp., Woolprass 81 2.0 S ameriramis Barnyard grass 83 2.0 ? ? Barnyard rass 1" water 84 2-0 ,Utail. Barnyard grasq C 85 1.0 ? ? . Barnyard rass 6" water 86 2-0 ? ? Barnyard grass 87 2.0 ? ? Phra mite 88 2.0 ? J 89 5.0 Barnyard grass 90 4.0 ? ? Barnyard grass, D- snicata - 7. ameri 91 3.0 ? J Barnyard Prass. Cattail, Phra mites 92 0.5 17 Table 4 Continued... Z s CA Notes / J 4 1.0 Barnyard grass, Phragmoteq 95 1.0 J J 96 2.0 ? ? S americanus. 4" water 97 2.0 1). svicata J J 99 1.0 Barnyard grass 100 5.0 ? ? Barnyard grass, Smartweed. Fennel, Aster sn. 101 4.0 ? ? 1) spicata. S- i Phra mite 102 5.0 Barnyard erass 103 5.0 Barnyard ra 104 2.0 ? ? T) -i-f, PhragMiteS 105 4.0 ricanus. Barnyard grass. 6" water S, ame J J - 107 5.0 Barnyard grags 108 4 ? ./ I 11 2.0 Barnyard grass 1 13 2.0 ? ? 114 0.0 Bare ground ? ? 116 0.5 117 2.0 Barnyard grass J J 119 4.0 Barnyard grass .4; americanus. 10 J J Barnyard grags 121 2.0 J J 'spicata. Phra mit 0 J / S americanus. Barnyard grass 123 5.0 B rn and grass. 2" water 124 1.0 Barnyard grass. .7. americanuv Phraizmites 125 5.0 S. americanus. Barnyard rass 1" water 126 50 J J .7 americanus 127 2.0 J 1 ? Cattail, Phraernites 2. ? ? S. am ricanus - Barnyard izrass 0.5 J ? wat- 4" ? ? - 0 grass- 2" water 0 136 5.0 IS, r r' s u s r s. Is. americanus - Cattail 138 5.0 Eleocharis s I" water 18 Table 4 Continued... z O N . L u w = u t/? x ? d z = y R c3e cn w d °L' fs. otes 139 2.0 Bam ard.grass. 2" water 1401 2.L - Barnyard grass 141 1 -- 3.0 Cattail. 4" water 1421 4.0 J ? Cattail- 4" w r ? J 1441 0.0 Rare Pround ? ? 146 if) -f mhustus 147 5.0 Ramvard grass, Eleorharis sn., 2" water 148 5.0 Cattail 4 ? J 150 3.0 Eleocharis so, I " water 50 153 O.o .... Rare ground 154 5.0 S americanmy 156 1 5.0 Cattail 1571 5.0 Cattail 1591 5.0 J ? S. americanus J ? ? J 161 SO ? J I? ampricanuy 169 10 J J 163 5-0 J J S, americanmy, Cattail 1 164 40 J ? S. americanus 165 1 50 ? ? S, americanus, Aster sp., Fennel 166 50 J ? S. americanus 67 20 J J S. ampricanus, Cattail 0 Sum Scale Value 536.5 Total # of lots 166 3.2 19 Site Notes: Other species noted: Scirpus americanus, sawgrass, black needle rush, Bidens sp., ragweed, Baccharis halimifolia, fennel, phragmites, redbay, cattail, red maple, and Pluchea sp. Trees were difficult to find in plot 1 due to thick grasses. 3.4 Conclusions (West Side) Of the 399 acres on this site, approximately 7 acres involved tree planting. This side of the site has also become extremely well vegetated with marsh grasses. There were 5 plots established throughout the planting areas, encompassing all plant communities. The 2001 vegetation monitoring revealed an average density of 649 trees per acre, which is much higher than the 320 trees per acre required by the success criteria. (East Side) During the 2001 monitoring of the vegetation on the east side, a frequency of 46.4% for the targeted species was found. A frequency of 70% is required. A vegetative scale value of 3.2 was recorded. A scale value of 5 is required by year 5. Of the 399 acres on this site, approximately 12.34 acres involved marsh grass planting. There were 167 random plots established throughout the planting areas, encompassing all plant communities. These plots were located with GPS. The northern side of the site was treated for phragmites in April 2001. Dr. Stratford H. Kay, Aquatic and Noncropland Weed Management Specialist with North Carolina State University, is currently working on a grant to study phragmites on this site and other potential NCDOT mitigation sites. 20 4.0 OVERALL CONCLUSIONS/ RECOMMENDATIONS 2001 represents the third full growing season (but the first official season) that the hydrologic data has been examined. All nine groundwater monitoring gauges met the jurisdictional wetland hydrology for 12.5% of the growing season; when considering cumulative days, all ten surface gauges met the 25% requirement of daily flooding the site during this same period. The overall monitoring results show that the site performed adequately from a hydrological standpoint. Vegetation monitoring on the west side of the restoration area yielded 649 trees per acre, above the 320 tree requirement. On the east side, a frequency of 46.4% for the targeted vegetative species was found. A frequency of 70% is required. A vegetative scale value of 3.2 was recorded. A scale value of 5 is required by year 5. NCDOT will continue to monitor the site for both hydrologic and vegetation success. 21 APPENDIX A DEPTH TO GROUNDWATER GRAPHS 22 T - C/) a? cc 0 m U m L Cf) 'a O w V) (1) O m a L0-oaa-80 LO-AON-6Z L 0-AON-OZ L 0-noN- L L LO-AON-ZO L O-130-VZ LO-??O-9 L LO-130-90 LO-daS-LZ LO-daS-8L LO-daS-60 LO-6n`d- L£ LO-6ny-ZZ LO-6ny-£L LO-6md-t0 LO-Inf 9Z LO-Inr`LL LO-Inf 80 LO-unf 6Z LO-unf OZ LO-unf LL LO-unf ZO LO-AeW-vz L 0-?eW-S L -AeW-90 Lo LO-JdV-LZ LO-AV-SL L0-AV-60 LO-Jew-L£ L 0-JeW-ZZ LO-JeW-£L 0 6i o0 r- (D Lo "T r> c? o cv ch n (-ui) y;dad Ja;eM aoejjnS .a a? r ? R ? o , Q! 75 M N N U) m a? C) U) .a ca O m O V) R m ?0-3aa-80 60-AON-6Z 60-^ON-OZ 60-nON-66 0-AON-ZO 60-130-vz 0-130-96 60-130-90 60-dOS-LZ I LE 60-daS-S 6 60-daS-60 60-6nV-6£ 60-6ny-ZZ 60-6ny-£ 6 Q 60-6ny-y0 N ® CO 60-Inf 9Z ? 60-Inf`L6 60-Inf`80 60-unf`6Z 60-un f`OZ 60-unf`66 60-unf`ZO 60-Aew-vz 60-Aew-S6 60-Aew-90 60-jdV-LZ 60-AV-86 60-AV-60 60-Jew- 6£ 60-aeW-ZZ 60-aew-£6 o rn co r o L v c? cal r o cv M v c n (•ui ) yj daa aajeM aae:pnS N M Cf) C) c4 C) V ca O Cf) R O G) O s R 2 N Q C9 R e7 U) N C) W co r co U-) v M N O < (•ui) yjdad .aajeM aoepnS ,Re U) 0 d v R U) ca O O O t ca 2 LO-32Q-80 LO-AOWU LO-AON-OZ L 0-noN- 4 L LO-AoN-ZO L O-13O-vz LO-3?0-5 L W-430-90 LOAOS-LZ Lo-&S-8L LOAOS-60 LO-6ny-L£ LO-6nd-ZZ LO-6ny-£L LO-End-Vo LO-Inf 9Z p LO-Inf`L L LO-Inf 80 LO-unf 6Z LO-unf`OZ LO-unf` L L LO-unf`ZO L 0-Ae W-vz L 0-AeW-9 L LO-AeW-90 L 0-adV-LZ L0-?db-8L LO-AV-60 LO-aeW-L£ LO-JeW-ZZ LO-aeW-£L o rn p r- cQ Lo r> c? o N c? o ? b 1 I 1 I (•ui) yldaa aajeM aaepnS b Q I'D N U) cc C? O U ca cc O 0= m O t ca 0 O CY) r ?0-000-90 O-AOWLZ 4O-noN-6 4 40-AOWO4 40-AON-ZO 40-100-9Z 40-100-9 4 40-100-80 40-&S-O£ 40-&S-4Z 40-daS-£ 4 40-&S-vo 40-6ny-LZ 40-6nV-64 40-6ny-04 Q 40-6ny-Z0 U) 40-Inf-SZ 40-Inf 94 40°Inf 80 40-unf -6Z 40-unf 4Z 40-unf £4 40-unf -t+0 40-AeW-LZ 7 10 0- 40-AeW-64 11 40-AeW-04 40°AeW-ZO 40-ad`d-£Z 4O-Ay-g 4 4O-AV-LO 40-aeW-6Z 40-aeW-4Z MJeW-£ 4 co ti (D LO "T Cl, r Cl N () V i ?: (-ui ) yj da(] .raleM a3e pnS N eo as ca 0 CD v Cl) O O O 2 Lp-aad-SO i LO-AON-9Z L O-AON-O L I LO-AON-60 ?'! ILO-3a0-L£ W-100-£Z i 40-330-14 [0-330-90 ! I LO-daS-LZ LO-daS-84 I LO-deS-O L LO-daS-LO LO-6ny-£Z ! ' LO-6nb'-5L LO-6n`d-90 LO-Inf-6Z I LO-Inf~OZ LO-Inf'-LL LO-Inf-£0 I I ', I LO-unf'-VZ j LO-unf-SL I i LO-unf -L0 LO-AeW-6Z I ? LO-?eW-LZ w-AeW-Z L LO-AeW-£O i LO-AV-SZ L O-AV-9 L LO-AV-LO LO-aeW-O£ LO-aeW-LZ W-JeW-£ L O M 00 r- tD -, r7 N O N M r (-ui) yldea aaleM aoepnS a? Q m 00 N r- d ca C? O v N O O O c? E (•u) y}da® aajeM aaepnS 60-Jau-uL 60-304- LO LO-AON-£Z 4O-nON-b L LO-AON-90 LO-1O0-8Z LO-1OO-OZ LO-130-LL LO-100-£0 LO-daS-bZ LO-daS-9 L LO-daS-LO LO-Bn`d-0£ LO-Bn`d-LZ LO-6md-£L LO-BnV-170 LO-Inf-a LO-Inf 8L LO-Inr-u LO-Inf-L0 LO-unf-£Z LO-unf -n LO-unf-90 LO-Am-8Z LO-AeW-OZ LO-AeW- L L LO-AeW-£0 LO-jd`d-vz LO-AV-9L LO-AV-LO LO-aew-0£ LO-aew- LZ LO-Jew-£ L LO a? m Q O ? CO N C, M M ti M 10 - M N O N M V r 00 U) a? 0 O U U) O w O O .C N E O 0') w ti CO LO d' M N O r N M r (•ui) 4ldaa aaleM aoejjnS W-Jeu-u ? W-0aa-ZO 60-AON-£Z 60-AON-S 6 60-AOWLO 60-100-0£ W-100-6z 60-100-£ 6 60-100-90 60-daS-LZ 60-daS-86 60-daS-06 60-daS-ZO 60-6nV-9Z 60-6nb-96 60-6ny-80 60-Inf-6£ 60-Inf-£Z 60-Inf-b6 60-Inf 90 60-unf-8Z 60-unf-OZ 60-u nf-66 60-unf-£0 60-fieW-9Z 60-AeW-n 60-AM-60 60-AeW-60 60-Jdd-£Z 60-Jdd-S 6 60-Jdv-90 60-JeW-6Z 60-JeW- 6Z 60-JeW-£ 6 LO v a? m ? 00 O U) 0 M 00 T- 0 Q) ca N R O m O t cu 2 W-300-80 L 0-nON-6Z LO-nON-OZ L 0-nON- L L LO-nON-ZO LO-130-vz L0-130-9 L LO-130-90 imp; LO-daS-LZ LO-daS-8L LO-daS-60 LO-6n`d-L£ LO-6nb-ZZ LO-6n`d-£L LO-6nV-Vo LO-Inf'-9Z LO-Inf`LL LO-Inf`80 LO-un f-6Z LO-unf`OZ LO-unf`LL LO-unf`ZO L 0-?(eW-trZ LO-?eW-S L LO-AeW-90 LO-JdV-LZ L 0-AV-8 L LO-Jdd-60 LO-JeW-L£ LO-J M-ZZ L 0-J eW-£ L O M W I-- CD LO q CO N r- O ? N M V ? r (•uI) ll;da0 Ja;eM aaejjnS m Q OD R o ? a? a? ca V m v cc 0 N 0 Cl) m a? Q rn R o ? N c? a) 0 m ca 0 R O W O E (•ui) uoijejidI38.1d LO LO LO N N r O O LO-?aa-80 LO-AON-6Z LO-^ON-OZ LO-noN-?L LO-AOWZO LO-??O-?Z LO-??O-S L LO-13O-90 LO-daS-LZ 60-daS-8 L LO-daS-60 LO-6nV-L£ LO-6n`d-ZZ LO-6nV-£L LO-6ny-V'0 LO-Inf 9Z 00-Inf`L L 00-Inf`80 00-unf'-6Z LO-unf`OZ LO-unf~ L L LO-unf`ZO LO-AaW-S L LO-fiaW-90 LO-AV-LZ LO-adb-8L LO-AV-60 LO--Jew-L£ LO-aLIW-ZZ LO-aeW-£ L 0 C? r 0 O N m cu 0 Q a) 0 a? m rn c? m O N U) C? 0 00 m 00 M Z Cl) M U') CD U-) CD LO C) U-) - N N (°ui).aajennpunoaE) of ujdoa CD r t? O O t E (•ui) uoi;ejidiaa.ad LO LO N N O O LO-aaa-80 O-AON-6Z 40-AOWOZ 40-noN- 4 4 40-AON-ZO 40-130-bZ 40'?aO'S4 40-130-90 40-daS-LZ 40-deS-84 40-daS-60 40-Bny-4£ 40-Bn`d-ZZ 40-Bnd-£4 40-Bny-y0 40-Inf 9Z 00-Inf -L4 00-Inf-80 00-unf -6Z 40-unf-OZ 40-unr-44 40-unf -Z0 40-AeW-17Z 40-AeW-S 4 40-AeW-90 40-adb-LZ 40-3 V-84 40-Ad-60 40-JeW-4£ 40-JeW-ZZ 40-aeW-E4 0 M T" O O N a) m 0 a a? 0 a? a- a? O C7 N 00 LL c? co C7 a! D! M O 00 ED 00 Cl) z M LO CD LO CD LO CD Lo N N (°ui).ialennpunoa!D of yldaQ C? a? a? O (D i O d O t N ca E (°ui) uoilelidiaaad L Lo N N r- O O LO-aaa-80 LO-AOWU LO-AOWOZ LO-AON- L LO-AOWZO L O-130-vz LO-430-9 L LO-430-90 LO-daS-LZ LO-deS-8L LO-daS-60 LO-6ny-L£ LO-6nV-ZZ LO-6ny-£ L LO-find-V0 LO-Inf'-9Z 00-Inf`LL 00-Inf'-80 00-unf`6Z LO-unf`OZ LO-unf` L L LO-unf?ZO LO-AeW-t,Z LO-AeW-9 L LO-AeW-90 LO-jd`d-LZ LO-jdy-8L LO-AV-60 Lo--Jew-Lc LO-aeW-ZZ LO-aeW-£ L 0 M 0 0 0 N ce 0 Q a? 0 a? co 0 O O M U) C? ry O M 0 co m 00 Cl) Z M to 0 `n O LO O LO N N (•ui).aajempunoaE) o} yjdap N r m ca t? 0 m 0 s C N (-ui) uoilelidioaad LO N O O LO-300-80 LO-noN-8Z LO-noN-8 L LO-AoN-80 LO-1o0-6Z 0-130-6L LO-1o0-60 LO-daS-6Z LO-daS-6L LO-daS-60 LO-6nV-0£ LO-BnV-OZ LO-6nd-0 L LO-Inf L£ LO-Inf LZ 00-Inf -LL 00-Inf-LO LO-unf-LZ LO-unf- LL LO-unf-LO LO-AeW-ZZ -lz LO-Aew-Z L LO-AeW-ZO LO-ady-ZZ L O-AV-Z L LO-adV-ZO LO-aew-£Z LO-aew-£ L 0 ch 0 0 O N CD 0 L 0- (D 0 a? N 0 rn (D O O CO N c? 2 co cn 0 00 co co Cl) z 10 M ?n Cl L o U') o `n r N N (-ui),aajempunoa0 o; yjdaQ (°ui) uoi;elid!OOJd L Ln N N O O M r m 0 O N O t ca 2 LO-oaa-80 LO-AON-6Z LO-AON-OZ LO-AON-LL LO-AON-ZO LO-130-17Z W-430-9L LO-130-90 60-&S-LZ LO-daS-8 L LOAOS-60 LO-6my-L£ LO-6ny-ZZ b0-6nV-£L O LO-6my-y0 oc N LO-Inf -9Z m 00-Inf LL m 00-Inf-80 00-unf-6Z LO-unf OZ LO-unf LL LO-unf-ZO LO-AeW-IVZ LO-AeW-S L LO-AeW-90 LO-AV-LZ LO-AV-8 L LO-AV-60 LO-JeW-L£ LO-JeW-ZZ LO-Jew-CL 0 M - r-CL a) 0 a) Z3 CT a) co CD 00 N m N U) l- it CD CD M 0 aD m w n z M LO o LO CD LJO CD LO N N i i ? o (•ui) aalempunoaE) of yldap r d V ca O N O O t ca 2 (•ui) uoilelidioaad Ln LO N N ? ? O O 60-300-06 W-3a0-ZO 60-AOWVZ LO-^ON-9 L LO-AON-80 L 0-330- L £ LO-330-£Z LO-330'S L 60-330-LO 60-daS-6Z 60-d0S-LZ LO-daS-£ L 60-daS-SO LO-Bny-8Z LO-Bny-OZ LO-Bnd-Z L 60-Bmd-b0 LO-Inf`LZ 00-Inf`6 L 00-Inf` L L 00-Inf`£0 00-unr-9Z L O-u n f-L L LO-unf`60 LO-unf`LO L0-Aemn LO-AeW-96 LO-AeW-80 LO-AV-0£ LO-adV-ZZ LO-jd`d-b L LO-AV-90 LO-aeW-6Z LO-aeW-LZ LO-Jew-£L 0 (7 0 0 C N d cc 0 Q a? o' v CD rn 0 ti LL co C7 G! co O 00 Co co co Z 0 00 M Ln O O O N (•ui) jalennpunoaE) o; yjdaa (°ue) uoljejidPO-ld V Cl) N O LO C? m cc O m O t m 2 LO-3aa-80 LO-AOWSZ LO-nON-8 L LO-nON-80 LO-13O-6Z W-130-64 40-330-60 LOAOS-6Z LOAOS-6 L LO-dOS-60 LO-6n`d-0£ LO-6n`d-OZ LO-6nd-o L LO-Inf L£ LO-Inf LZ 00-Inf L L 00-Inf LO LO-unf LZ LO-unf L L LO-unf'-LO LO-AL,w-ZZ LO-AeW-Z L LO-AeW-ZO LO-AV-ZZ Q a? O m 07 a) LO ti 0 00 0 00 N LL U) C? LO-Jdy-Z L LO-Jdv-ZO 40-JeW-£Z Lo-Jew-CL O M O CC) CD CC) n z LO O d0 O U-) O LO N N (•ui) ao}empunoaE) o} yldoa (•ui) uol}e}idioaJd LO N N O O CD r O O ca C7 O d O LO-Oaa-80 LO-AOWU LO-^ON-8 L LO-^ON-80 LO-1a0-6Z LO-300-6 L LO-;00-60 LO-daS-6Z LO-&S-6 L LOAOS-60 LO-i3nV-0£ LO-6n`d-OZ LO-6nV-0L LO-Inf L£ LO-Inf LZ 00-Inf LL OO-I n f,- L 0 LO-unr? LZ LO-unf L L LO-unf LO LO-Aemn w4ew-Z L LO-AeW-ZO LO-Jdv-ZZ LO-AV-Z L LO-AV-ZO LO-JE W-£Z 14- LO-Jew-£L O M Q N 0 a a? L 07 a? c? LO o 0 LL- N co C? O co m co co z U-) C) LO CD Un O Ln N N (-ui) JalempunoaE) o; yjdaa (•ui) uoilelidiaaad LO N N O O ti a? C? 0 m 0 t 2 LO-004-80 LO-^ON-8Z LO-^ON-8 L LO-AON-80 LO-130-6Z LO-100-6 L LO-130-60 LOAOS-6Z LOAOS-6 L LO-dOS-60 LO-6nV-O£ LO-6n`d-OZ LO-BnV-o L LO-Inf L£ LO-Inf'-LZ 00-Inf'- L L 00-Inf` LO LO-unf` LZ LO-unf`LL LO-unf-LO LO-Aew-ZZ LO-Auw-Z L LO-Aew-ZO LO-adv-ZZ LO-jdy-Z L LO-ady-ZO LO-aeW-£Z LO-aew-£L O 0 0 N 0 n. a? 0 a a? L 6 a> ti C7 w 00 LL co U) C? co O co m co Cl) z LO CD U') O LO O LO N N (•ui).aajempuno.aE) of yjdaQ APPENDIX B PHOTO AND VEGETATION PLOT LOCATIONS, SITE PHOTOS 42 jF 14 13 2 f ff_ ?. f c,i r;a ?I Q ti rtt iJ ? l i I M ;t i • its • r -y ....i.?... CD ...E C +?,ti It 5'4? b 4r k by ? !! ?? « s~ x i{ 4 ? l } Mashoes Road -Photos 4 z , ?i F, Photo 1 Photo 3 Photo 5 le' Photo 2 "Iv- 4 m J , ti Photo 4 Photo 6 3 45 Mashoes Road -Photos Photo 7 Photo 9 Photo 8 46