Loading...
HomeMy WebLinkAboutNCC203429_ESC Approval Submitted_20200811ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Uirectbr (NORTH CAROLINA EavironmenwOuality August 7, 2020 LETTER OF APPROVAL Caviness Land Development, Inc. Watson Caviness, President 1041 B Robeson Street Fayetteville, NC 28305 RE: Project Name: Forest Oaks Ph 5, Sec 2 Lots 260, 261, 262, 271, 272 & 321 Acres Approved: I.82 Project ID: HARNE-2021-008 County: Harnett, City: Anderson Creek Address: Southern Oaks Ct/Silk Oak Dr River Basin: Cape Fear Stream Classification: Other Submitted by: Larry King Date Received by LQS: July 2, 2020 Plan Type: Residential Dear Mr. Caviness: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and herebyissue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement. of any land disturbing activity on the above -named project. The NOI form may be accessed at deg.nc.gov/NCGOI. Please direct questions about the NOI form to Annette Lucas at Annettelucas ncdenr. ov or Paul Clark at Paul.e_1_ark ckncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after June 1, 2019, a 5100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. rx:�r:ir��S Oepe[L�eR[9E Fnu9mtimuslsf4uaHIdi North Carolina department of Environmental Quality I Division of Energy, Mineral and Land Resources rayetteville Regional Office 1 225 Green Street. Suite 7141 Fayetteville. North Car4lina:28301 9.10.4313300 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and the stormwater retention measures. (GS 113A-54.1(b)). In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, 3�- Chris Baker Assistant Regional Engineer DEMLR - Fayetteville Regional Office Enclosures: Certificate of Approval cc: Larry King, R. L. S., Larry King & Associates, P. A. — electronic copy Landon Chandler, Harnett County Planning & Inspections Office — electronic copy Fayetteville Regional Office