HomeMy WebLinkAboutNCG030070_DMR_20200324 11 II II ABB Motors and Mechanical
"111P 70 Reems Creek Rd
Weaverville, NC 28787
May 20, 2020
Central Files
Division of Water Resources (DWR) RECFI\/Fir
1617 Mail Service Center
Raleigh,NC 27699-1617 JUN 0 2 2020
cEN Re: ABB Motors and Mechanical (Baldor Electric) DWR
SE f SE.; t-I�.ES
CTION
General Permit No. NCG0030070
Please find enclosed the stormwater discharge monitoring reports for March and April 2020.
March is a Tier II sampling and April is the first Semi Annual sampling for 2020.
We are currently in Tier II status at these two conveyance points
B—Zinc
D—Zinc
No significant process sources of zinc have been identified at our facility. We continue to
believe that the major contributors are infrastructure sources. We have continued increasing
the cleaning frequency for outside areas where forklifts and trucks travel.
Please contact me with operational or compliance issues. Otherwise contact Dan March of
Pisgah Environmental Services at 828-768-3335 or via email at Pisgah-air@vt.edu if you
have questions or comments concerning technical aspects of this report.
Sincerely,
/41.4/1‘
Gary Ma ey 41714A1/
Safety Coordinator
ABB Motors and Mechanical
828-645-1718
gary.massey@us.abb.com
Page 1 of 1
Stormwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000
Date submitted March 2 3 , 2 02 0
CERTIFICATE OF COVERAGE NO. NCGO3 0 0 7 0 SAMPLE COLLECTION YEAR 2 02 0
FACILITY NAME ABB Motor and Mechanical, Inc. SAMPLE PERIOD ❑Jan-June ❑July-Dec
COUNTY Buncombe or X❑ Monthly1 March (month)
PERSON COLLECTING SAMPLES Dan March DISCHARGING TO CLASS ❑ORW ❑HQW iTrout ❑PNA
LABORATORY Pace Analytical Lab Cert.# 40 ❑Zero-flow ❑Water Supply ❑SA
Comments on sample collection or analysis: ['Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
Part A: Stormwater Benchmarks and Monitoring Results
n No discharge this period?2
Date Sample 24-hour rainfall pH, Non-Polar O&G/ Total Toxic
Outfall No. Collected) amount, Total Suspended Solids Standard units Total Copper Total Lead Total Zinc Total Petroleum
Organics'
(mo/dd/yr) Inches) Hydrocarbons
Benchmarks _ - 100-mg/Lor 50 mg/L° 6.0—9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L
Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141
D 03/13/20 0 . 1 < 2 . 5 7 . 1 < 0 . 005 < 0 . 005 0 .202 < 4 . 8 NA
G 03/13/20 0 . 1 3 . 2 6 .4 < 0 . 005 < 0 . 005 0 . 048 < 4 . 8 NA
' Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
'See General Permit, Section B,Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies.
'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor
manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018
Page 1 of 3
• "..
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
-Da►e S10ive .-)
Name(Print name)
to -I+ ►' e"vl c, `i-e r
Ti (Print title) J
(Print
' S• ZO• 20
Signature Date
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non-detect, ND, or other similar non-numerical
format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L",where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
No discharge this period?2
OutfaII No. Date Sample Collected' 24-hour rainfall amount, New Motor Oil or Non-Polar O&G/Total Total Suspended
(mo/dd/yr) Inches; Hydraulic Oil Usage Petroleum Hydrocarbons Solids
Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L4
Parameter Code - 46529 NCOIL 00552 C0530
Footnotes from Part A also apply to Part B
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 2 of 3
• 0 .
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES X❑NO❑
IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OF ICE? YES ❑X NO
REGIONAL OFFICE CONTACT NAME: grAWL ey
ivlail an original copy of this DMR, including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the
case of"No Discharge"reports)to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or
those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I
am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations."
?_ S20 . 20
Signature of Permittee Date
Permit Date: 11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018
Page 3 of 3
r `1
Stormwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000
Date submitted May 6 , 2 02 0
CERTIFICATE OF COVERAGE NO. NCGO3 0 0 7 0 SAMPLE COLLECTION YEAR 2 02 0
FACILITY NAIVIE ABB Motor and Mechanical, Inc . SAMPLE PERIOD IX I Jan-June I I July-Dec
COUNTY Buncombe or I I Monthly1 (month)
PERSON COLLECTING SAMPLES Dan March DISCHARGING TO CLASS f ORW f HQW X❑Trout I jPNA
LABORATORY Pace Analytical Lab Cert.fl 40 I 1Zero-flow [ ]Water Supply [ ISA
Comments on sample collection or analysis: nOther
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 --)
Part A: Stormwater Benchmarks and Monitoring Results
No discharge this period?2
Date Sample 24-hour rainfall pH, Non-Polar O&G/
Outfall No. 1 Total Suspended Solids Total Copper Total Lead Total Zinc Total Petroleum Total Toxic
Collected amount, Standard units
Hydrocarbons
Organics'
(mo/dd/yr) Inches Y
Benchmarks - - 100-mg/L-or 50 mg/L4 6.0—9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L
Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141
B 04/23/20 0 . 45 < 2 . 6 6 . 1 0 . 0069 < 0 . 005 0.415 < 5 . 0 NA
C 04/23/20 0 . 45 5 . 4 6 . 2 0 . 0075 < 0 . 005 0 . 0975 < 5 . 0 NA
D 04/23/20 0 . 45 < 2 . 5 7 . 0 < 0 . 005 < 0 . 005 0 . 123 < 5 . 0 NA
E 04/23/20 0 . 45 < 2 . 9 6 . 3 < 0 . 005 < 0 . 005 0 . 054 < 5 . 0 NA
F 04/23/20 0 . 45 < 2 . 6 7 . 1 0 . 0054 < 0 . 005 0 . 0444 < 5 . 0 NA
` Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
`'See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor
manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 1 of$ 4
Stormwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000
Date submitted May 6, 2 02 0
CERTIFICATE OF COVERAGE NO. NCGO3 0 0 7 0 SAMPLE COLLECTION YEAR 2 02 0
FACILITY NAME ABB Motor and Mechanical , Inc. SAMPLE PERIOD X Jan-June ❑July-Dec
COUNTY Buncombe or ❑ Monthly' (month)
PERSON COLLECTING SAMPLES Dan March DISCHARGING TO CLASS ❑ORW ❑HQW nTrout I IPNA
LABORATORY Pace Analytical Lab Cert.# 4 0 ❑Zero-flow I (Water Supply SA
Comments on sample collection or analysis: ['Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 --)
Part A: Stormwater Benchmarks and Monitoring Results
No discharge this period?2
Non-Polar O&G/
Outfall iVo. Date Sample 24-hour rainfall Total Suspended Solids pH' Total Copper Total Lead Total Zinc Total Petroleum Total Toxic
Collected amount, Standard units Organicss
(mo/dd/yr) Inches' Hydrocarbons
Benchmarks - - 100-mg/Lk or 50 mg/L4 6.0—9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L
Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141
(3 04/23/20 0 . 45 5 . 1 6 . 2 < 0 . 005 0 . 0052 0 . 0641 < 5 . 0 NA
1 04/23/20 0 . 45 < 2 . 5 6 . 3 < 0 . 005 < 0 . 005 0 . 0462 < 5 . 0 NA
' Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
'See General Permit, Section B,Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies.
'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page tiabex 2 of 4
. �
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Name(Print name
,1os - 1" L4ytysQc-
T (Print title)
Signature Date
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non-detect, ND, or other similar non-numerical
format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging> 55 gal of new oil per month.
No discharge this period?2
Outfall No. Date Sample Collected' 24-hour rainfall amount, New Motor Oil or Non-Polar O&G/Total Total Suspended
(mo/dd/yr) Inches; Hydraulic Oil Usage Petroleum Hydrocarbons Solids
Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L4
Parameter Code - 46529 NCOIL 00552 C0530
Footnotes from Part A also apply to Part B
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Permit Date: 11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018
Page kat 3x 3 of 4
,
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES X❑NO❑
IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES 0 NO❑
REGIONAL OFFICE CONTACT NAME: 51rb#1LEr AI/'Ef
Mail an original copy of this DMR, including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the
case of"No Discharge"reports)to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Y!)U MUSI SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or
those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I
am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations."
,�- 19
Signature of Permitt Date
Permit Date: 11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018
Page$lam 4 of 4