HomeMy WebLinkAboutSW3200801_2019-10-28-eROSION cO_20200810ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Attention: Tim Furr
5615 Shoreview Drive
Concord, North Carolina 28025
NORTH CAROLINA
Environmental Quality
October 28, 2019
RE: Project Name: Furr Building
Acres Approved: 6.1
Project ID: CABAR-2020-021
County: Cabarrus, City: Concord
Address: 5995 Highway 200
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Tim Furr
Date Received by LQS: October 7 h, 2020
Plan Type: New
Dear Mr. Furr:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required
by Title I5A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of
any land disturbing activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged
annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
D E Q�, Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
a 704.663.1699
Letter of Approval with Modifications
Tim Furr
5615 Shoreview Drive
Page 2 of 3
2. The NCGOI permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify this office
of the proposed starting date for this project. Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
erely,
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: Bluestone Land Management
470 North Broad Street, Suite A
Mooresville, North Carolina 28115
Inspection Department
Letter of Approval with Modifications
Tim Furr
5615 Shoreview Drive
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Furr Building
Project ID: CABAR-2020-021
County: Cabarrus
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. Divert PD#2 into skimmer basin. Additional measures may be required - The applicant is responsible
for the control of sediment on -site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this
site. [15A NCAC 4B .0115]