Loading...
HomeMy WebLinkAbout20200801 Ver 1_Email_20200801Strickland, Bev From: Charles, Thomas P CIV USARMY CESAW (USA) <thomas.p.charles@usace.army.mil> Sent: Saturday, August 1, 2020 8:58 AM To: dlutheran@segi.us Cc: Snider, Holley; Mairs, Robb L; Mickey Sugg Subject: [External] RE: [Non-DoD Source] RE: NWP# 18 request • External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to m nc. ov No problem, I think that is far. Have a good weekend too. Tom Charles thomas.p.charles@usace.army.mil Regulatory Specialist 910-251-4101 cell 910-465-7602 https://www.saw.usace.army.miI/Missions/Regulatory-Permit-Program/Permits/2017-Nationwide-Permits/ The Wilmington District is committed to providing the highest level of support to the public. E-PCN WilmingtonNCREG@usace.army.mil PJDs' & JD's. http://saw-reg.usace.army.mil/JD/FINALSAW-JD-REQUEST-FORM-20170508.pdf To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 From: dlutheran@segi.us <dlutheran@segi.us> Sent: Friday, July 31, 2020 2:03 PM To: Charles, Thomas P CIV USARMY CESAW (USA) <thomas.p.charles@usace.army.mil> Cc: 'Snider, Holley' <hol ley.snider@ ncdenr.gov>; 'Mairs, Robb L' <robb.mairs@ncdenr.gov>; Sugg, Mickey TCIV USARMY CESAW (USA) <Mickey.T.Sugg@usace.army.mil> Subject: RE: [Non-DoD Source] RE: NWP# 18 request Hi, Tom Thank you, for taking the time to speak with me today and agreeing to starting the Corps' 45 day clock, from the date of our site visit, which was 7/24. This will allow us to sufficiently address the Corps' concerns, with supporting documentation. Have a great weekend. Dana 50uthem Environmental Group, Inc. 55 1 5 South College }load, Suite r- Wilmington, NC 25-+ 1 2 Office: 9 10.45 2.271 1 Mokile: 9 10.228.1 84 i (preferred) glocLedwww.segi.us From: Charles, Thomas P CIV USARMY CESAW (USA) <thomas.p.charles@usace.army.mil> Sent: Friday, July 31, 2020 1:02 PM To: dlutheran@segi.us Cc: 'Snider, Holley' <holley.snider@ncdenr.gov>;'Mairs, Robb L' <robb.mairs@ncdenr.gov>; Sugg, Mickey TCIV USARMY CESAW (USA) <Mickey.T.Sugg@usace.army.mil> Subject: RE: [Non-DoD Source] RE: NWP# 18 request Dana, Good afternoon. The Corps is still moving forward on denial on your proposal, in its present form, still doesn't comply with the conditions of avoidance to waters of the US. Have a good weekend. Regards, Tom Tom Charles thomas.p.charles@usace.army.mil Regulatory Specialist 910-251-4101 cell 910-465-7602 Blockedhttps://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Permits/2017-Nationwide-Permits/ The Wilmington District is committed to providing the highest level of support to the public. E-PCN WilmingtonNCREG@usace.army.mil PJDs' & JD's. Blockedhttp://saw-reg.usace.army.miI/JD/FlNALSAW-JD-REQUEST-FORM-20170508.pdf To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: Blockedhttp://corpsmapu.usace.army.miI/cm apex/f?p=136:4:0 From: dlutheran@segi.us <dlutheran@segi.us> Sent: Friday, July 31, 2020 12:31 PM To: Charles, Thomas P CIV USARMY CESAW (USA) <thomas.p.charles@usace.army.mil> Cc: 'Snider, Holley' <holley.snider@ncdenr.gov>;'Mairs, Robb L' <robb.mairs@ncdenr.gov>; Sugg, Mickey TCIV USARMY CESAW (USA) <Mickey.T.Sugg@usace.army.mil> Subject: [Non-DoD Source] RE: NWP# 18 request Tom, I apologize for the delay in my response. I just received Coastal Land Design's purpose and need information, for the secondary access drive (see attached). It is important to note, but was not clearly stated in the engineer's statement, the proposed crossing will be the primary access for the Applicant, family, friends and smaller delivery services, such as pizza delivery. The existing drive will only be used for larger delivery services, such as Fed Ex or UPS, reducing the number of trips through the Oak Street community, an issue that was brought up many times during the projects Special Use Permit process. Based on the engineer's comments, it is of my opinion that the proposed plan is the only practicable alternative. Should you have questions or further concerns, please call me at 910.228.1841. Holley, I will be responding to your email, early next week. Dana Southem r-nvironmental Group, Inc. 55 i 5J- outh College }load, Suite r- Wilmington, NC 2841 2 Office: 9 10.45 2.271 1 mokile: g i 0.228. i 84 i (Preferred) E)locl CJ5loACJWww.se'Si.us From: Charles, Thomas P CIV USARMY CESAW (USA)<thomas.p.charles@usace.army.mil> Sent: Saturday, July 25, 2020 11:39 AM To: dlutheran@segi.us; David Scibetta <dscibetta@segi.us> Cc: Snider, Holley <holley.snider@ncdenr.gov>; Mairs, Robb L <robb.mairs@ncdenr.gov>; Sugg, Mickey T CIV USARMY CESAW (USA) <Mickey.T.Sugg@usace.army.mil> Subject: NWP# 18 request Mrs. Dana Lutheran, Referencing your 6/17/2020 NWP# 18 request, you submitted for the Department of the Army (DA) authorization to discharge fill material into approximately 1,050 square feet of jurisdictional waters of the U.S. for the construction of new access to property. Based on our review of the plans provided in the application and the Corps site visit on 7/23/2020 we believe that the location of the new access with impacts to jurisdictional waters on the property could be avoidable by utilizing the existing access. The Corps is moving to denial on your proposal, in its present form, does not comply with the conditions of avoidance to waters of the US. As discussed with you, our recommendation is to utilize existing access on the property. By avoiding impacts to Waters of the U.S. and utilizing the available access a permit from the Corps will not be required. Regards, Tom Tom Charles thomas.p.charles@usace.army.mil Regulatory Specialist 910-251-4101 cell 910-465-7602 BlockedBlockedhttps://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Permits/2017-Nationwide- Permits The Wilmington District is committed to providing the highest level of support to the public. E-PCN WilmingtonNCREG@usace.army.mil PJDs' & JD's. Blocked Blockedhttp://saw-reg.usace.army.miI/JD/FlNALSAW-JD-REQUEST-FORM-20170508.pdf To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: BlockedBlockedhttp://corpsmapu.usace.army.miI/cm apex/f?p=136:4:0