Loading...
HomeMy WebLinkAbout20150703 Ver 2_More Info Requested_20200811Strickland, Bev From: Homewood, Sue Sent: Tuesday, August 11, 2020 8:24 AM To: Jon Swaim Cc: Turlington, Chad; Greer, Emily C CIV USARMY CESAW (USA) Subject: RE: [External] FW: SAW-2015-02060 Rhodes Pond Thanks Jon, The Division will place the application on hold until we receive your updated plan sheets, impact maps, and response to the public comments provided by the USACE. Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 3" i From: Jon Swaim <jon.swaim@mcgillassociates.com> Sent: Tuesday, August 11, 2020 8:22 AM To: Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Turlington, Chad <chad.turlington@ncdenr.gov> Subject: RE: [External] FW: SAW-2015-02060 Rhodes Pond rnal email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to o nc. ov No problem, I'm planning on submitting updated maps and plans once we receive the comment letter from the Corps. There will likely be some other needed changes based on the comments. Thanks, Jon Swaim Project Manager McGill Associates, P.A. 1013 State Farm Road, Boone, NC 28607 T 828.386.1920 C 828.434.0951 jon.swaim(cD-mcgillassociates.com mcgillassociates.com From: Homewood, Sue <sue.homewood@ncdenr.gov> Sent: Monday, August 10, 2020 9:23 PM To: Jon Swaim<jon.swaim@mcgillassociates.com> Cc: Turlington, Chad <chad.turlington@ncdenr.gov> Subject: RE: [External] FW: SAW-2015-02060 Rhodes Pond Hi Jon, I was reviewing this application to determine if we had everything needed to proceed with the 401 Certification and I realized I'm unclear based on this email as to whether you are planning on sending updated impact maps/revised plan sheets. I sounds like you are but I don't see that we received any yet. Sorry for not quite being on top of this project. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 ND v # �...: x x � x.� .. 0�.. x.. Vxtv.:r t ..: :......... .J......... ..,.. From: Jon Swaim<jon.swaim@mcgillassociates.com> Sent: Wednesday, July 15, 2020 4:15 PM To: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: [External] FW: SAW-2015-02060 Rhodes Pond =External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment o m nc. ov Emily's response. o�� I II lui Jon Swaim Project Manager McGill Associates, P.A. 1013 State Farm Road, Boone, NC 28607 T 828.386.1920 C 828.434.0951 ion.swaim(cDmcgillassociates.com mcgillassociates.com We launched a refreshed brand. Please note email / web address changes above. From: Jon Swaim Sent: Monday, July 6, 2020 10:34 AM To: Greer, Emily C CIV USARMY CESAW (USA) Subject: RE: SAW-2015-02060 Rhodes Pond Sounds good, thanks, Jon Swaim Project Manager McGill Associates, P.A. 1013 State Farm Road, Boone, NC 28607 T 828.386.1920 C 828.434.0951 ion.swaim(cDmcgillassociates.com mcgillassociates.com From: Greer, Emily C CIV USARMY CESAW (USA) <Emily.C.Greer@usace.army.mil> Sent: Monday, July 06, 2020 10:32 AM To: Jon Swaim<jon.swaim@mcgillassociates.com> Subject: SAW-2015-02060 Rhodes Pond Morning Jon - The additional impact does not require a major change to the overall project so we do not have to put it back out on notice. We will address updating the submittal in our comment letter. Also, please remember to put the SAW # in the subject line of all written communication related to this project so I can track it. Thank you - Emily Greer, Regulatory Specialist Wilmington District - Wilmington Regulatory Field Office 69 Darlington Avenue, Wilmington, NC 28403 910.251.4567 (o) From: Jon Swaim<ion.swaim@mcgillassociates.com> Sent: Monday, July 6, 2020 9:51 AM To: Greer, Emily C CIV USARMY CESAW (USA) <Emily.C.Greer@usace.army.mil> Subject: [Non-DoD Source] Rhodes Pond Hi Emily, I just left you a voicemail concerning Rhodes Pond. Dam safety has provided additional comments on the design and has decided to require rip rap wave protection along the entire length of the existing dam northeast of the spillway. Unfortunately we did not have this information prior to the IP submittal. I've attached an aerial showing the approximate location of the required rip rap wave protection. The rip rap will be keyed in to closely match existing ground elevation, resulting in approx. 4 linear feet of fill below the historical pond level elevation. We estimate this fill below that elevation will result in approx. 0.15-acres of impacts. See attached 'Pages from Engineering Drawings' Detail 4. I can provide revised impact maps and plan sheets, etc. The main question we have is will this require a revised public notice and start the clock over for permit review/approval? Thanks, Jon Swaim Project Manager McGill Associates, P.A. 1013 State Farm Road, Boone, NC 28607 T 828.386.1920 C 828.434.0951 ion.swaim(cDmcaillassociates.com mcgillassociates.com