HomeMy WebLinkAbout20150703 Ver 2_More Info Requested_20200811Strickland, Bev
From: Homewood, Sue
Sent: Tuesday, August 11, 2020 8:24 AM
To: Jon Swaim
Cc: Turlington, Chad; Greer, Emily C CIV USARMY CESAW (USA)
Subject: RE: [External] FW: SAW-2015-02060 Rhodes Pond
Thanks Jon,
The Division will place the application on hold until we receive your updated plan sheets, impact maps, and response to
the public comments provided by the USACE.
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue. Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
3"
i
From: Jon Swaim <jon.swaim@mcgillassociates.com>
Sent: Tuesday, August 11, 2020 8:22 AM
To: Homewood, Sue <sue.homewood@ncdenr.gov>
Cc: Turlington, Chad <chad.turlington@ncdenr.gov>
Subject: RE: [External] FW: SAW-2015-02060 Rhodes Pond
rnal email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
o nc. ov
No problem, I'm planning on submitting updated maps and plans once we receive the comment letter from the Corps.
There will likely be some other needed changes based on the comments. Thanks,
Jon Swaim
Project Manager
McGill Associates, P.A.
1013 State Farm Road, Boone, NC 28607
T 828.386.1920
C 828.434.0951
jon.swaim(cD-mcgillassociates.com
mcgillassociates.com
From: Homewood, Sue <sue.homewood@ncdenr.gov>
Sent: Monday, August 10, 2020 9:23 PM
To: Jon Swaim<jon.swaim@mcgillassociates.com>
Cc: Turlington, Chad <chad.turlington@ncdenr.gov>
Subject: RE: [External] FW: SAW-2015-02060 Rhodes Pond
Hi Jon,
I was reviewing this application to determine if we had everything needed to proceed with the 401 Certification and I
realized I'm unclear based on this email as to whether you are planning on sending updated impact maps/revised plan
sheets. I sounds like you are but I don't see that we received any yet. Sorry for not quite being on top of this project.
Thanks,
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue. Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
ND v #
�...: x x � x.� .. 0�.. x..
Vxtv.:r t ..: :......... .J......... ..,..
From: Jon Swaim<jon.swaim@mcgillassociates.com>
Sent: Wednesday, July 15, 2020 4:15 PM
To: Homewood, Sue <sue.homewood@ncdenr.gov>
Subject: [External] FW: SAW-2015-02060 Rhodes Pond
=External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment
o m nc. ov
Emily's response.
o�� I II lui
Jon Swaim
Project Manager
McGill Associates, P.A.
1013 State Farm Road, Boone, NC 28607
T 828.386.1920
C 828.434.0951
ion.swaim(cDmcgillassociates.com
mcgillassociates.com
We launched a refreshed brand. Please note email / web address changes above.
From: Jon Swaim
Sent: Monday, July 6, 2020 10:34 AM
To: Greer, Emily C CIV USARMY CESAW (USA)
Subject: RE: SAW-2015-02060 Rhodes Pond
Sounds good, thanks,
Jon Swaim
Project Manager
McGill Associates, P.A.
1013 State Farm Road, Boone, NC 28607
T 828.386.1920
C 828.434.0951
ion.swaim(cDmcgillassociates.com
mcgillassociates.com
From: Greer, Emily C CIV USARMY CESAW (USA) <Emily.C.Greer@usace.army.mil>
Sent: Monday, July 06, 2020 10:32 AM
To: Jon Swaim<jon.swaim@mcgillassociates.com>
Subject: SAW-2015-02060 Rhodes Pond
Morning Jon -
The additional impact does not require a major change to the overall project so we do not have to put it back out on
notice. We will address updating the submittal in our comment letter. Also, please remember to put the SAW # in the
subject line of all written communication related to this project so I can track it.
Thank you -
Emily Greer, Regulatory Specialist
Wilmington District - Wilmington Regulatory Field Office
69 Darlington Avenue, Wilmington, NC 28403
910.251.4567 (o)
From: Jon Swaim<ion.swaim@mcgillassociates.com>
Sent: Monday, July 6, 2020 9:51 AM
To: Greer, Emily C CIV USARMY CESAW (USA) <Emily.C.Greer@usace.army.mil>
Subject: [Non-DoD Source] Rhodes Pond
Hi Emily, I just left you a voicemail concerning Rhodes Pond. Dam safety has provided additional comments on the
design and has decided to require rip rap wave protection along the entire length of the existing dam northeast of the
spillway. Unfortunately we did not have this information prior to the IP submittal.
I've attached an aerial showing the approximate location of the required rip rap wave protection. The rip rap will be
keyed in to closely match existing ground elevation, resulting in approx. 4 linear feet of fill below the historical pond
level elevation. We estimate this fill below that elevation will result in approx. 0.15-acres of impacts. See attached 'Pages
from Engineering Drawings' Detail 4.
I can provide revised impact maps and plan sheets, etc. The main question we have is will this require a revised public
notice and start the clock over for permit review/approval?
Thanks,
Jon Swaim
Project Manager
McGill Associates, P.A.
1013 State Farm Road, Boone, NC 28607
T 828.386.1920
C 828.434.0951
ion.swaim(cDmcaillassociates.com