HomeMy WebLinkAboutWM0501402_Final Permit_20200810
August 10, 2020
Rich Mator
Bristol-Myers Squibb Co.
3551 Lawrenceville Road
Princeton, NJ 08540
Subject: Monitoring Well Construction
Permit # WM0501402
TW Alexander
Durham County
Mr. Mator,
In accordance with the application received on July 31, 2020, we are forwarding herewith
Monitoring Well Construction Permit No. WM0501401 dated August 10, 2020, issued for the
construction of a monitor well system (installation of one monitoring well) at the subject
properties. Please be aware that some counties have well construction programs, and you may
be required to obtain a well construction permit before installation. This Permit will be effective from the date of its issuance and shall be subject to the
conditions and limitations as specified therein. Please note the addition of stipulation #3 to the
permit enclosed. If you have questions regarding this Permit, please feel free to contact Brion
Byers at (919) 791-4237, or by email at brion.byers@ncdenr.gov.
Sincerely,
Scott Vinson, Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office
Division of Water Resources, NCDEQ
Enclosure cc: Laserfiche Files Durham County Health Department
Jan J. Smith, Wood Plc., Jan.smith2@Woodplc.com, (send via email) Samuel Watts, S&ME, swatts@smeinc.com, (sent via email)
DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES
PERMIT FOR THE CONSTRUCTION OF A MONITORING WELL
In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable
Laws, Rules and Regulations.
PERMISSION IS HEREBY GRANTED TO
Bristol-Myers Squibb Co.
FOR THE CONSTRUCTION OF A MONITOR WELL SYSTEM (TW Alexander) consisting of a monitoring well
system (one (1) monitoring well) owned by Bristol-Myers Squibb Co.at mailing address 3551 Lawrenceville Road,
Princeton, NJ 08540. One monitoring wells will be installed on property owned by Merritt-IB1, , located at 3252 S.
Miami Blvd, Durham 27703(PIN #0749-40-33-3022), This Permit is issued in accordance with the application
received on July 31, 2020, which is filed with the Department of Environmental Quality and are considered integral
parts of this Permit.
This Permit is for well construction only, and does not waive any provision or requirement of any other applicable
law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina
Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and
regulations pertaining to well construction.
If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing
upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition
conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit
is final and binding.
This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions,
limitations, or exceptions as follows:
1. Issuance of this Permit does not obligate reimbursement from State trust funds, if these wells are being
installed as part of an investigation for contamination from an underground storage tank or dry cleaner
incident.
2. Issuance of this Permit does not supersede any other agree ment, permit, or requirement issued by another
agency.
3. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit
application.
4. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(o).
5. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resource’s
Information Processing Unit within 30 days of the well completion.
6. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113
and a well abandonment record (GW-30) shall be submitted to the Division of Water Resource’s Information
Processing Unit within 30 days of the well abandonment.
7. If the well penetrates any water-bearing zone that contains contaminated waters, the upper three feet of the
well shall be grouted within one day after the casing is set or the well abandoned.
8. Temporary wells must be permanently abandoned or converted to a permanent well within seven days (168
hours) of the completion of drilling of the borehole.
Permit issued the 10st of August, 2020
FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
____________________
Scott Vinson, Regional Supervisor
Division of Water Resources
By Authority of the Environmental Management Commission
Permit No. WM0501402