Loading...
HomeMy WebLinkAbout20191252 Ver 1_B4635 Wetland_Impact_Summary_Form_20191216 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) WB L 15+85 TO 19+20 LT ROADWAY FILL 0.10 0.07 WA L 20+40 TO 23+53 LT ROADWAY FILL 0.08 0.07 WE L 14+09 TO 19+17 RT ROADWAY FILL 0.20 0.03 0.15 WE DETL 11+67 TO 16+66 RT TEMPORARY FILL 0.08 0.02 0.07 WF L 21+19 TO 23+37 RT ROADWAY FILL 0.02 WF DETL 20+00 TO 21+08 RT TEMPORARY FILL 0.06 0.03 0.02 100 WB L 19+20 LT/RT IMPERVIOUS DIKE 0.02 86 WA L 20+19 LT/RT IMPERVIOUS DIKE TOTALS*: 0.41 0.14 0.03 0.31 0.10 0.04 0 186 0 *Rounded totals are sum of actual impacts NOTES: * Impervious dikes included due to the request of roadside environmental NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 12/6/2019 SAMPSON COUNTY B-4635 38446.1.2 Revised 2018 Feb SHEET 18 OF 18