HomeMy WebLinkAbout20060930 Ver 4_More Info Received_20100210FW: 2006 0930 V3
FW: 2006 0930 V3
Steenhuis, Joanne
Sent: Wednesday, February 10, 2010 2:29 PM
To: Strickland, Bev
Attachments: RAILFORD TRASK PERMIT.pdf (2 MB) ; RAILFORD TRASK WPD.pdf (599 KB)
Page 1 of 1
From: Beveridge, Robin
Sent: Wednesday, February 10, 2010 10:34 AM
To: Timpy, David L SAW; Steenhuis, Joanne; Spencer, Thekla
Subject:
https://mail.nc.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAAAAOgPoLNIPQZ06vHVR... 2/10/2010
Permit Class
NEW
Permit Number
18-10
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
ermi t
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Raiford Trask, 1202 Eastwood Road, Wilmington, NC 28403
Authorizing development in New Hanover County adi. to the headwaters of Bradley Creek, at 1202
Eastwood Road, in Wilmington , as requested in the permittee's application dated 12/16/08 (MP-1 and MP-4) and
2/8/09 (MP-3), including the attached workplan drawings (4), 1 dated 12/17/08, 1 dated 2/2/09, 1 dated 7/22/08, 1 dated 1/28/09
This permit, issued on February 9, 2010 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Upland Development
1) Unless specifically altered herein, this permit authorizes the grading and other land disturbing
activities associated with the development of the kayak launching facility, all as expressly and
specifically set forth in the attached permit application and workplan drawings. Any additional land
disturbing activities and/or construction, may require a modification of this permit. Contact a
Division of Coastal Management representative at (910)-796-7215 for this determination.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
v /7?
James H. Gregson, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
November 21, 2014
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signature of Permittee
Raiford Trask
ADDITIONAL CONDITIONS
Docking Facility
Permit # 18-10
Page 2 of 3
2) Unless specifically altered herein, this permit authorizes only the canoe/kayak launches, and other
structures and uses located in or over the water that are expressly and specifically set forth in the permit
application. No other structure, whether floating or stationary, may become a permanent part of this
canoe/kayak launching facility without permit modification. No non-water dependent uses of structures
may be conducted on, in or over public trust waters without permit modification.
3) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
4) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
5) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee will not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
6) The permittee must install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
7) The authorized project is located in an inland PNA, as designated by the Division of Marine Fisheries.
Therefore, in accordance with T15A:07H.0208 of the Rules of the Coastal Resources Commission, no
new dredging or excavation within the PNA shall be permitted. New dredging in any manner, including
"kicking" with boat propellers, is not authorized. This prohibition shall be applied and enforced
throughout the entire existence of the permitted structure.
General
8) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions
caused thereby, without expense to the United States or the state of North Carolina. No claim shall be
made against the United States or the state of North Carolina on account of any such removal or
alteration.
9) No open water areas or vegetated wetlands shall be excavated or filled, even temporarily.
10) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
Raiford Trask
ADDITIONAL CONDITIONS
Permit # 18-10
Page 3 of 3
NOTE: This major modification does not eliminate the need to obtain any additional state, federal or
local permits, approvals or authorizations that may be required.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252)-808-2808 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No.
06-0930 Ver. 3, which was issued on 5/15/09.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No.
SAW-2006-40204.
BMW
APMUTIONar
DEC
o r ZOpB .
Malor Development Permit
(last revised 12!27106)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner lnfon»adon
Business Name Project Name (if applicable)
Autumn Hall
Applicant 1: First Name
Raiford MI Last Name
Trask
Applicant 2: First Name MI Last Name
ff additional applicants, please attach an additional page(s) with names listed.
Mailing Address
1202 Eastwood Road PO Box City
Wilmington State
NC
ZIP
28403 Country Phone No.
- - ext. FAX No.
- -
Street Address (if different from above) City State ZIP
Email
2. Agent/Contractor Information
Business Name
Waterline Marine Construction And Consulting
Agent/ Contractor 1: First Name MI Last Name
Jim D Hundley
AgenN Contractor 2: First Name MI Last Name
Mailing Address PO Box City State
1646 Wrightsville Beach NC
ZIP Phone No. 1 Phone No. 2
28480 910 - 264 - 9977 ext. - - ext.
FAX No. Contractor #
910 792 0942 62058
Street Address (if different from above) City State ZIP
REIN'
Email
jimhundleyjr@ec.rr.com DEC 18 2008
<Form continues on backs DC M W I L M I N G FO 1,1, W",
Form DCM MP-1 (Page 2 of 4)
U(;44
W/C?Fi F
M/NG 0 O
DEc 01' 2008 N, A/c
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple) Street Address State Rd. #
New Hanover 1202 Eastwood Road
Subdivision Name City State Zip
Autumn Hall Wilmington NC 28403-
Phone No. Lot No.(s) (if many, attach additional page with list)
- - ext. , ,
a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project
6 t4 PC Icjfo*l'f-- Bradley Creek
c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site.
®Natural []Manmade []Unknown AIVWV
e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes ?No work falls within.
Wilmington, NC
4. Site Description
a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.it)
235' 9,876,794 (236 acres)
c. Size of individual lot(s) d. Approximate elevation of tract above NM (normal high water) or
NWL (normal water leveo
(If many lot sizes, please attach additional page with a list) 5' ®NHW or ?NWL
e. Vegetation on tract
Naturally occurring vegetation
f. Man-made features and uses now on tract
Former golf course
g. Identify and describe the existing land uses adjacent to the proposed project site.
Residentiallmixed use
h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning?
MX (Attach zoning compliance certificate, if applicable)
Oyes ?No ?NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ?NA
If yes, by whom?
1. Is the proposed project located in a National Registered Historic District or does it involve a []Yes e
01%
National Re
i
t
list
@.
d
ibl
li
?
t
,
g
s
er
e
g
or e
e property
RE IV E
<Form continues on next page> DEC 18 2008
DC;h# WILWW a-4*0' I
r - r >g - ' i?? i;
Form DCM MP-1 (Page 3 of 4)
U6? P?UCATION for
Major Development Permit
m. (i) Are there wetlands on the site? ®Yes []No
(i) Are there coastal wetlands on the site? OYes QNo
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? QYes ®No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
Community System
o. Describe existing drinking water supply source.
City
p. Describe existing storm water management or treatment systems.
Surface runoff/retention ponds
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? QCommercial ?Public/Govemment
®Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
The project will serve as access for the residents of the proposed community of Autumn Hall to Bradley Creek for the
purpose of kayaking and exploring the surrounding creeks.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Standard marine construction practices will be employed with light equimpent requirements.
d. List all development activities you propose.
Installation of a fixed pier for the purpose of accessing Bradley Creek and launching kayaks
e. Are the proposed activities maintenance of an existing project, new work, or both? New work
f. What is the approximate total disturbed land area resulting from the proposed project? n/a
QSq.Ft or QAcres
g. Will the proposed project encroach on any public easement, public ac cessway or other area QYes ®No QNA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
Surface runoff
i. Will wastewater or storrnwater be discharged into a wetland? QYes ®No QNA
If yes, will this discharged water be of the same salinity as the receiving water? QYes QNo ®NA
j. Is there any mitigation proposed?
If yes, attach a mitigation proposal. WtC;EffELJ
<Form continues on back> DEC 18 2008
,fir T
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
& Additionallnfonn?adon
In addition to this completed application form, (MP 1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) - (t) are always applicable to any major development application. Please consult the application
instruction booklet on how to property prepare the required items below
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, dearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name New Hanover County Phone No.
Address 320 Chestnut Street, Wilmington, NC 28401
Name Russell Rehder Phone No.
Address 4134 Carribean Street, Oxnard, CA 93035
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
h. Signed consultant or agent authorization form, If applicable.
i. Welland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
17. Certification and Permission to Enter on Land 1
I understarxf that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fad grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow=up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date Print Name Jim Hundley
Signature
DCn'
Please indicate application attachments pertaining to your proposed project.
?DCM MP-2 Excavation and Fill Information ODCM MP-5 Bridges and Culverts DEG, , Air,
?DCM MP-3 Upland Development U 1 4ti6v
RECEIVE
DEC 1 8 2008
®DCM MP-4 Structures information
wILMINGTON, NC
Form DCM MP-3
UPLAND DEVELOPMENT
(Construction andfor land disturbing actMtles)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
GENERAL UPLAND DEVELOPMENT I
a. Type and number of buildings, facilities, units or structures
proposed.
3 00 6t-s-4 co rh l g i?rtr ul'fdil-o.
c. Density (give the number of residential units and the units per
acre).
ho?s?s ( ?r.?Is Pcr
300
/?Crc
e. If the proposed project will disturb more than one acre of land, the
Division of Land Resources must receive an erosion and
sedimentation control plan at least 30 days before land-disturbing
activity begins.
(i) If applicable, has a sedimentation and erasion control plan been
su?nltted to the Division of Land. Resources?
es ?No ?NA
b. Number of lots or parcels.
-?0O
d. Size of area to be graded, filled, or disturbed including roads,
ditches, etc.
C-11-1 acre 5
f. List the materials (such as marl, paver stone, asphalt, or concrete)
to be used for impervious surfaces.
45 ph & )f, CGK cry ,
(ii) If yes, list the date submitted:
g. Give the percentage of the tract within the coastal shoreline AEC to h. Projects that require a CAMA Major Development Permit may also
be covered by impervious and/or buil-upon surfaces, such as require a Stormwater Certification.
pavement, building, rooftops, or to be used for vehicular driveways (i) Has a site development plan been submitted to the Division of
or parking. er Quality for review?
3 c.' p'Yes ?No ?NA
1. Give the percentage of the entire tract to be covered by impervious
and/or built-upon surfaces, such as pavement, building, rooftops,
or to be used for vehicular driveways or parking.
7S^°?o
j. Describe proposed method of sewage disposal. k.
V,, e. ?'
I. Describe location and type of proposed discharges to waters of the M.
state (e.g., surface runoff, sanitary wastewater, industrial/
commercial effluent, 'wash down' and residential discharges).
Stk F ec ALKO 1 , L--k,gh L,
rk Y%. (f K"¢ d a I d115 oki -5e5
(ii) If yes, list the date submitted:
Have the ild . described in Item (i) received state or local
ro
appes ?No ?NA
If yes, attach appropriate documentation.
F'n a proposed project include an innovative stormwater
?No ?N
A
If yes, attach appropriate documentationECE I N E
FEB 12 2009
DCM WILMINGTON, NC
Farm DCM MP-3 Wpland Op,?vMIcpp -nn. Pace 2 a-t
m. Describe proposed drinking water supply source (e.g., well,
community, public system, etc.)
C 1` ? y eA4 V-
n. (1) Will water be impounded? ?Yes 8j6o' ?NA
(ii) If yes, how many acres?
o. When was the lot(s) platted and recorded? P. If pro ed development is a subdivision, will additional utilities be
inst for this upland development?
Cg?es ?No ?NA
2 / 6109
Date
U.4 4 n
Project Name
6 I'La ( k? 6Applicant Name z-
Ncant Signature
RE EI E
FEB 12 2009
LLCM WiLMINGTON, C
Form DCM MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
t. DOCKING FACIUM MARINA CHARACTERISTICS
a. (Q Is the docking facility/marina:
?Commercial ?Public/Govemment ®Private/Community
?This section not applicable
b. (i) Will the facility be open to the general public?
?Yes ®No
c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? OYes ONO
(ii) Number If yes:
(iii) Length (6) Number
(iv) Width _ (iii) Length
(v) Floating as ®No (iv) Width
(v) Floating ?Yes ONo
e. (i) Are Platforms included? ®Yes ?No f. () Are Boattitts included? ?Yes ONo
If yes: If yes:
(ii) Number 7- (ii) Number
(iii) Length 16 m 2 y (iii) Length
(iv) Width 16 m $ (iv) Width
(v) Floating ?Yes ONo
Note: Roofed areas are calculated from drip/ine dimensions.
g. f 7 Number of slips proposed h. Check aft the types of services to be provided.
2-kayak launches ? Full service, including travel lift and/or rail, repair or
(0) Number of slips existing service
mili6lienerwe n/a ? Dockage, fuel, and marine supplies
'- Q Dockage ("pet shps') only, number of slips:
? Dry storage; number of boats:
? Boat ramp(s); number of boat ramps:
.Other, please describe:
i. Check the proposed type of siting: j. Describe the typical boats to be served (e.g., open runabout,
? Land cut and access channel charter boats, sail boats, mixed types).
?Open water, dredging for basin and/or channel Kayaks, canoes
?Open water, no dredging required
®Other, please describe:
Headwaters of Bradley Creek
Dc R?CE?JVer)
k. Typical boat length: 14' 1. @ Will the open to the general,pLic? LNG r0N NC
UC 0 1 2008
m. (i) Will the facility have tie pilings? REC
?Yes ONo ??Oq
(ii) If yes number of tie pilings? DEC a
DCnry NNILMING10tq, C
I DOCKING FACILITY/MARINA OPERATIONS 0This section not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
? Office Toilets
? Toilets for patrons; Number: ; Location:
? Showers
? Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
(ii) Give the location and number of 'Pumpout Available' signs proposed.
f. Describe the special design, if applicable, for containing industrial type potlutants, such as paint, sandblasting waste and petro*um-products.
g. Where wig residue from vessel maintenance be disposed of?
h. Give the number of channel markers and 'No Wake" signs proposed.
i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on ovemight and liv"board dockage?
k. Describe design measures that promote boat basin flushing?
I)
1. If this project is an expansion of an existing marina, what types of services are currently provided? CM w/LM/Nc'TO
NC
®1; C DEC 012op?
m. Is the marina/docking facility proposed within a primary or secondary nursery area? DEC 1 s 2008
?Yes ?No
DCM WILMINGTON, NC
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
?Yes ?No
o. Is the madnaldodcing facility proposed within or adjacent to coastal wetiands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
?CW ?SAV ?SB
?WL ?None
p. Is the proposed marina/docking facility located within or within dose proximity to any shellfish leases? ?Yes ?No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOA THOOSE (including covered lilts) 0This section not applicable
a. @ Is the boathouse structure(s):
?Commercial ?Public/Govemment ?Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from d6pline dimensions.
4. GROIN (e.g., wood, sheeokl etc. Ifa rock groin, use MP-2, Excavation and Fill.) 0This section not applicable
a• (i) Number
(H) Length
(iii) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) 0This section not applicable
a. Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOONING PILINGS and BUOYS 0This section not applicable
a. Is the structure(s):
?Commercial ?Public/Govemment ?Private/Community
c. Distance to be placed beyond shoreline _
Note: This should be measured from marsh edge, if present
e. Arc of the swing
7. GENERAL
DDM W?c I
MINc??^A, ?,?
DEC 01 20o8
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
RECEIVE
DEC 18 2008
DCM W1001e14G ON, NC
; . _.. o . «.. 10e,
a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities.
>I V n/a
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c. Width of water body
^-60'
d. Water depth at waterward end of structure at NLW or NWL
-2 NLW
e. (i) Will navigational aids be required as a result of the project?
OYes ONo ?NA
(ii) If yes, explain what type and how they will be implemented.
8. OTHER ?This section not applicable
a. Give complete description:
Instaltatiorr of a 16 x 46' platform. A ramp will least to a fixed pier section with a lower elevation.
The lower elevation will measure 8'x 24' to allow for access to the creek as a kayak launch.
'-X%M (Z)??o ?O Q
Dats
Autumn Hail
Project Name
Jim Hundley
Ap mant Na
Sig
s?
DEC zaas
®CM 1f?1ILMi'NGION, ! ,
RE?Ceiv
DCA4
INr-?rDEC 0 1 2008
? 4.
m
a
zi, -? 3.0
Cf)
C) 0
/ z 8 8'
o OZ ?
CO ??\ D m °
C) U)
(-) o
° /\\\ m o (f') z
Fl / D D
co + N n /j\\ N m AMP
m o W
\
j
0 1 N ;:u
? Z
3 f z Yo N R1
C) C?
z
o _ F-
D
a z i
0 CD 0 CD DC) Z
0
Zm?m> V H,
OJG)?ImTI??'Cz
„W4O_ D? Z
N ?? <z?D?
S r*?D ?z0?D
m 2 C) >
D Z O n A-
GO ' n m C D
= Z
O
z z tl
n -? D
O° R C
C)
r
?I
Q
Q
Ilk
A-T: 14U TuM1U 1(,4cc
(, ommtA,urry KAyAK 411FI4
FA 5? w0o1) R!
NrL MrN0DN, A
AiEcv i?ANovet coolvT Y
f3`l uA--t tLcr-)C mvtrNE coNSTtAActTo,v
Po 6Ox /6L/&
6VK- &14 SV.CLL
D4AwN $y; GUr??=AM }F ZVA2,CEN
c'9Cl`MRF0 1-) 2aGre
COMMUNITY KAYAK AREA
5 #EE LoF3
KAYAK AREA PLAN
40 zo a 146
L t i ,
StA?E i " - qo
BR.a _
I
u
a;
il,'?
Drawn By: Charlie Booth
Waterline Marine Con.
Project: Autumn Hall
2/2/09
1 RECEIVED
FEB 12 2009
SIIE-F1 9 eg ?
HYDRO-GRAPHIC SURVEY
I AUTUMN HALL
WILMINGTON TOWNSHIP
NEW HANOVER COUNTY
NORTH CAROLINA
DATE: JULY 22, 2008
5
4F
3
ti
4
2
16
MHHW = 4.64
MHW = 4.29
0
3
NAVD'88 = 2.96 0,95
u?
rn
MTL=2.26 °
'
29 = 2.01
NGVD 0.00
°
rn
N
a ? 2
3
MLW = 0.15 -1.86'
MLLW = 0.00
-11m
- HORIZONTAL DATUM IS RELATIVE TO NAD '83 "SUNOCO".
- VERTICAL DATUM RELATIVE TO MEAN LOW WATER
DETERMINED RELATIVE TO TIDAL BENCH MARK "865 8559 TIDAL 1".
\
A\
C
NEW HANOVER \ \
COUNTY TITAL
CREEKS TRACT
BOOK 4969 PAGE 403
/
/ WEBS TER TRASK
BOOK 5247 PAGE 1773
MAP BOOK 52 PAGE 15
Q TRACT 3A
/ DUCK HAVEN GOLF COURSE
x ??. PAL
x ??h x A
x y /?,ER v v RANDALL REHDER
(PROP BOOK 3709 PAGE 260
x ?9 y P\L ABC
y \
y \
=m
m?
30' 15 O 15 HANOVER DESIGN SERVICES, P.)
D LAND SURVEYORS ENGINEERS LAND PLANNERS
1123 FLORAL PARKWAY
M SCALE IN FEET WILMINGTON, N.C. 28403
30 PHONE (910) 343-8002
1" = FT FAX- (910) 343-9941
WEBSTER TRASK
BOOK 5247 PAGE 1773
MAP BOOK 52 PAGE 15
TRACT 3A
DUCK HAVEN GOLF COURSE
MEAN LOW
WATER = 0.0'
CON TROL
POINT
N: 176, 451.72
E.• 2,348,508.71
%K
hh
h
CONTROL
POINT
N: 176,358.20
E 2,348,441.50
TOP OF '
TOP OF
BANK
BANK
GRASS 6
/ '°• x1
Ix/gyp xD? x6 x? W y
i
0 y y
x b x Etry y
i
0
x tc y y
`x ?1 • y
\ ?Y +Y
x J?1 x /hh
'4/ Nke
x ?h
x,ary y y
WEBSTER TRASK
BOOK 5247 PAGE 1773
MAP BOOK 52 PAGE 15
TRACT 3A
DUCK HAVEN GOLF COURSE
n
0
z
NOTES
1. SURVEYED JULY 2008
2. PROPERTY LINES TAKE FROM
MAP 800K 52 PAGE 15
RECEIVED
GCM WILMINGTON, NC
AUG 18 2008
TOP OF
BANK , p x a6 GRASS
x? i y ? y
x k9 y '