Loading...
HomeMy WebLinkAbout20200907 Ver 1_More Info Received_20200805Strickland, Bev From: Jon Swaim <jon.swaim@mcgillassociates.com> Sent: Wednesday, August 5, 2020 10:58 AM To: Homewood, Sue Cc: Boggs, Brandee C CIV USARMY CESAD (USA) Subject: RE: [External] RE: Wilkesboro WTP Upgrades Attachments: Wilkesboro - Raw Water Intake DESIGN.pdf Follow Up Flag: Flag for follow up Flag Status: Flagged External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to nc. ov Sorry about that. Please find attached. Thanks, a Jon Swaim Project Manager McGill Associates, P.A. 1013 State Farm Road, Boone, NC 28607 T 828.386.1920 C 828.434.0951 jon.swaim@mcgillassociates.com mcgillassociates.com From: Homewood, Sue <sue.homewood@ncdenr.gov> Sent: Tuesday, August 04, 2020 12:16 PM To: Jon Swaim <jon.swaim@mcgillassociates.com> Subject: RE: [External] RE: Wilkesboro WTP Upgrades Hey Jon, I just reviewed the application. You make reference to the coffer dam/pump around details but I didn't see a plan sheet with those details. In fact, there were no construction drawings. Can you send me those please. Thanks. Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 1 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 ti... x... t x.t x. +xt ..+x.. x.... x x. .... x x.s .. .+.. :x : xx.+ . x....t x t x. ..x.:'. %; e *x.+::.s a ,.�°. .:Y:C :. .gyp £+' ,. + '+x. :. a:.¥ x. ....... '+ + ++ From: Jon Swaim<ion.swaim@mcgillassociates.com> Sent: Thursday, July 2, 2020 10:00 AM To: Boggs, Brandee C CIV USARMY CESAD (USA)<Brandee.C.Boggs@usace.army.mil> Cc: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: [External] RE: Wilkesboro WTP Upgrades WT07kil, External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to rmmwm@nc.gov Thanks Brandee, We would be filling the riverbed outside of the existing intake footprint so I don't think a non - notification NW3 would work. Possibly a non -notification NW12? It's looking like there will be about 40LF of permanent river impacts and an additional 60LF of temporary impacts for flow diversion during construction. I'm planning on submitting a PCN regardless to make sure we are covered. The coordinates are 36.144527,-81.178778 https://goo.gl/maps/VF5xXmbAVFLD5iR99 [goo.gll Jon Swaim Project Manager McGill Associates, P.A. 1013 State Farm Road, Boone, NC 28607 T 828.386.1920 C 828.434.0951 ion.swaim(cDmcgillassociates.com mcgillassociates.com [mcgillassociates.coml From: Boggs, Brandee C CIV USARMY CESAD (USA)<Brandee.C.Boggs@usace.army.mil> Sent: Wednesday, July 01, 2020 8:11 PM To: Jon Swaim<ion.swaim@mcgillassociates.com> Cc: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: RE: Wilkesboro WTP Upgrades Hi Jon, you are correct, that is not Section 10, 1 believe Section 10 doesn't start until it becomes the Pee Dee. As far as NWP#7 or #12, I'll need to look at that further, but my inclination is either will work and NWP #12 may allow it to fall below the notification threshold unless there is something I am missing from first glance. Is the NWP#12 non- notification what you were shooting for? I believe we could also consider a #3 (if this is in the same site) and this too might fall below notification thresholds (751-f). What are the coordinates for the project? I'll check and see if there is any reason we would need to keep it at a NWP#7 Cheers, Brandee From: Jon Swaim<ion.swaim@mcgillassociates.com> Sent: Wednesday, July 1, 2020 3:19 PM To: Boggs, Brandee C CIV USARMY CESAD (USA)<Brandee.C.Boggs@usace.army.mil> Cc: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: [Non-DoD Source] Wilkesboro WTP Upgrades Hi Brandee, We are in the process of designing upgrades to the Town of Wilkesboro water treatment plant. Part of the upgrades includes abandoning the existing raw water intake on the Yadkin River and replacing it with a new intake screen which will be anchored to the river bed. The installation will result in temporary river bank and bed impacts to trench in the intake and 24" pipe, and permanent impact to the river bed for the screens. See attached plan sheet for reference. Would we permit this under a NW7 or NW12? Also, I don't think this section of the Yadkin is a Section 10 water, but wanted to confirm. Thanks! III Jon Swaim Project Manager McGill Associates, P.A. 1013 State Farm Road, Boone, NC 28607 T 828.386.1920 C 828.434.0951 ion.swaim(cDmcgillassociates.com mcgillassociates.com A AB BRAW WATER INTAKE SITE PLAN AND DETAILS 19.00329 TOWN OF WILKESBORO WILKESBORO WATER TREATMENT PLANT UPGRADE PHASE 155 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com SCALE VARIES M-104R \\MCGILL-ASH-DC\USERFOLDERS$\MICHAEL\DESKTOP\19.00329\19.00329 RAW WATER INTAKE DESIGN.DWG PLOT DATE 4/29/2020 5:04 PM MICHAEL WHITTENBURGNO. DATE BY DESCRIPTION OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING # SHEET 16 MGD INTAKE SCREEN PLAN WILKES COUNTY, NORTH CAROLINA TOWN OF WILKESBORO WILKESBORO WATER TREATMENT PLANT UPGRADE PHASE 1 M. CATHEY M. DOWD J. BYRD _APRIL 2020 19.00329 N/APRELI MI NARY RCALL811BEFOREY O U DGI SAF E DIGGING P A R TNERDIVISION VALUE: 1/2" = 1'-0"GRAPHIC SCALE 2'0 1' 2'4'0 SECTION B-B DIVISION VALUE: 1/2" = 1'-0"GRAPHIC SCALE 2'0 1' 2'4'0 RAW WATER INTAKE SCREEN SITE PLAN DIVISION VALUE = FEETGRAPHIC SCALE 30 15 30 60 30 0 RAW WATER MAIN CONNECTION DIVISION VALUE = FEETGRAPHIC SCALE 0080 40 80 160 80 SECTION A-A DIVISION VALUE: 1/2" = 1'-0"GRAPHIC SCALE 2'0 1' 2'4'0 COIR MATTING DETAILPLANELEVATION··®··®·®®NOT TO SCALE·®®®®· TEMPORARY STREAM BYPASSM77UPDATED MARCH, 2017NOT TO SCALEWORK AREA TYPICAL COFFER DAM DETAIL NOT TO SCALE RIVER RIVER RIVER RIVER RIVER EC 44 NORTH CAROLINA LAND QUALITY SECTION EROSION CONTROL NOTES CUT/FILL SLOPES SEEDING SPECIFICATIONS - STEEPER THAN 3:1 DITCH/OPEN AREA PERMANENT SEEDING SPECIFICATION TEMPORARY SEEDING SPECIFICATION UPDATED FEBRUARY, 2020 NATIVE SEEDING: NATIVE PLANT SEEDING MIX FOR WETLAND STREAM OR RIVERBANK STABILIZATION