Loading...
HomeMy WebLinkAbout20201022 Ver 1_Shoreline Stabilization_20200810Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 8/7/2020 2:41:24 PM (Submittal) Approve by Montalvo, Sheri A 8/10/2020 10:09:25 AM (Non -DOT - Approver) • The task was assigned to Montalvo, Sheri A 8/7/2020 2:41 PM Submission Form I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * Owner Information: Name: * Email: * Phone Number:* Mailing Address:* Is there an agent working on the project?* Agent/Consultant Information ................................................................................................................. Name: Company Affiliation: Email:* Phone Number:* heather_ a_ davis@yahoo.com Rease provide an email address for payment and requests for pore information here. Ross Majewski heather a davis@yahoo.com (281)546-1200 (xxx)xxx-xxxx Street Address 2815 Idlewood Circle Address Line 2 city Charlotte Fbstal / Zip Code 28209-1409 r Yes r No Janice Estep CBC Stone & Recycling, LLC info@cbcstoneandrecychng.com (704)660-5111 (xxx)xxx-xxxx State / Frovince / Region NC Country US Mailing Address:* Street Address 638 Oakridge Farm Hwy Address Line 2 city Mooresville Fbstal / Zip Code 28115 Asigned and dated copy of the Agent Authorization letter:* Auth Form.pdf 223.98KB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Majewski Property State / Province / Pegion NC Country United States If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* F Upload File r Lookup address Upload Map: Survey.pdf Vicinity Map.pdf Buffer Form.pdf Directions.pdf Latitude:* 35.343687 529.14KB 2.31MB 364.01KB 240.93KB Longitude:*-80.922043 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Site Plan.pdf 320.97KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Shoreline Pics.pdf 2.68MB 4. Location of the property (where work is to be conducted) Nearest Town:* Charlotte County:* Mecklenburg Lake/ river/ ocean adjacent to Norman property: Subdivisions name or site address:* 11900 Mountain Crest Cit. Charlotte, NC 28216 PID# 02316446 Lot #82 hclude phaseAot nunber Directions to site:* 610 E Center Ave Mooresville, NC 28115 Get on I-77 S/US-21 S in Davidson from S Main St, NC-115 S and Langtree Rd 12 min (5.7 mi) Head west on E Center Ave toward Cedar St 0.5 mi Turn left onto S Church St 0.5 mi Turn right onto College St 0.1 mi Turn left onto S Main St 1.2 mi Continue onto NC-115 S 2.1 mi Turn right onto Langtree Rd 1.1 mi Use the left 2 lanes to turn left to merge onto I-77 S/US-21 S 0.2 mi Continue on I-77 S to 11, Long Creek. Take exit 18 from 1-485 Outer 15 min (16.2 mi) Merge onto I-77 S/US-21 S Continue to follow I-77 S 11.1 mi Use the right 2 lanes to take exit 1913-A toward I-85 S/Pineville 1.1 mi Merge onto I-485 Outer 3.7 mi Take exit 18 for Oakdale Rd 0.2 mi Follow Mt Holly-Huntersville Rd, Abernathy Rd and Mountain Point Ln to Mountain Crest Cir 7 min (3.2 mi) At the traffic circle, take the 1st exit onto Oakdale Rd 0.2 mi At the traffic circle, take the 2nd exit onto Mt Holly-Huntersville Rd 1.2 mi Turn right onto Abernathy Rd 0.6 mi Turn right onto Mountain Point Ln 1.1 mi Turn left onto Mountain Crest Cir 135 ft 11900 Mountain Crest Cir Charlotte, NC 28216 Rease include road naves and nunbers, landnarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Undeveloped Lot Fbsidential, undeveloped, etc. 6. Property Size 1.300 acres Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Shape and slope shoreline. Install matting and boulder rip rap for a new shoreline stabilization. Install TN Crab Orchard Steps 8. How will the work be done?* PF From Land r- From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 4' below (600 sf) square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) F below (150 sf) 10' x 50' access corridor (500 sf temp. impact) square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nunber of trees, for instance) Undeveloped, wooded lot, no trees to be removed, minimal disturbance to buffer Sketch: Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): $240.00 for impacts to lake (below normal water level) of less than 1 acre $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit this form. Full Name:* JaniceFstep Signature: Cz.er5u^.��fr= WC,..ccb Initial Review Is this accepted into the review process?* Project Number:* 20201022 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Alan Johnsomeads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 AG -ENT AUTHORIZATION FORM PROPEWrY LEGAL DESCRiPr[ N- SiREEs"RDDRESS: i19oCD ti "ad Ll�— Please print: Property Owner: Property Owner d The undersigned, registered property openers of tiie above noted property, do hereby authorize G -.—�C�,l�i C2. 5 hr c� � r nq 'Contractor / Agents �— (Name of consulting firm) � :J to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit of certification and any and all standard and special conditions attached. Property Owner's Address (if d ffc ent than property above): -Zg f-Tate C ��a t _ Z zoo Telephone: 2 L_-5 Y 6�--�ac2 We hereby certify the above infprMazon submitted in this application is true and accurate to tif: best of our knowledge. :+ut or�xea. SFSFjcrdiur Date:-•_.._.—��� _.._ __ Authorized Signature Date: "I CERTIFY THAT THIS MAP WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION (DEED DESCRIPTION RECORDED IN BOOK: 6= PAGE: AM OR OTHER REFERENCE SOURCE MAP BOOK: a PALE: =: THAT THE BOUNDARIES NOT SURVEYED ARE INDICATED AS DRAWN FROM INFORMATION IN ROOK —. PAGE: _.,,,, OR OTHER REFERENCE SOURCE SHOWN HEREON THAT THE RATIO OF PRECISION IS 1:10_00a. AND THAT THIS MAP MEETS THE REQUIREMENTS OF THE STANDARDS OF PRACTICE FOR LAND SURVEYING IN NORTH CAROLINA (2t NCAC 56.1600)." THIS 9 DAY OF _NOV_FMRER_. 20,._]z_-_. THIS MAP IS NOT INTENDED TO MEET G.S. 47-30 REQUIREMENTS. 'THIS, SURVEY DOES NOT REFLECT A COMPLETE TRIP EXAMINATION' NOTES- 1. BOUNDARY SURVEY {JADE USING EJASTING PHYSTCAL SIGNED EVIDENCE OBSERVED DURING FIELD SURVEY. RDEFRT E US, P 9.NONK IIYHD 9uNEYDR L-47C5 FIT OF A SUBJECT WERE TAKEN FROM DEEDS, SURVEYED ,43E SHOWN As LEamD BET ftEOUPIWEM-ENLTa BETFONiHINown REJM OMS OR PROPERTY LSD RES7AICTNECONRWfT8 MAY Eg6TFORTHMPROPERTY. PRIORTO —ADJOWER PRGPERIY LINE ANYCONSTHUMIONONTHOMPER3 BUnmCNRFAUIREhi4a — ---EASEMENT LINE —X^-X—X—X—FENCE LINE MUST BEVERIFED BYTHEHOMEOWIO:RORCONTRACTOR. 7- THIS PROPERTY IS NOT GRAPHICALLY SHOWN IN A DESIGNATED —OVERHEAD UTILITY LINE FLOOD HAZW AREk RIGHT-OF-WAY 8. UNDERGROUND UTILITIES NOT LOCATED AT THE TIME OF SURVEY. —SEMA" IF SHOWN UTAITY LOCATKDNS ARE APPROXIMATE BASED ON E.R. - EXISTING ipm RMAR .P. - EXISTING IRON PIPE LOCATIONS OF ABOVE GROUND APPURTENANCES. UNDERGROUND UTILITIES NOT SHOWN HEREON MAY EXIST. cp. - COMPUTED POIKT S. MINOR IMPROVEMENTS INCIDENTAL TO THE STRUCTURE OR YARD S.I.A. - RE -SET i4 IRON HEBAR MAY EXIST AND ARE NOT SHOWN HEREON. P.S.D.E. - PUBLJ STORM DRAINAGE EASiM81V 10. THE TERM ENCROACHMENT IS USED AS A MEANS TO CONVEY S.S.E - SANITARY SEWER EASEMENT THAT PER LISTED DEEDS AND MAPS THAT AN OBJECT TOUCHES RCP - RF]WFORCED CONCRETE PIPE R/W - RIONt-OF-WAY OR CROSSES THE DEED OR MAP LINE IN THAT AREA ON THE DATE OF SURVEY, NO CERTIFICATION OR STATEMENT IS BEING PP- - POWER POLE MADE TO THE POSSESSION, ADVERSE OR OTHENATSE OR TTSLE M.B. - MAP BOOK ED D.B. - DEBOOK TO THE LAND EFFECIM PG. - PAGE L - LINE C - CURVE \ - TAX PARCEL IDENTIFICATION NUMBER r� Nis - NOT TOO SCALE KTS Q APPROXIMATE LOCATION OF FLOOD AS 5CAlID FROEM M.B. 23, PG. 55BAPPROXIMATE YI-7Z LOCAM"OAAEEN'"JJOF 100 YEAR FEMARODDLI AS E (ZONEBURG FROMMECK.Wk. LOUE-) SGSCALED 75.08 G A ►? �4i tk X �!'• SEAL • L-4755 MOUNTAIN ISLAND LAKE PROPERTY LNE FOLLOWS JAN , 1 PER M.B. 27. PG, SSe S84 59' 19"E ww OA rTv,.�. 566Z.060 Sqv.ft. NOW OR FORMERLY LOT 81 M.B. 23, PG. 558 / / RID #02316445 NOW OR FORMERLY QA3/ LOT 83 & STRIP M.B. 23, PG. 558 (pDt wa i_) =a D.B. 26712, PG. 512 PID #02316447 5'04' ° 15.99 TIE �V DR IN FLOOD HAZARD AREA CERTIFICATION: ADDITIONAL NOTES rPER M A 23. PO. M— ANY CONSTRUCTION OR USE WnWN THE AREAS OELNEATEO AS FLOODWAY FRINGE D'STRICP BWHMRY LINE AND FLOODWAY DSMCT F77CRO4 LTDiT LFNE IS SUBJECT �r2�w TO THE RESTRICOONS IMPOSED e'f THE FLOODWAY REGULATIONS OF MECNIENSURG VR COUNTY. n �ArY�aliljp0~ NUM DELTA ARC 50'p !C)L-AtvJ; I C1 84'11'27" 29.39 m C2 49'59'52" 21.82 LEE LAND SURVEYING, PLLC. NC FIRM LICENSE NUMBER: P-1259 P.O. BOX 180 MT. HOLLY, NC 28120 PHONE: (704)575-2556 EMAIL: mbertIee@IesIandsurvong.wm -100 0 100 SCALE: V = 100' IN ACCORDANCE WXTH NATIDHAL FLOOD INSURANCE RATE MAPS PUBuSWEO By THE UNITED STATES DEPARTMENT OF HOUBENG AND URBAN DEVELOPMENT (HUD). FEDERAL INSURANCE ADMINISTHATICN, AND PROVIDED BY THE FEDERAL EMERGENCY MPNAGDJENT ADENCY (FELUI. TAPS PROPERTY HAS BEEN DUMMINI NN LIE INSIDE A SPECIAL FLOOD AaARD AREA DESMmito AS ZONE 'W. (PER IMECKLENBURG COUNTY, NORTH CAROLPU FLOOD NSUR44CE RATE MAP). COUNTY COMMUNITY -PANE, NO. 370158 452E L, WP NUMBER 37IM280CL EFFECTIVE DATE, SEPTEIMBER 2, 2015. NUM I BEARING DISTANCE RING I DISTANCE 25"W 26.81 17"E 1 21.13 #11200 MOUNTAIN CREST CIRCA LOT 82 OF MOUNTAIN POINT, PHASE II - MAP 3 LONG CREEK TOWNSHIP, MECKLENBURG COUNTY, NC PROSPECTIVE OWNER: ROSS MAJEWSKI AND HEATHER DAVIS LEGAL REFERENCES: MAP BOOK: 23 PAGE: 558 DEED BOOK: 6206 PAGE: 675 TAX PARCEL IDENTIFICATION NUMBER: 023-164-46 DRAWN BY: R. LEE JOB NUMBER: 4586 3 oO N O m w ,.4k- �o�� m w O CD.: ,m �=r _ d o m ° m . CEp =O C cp � �,` �'_ ...tit, � "�'�' �+�s, .�,xt;: �"M.�, 'S`'��'"4..� +t.��S• A. , N cr AYu w o w n *$ � � �'§ �. •- . ,� .!�- � ri """ '�* r �', . ,.mow :.: CL 0 &CD 3 nCLcr CD d 8 a x: Q CD m -' _ , CD P m C A, t ... < y� CD CL w CD x m A. y as o 'v< w- -ram ` 00 CD C, k aCD m w YY y W 4 . F o CD _ U1 m Rq �, �, r5 44 a U G.� Fim rlv A t In CD O Pi �41T�+GV o, wPero O y r�r y� Wqd �miitvyt mm� (V ® r� Zm V lJ pyi X -40 7 O C) `Ai�etiurclY � a a ro v 1 drr o 'B n a Rd cn o N A o r m N 3� o p �f 4 �R CATAWBA RIPARIAN BUFFER NOTIFICATION FORM n as2lb Project Name/address: I !_ QOQ 0JpQ0A& n CJ�re_4 Cr _ C 6Ar kaKC , tC_. County: YYI n� Owner: _ OSS (� C� �, e l u sk��Lo Ai.-_ 1 Print '_J Signature Contractor/agent: C QC S�We i IRECLILr_xt- u C Print L .J J l /Signature The approval is for the purpose and design described in your application. impacts not indicated in the application isa, violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 026.0243(8)1 Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 028 .0243(6)) Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)) Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6).j Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 0211,050Z and 15A NCAC 028.0243 (4), (6), (8)) Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. (15A NCAC 02B .0243(5), (6)) Acknowledgement of Notification i, hereby state that i have been informed of the Catawba Riparian Buffer Rule_ Any work conducted in the buffer, not specifically stated in the application and approved by the {Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): Date: on$ F3 o w G � n v � C N n r a O 6 r; � m m 3 M a g E ,l 4- - s _ O 2 = 3 � O m27 � 3 a — n o Full Pond/ Normal Water Level Shoreline La ke (At Full Pond/Normal Water Level) y ' �etow )C 156 ! I moue ? - 150, F-, 5�'PS 150, 1 e-n3tk u nde.Uelo?e�d wins. C C. It ��_®n NAo-�,cee5 remoued 0%Vi,Cno. C tS��lri�0.t�Ce, 1-0 100�r Please approximately sketch the following information on this plan, length of shoreline (provide dimensions for each item, such as loft x 10o ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3