Loading...
HomeMy WebLinkAboutWQ0041873_Sewer Extension, email_20200730Zorio, Stephanie From: Ross Godwin <rgodwin@trianglesitedesign.com> Sent: Friday, July 31, 2020 1:04 PM To: Zorio, Stephanie Subject: Re: [External] RE: Starbucks - Strickland Bridge / Raeford Rd - Sewer permitting Follow Up Flag: Follow up Flag Status: Flagged 7External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Stephanie I just spoke with the contractor and we are going to install the duplex pump and both will be the same size so let's keep moving forward with the fast trace permit. I will send the flow tracking update from PWC as soon as I get it. Get Outlook for iOS From: Zorio, Stephanie <stephanie.zorio@ncdenr.gov> Sent: Friday, July 31, 2020 9:36:30 AM To: Ross Godwin <rgodwin@trianglesitedesign.com> Subject: RE: [External] RE: Starbucks - Strickland Bridge / Raeford Rd - Sewer permitting Hi Ross, Unfortunately, per 2T regulations simplex grinder systems cannot be permitted through the fast track process and must be submitted to Raleigh for full technical review. More information can be found here. Particularly under "Standard Sewer Extension Permitting": https://deg.nc.gov/about/divisions/water-resources/water-resources-permits/wastewater-branch/collection- systems/sewer-extension-permitting Would you like us to mail your application fee check back to you or destroy it here? Regards, Stephanie Dr. Stephanie D. Zorio Environmental Specialist Office: 910 433 3322 Cell: 919 368 6077 stephanie.zorio@ncdenr.gov 225 Green Street Suite '714 Fayetteville, NC 28384 r: t — `2Vothing Compares_ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 am currently teleworking. If you need immediate assistance please contact a water resources staff member at our main number, 910-433-3300. From: Ross Godwin [mailto:rgodwin@trianglesitedesign.com] Sent: Friday, July 31, 2020 9:11 AM To: Zorio, Stephanie <stephanie.zorio@ncdenr.gov> Subject: [External] RE: Starbucks - Strickland Bridge / Raeford Rd - Sewer permitting CAUTIOrnal email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to nc. ov Stephanie Please see the attachment where I made the update for item #1. Also regarding item 2, we are using a single grinder pump. I'm following up with PWC to get item #3. Unfortunately the person at PWC that I've been working with is out this week which is not good because the contractor is looking to get rolling Monday morning. Ross Godwin Triangle Site Design, PLLC From: Zorio, Stephanie <stephanie.zorio@ncdenr.gov> Sent: Friday, July 31, 2020 8:51 AM To: Ross Godwin<rgodwin@trianglesitedesign.com>; Matt Lowder<mlowder@trianglesitedesign.com> Subject: Starbucks - Strickland Bridge / Raeford Rd - Sewer permitting Good morning, I just have a couple comments about your application before it can be processed. 1. #6 on page 6 of the application pdf: Please include a copy of the flow reduction approval letter if a flow reduction has been approved under 2T guidelines. However, I feel this likely a simple typo. 2. Will the pump station be duplex? 3. The Flow -Tracking document needs to indicate pump stations that are located between the project and the Rockfish wastewater treatment plant (part II). Please provide an updated application. A digital copy can be sent directly to me and I'll be happy to append it. Thank you, Stephanie Dr. Stephanie D. Zorio Environmental Specialist Office: 910 433 3322 Cell: 919 368 6077 stephanie.zorio@ncdenr.gov 225 Green Street Suite 714 Fayetteville, NC 28384 — `Nothing Compares -,,,- Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. I am currently teleworking. If you need immediate assistance please contact a water resources staff member at our main number, 910-433-3300.