Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Raeford Rd Fayetteville 2019, LLC
Project Name for which flow is being requested: Starbucks - Raeford Rd
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along rite route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Rockfish Wastewater Treatment Facility
b. WWTP Facility Permit #: NPDES NC0050105
c. WWTP facility's permitted flow
All flows are in MGD
21.0
d. Estimated obligated flow not yet tributary to the WWTP 3.4667
e. WWTP facility's actual avg. flow 15.6
f. Total flow for this specific request 0.0019
g. Total actual and obligated flows to the facility 19.0686
h. Percent of permitted flow used 90.80
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
Design
Pump
Pump
Average
Station
Station
Firm Daily Flow**
(Name or
Permit
Capacity, * (Firm / pf),
Number)
No.
MGD MGD
(B)
(C)
(D)=(B+C) (E)=(A-D)
Obligated,
Approx.
Not Yet
Total Current
Current
Tributary
Flow Plus
Avg. Daily
Daily Flow,
Obligated Available
Flow, MGD
MGD
Flow Capacity***
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): PWC/Fa etteville Collection System
Downstream Permit Number: PWC2013-SO11