Loading...
HomeMy WebLinkAboutWQ0041873_Sewer Extension, original_20200730h TRIANGLE S I T E D E S I G N :Cli Transmittal 4004 E , i 1 Ralei r�D609 TEL (919) 553-6570 JUL 3 0 2020 WQROS FAYETT9:1111 117 PPPlONALOFFICE Date: July 23, 2020 Job Number: 009016 Project Name: Starbucks — Raeford Rd To: NCDEQ — Fayetteville Regional Office Water Quality Section 225 Green Street, Suite 714 Fayetteville, NC 28301-5094 We are sending these by ❑ U.S. Mail ❑ Other /1 ' ❑ Hand Delivery We are sending you ❑ Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints/Plans ❑ Samples ❑ Specifications ❑ Change Orders ® Other This document serves as the cover letter listing everything included in this submittal package nntn ATn n0(`/'N77'f i7/l Yl 1 Fast Track Sewer System Extension Application - original l Fast Track Sewer System Extension Application — copy 1 Application fee - $480 l LLC Certificate — documentation showing registered business with the NC Secretaryof State 1 Flow tracking/acceptance form 1 Topo Map 1 Street Level Map 1 Pump Station Reliability Statement These are transmitted as checked below: ❑ For your use ❑ Approved as submitted ❑ Resubmit ❑ Copies for approval ❑ As requested ❑ Approved as noted ❑ Submit ❑ Copies for distribution ® For review and comment ❑ Returned for corrections ❑ Return ❑ Corrected prints Remarks: Requesting review of the stormwater application for a force main that will west run from the Starbucks site under Strickland Bridge Rd and connect to the PWC sewer system. This will serve just the Starbucks site and will contain a grinder pump. J' Copy to: Signed: Ross Godwin State of North Carolina Department of, Environmental Quality d, Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A NCAC 02T, 15A NCAC 02T .0300, Division policies and good engineering practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be available upon request by the Division. Projects that are deemed perniitted (do not require a pennit from the Division) are explained in 15A NCAC 02T.0303. Projects not eligible for review via the fast track process (must be submitted for full technical review): ➢ Projects that require an enviromnental assessment in accordance with 15A NCAC 1C .0100; ➢ Projects that do not meet any part of the minimum design criteria (NIDC) document; ➢ Projects that involve a variance from the requirements of 15A NCAC 2T; ➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPS) or simplex grinder pumps; ➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains): ➢ Vacuum sewer systems. General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents ® Required unless otherwise noted B. Cover Letter (Required for All Application Packages): ® List all items included in the application package, as well as a brief description of the requested permitting action. ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Major Modification Application Packages): ® Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages): ® Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attaclunents to the application may be made. ® If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item I.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ® The Project Name in Item IL 1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. ® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 1.5A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 1 of 3 E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable): ® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to pennnit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143- 215.67 a . ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. ➢ Location of the project (gravity sewer, pump stations & force main) ➢ Downstream connection points and pennit number (if known) for the receiving sewer ® Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field. G. Existing Permit (All Modification Packages): ❑ Submit the most recently issued existing pen -nit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e.. permit description, flow allocation, treatment facility, etc.). H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ® Per 15A NCAC 02T .0305(h)(1), submit documentation of power reliability for pumping stations. ➢ This alterative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Propeny, Owners' Associations ❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: DEW For more information, visit the Divisions collection systems website INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, .(919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pender (910) 796-7215 (910) 350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Alamance, Alleghany, Ashe, Caswell, Davidson, Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336) 776-9800 INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 3 of 3 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's naive: Raeford Rd Fayetteville 2019, LLC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ❑ Other 3. Signature authority's name: Collins Hartzog per 15A NCAC 02T .0106(b) Title: Member/manager 4. Applicant's mailing address: 109 Still Wild Ln City: Elgin State: SC Zip: 29045- 5. Applicant's contact information: Phone number: (803) 361-6718 Email Address: collinshartzog_ggnnail.com H. PROJECT INFORMATION: 1. Project name: Starbucks - Raeford Rd 2. Application/Project status: ® Proposed (New Pen -nit) ❑ Existing Pennit/Prcject If a modification, provide the existing pennit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Cumberland 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.039458' Longitude:-79.000301° 5. Parcel ID (if applicable): 9496-99-9355 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: l . Professional Engineer: Matt Lowder License Number: 24434 Finn: Triangle Site Design Mailing address: 4004 Barrett Dr, Suite 101 City: Raleigh State: NC Zip: 27609- Phone number: (919) 553-6570 Email Address: nflowderAtrianglesitedesi sign. com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Rockfish WWTF Permit Number: NPDES NC0050105 Owner Name: Fayetteville Public Works Commission V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Pennit Number(s): PWC2013-SO11 Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS00007 Owner Name(s): Fayetteville Public Works Conunission FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? [:]Yes [:]No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Associatiom has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/ser0ce ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swinuning Pool /Clubhouse ® Food and drink facilities ❑ Church ❑ Swinuning Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Conunercial Industrial (See 15A NCAC 02T .0103(20)) I I- Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 021.0114(f)? ®Yes ❑ No ➢ If _yes, provide a cony of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow',b No. of Units Flow Restaraunt 25 gal/seat 75 1,875 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 1,875 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property, located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be detennined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 1,875 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be pennitted in subsequent pen -nits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material ➢ Section II & III of the MDC for Pennitting of Gravity Sewers contains information related to design criteria Section III contains information related to ininimum slopes for gravity sewer(s) Y Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: Pentair Myers VRS20A-21 2. Approximate Coordinates (Decimal Degrees): Latitude: 35.039458' Longitude:-79.000301' 3. Design flow of the pump station: 0.0019 mullions gallons per day (fine capacity) 4. Operational point(s) of the pump(s): 6.5 gallons per minute at 20 feet total dynamic head (TDH) 5. Summarize the force main to be pennitted (for this Pump Station): Size (inches) Length (feet) Material 1.5 222 PVC 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(ln)(1)(B). Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ® Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(ln)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timefrunes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (g) ® Yes ❑ No ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from nonnal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impounchnent, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top sloe of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual pennits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related enviromnental pennits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this pen -nit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, `high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streannbanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A If yes, include an attachment with details for each line, including type (aerial line, size, material. and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 1.5A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity, Sewer Minimum Design Criteria (latest version) as applicable? 2 ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. I, Certification: (Professional Engineer's name from Application Item III.1.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Pennitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. His North Carolina Professional Engineer's seal, signature, and date: Applicant's Certification per 15A NCAC 02T .0106(b): I, (Signature Authori 's name &title from n Item I.3.) attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attaclunents are not included, thus application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of tlus permit be violated. I also understand that if all required parts of tlus application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: 0 FORM: FTA 04-16 Page 5 of 5 S SOSID: 1922394 Date Filed: 12/2/2019 11:19:00 AM State of North Carolina Elaine F. Marshall North Carolina Secretary oi' State Department ofthe Secr•etarh of��State C2019 330 01106 APPLICATION FOR CERTIFICATE OF AUTHORITY FOR LIMITED LIABILITY COMPANY Pursuant to'§57D-7-03 of the General Statutes of North Carolina, the undersigned limited liability company hereby applies for a Certificate of ALIthority to transact business in the State of North Carolina, and for that purpose submits the following: 1. The name of the limited liability company is Raeford Rd. Fayetteville 2019, LLC ; and if the limited liability company name is unavailable f'or use in the State of North Carolina, the name the limited liability company wishes to use is T 2. The state or country under whose laws the limited liability company was formed is South Carolina I Principal office information: (Select either a or b.) a. X❑ The limited liability company has a principal office. The principal office telephone number: 803-233-3825 The street address and county of the principal office of the limited liability company is Number and Street: 109 Still Wild Lane City: Elgin State: SC Zip Code: 29045 County: Richland The mailing address, if different from the street address, of the principal office of the corporation is: Number and Street: City: State: Zip Code: _ County: b. ❑ The limited liability company does not have a principal office. 4. The name of the registered agent in the State of North Carolina is: Elizabeth W. Voltz 5. The street address and county of the registered agent's office in the State of North Carolina is: Number and Street: 3700 Glenwood Avenue, Suite 250 City: Raleigh State: NC Zip Code: 27612 County: Wake 6. The North Carolina mailing address, if different from the street address, of the registered agent's office in the State of North Carolina is: Number and Street: City: State: NC Zip Code:____ County: BUSINESS REGISTRATION DIVISION P.O. BOX 29622 RALEIGH, NC 27626-0622 (Revised July 2017) (Pbrin L-09) APPLICATION FOR CERTIFICATE OF AUTHORITY Page 2 7. The names, titles, and usual business addresses of the current company officials of the limited liability company are: (use attachment if necessai)�) (This document must be signed by a person listed in item 7.) Name and Title Business Address Hartzog Holdings LLC Sole Member - 109 Still Wild Lane Elgin SC 29045 - 8. Attached is a certificate of existence (or document of similar import), duly authenticated by the secretary of state or other official having custody of limited liability company records in the state or country of formation. The Certificate of Existence must be less than six months old. A photocopy of the certification cannot be accepted. 9. If the limited liability company is required to use a fictitious name in order to transact business in this State, a copy of the resolution of its managers adopting the fictitious name is attached. 10. (Optional): PIease provide a business e-mail address: The Secretary of State's Office will e-mail the business automatically at the address provided above at no cost when a document is filed. The e-mail provided will not be viewable on the website. For more information on why this service is offered, please see the instructions for this document. 11. This application will be effective upon filing, unless a delayed date and/or time is specified: 'this the '72 day of November , 2019 Raeford Rd. Fayetteville 2019, LLC, a South Carolina LLC Name of Limited Liability Company -- --- Signature onrpatry Official By: Hartzog Holdings, C, a South Carolina LLC, its Sole Member By: W. Collins Hartzog, President Type or Print Name and Title Notes: 1. Filing fee is $250. This document must be filed with the.Secretary of State. BUSINESS REGISTRALTION DIVISION P.O. BOX 29622 RALEIGH, NC 27626-0622 (Revised July 2017) (Form L-09) The State of South Carolina Office of Secretary of State Mark Hammond Certificate of Existence 1, Mark Hammond, Secretary of State of South Carolina Hereby Certify that: Raeford Rd. Fayetteville 2019, LLC, a limited liability company duly organized under the laws of the State of South Carolina on November 12th, 2019, with a duration that is at will, has as of this date filed all reports due this office, paid all fees, taxes and penalties owed to the State, that the Secretary of State has not mailed notice to the company that it is subject to being dissolved by administrative action pursuant to S.C. Code Ann. §33-44-809, and that the company has not filed articles of termination as of the date hereof. Given under my Hand -and the Great Seal of the State of South--`Carpjlna this 12th day of November, 2019, Mark Fla ninon l-�ec a y of State State of North Carolina Department of Environmental Quality Division of Water Resources ...fgs� of M,r.�ter Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Raeford Rd Fayetteville 2019, LLC Project Naive for which flow is being requested: Starbucks - Raeford Rd More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all ptimp stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Rockfish Wastewater Treatment Facility b. WWTP Facility Permit #: NPDES NCO050105 All f Zows are in MGD c. WWTP facility's permitted flow 21.0 d. Estimated obligated flow not yet tributary to the WWTP 3.4667 e. WWTP facility's actual avg. flow 15.6 f. Total flow for this specific request 0.0019 g. Total actual and obligated flows to the facility 19.0686 h. Percent of permitted flow used 90.80 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. * * * A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): PWC/Fayetteville Collection System Downstream Permit Number: PWC2013 -SO 11 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Joseph E. Glass, P.E. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. r. NAew'.- ov Siting Official Signature Date [.:: "(MI HCEr2.NG d/V#4rYr4 6AF4 Title of Signing Official Page 2 of 6 FTSE 10-18 DARSWEIL L. ROGERS, COMMISSIONER WADE R. FOWLER, 1R., COMMISSIONER EVELYN 0. SHAW, COMMISSIONER D. RALPH HUFF, 111, COMMISSIONER DAVID W. TREGO, CEO/GENERAL MANAGER te� • ) FAYETTEVILLE PUBLIC WORKS COMMISSION C 955 OLD WILMINGTON RD J P.O. BOX 1089 H ME OWN UTILITY FAYETTEVILLE, NORTH CAROLINA 28302-1089 TELEPHONE (910) 483-1401 WWW.FAYPWC.COM July 27, 2020 TO WHOM IT MAY CONCERN: SUBJECT: Flow Acceptance — Starbucks — Raeford Road 920 Strickland Bridge Road This letter is in response to the inquiry regarding the availability of sanitary sewer to serve the proposed Starbucks — Raeford Rd project located at 920 Strickland Bridge Road in the City of Fayetteville, Cumberland County NC. Raeford Rd Favetteville 2019, LLC has submitted a permit application for a private pump station and force main on this project. The Fayetteville Public Works Commission does not have an operation and maintenance agreement with Raeford Rd Fayetteville 2019, LLC, but has agreed to accept and treat sanitary sewer from this project. The sewage and wastewater collected by this system shall be treated in the Fayetteville Public Works Commission Rockfish Creek Wastewater Treatment Facility (NPDES Permit No. NC0050105) prior to being discharged into the receiving stream. The projected flow for this development is 1,875 gallons per day. The Rockfish Facility has the capacity to accept the flow generated by this project. If you have any questions concerning this letter, please call me at (910) 223-4740. Very truly yours, F YETTEVILLE PUBLIC WORKS COMMISSION a r. AVV oseph E. Glass, P.E. Water Resources Engineering Manager cc: Project File BUILDING COMMUNITY CONNECTIONS SINCE 1905 AN EQUAL EMPLOYMENT OPPORTUNITY EMPLOYER 0 c:) co c LLJ -ABB U.1 co b AS�Rll uj 80 A975W19H ,` : ,'ti, i MERRIMAC DR 08 98IHSAGY90 PENROSE DR ac 80 A889977VH cc 08 (780-4 A88n). cc 0, D AM R pTO'� H U-i a YGNO Y8 ,` ' ' � ,; _ ;TON pR- - 3 D OR PUMP STATION RELIABILITY STATEMENT Pump Station Address: Owner Information: 24 HR Emergency Contact (In case of power outage or equipment failure) Pump Station Installer: Starbucks 920 Strickland Bridge Rd Fayetteville, NC 28304 Hartzog Holdings, LLC 109 Still Wild Lane Elgin, SC 29045 Collins Hartzog 803-361-6718 Jordan Williamson 901-740-5552 Heath Grading & Utilities State of North Carolina Department of Environmental Quality Division of Water Resources ? R 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Nurnber: (to be completed by Dwx) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's naive: Raeford Rd Fayetteville 2019, LLC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Muiucipal ❑ Other 3. Signature authority's name: Collins Hartzog per I5A NCAC 02T .0106(b) Title: Member/manager 4. Applicant's mailing address: 109 Still Wild Ln City: Elgin State: SC Zip- 29045- 5. Applicant's contact information: Phone number: (803) 361-6718 Email Address: collinshartzog�%cmail.com II. PROJECT INFORMATION: 1. Project name: Starbucks - Raeford Rd 2. Application/Project status: - - If a modification, provide t TRIANGLE SITE DESIGN PLLC 3215 4004 BARRETT DR STE 101 66-1121531 If new construction but par RALEIGH, NC 27609 3. County where project is hoc 4. Approximate Coordinates i Pay to the /C Jc �� Cc� � d c"o Order 5. Parcel ID (if applicable): D t F - Sphoto ee (or Parcel ID to closest do` Q r.'t ©ottars ® Dep Deposit Cetoits ort 6.uk III. CONSULTANT INFORMA7 BRANCH BANKING AND TRUST COMPANY f F � 1-800-BANK BBT BBT.com 1. Professional Engineer: Ma NP Finn- Triangle Site Design For Mailing address: 4004 Bar City: Raleigh State: NG Phone number: (919) 553-6.. IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Rockfish WWTF Permit Number: NPDES NCO050105 Owner Name- Fayetteville Public Works Conunission V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): PWC2013-S011 Downstream (Receiving) Sewer Size: 8 inch System Wide Collection Systenn Permit Number(s) (if applicable): WQCS00007 Owner Name(s): Fayetteville Public Works Conunission FORM: FTA 04-16 Page 1 of 5