Loading...
HomeMy WebLinkAboutWM0301071_Final Permit_20200807ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Mr. Kenny Patel (via email) c/o Royster Oil Company 100 W. Church Street Cherryville, NC 28021 Dear Mr. Patel, NORTH CAROLINA Environmental Quality August 7, 2020 RE: Monitoring Well Construction Permit Permit # WM0301071 NE Corner of N. Mountain St. & W. Church St., Cherryville, Gaston County In accordance with your completed application received on August 7, 2020, we are forwarding herewith Monitoring Well Construction Permit Numbered WM0301071 and issued for the construction of one monitoring well located at the subject site in Cherryville, Gaston County. This Permit will be effective for one year from the date of issuance and shall be subject to the conditions and limitations as specified therein. Should you have any questions, please contact Edward Watson at (704) 235-2198, or by email at edward.watson(c-bncdenr.gov. Sincerely, DocuSigned by: 4. u N Nuft F161FB69A2D84A3... Andrew H. Pitner, P.G., Assistant Regional Supervisor Mooresville Regional Office Water Quality Regional Operations Section Division of Water Resources CC: WQROS, Central Office (via Laserfiche) Ryan Kerins, Terraquest Environmental Consultants, PC (via email) D E Qbi�� North Carolina Department of Environmental Quality I Division of Water Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 vOry rN Cx:40:.itiA � 0.. a to E".w^^�"��a°:r� /� 704.663.1699 NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT FOR THE CONSTRUCTION OF A MONITORING WELL In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules and Regulations. PERMISSION IS HEREBY GRANTED TO Royster Oil Company (Terraquest Environmental as Agent) FOR THE CONSTRUCTION OF A MONITOR WELL SYSTEM consisting of one monitoring well owned by Royster Oil Company at the subject site, Cherryville, Gaston County. This Permit is issued in accordance with the application received on August 7, 2020, in conformity with specifications and supporting data, all of which are filed with the Department of Environmental Quality and are considered integral parts of this Permit. This Permit is for well construction only, and does not waive any provision or requirement of any other applicable law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well construction. If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. Issuance of this Permit does not obligate reimbursement from State trust funds, if these wells are being installed as part of an investigation for contamination from an underground storage tank or dry cleaner incident. 2. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency. 3. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit application. 4. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(o). 5. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resources' Information Processing Unit within 30 days of the well completion. 6. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resources' Information Processing Unit within 30 days of the well abandonment. 7. If the well penetrates any water -bearing zone that contains contaminated waters, the upper three feet of the well shall be grouted within one day after the casing is set or the well abandoned. 8. Temporary wells must be permanently abandoned or converted to a permanent well within seven days (168 hours) of completion of drilling the borehole. 9. Adequate permits shall be obtained from Gaston County Environmental Health. Permit issued the 7th day of August, 2020 FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DocuSigned by: F161FB69A2D84A3... Andrew H. Pitner, P.G., Assistant Regional Supervisor Division of Water Resources By Authority of the Environmental Management Commission Permit No. # WM0301071