Loading...
HomeMy WebLinkAboutNC0031046_AUTHORIZATION TO CONSTRUCT_19951006ti NPDES DOCUMENT SCAMMIMS COMER SHEET NPDES Permit: NCO031046 Document Type: Permit Issuance Wasteload Allocation IChorization to Construct ) Permit Modification Complete File = Historical Compliance Speculative Limits Instream Assessment (67b) Environmental Assessment (EA) Permit History Document Date: October 6, 1995 W1240 document 10 Printed on reuMOaPaper -ignore any content on the r W WOX-Se Oide 4.. State of North Carolina Department of Environment,WA Health and Natural Resources 1 • • • Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary p E H N F11 A. Preston Howard, Jr., P.E., Director October 6, 1995 Mr. Dan C. Miller Colonial Pipeline Company P. O. Box 87 Paw Creek, North Carolina 28130 Subject: Permit No. NCO031046 Authorization to Construct Greensboro Junction Wastewater Treatment Facility Guilford County Dear Mr. Miller: The Division received a letter of request for an Authorization to Construct on July 10, 1995 and final plans and specifications for the subject project have been reviewed and found to be satisfactory. •Authorization is hereby granted for the construction of an oil/water separator and associated piping with discharge of treated wastewater into an unnamed tributary to the East Fork Deep River. This Authoti-ation to Construct is issued in accordance with Part III, Paragraph A. of NPDES Permit No. NC0031v46 issued January 31, 1992 and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0031046. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Environmental Management. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number 910/771-4600, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626-0535. • Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919.733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Permit No. NC0031046 Authorization to Construct Colonial Pipeline Company •October 6, 1995 Page 2 classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class 11, III, and IV facility at least daily, excluding weekends and holidays, and must properly manage and document daily operation and maintenance of the facility and must comply with all other conditions of Title 15A, Chapter 8A, .0202. Once the facility is classified, the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge within thirty days after the wastewater treatment facilities are 50% complete. A copy of the approved plans and specifications shall be maintained on file by the Petmittee for the life of the facility. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Environmental Management in accordance with North Carolina General Statute 143-215.64to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any. •questions or need additional information, please contact Jay Lucas, P.E., telephone number 919/733-5083 extension 502. Sincerely, Presto Jard, Jr., P.E. cc: Central Files Winston-Salem Regional Office, Water Quality e`rmits and Engineering Unit-:7 Facility Assessment Unit Guilford County Health Department Technical Assistance and Certification Group