Loading...
HomeMy WebLinkAbout20200798 Ver 2_Copy of Blasting - Google Docs_20200806Blasting will be most likely required to complete the proposed work during Summer 2020 - Fall 2021. Geotechnical investigations have been performed along the project corridor, but the specific locations where blasting might be necessary are not yet known. Pre -drilling will be performed once construction begins and the blasting plan will be developed as necessary. The blasting plan will be provided upon request once completed. There are no red HUCs within 0.25 mile from the study area.