HomeMy WebLinkAboutNCC202578_ESC Approval Submitted_20200807ROY COOP1wR,
NORTH CAROUNA
May 1, 2020
LETTER OF APPROVAL WITH PERFORMANCE RESERVATIONS
Cabarrus County Schools ,
Attention: Tim Lowder, Executive Director Operations
4401 Old Airport Road
Concord, North Carolina 28025
RE: Project Name: Cabarrus County Middle School
Acres Approved: 40.90
Project ID: CABAR-069
County: Cabarrus
City: Concord
Address: Roberta Road
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Cabarrus County Schools
Date Received by LQS: April 9, 2020
Plan Type: New
Dear Mr. Lowder,
This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter
of Approval with Modifications and Performance Reservations. A list of the modifications and reservations
is attached. This plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should. the plan not
perform adequately, a revised plan will be required (G.S. 113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (eNQI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction
General Permit. After the. Form is reviewed and found to be complete, you will receive a link with payment
instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email.
You MUST obtain the COC prior to commencement of any land disturbing activity. The eNQI form may
be accessed at deq.nc.gov/NCG01. Please direct questions about the eNQI form to Annette Lucas at
Annette: lueasgnedenr,gov or Paul Clark at Paul.cl.arkgncdenr, _ov. If the owner/operator of this project
changes in the future, the new responsible party is required to apply for his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on
file at the job site:
1. The approved USC plan as well as any approved deviation,
2. The NCG01 permit and the COC, once it is received,
3. Records of inspections made during the previous 12 months, =
ff Nbrth CaC7e�,vttrient of�nvfrr'c meritaE (�uaHt1+ I Iahrttis�n: 9?4. fh►erel$r sc set
MOOONAPC: tq!0r MI-6 I 610,E t`CmWr,&aW,$*e3% [ Maork& #*,NorthCVg i2a1L9
xrra r;�a�r�4a
Letter of Approval with Modifications and Performance Reservations
Cabarrus County Schools
May 1, 2020
Page 2 of 3
AIso, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
elly,
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
c: F.Chambers Engineering
Attention: Samuel J. Smith, PE
129 North First Street
Albemarle, North Carolina 28001
Inspection Department
Letter of Approval with Modifications and Performance Reservations
Cabarrus County Schools
May 1, 2020
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Cabarrus County Middle School
Project 1D: CABAR-2020-069
County: Cabarrus
1. Additional measures may be required - The applicant is responsible for the control
of sediment on -site. If the approved erosion and sedimentation control measures
prove insufficient, the applicant must take those additional steps necessary to stop
sediment from leaving this site. [15A NCAC 4B ,0115]