Loading...
HomeMy WebLinkAbout20201017 Ver 1_401 Application_20200805  219 Station Road, Suite 101 | Wilmington, NC 28405  t: 910.256.9277 | www.withersravenel.com | License No. C‐0832  Asheville | Cary | Greensboro | Pittsboro | Raleigh | Wilmington      August 5, 2020    US Army Corps of Engineers NC‐Division of Water Resources  Washington Regulatory Field Office 401 & Buffer Permitting Unit  Ms. Emily Thompson Mr. Paul Wojoski  2407 W. 5th Street 1617 Mail Service Center  Washington, NC 27889 Raleigh, NC 27699    Re:  City of Kinston – Smithfield Way Gravity Sewer Extension ‐ NWP 12 PCN Submittal   Kinston, Lenoir County   WR Project #02180652.01    Dear Ms. Thompson and Mr. Wojoski,  On behalf of the City of Kinston, we are requesting authorization from the USACE to use NWP 12  for 0.277 acres of temporary impacts to jurisdictional ditches for construction of the Smithfield  Way Gravity Sewer Extension project, located along Smithfield Way in Kinston, Lenoir County.   We are also requesting an NCDWR 401 WQC for the referenced impacts.    The project area is ±4.0 acres in size and is located along Smithfield Way, beginning at an existing  manhole at Enterprise Drive (Lat: 35.270992°N; ‐77.669623°W), and running east along the north  side of Smithfield Way to an existing manhole north of the Parrott Dickerson pump station (Lat:  35.270598°N; Long: ‐77.661794°W).  The proposed sewer expansion is located within a new  utility easement acquired by the City of Kinston.    The project is located in the Neuse River basin and drains to Falling Creek.  The Water Quality  Classification for Falling Creek is C;Sw;NSW, and the Stream Index Number is: 27‐77.  The  cataloging unit for the site is 030202020206.    Proposed Project    The purpose of the proposed project is to construct a gravity sewer line to reroute flow from the  existing sewer line along Enterprise Blvd that currently flows to the Oliver Glass to the Parrott  Dickerson lift station which has available capacity.  The Oliver Glass lift station which is currently  over capacity, and rerouting flow to the Parrot Dickerson lift station will alleviate the potential for  line failure and SSOs.    The proposed project consists of the construction of 2,360 lf of 18" PVC gravity sewer line and  145 lf of 8" PVC service line.  The proposed sewer line will connect to the existing gravity sewer  line along Enterprise Blvd which currently flows to the Oliver Glass lift station and reroute a  portion of the flow to the Parrott Dickerson lift station which has excess available capacity.      The sewer line will be located within a utility easement acquired by the City of Kinston.  NCDOT  required that the sewer line and easement be located outside of the ROW for Smithfield Way.    Smithfield Way Gravity Sewer Extension – Kinston, Lenoir Co.  Page 2 of 3    The majority of the sewer line will be installed via trench and backfill methods, and traditional  commercial construction equipment will be used.  The sewer line will be installed via jack and bore  beneath the railroad and Ditch 2 & 3.    Project History    WithersRavenel conducted a delineation of the project area in May 2020.  There are no wetlands  or streams within the project area.  The only features present are man‐made ditches, for which  jurisdiction was conceded.  A PJD Request Packet has been attached to this application.  However,  we are not requesting issuance of a PJD in conjunction with issuance of the NWP 12.    WithersRavenel coordinated via email with Emily Thompson with the USACE regarding the current  jurisdictional status of the onsite ditches.  Due to time constraints, WithersRavenel decided to  move forward with conceding the ditches as jurisdictional and moving forward with permitting of  the impacts.    WithersRavenel submitted a Buffer Determination Request via email to Chris Pullinger with  NCDWR on 7/6/2020.  As of the date of this application WithersRavenel has not received any  correspondence from Mr. Pullinger.  Based on previous experience with man‐made jurisdictional  ditches not being subject to Neuse River Riparian Buffers, WithersRavenel does not believe that  the jurisdictional ditches within the project area should be subject to buffers.  Therefore, we are  requesting confirmation that the ditches within the project area are not subject to Neuse River  Riparian Buffers in conjunction with issuance of the 401 WQC.  A copy of the Buffer  Determination Request submitted to Mr. Pullinger has been attached to this application.    Proposed Impacts    The proposed impacts consist of 0.277 acres (12,076 sf) of temporary jurisdictional ditch impacts  for installation of the proposed gravity sewer line.    Avoidance and Minimization    The proposed impacts have been minimized to only temporary impacts to jurisdictional ditches.   Impacts could not be avoided, as the sewer line must be located within the easement that the City  of Kinston was able to acquire from private property owners and must be located outside of the  ROW of Smithfield Way per NCDOT requirements.    Impacts have been minimized by using jack and bore to install the sewer line beneath the railroad  and Ditch 2 & 3.    During construction, coffer dams will be installed upstream and downstream of the construction  area, and flow will be pumped around the construction area so that work can be completed in the  dry.      Upon completion of installation of the sewer line, the ditches will be restored to pre‐construction  grades/contours and stabilized with biodegradable matting and seeded to provide temporary  Smithfield Way Gravity Sewer Extension – Kinston, Lenoir Co.  Page 3 of 3    stabilization.  All coffer dams and inlet protection will be removed once the disturbed areas are  sufficiently vegetated and stabilized.    Mitigation    The proposed project will result in temporary impacts to jurisdictional ditches, and therefore  mitigation is not required.    The current request is for 0.277 acres (12,076 sf) of temporary jurisdictional ditch impacts (see  the attached maps and PCN for details).    Please feel free to call if you have questions or require additional information.    Sincerely  WithersRavenel  Troy Beasley  Senior Environmental Scientist    Attachments:   Agent Authorization   Parcel/Owner Information   Delineation Exhibit   Aerial Photo   USGS Quads   Lenoir County Soil Survey   Preliminary JD Request   NCDWR Riparian Buffer Determination Request (Previously Submitted)   NCNHP Project Review Letter   USFWS T&E List for Lenoir County   Impact Exhibits  DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form April 11, 2020 Ver 3.1 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* C Yes r No Change only if needed. BIMS # Assigned 20201017 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Reviewing Office * Washington Regional Office - (252) 946-6481 Information for Initial Review 1a. Name of project: City of Kinston - Smithfield Way Gravity Sewer Extension 1a. Who is the Primary Contact?* Troy Beasley 1b. Primary Contact Email:* tbeasley@Wthersravenel.com Date Submitted 8/5/2020 Nearest Body of Water Falling Creek (Stream Index 27-77) Basin Neuse Water Classification C;Sw,NSW Site Coordinates Latitude: Longitude: 35.270321-77.664566 A. Processing Information County (or Counties) where the project is located: Lenoir Is this a NCDMS Project r Yes r No Is this project a public transportation project?* r Yes r No 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Version#* 1 What amout is owed?* r $240.00 r $570.00 Select Project Reviewer* Robert Tankard:eads\rbtankard 1c. Primary Contact Phone:* (910)509-6512 U 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit 12 - Utility Lines le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: F- 401 Water Quality Certification - E)press r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Falling Creek Farms 2b. Deed book and page no.: Book: 924; Page: 406 2c. Responsible party: 2d.Address Street Address 2377 Sanderson Way Address tine 2 city Kinston Postal / Zip Code 28504 2e. Telephone Number: (252)939-3111 2g. Email Address:* Tony.Sears@Ci.Kinston.nc.us 2a. Name(s) on recorded deed: RD Kinston, LLC State / Rwince / Ifgion NC Country USA 2f. Fax Number: r Yes r No r Yes r No 2b. Deed book and page no.: Book: 1052; Page: 646 2c. Responsible party: 2d.Address Street Address 418 Clifton Ave Address Line 2 Suite 200 City Lakewood Fbstal / Zip Cork 08701 2e. Telephone Number: (252)939-3111 2g. Email Address:* Tony.Sears@Ci.l<jnston.nc.us 2a. Name(s) on recorded deed: Lenoir County 2b. Deed book and page no.: Book:900;Page:253 2c. Responsible party 2d.Address Street Address PO Box3289 Address Line 2 City Kinston Fbstal / Zip Ode 28502 2e. Telephone Number: (252)939-3111 2g. Email Address:* Tony.Sears@Ci.Kinston.nc.us 2a. Name(s) on recorded deed: City of Kinston 2b. Deed book and page no.: Book: 1547; Page: 645 2c. Responsible party: Tony Sears - City Manager 2d.Address Street Address PO Box 339 Address Une 2 aty Kinston Postal / Zip Code 28501 2e. Telephone Number: (252)939-3111 2g. Email Address:* Tony.Sears@Ci.Kinston.nc.us 2a. Name(s) on recorded deed: Lenior County 2b. Deed book and page no.: Book: 888; Page: 690 2c. Responsible party State / Rwince / Fbgion NJ Country USA 2f. Fax Number: State / Rwince / Pegion NC Country USA 2f. Fax Number: State / Rwince / Fbgion NC Country USA 2f. Fax Number: 2d.Address Street Address PO Box3289 Address tine 2 City State / Province / legion Kinston NC Postal / Zip Code Country 28502 USA 2e. Telephone Number: 2f. Fax Number: (252)939-3111 2g. Email Address:* Tony.Sears@Ci.Kinston.nc.us 2a. Name(s) on recorded deed: Robert Parrott Trustees 2b. Deed book and page no 2c. Responsible party: 2d.Address Street Address 12337 The Gates Drive Address Line 2 City State / Province / legion Raleigh NC Postal / Zip Code Country 27614 USA 2e. Telephone Number: 2f. Fax Number: (252)939-3111 2g. Email Address:* Tony.Sears@Ci. Kinston. nc. us 2a. Name(s) on recorded deed: City of Kinston 2b. Deed book and page no.: Book: 888; Page: 690 2c. Responsible party: Tony Sears - City Manager 2d.Address Street Address PO Box 339 Address Line 2 City State / Province / legion Kinston NC Postal / Zip Code Country 28501 USA 2e. Telephone Number: 2f. Fax Number: (252)939-3111 2g. Email Address:* Tony.Sears@Ci. Kinston. nc. us 3. Applicant Information (if different from owner) 3a. Name: Tony Sears - City Manager 3b. Business Name: City of Kinston 3c.Address Street Address PO Box 339 Address tine 2 City State / Province/ Region Kinston NC Postal / Zip Code Country 28501 USA 3d. Telephone Number: (252)939-3111 3f. Email Address:* Tony.Sears@Ci. Kinston. nc. us 4. Agent/Consultant (if applicable) 4a. Name: Troy Beasley 4b. Business Name: WithersRavenel 4c.Address Street Address 219 Station Road Address Line 2 Suite 101 City Wilmington Fbstal / Zip Code 28405 4d. Telephone Number: (910)509-6512 4f. Email Address:* tbeasley@Wthersravenel.com Agent Authorization Letter* WR Appt of Agent signed.pdf 3e. Fax Number: State / Rmince / Pegion NC Country USA 4e. Fax Number: 321.2K6 C. Project Information and Prior Project History C^U 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/ town: Kinston 2. Project Identification 2a. Property Identification Number: 359502664004;359502766695; 359502755414;359502863864; 450501056447;359502861055; 359502867032 2c. Project Address Street Address Smithfield Way Address Line 2 City Kinston Fbstal / Zip Code 28504 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Falling Creek (Stream Index 27-77) 3b. Water Resources Classification of nearest receiving water:* C; Sw, NS W 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202020206 2b. Property size: Project Area - t4.0 acres State / Fr vine / Rion NC Country USA 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The proposed sewer alignment is located within existing mowed grassed lawns, maintained ROW and agricultural fields. The general land use in the vicinity consists of agricultural and commercial land use. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) USGS Quads.pdf 469.14KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Soil Survey.pdf 3.49MB 4f. List the total estimated acreage of all existing wetlands on the property: Wetlands - N/A; Jurisdictional Ditches - 0.31 acres 4g. List the total estimated linear feet of all existing streams on the property: N/A 4h. Explain the purpose of the proposed project:* The purpose of the proposed project is to construct a gravity sewer line to reroute flowfrom the existing sewer line along Enterprise Blvd that currently flows to the Oliver Glass to the Parrott Dickerson lift station which has excess available capacity to handle the flow. The Oliver Glass lift station which is currently over capacity, and rerouting flowto the Parrot Dickerson lift station will alleviate the potential for line failure and SSOs. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The proposed project consists of the construction of 2,360 If of 18" PVC gravity sewer line and 145 If of 8" PVC service line. The proposed sewer line will connect to the existing gravity sewer line along Enterprise Blvd which currently flows to the Oliver Glass lift station, and reroute a portion of the flow to the Parrott Dickerson lift station which has excess available capacity to handle the flow. The sewer line will be located within a utility easement acquired by the City of Kinston. NCDOT required that the sewer line and easement be located outside of the ROW for Smithfield Way. The majority of the sewer line will be installed via trench and backfill methods, and traditional commercial construction equipment will be used. The sewer line will be installed via jack and bore beneath the railroad and Ditch 2 & 3. 4j. Please upload project drawings for the proposed project. 2020-07-30 - Ditch Impacts Map - Smithfield Way.pdf 821.32KB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No Comments: WithersRavenel conducted a delineation of the project area in May 2020. There are no wetlands or streams within the project area. The only features present are man-made ditches, for which jurisdiction was conceded. A PJD Request Packet has been attached to this application. However, we are not requesting issuance of a PJD in conjunction with issuance of the NWP 12. 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Troy Beasley Agency/Consultant Company: WithersRavenel Other: O Unknown 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR WithersRavenel coordinated via email with Emily Thompson with the USACE regarding the current jurisdictional status of the onsite ditches. Due to time constraints, WithersRavenel decided to move forward with conceding the ditches as jurisdictional and moving forward with permitting of the impacts. WithersRavenel submitted a Buffer Determination Request via email to Chris Pullinger with NCDWR on 7/6/2020. As of the date of this application WithersRavenel has not received any correspondence from Mr. Pullinger. Based on previous experience with man-made jurisdictional ditches not being subject to Neuse River Riparian Buffers, WithersRavenel does not believe that the jurisdictional ditches within the project area should be subject to buffers. Therefore, we are requesting confirmation that the ditches within the project area are not subject to Neuse River Riparian Buffers in conjunction with issuance of the 401 WQC. A copy of the Buffer Determination Request submitted to Mr. Pullinger has been attached to this application. 5d1. Jurisdictional determination upload PJD Request - Smithfield Way Sewer Extension - 06.05.2020.pdf 6.39MB 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are anyother NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed projector related activity? No D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): r Wetlands W Streams -tributaries r Buffers r Open Waters r Pond Construction 3. Stream Impacts 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name* 3e. Stream Type * 3f. Type of 3g. S. width* 3h. Impact ❑ (?) 11 Jurisdiction" length" S1 Impact Sewer Temporary Other Ditch 1 Jurisdictional Ditch BothConstr 3Average(fee) 28 uc- �rfeet) S2 Impact 2 - Inlet P Temporary P rY Other Ditch 1 Jurisdictional Ditch Both 16 15 Protection/Erosion Control Average (feet) (linearfeet) S3 Impact 3 - Sewer Temporary Other Ditch 3 Jurisdictional Ditch Both 10 1,010 Construction Average (feet) (linearfeet) S4 Impact 4 - Check P Tem orar P Y Other Ditch 3 Jurisdictional Ditch Both 19 S Dam/Erosion Control Average (feet) (lir�rfeet) S5 Impact 5 - Inlet Temporary Other Ditch 4 Jurisdictional Ditch Both 19 16 Protection/Erosion Control Average (fee) (lines feet) S6 Impact 6 - Check Temporary Other Ditch 3 Jurisdictional Ditch Both 19 Dam/Erosion Control Average (feet) (lir�rfcet) S7 Impact 7 - Inlet P Temporary P rY Other Ditch 3 Jurisdictional Ditch Both 14 16 Protection/Erosion Control Average (feet) (linearfeet) 3i. Total jurisdictional ditch impact in square feet: 12,077 31. Total permanent stream impacts: 31. Total stream and ditch impacts: 91 31. Total temporary stream impacts: 1,100 3j. Comments: All proposed ditch impacts will be temporary and will be restored upon completion of construction. E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The proposed impacts have been minimized to only temporary impacts to jurisdictional ditches. Impacts could not be avoided, as the sewer line must be located within the easement that the City of Kinston was able to acquire from private property owners, and must be located outside of the ROW of Smithfield Way per NCDOT requirements. Impacts have been minimized by using jack and bore to install the sewer line beneath the railroad and Ditch 2 & 3 During construction, coffer dams will be installed upstream and downstream of the construction area, and flow will be pumped around the construction area so that work can be completed in the dry. Upon completion of installation of the sewer line, the ditches will be restored to pre -construction grades/contours and stabilized with biodegradable matting and seeded to provide temporary stabilization. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Silt fencing will be installed around all disturbed areas. Access during construction will occur within uplands. The sewer line will be installed via jack and bore beneath the railroad and Ditch 2 & 3. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? u r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The proposed project will result in temporary impacts to jurisdictional ditches, and therefore mitigation is not required. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) r Other SCM that removes minimum 30 % nitrogen W Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15ANCAC 02H .1003(2)? r Yes r No Comments: The project consists of construction of a subsurface sewer line, which will not result in impervious area requiring Stormwater treatment and will not result in concentrated flow requiring diffuse flow. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPAISEPA)? * r Yes r No Comments:* The proposed project does not meet thresholds requiring NEPA/SEPA. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The proposed project is intended to alleviate the issue with the Oliver Glass lift station being over capacity by rerouting flow to the Parrott Dickerson lift station, which is currently underutilized. Therefore, the project will not be a catalyst for future development that could impact nearby downstream water quality. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor NIA 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. The proposed project will reroute eAsting flowfrom the Oliver Glass lift station to the Parrott Dickerson lift station, both of which flowto the City of Kinston treatment facility. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?' r Yes r No r Unknown 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? WR reviewed the NC Natural Heritage Program database, located at http://www.ncnhp.org/web/nhp/home, as well as NCNHP GIS data to identify if there were any known occurrences of endangered species on or near the proposed project. The review of the NCNHP data did not identify any recent occurrences of federally listed threatened or endangered species or critical habitat on the subject property or within 1.0 miles of the project, see attached NCNHP project review letter. Furthermore, site reviews did not identify any potential habitat for any federally protected species known to occur in Lenoir County. Therefore, the proposed project will have No Effect on federally protected species. Consultation Documentation Upload NCNHP Project Review Letter_2020-07-28.pdf 213.03KB USFWS T&E List for Lenoir County_2020-07-17.pdf 139.8KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* WR reviewed the NOAA Essential Fish Habitat online mapper, located at: http://www.habitat.noaa.gov/protection/efh/efhmapper/indexhtmi. There are no waters classified as EFH in Lenoir County. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* WR reviewed the NC State Historic Preservation Office's online database, located at: http://gis.ncdcr.gov/hpoweb/, to determine if there were any known historic or cultural resources within or in the vicinity of the proposed project. The database review did not identify any known resources within or in the vicinity of the proposed project. 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* www.ncfloodmaps.com Miscellaneous Comments Miscellaneous attachments not previously requested. Aerial.pdf 420.05KB Parcel -Owner Info.pdf 1.12MB Buffer Determination Request - Smithfield Way Sewer 6dension 2020.06.23.pdf 6.7MB PCN Cover Letter.pdf 112.04KB Signature V By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AGC); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. cull Name: Troy Beasley - Authorized Agent Signature Date 8/5/2020 WithersRavenel ;0 Our People. Your Success. AUTHORITY FORAPPOINTMENT OFAGENT The undersigned Municipality City of Kinston (Client) does hereby appoint WithersRavenel. Inc. as his, her, or it's agent for the purpose of petitioning the appropriate local, state and federal environmental regulatory agencies (US Army Corps of Engineers, NC Division of Water Quality, NC Division of Coastal Management, local municipalities, etc.) for: a) review and approval of the jurisdictional boundaries of onsite jurisdictional areas (wetlands, surface waters, riparian buffers, etc.) and/or; b) preparation and submittal of appropriate environmental permit applications/requests for the gravity sewer extension that is located entirely within the ROW of Smithfield Way in Kinston, NC, The Client does hereby authorize that said agent has the authority to do the following acts on behalf of the owner: (1) To submit appropriate requests/applications and the required supplemental materials; (2) To attend meetings to give representation on behalf of the Client. (3) To authorize access to subject property for the purpose of environmental review by appropriate regulatory agencies. This authorization shall continue in effect until completion of the contracted task or termination by the Client. Agent's Name, Address &Telephone: WithersRavenel. Inc. 115 MacKenan Drive Cary, NC 27511 Tel.(919)-469-3340 Signature of Client: 0 0 �f �I SriI e, r Warne - q nt) (Title) (Signature) � ,AV 33 9 Mailing Address 41C, Zgsol City State Zip Phone: ZSZ — 93`J- 3/// 115 MacKenan Drive � Cary, NC 27511 t: 919.469.3340 � f: 919.467.6008 � www.withersravenel.com � License No. C-0832 Asheville � Cary � Greensboro � Pittsboro � Raleigh � Wilmington PROJECTLOCATION1 inch = 2000 ft.GRAPHIC SCALE0 1000 2000CITY OF KINSTONLOCATION EXHIBIT - USGS QUAD (2019) - FALLING CREEK KINSTONLENOIR COUNTYNORTH CAROLINAWithersRavenelEngineers | Planners | SurveyorsSMITHFIELD WAY GRAVITY SEWER EXTENSION PROPOSED SEWERALIGNMENT1 inch = 500 ft.GRAPHIC SCALE0250500CITY OF KINSTON USGS QUAD (2019) - FALLING CREEK KINSTONLENOIR COUNTYNORTH CAROLINAWithersRavenelEngineers | Planners | SurveyorsSMITHFIELD WAY GRAVITY SEWER EXTENSION PROPOSED SEWERALIGNMENT1 inch = 500 ft.GRAPHIC SCALE0250500CITY OF KINSTONLENOIR COUNTY SOIL SURVEY (1977) - SHEET 15KINSTONLENOIR COUNTYNORTH CAROLINAWithersRavenelEngineers | Planners | SurveyorsSMITHFIELD WAY GRAVITY SEWER EXTENSION S SSSS S1049.95SMH S3050.88SMH 9543.04CMP 9643.09CMP 9747.78CMP 9847.18CMP 32444.81RCP 32544.96RCP 35446.97CMP 35546.97CMP 35645.16RCP 35745.23RCP 35845.63RCP 37846.35CMP 37947.14CMP 45645.92RCP 45745.82RCP 45849.02DI45945.89RCP 46045.35CMP 46146.09CMP 54750.15DI54847.25RCP 54946.78RCP 59346.67RCP 61350.07DI61446.98RCP 61550.34DI 61646.81RCP 61747.44RCP 61847.75RCP S68150.04SMH S68252.86SMH S68350.29SMH S SSS S S SS SS SS IIIIS SS GSS No. Checked By Revision Designer Drawn By Date By Scale Date Job No. Sheet No.WithersRavenel Engineers | Planners | Surveyors 115 MacKenan Drive | Cary, NC 27511 t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02180652.01 16/26/2020 1" = 50' Kinston Lenoir NC PBC SMITHFIELD WAY GRAVITY SEWER JURISDICTIONAL DITCH IMPACTS OVERALL SITE PLAN GRAPHIC SCALE 1 inch = 200 ft. 200 0 100 200 400 LEGEND JURISDICTIONAL DITCH - TEMPORARY DITCH IMPACT - SMITHFIELD WA Y (SR 2021) 100' PUBLIC ROWENTERPRISE BLVD(SR 2001)100' PUBLIC ROWPROPOSED 18" DIP GRAVITY SEWER BY OPEN CUT PROPOSED 8" DIP SEWER SERVICE EX. DITCH EX. DITCH IMPACTS 1 & 2 SEE SHEET 2 IMPACTS 3 & 4 SEE SHEET 3 & 4 DITCH IMPACT SUMMARY IMPACT # TEMPORARY DITCH IMPACT ACRES SQ. FEET 1 0.021 926 2 0.006 241 3 0.231 10066 4 0.003 148 5 0.007 305 6 0.003 148 7 0.006 242 TOTAL 0.2770 12,076 SS SS SS SS SS SS EEE EEEEEEEEEEEEEEEEEEEEEIIII32444.81RCP 32544.96RCP 35446.97CMPCMP 35546.97CMP 35645.16RCP 35745.23RCP 35845.63RCP 37846.35CMPCMP 37947.14CMP 45645.92RCP 45745.82RCP 45849.02DI 45945.89RCP 46045.35CMP 46146.09CMP 54750.15DIDI54847.25RCPRCP 54946.78RCP SS SS SS SS SS SS 18" DIP IIIIIIIIIIIIIIIIIIIIIISF SF SF SF SF SF SF 8" DIPSSSS48" RCP INVERT 4 5 . 9 2 ' 24" RCP I N V E R T 4 5 . 8 2 ' DI @ RIM/ G R A T E 4 9 . 0 2 ' 24" RCP E A S T O U T 4 5 . 8 9 ' DI @ RIM / G R A T E 5 0 . 1 ' 18" RCP S O U T H O U T 4 7 . 2 5 ' 18" RCP W E S T I N 4 7 . 2 5 ' 18" RCP N O R T H O U T 4 6 . 7 8 ' 36" CMP INVERT 4 6 . 0 9 36" CMP INVERT 4 7 . 1 4 36" CMP I N V E R T 4 6 . 9 7 48" RCP I N V E R T 4 5 . 6 3 ' 48" RCP INVERT 4 5 . 2 3 ' 48" RCP I N V E R T 4 5 . 1 6 ' 36" RCP INVERT 4 4 . 9 6 ' 36" RCP I N V E R T 4 4 . 8 1 ' 36" CMP I N V E R T 4 5 . 3 5 ' DI @ RIM/ G R A T E 5 0 . 2 2 ' 18" RCP E A S T O U T 4 6 . 8 9 ' 36" RCP INVERT 46.62' 36" RCP INVERT 46.66' 36" RCP INVERT 46.34' 36" RCP INVERT 46.34' 50 50 50 50 5010+0011+0011+45.9215+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 PROPOSED BORE & JACK RECEIVING PIT PROPOSED 18" DIP GRAVITY SEWER IMPACT 1 TEMPORARY DITCH IMPACT 0.021 AC (926 SF) IMPACT 2 TEMPORARY DITCH IMPACT FOR INLET PROTECTION 0.006 AC (241 SF) PROPOSED CHECK DAM, TYP. PROPOSED INLET PROTECTION PROPOSED 8" DIP SEWER SERVICE STEEL ENCASEMENT PIPE BY BORE AND JACK PROPOSED BORE PIT PROPOSED RECEIVING PIT MATCH LINE STA: 22+00 - SEE SHEET 3DITCH CENTERLINE ELEV. = 46.5'DITCH TOP OF SLOPE No. Checked By Revision Designer Drawn By Date By Scale Date Job No. Sheet No.WithersRavenel Engineers | Planners | Surveyors 115 MacKenan Drive | Cary, NC 27511 t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02180652.01 26/26/2020 1" = 50' Kinston Lenoir NC PBC SMITHFIELD WAY GRAVITY SEWER JURISDICTIONAL DITCH IMPACTS SHEET 2 GRAPHIC SCALE 1 inch = 50 ft. 50 0 25 50 100 LEGEND JURISDICTIONAL DITCH - TEMPORARY DITCH IMPACT - SS SSE32444.81RCP 32544.96RCP 35446.97CMPCMP 35645.16RCP SS SS SS SS SS SSI SF SF SF SF SF SF SF SF SF SF SF SF SF SS SS SS 36" CMP I N V E R T 4 6 . 9 7 48" RCP I N V E R T 4 5 . 1 6 ' 36" RCP INVERT 4 4 . 9 6 ' 36" RCP I N V E R T 4 4 . 8 1 ' 50 50 50 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 DITCH TOP OF SLOPE DITCH CENTERLINE ELEV = 45' PROPOSED BORE & JACK RECEIVING PIT PROPOSED 18" DIP GRAVITY SEWER INSTALLED BY OPEN CUT IMPACT 3 TEMPORARY DITCH IMPACT 0.231 AC (10066 SF) (CONT. ON SHEET 4)PROPOSED SILT FENCE MATCH LINE STA: 28+00 - SEE SHEET 4TEMPORARY DITCH IMPACT (CONT. FROM SHEET 3)MATCH LINE STA: 22+00 - SEE SHEET 2No. Checked By Revision Designer Drawn By Date By Scale Date Job No. Sheet No.WithersRavenel Engineers | Planners | Surveyors 115 MacKenan Drive | Cary, NC 27511 t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02180652.01 36/26/2020 1" = 50' Kinston Lenoir NC PBC SMITHFIELD WAY GRAVITY SEWER JURISDICTIONAL DITCH IMPACTS SHEET 3 GRAPHIC SCALE 1 inch = 50 ft. 50 0 25 50 100 LEGEND JURISDICTIONAL DITCH - TEMPORARY DITCH IMPACT 1 - S1049.95SMH 9543.04CMP 9643.09CMP 9747.78CMP 9847.18CMP S SS SS SS SS SS SS SS SS SS SS SS SSSS18" DIPS SS SF SF SF SF SF SF SF SF SF G GG84" CMP INVERT 43.04' 15" CMP INVERT 47.18' 84" CMP INVERT 43.09' 15" CMP INVERT 47.78' 50 50 50 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00MATCH LINE STA: 28+00 - SEE SHEET 3PROPOSED CHECK DAM, TYP. PROPOSED INLET PROTECTION, TYP. PROPOSED SILT FENCE IMPACT 3 TEMPORARY DITCH IMPACT 0.231 AC (10066 SF) (CONT. FROM SHEET 3) DITCH TOP OF SLOPE PROPOSED 18" DIP GRAVTY SEWER BY OPEN CUT DITCH CENTERLINE, ELEV = 45' IMPACT 4 TEMPORARY DITCH IMPACT FOR CHECK DAM 0.003 AC ( 148 SF) IMPACT 5 TEMPORARY DITCH IMPACT 0.007 AC (305 SF) IMPACT 6 TEMPORARY DITCH IMPACT FOR CHECK DAM 0.003 AC (148 SF) IMPACT 7 TEMPORARY DITCH IMPACT FOR INLET PROTECTION 0.006 AC (242 SF) No. Checked By Revision Designer Drawn By Date By Scale Date Job No. Sheet No.WithersRavenel Engineers | Planners | Surveyors 115 MacKenan Drive | Cary, NC 27511 t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02180652.01 46/26/2020 1" = 50' Kinston Lenoir NC PBC SMITHFIELD WAY GRAVITY SEWER JURISDICTIONAL DITCH IMPACTS SHEET 4 GRAPHIC SCALE 1 inch = 50 ft. 50 0 25 50 100 LEGEND JURISDICTIONAL DITCH - TEMPORARY DITCH IMPACT 1 - SMITHFIELD WAY INDUSTRIAL DRIVEENTERPRISE BLVDPARROTT DICKERSON ROADPROPOSED SEWER ALIGNMENT EXISTING SEWER LINE EXISTING SEWER LINE PARROTT DICKERSON PUMP STATION Checked By Designer Drawn By Scale Date Job No. SMITHFIELD WAY WEST GRAVITY SEWER EXTENSION AERIAL (2016) KINSTON LENOIR COUNTY NORTH CAROLINA 1 inch = 200 ft. GRAPHIC SCALE 0 100 200 WithersRavenel Engineers | Planners | Surveyors NCNHDE-12572 July 28, 2020 Troy Beasley Withers & Ravenel 115 MacKenan Drive Cary, NC 27511 RE: City of Kinston - Smithfield Way Gravity Sewer Extension; 02180652.01 Dear Troy Beasley: The North Carolina Natural Heritage Program (NCNHP) appreciates the opportunity to provide information about natural heritage resources for the project referenced above. Based on the project area mapped with your request, a query of the NCNHP database indicates that there are no records for rare species, important natural communities, natural areas, and/or conservation/managed areas within the proposed project boundary. Please note that although there may be no documentation of natural heritage elements within the project boundary, it does not imply or confirm their absence; the area may not have been surveyed. The results of this query should not be substituted for field surveys where suitable habitat exists. In the event that rare species are found within the project area, please contact the NCNHP so that we may update our records. The attached ‘Potential Occurrences’ table summarizes rare species and natural communities that have been documented within a one-mile radius of the property boundary. The proximity of these records suggests that these natural heritage elements may potentially be present in the project area if suitable habitat exists. Tables of natural areas and conservation/managed areas within a one-mile radius of the project area, if any, are also included in this report. If a Federally-listed species is found within the project area or is indicated within a one-mile radius of the project area, the NCNHP recommends contacting the US Fish and Wildlife Service (USFWS) for guidance. Contact information for USFWS offices in North Carolina is found here: https://www.fws.gov/offices/Directory/ListOffices.cfm?statecode=37. Please note that natural heritage element data are maintained for the purposes of conservation planning, project review, and scientific research, and are not intended for use as the primary criteria for regulatory decisions. Information provided by the NCNHP database may not be published without prior written notification to the NCNHP, and the NCNHP must be credited as an information source in these publications. Maps of NCNHP data may not be redistributed without permission. The NC Natural Heritage Program may follow this letter with additional correspondence if a Dedicated Nature Preserve, Registered Heritage Area, Clean Water Management Trust Fund easement, or Federally-listed species are documented near the project area. If you have questions regarding the information provided in this letter or need additional assistance, please contact Rodney A. Butler at rodney.butler@ncdcr.gov or 919-707-8603. Sincerely, NC Natural Heritage Program Natural Heritage Element Occurrences, Natural Areas, and Managed Areas Within a One-mile Radius of the Project Area City of Kinston - Smithfield Way Gravity Sewer Extension Project No. 02180652.01 July 28, 2020 NCNHDE-12572 No Element Occurrences are Documented Within a One-mile Radius of the Project Area No Natural Areas are Documented Within a One-mile Radius of the Project Area Managed Areas Documented Within a One-mile Radius of the Project Area Managed Area Name Owner Owner Type Caswell Research Farm NC Department of Agriculture, Research Stations Division State NC Department of Transportation Mitigation Site NC Department of Transportation State NC Department of Transportation Mitigation Site NC Department of Transportation State Definitions and an explanation of status designations and codes can be found at https://ncnhde.natureserve.org/help. Data query generated on July 28, 2020; source: NCNHP, Q3 July 2020. Please resubmit your information request if more than one year elapses before project initiation as new information is continually added to the NCNHP database. Page 2 of 3 Powered by TCPDF (www.tcpdf.org) Page 3 of 3 Endangered Species, Threatened Species, and Candidate Species, Lenoir County, North Carolina Updated: 07-17-2020 TR VALIGN=TOP> Common Name Vertebrate: American alligator Bald eagle Carolina madtom Range by Basin Neuse River waterdog Range by basin Red -cockaded woodpecker West Indian manatee Invertebrate: Atlantic pigtoe Range by Basin Vascular Plant: Georgia lead -plant Sensitive joint -vetch Venus' fly -trap Nonvascular Plant: Lichen: Scientific name Federal Record Status Status Alligator mississippiensis T (S/A) Current Haliaeetus leucocephalus BGPA Current Noturus furiosus ARS Current Necturus lewisi ARS Current Picoides borealis E Historical Trichechus manatus E Current Fusconaia masoni ARS Current Amorpha georgiana var. georgiana ARS Historical Aeschynomene virginica T istorical Dionaea muscipula ARS Historical Definitions of Federal Status Codes: E = endangered. A taxon "in danger of extinction throughout all or a significant portion of its range." T = threatened. A taxon "likely to become endangered within the foreseeable future throughout all or a significant portion of its range." C = candidate. A taxon under consideration for official listing for which there is sufficient information to support listing. (Formerly "C1" candidate species.) BGPA =Bald and Golden Eagle Protection Act. See below. ARS = At Risk Species. Species that are Petitioned, Candidates or Proposed for Listing under the Endangered Species Act. Consultation under Section 7(a)(2) of the ESA is not required for Candidate or Proposed species; although a Conference, as described under Section 7(a)(4) of the ESA is recommended for actions affecting species proposed for listing. T(S/A) = threatened due to similarity of appearance. A taxon that is threatened due to similarity of appearance with another listed species and is listed for its protection. Taxa listed as T(S/A) are not biologically endangered or threatened and are not subject to Section 7 consultation. See below. EXP = experimental population. A taxon listed as experimental (either essential or nonessential). Experimental, nonessential populations of endangered species (e.g., red wolf) are treated as threatened species on public land, for consultation purposes, and as species proposed for listing on private land. P = proposed. Taxa proposed for official listing as endangered or threatened will be noted as "PE" or "PT", respectively. Bald and Golden Eagle Protection Act (BGPA)_ In the July 9, 2007 Federal Register( 72:37346-37372), the bald eagle was declared recovered, and removed (de- listed) from the Federal List of Threatened and Endangered wildlife. This delisting took effect August 8,2007. After delisting, the Bald and Golden Eagle Protection Act (Eagle Act) (16 U.S.C. 668-668d) becomes the primary law protecting bald eagles. The Eagle Act prohibits take of bald and golden eagles and provides a statutory definition of "take" that includes "disturb". The USFWS has developed National Bald Eagle Management Guidelines to provide guidance to land managers, landowners, and others as to how to avoid disturbing bald eagles. For mor information, visit http://www.fws.goy/migratorybirds/baldeagle.htm Threatened due to similarity of appearance(T(S/A))_ In the November 4, 1997 Federal Register (55822-55825), the northern population of the bog turtle (from New York south to Maryland) was listed as T (threatened), and the southern population (from Virginia south to Georgia) was listed as T(S/A) (threatened due to similarity of appearance). The T(S/A) designation bans the collection and interstate and international commercial trade of bog turtles from the southern population. The T(S/A) designation has no effect on land management activities by private landowners in North Carolina, part of the southern population of the species. In addition to its official status as T(S/A), the U.S. Fish and Wildlife Service considers the southern population of the bog turtle as a Federal species of concern due to habitat loss. Definitions of Record Status: Current - Based on NC Natural Heritage Program information, this taxon is considered to be extant in the county. Historical - Based on NC Natural Heritage Program information, this taxon is considered to be historical in the county, meaning that all recorded occurrences are either extirpated, have not been found in recent surveys, or have not been surveyed recently enough to be confident they are still present. Obscure - the date and/or location of observation is uncertain. Incidental/migrant - the species was observed outside of its normal range or habitat. Probable/potential - the species is considered likely to occur in this county based on the proximity of known records (in adjacent counties), the presence of potentially suitable habitat, or both.