Loading...
HomeMy WebLinkAboutNCG080311_Renewal Letter with COC_20121204A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Sadler Bros Oil Co PO Box 871 Emporia, VA 23847 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Sadler Bros Oil Co -Travel Plz COC Number NCG080311 Harnett County In response to your renewal application for continued coverage under stormwater General Permit NCG080000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG080000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vaturalltf December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Fayetteville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG080000 CERTIFICATE OF COVERAGE No. NCG080311 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Sadler Bros Oil Co is hereby authorized to discharge stormwater from a facility located at: Sadler Bros Oil Co -Travel Piz Exit 75 I-95 Jonesboro Rd Dunn Harnett County to receiving waters designated as Stony Run (Hannas Pond), a class C;Sw waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. t5 r �- - for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission