Loading...
HomeMy WebLinkAboutWQ0007217_Monitoring - 04-2020_20200611UNITED STATES MARINE CORPS MARINE CORPS AIR STATION POSTAL SERVICE CENTER 8003 CHERRY POINT, NORTH CAROLINA 28533-0003 IN REPLY REFER TO: 5090/07109 LN May 19, 2020 s North Carolina Department of J; Environmental Quality'" o n Division of Water Resources Attn: Information Processing Unit 1617 Mail Service Center` " Raleigh, NC 27699-1617 w, Subj: NON -DISCHARGE PERMIT MONTHLY REPORTS Marine Corps Air Station Cherry Point submits the enclosed monthly Non -Discharge Application Reports (NDAR) and Non -Discharge Monitoring Reports (NDMR) in accordance with the following permit WQ0007217 for the month of April 2020. Should you have any questions, please contact Mr. Timothy Lawrence of the Environmental Affairs Department at your earliest convenience at (252) 466-2754. Sincerel , C. E. SCHULZ Deputy Facilities Director By direction of the Commanding Officer Enclosures: (1) NDMR for Piney Island (BT-11) FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR) Page 1 of 2 Permit No.: 1111 ' Field AMName- Are. (.cr.1 Area (acres): Area (acres):' Area (acres): Cover Cro ■ G •Hourly Rate® Hourly . Annual Rate (i Annual Rate (in): Annual Rate (in): Annual Rate (in):, ... ■ ■ • Field Irrigated?■ ■Field Irrigated?■ • ■ ■ • FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR) Page 2 of 2 r Did the application rates exceed the limits in Attachment B of your permit? p mpllant dJon-Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? OCompliant melon -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? p mpllant melon -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? pcompliant ONon-Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑Compliant peon -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Jeffrey Clayton Permittee: U.S. Marine Corps Air Station, Cherry Point Certification No.: 998515 Signing Official: C. E. SCHULZ Grade: SI Phone Number: 252-466-5874 Signing Officials Title: By direction of the Commanding Officer Has the ORC changed since the previous NDAR-1? ❑yes ONo Phone Number: 252-�599 Permit Exp.: 4/30/21 5/13/20 Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. Signature i \ Date I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page 1 of 2 Permit No.: 111117217 � Facility Name: U. S. NAVAL FAC. ATLANTIC • 1 1 11 Bnfluent ■ ■ . Flow Generated ■ ■ ■ . . ■ .. INININ • FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Sampling Person(s) Certified Laboratories Name: J. Clayton Name: MCAS Cherry Point, NC 28533 Name: Name: Page 2 of 2 Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit?Compliant ❑Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Jeffrey Clayton Permittee: U.S. Marine Corps Air Station, Cherry Point Certification No.: 998515 Signing Official: C. E. SCHULZ Grade: SI Phone Number: 252-466-5874 Signing Official's Title: By direction of the Commanding Officer Has the ORC changed since the previous NDMR? ❑Yes ao Phone Number: 252- 66-4599 Permit Expiration: 4/30/2021 7 5/13/2020 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attach s were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617