Loading...
HomeMy WebLinkAbout20200793 Ver 1_More Info Received_20200724($ Stantec July 24, 2020 Stantec Consulting Services 56 College Street, Suite 201 Asheville NC 28801 File: Little Ivy Stream Mitigation Project Madison County, North Carolina French Broad River CU 06010105 A/E Project ID No. 172621108 Attention: Andrew Moore, Environmental Specialist II Water Quality Regional Operations Section North Carolina Department of Environmental Quality 2090 US Hwy 70 Swannanoa, NC 28778 Reference: 401 Review - Request for Additional Information Dear Mr. Moore, Stantec has received the request for additional information provided by the Water Quality Regional Operations Section for the 401 Review. The following is the response to that request Comment: (1) The Division understands that, due to the size of the watershed, Condition 11.9. of 401 General Water Quality Certification 4134 cannot be met for the project. Please provide additional details regarding construction techniques, sequencing, and BMPS, both in -stream and in upland areas, that will be implemented to control sediment and erosion so that no violations of state water quality standards, statutes, or rules occur. [15A NCAC 02H .0506 (b) (2) and 15A NCAC 02B .0200] Response: The following language will be added to the Final Construction Plans, Typical Notes, Sheet 2A, under the heading, "Construction Sequence:" CONSTRUCTION SEQUENCE THE CONTRACTOR SHALL FOLLOW THE SEQUENCE OF CONSTRUCTION IN ACCORDANCE WITH THE PLANS AND AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL CONDUCT STREAM WORK, INCLUDING INSTALLATION OF IN -STREAM STRUCTURES, GRADING, STABILIZATION MEASURES, AND SEEDING AND MULCHING, ON A LIMITED SECTION OF STREAM IN ORDER TO AVOID AN EXCESSIVE DISTURBED AREA AS APPROVED BY THE ENGINEER. Design with community in mind July 24, 2020 Andrew Moore - Environmental Specialist II Page 2 of 3 Reference: 401 Review - Request for Additional Information 1. THE CONTRACTOR SHALL IDENTIFY THE PROJECT BOUNDARY, LIMITS OF DISTURBANCE, SENSITIVE AREAS, STAGING AREAS, AND CONSTRUCTION ENTRANCES WITH THE ENGINEER. 2. THE CONTRACTOR SHALL PREPARE STABILIZED CONSTRUCTION ENTRANCES IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS OR AS DIRECTED BY THE ENGINEER. 3. THE CONTRACTOR SHALL MOBILIZE EQUIPMENT, MATERIALS, PREPARE STAGING AREAS, AND STOCKPILE AREAS IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS OR AS DIRECTED BY THE ENGINEER. 4. CONSTRUCTION TRAFFIC TO BE LIMITED TO "LIMITS OF DISTURBANCE" AS INDICATED ON THE CONSTRUCTION PLANS AND AS DIRECTED BY THE ENGINEER. 5. THE CONTRACTOR SHALL INSTALL ALL TEMPORARY ROCK CHECK DAMS, SILT FENCE, TREE PROTECTION FENCE, AND MULCHING AROUND ALL CONSTRUCTION AREAS INCLUDING STAGING AND STOCKPILE AREAS AS INDICATED ON THE CONSTRUCTION PLANS AND AS DIRECTED BY THE ENGINEER. b. THE CONTRACTOR SHALL INSTALL TEMPORARY STREAM CROSSINGS AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. DITCHES AND STREAM REACHES WILL BE LEFT OPEN DURING INITIAL PHASES OF CONSTRUCTION TO ALLOW FOR DRAINAGE AND TO KEEP SITE ACCESSIBLE. TEMPORARY STREAM CROSSINGS SHALL CONSIST OF TEMPORARY, STABILIZED FORD CROSSINGS INSTALLED PERPENDICULAR TO THE CHANNEL. 7. CONSTRUCTION ACTIVITIES ASSOCIATED WITH THE CONSTRUCTION OF THE CHANNEL BED, CHANNEL BANKS, IN -STREAM STRUCTURES, AND STABILIZATION MEASURES MAY REQUIRE THAT CONSTRUCTION OCCURS IN THE ACTIVE CHANNEL (IN FLOWING WATER). WHENEVER POSSIBLE, THE CONTRACTOR SHALL LIMIT EQUIPMENT TIME SPENT IN ACTIVE FLOW. THIS SHALL BE ACCOMPLISHED BY STAGING ALL REQUIRED MATERIALS ADJACENT TO THE WORK AREA TO MINIMIZE DWELL TIME, UTILIZING NATIVE COBBLES TO CONSTRUCT COFFER DAMS TO SHUNT ACTIVE FLOW AWAY FROM WORK AREA AND BUILDING FROM THE BANK WHERE PRACTICABLE. 8. THE CONTRACTOR SHALL BEGIN CLEARING, FLOODPLAIN EXCAVATION, AND GRADING WORK TO DESIGN GRADES AT THE UPSTREAM END OF EACH CHANNEL AS INDICATED ON THE CONSTRUCTION PLANS. THE CONTRACTOR SHALL NOT DISTURB ANY MORE FLOODPLAIN AREA AND STREAM REACH THAN NECESSARY TO COMPLETE THE WORK AND SHALL ONLY DISTURB AS MUCH AREA AS CAN BE COMPLETED AND STABILIZED IN ONE WORKING DAY. 9. THE CONTRACTOR SHALL CLOSELY MONITOR SHORT- AND MID-TERM WEATHER FORECASTS AND SHALL ADJUST DAILY PLANNED WORK TO ALLOW FOR COMPLETE STABILIZATION OF DISTURBED AREA AHEAD OF ANY SIGNIFICANT FORECAST RAIN EVENTS. 10. WHENVER POSSIBLE, THE CONTRACTOR SHALL BUILD OFFLINE PORTIONS OF PROPOSED CHANNEL IN A MANNER SUCH THAT THE WORK AREA REMAINS ISOLATED FROM ACTIVE FLOW. 11. ONCE A SECTION OF STREAM AND FLOODPLAIN HAS BEEN EXCAVATED TO DESIGN GRADES, IN -STREAM STRUCTURES, MATTING AND TRANSPLANTS SHALL BE INSTALLED IN THAT SECTION. 12. THE CONTRACTOR SHALL BEGIN INSTALLING IN -STREAM STRUCTURES FROM THE UPSTREAM SECTION WORKING DOWNSTREAM. IF EXCESSIVE SEDIMENTATION DOWNSTREAM BECOMES A CONCERN, THE ENGINEER OR PROJECT MANAGER IN CHARGE MAY DIRECT THE Design with community in mind July 24, 2020 Andrew Moore - Environmental Specialist II Page 3 of 3 Reference: 401 Review - Request for Additional Information CONTRACTOR TO INSTALL A TEMPORARY ROCK CHECK DAM AND SETTLING BASIN DOWNSTREAM. THIS MAY BE ACCOMPLISHED BY UTILIZING EXISING POOLS IN CONJUNCTION WITH NATIVE COBBLES ADDED TO THE DOWNSTREAM HEAD OF RIFFLE TO INCREASE POOL DEPTH. THIS AREA IS TO BE MAINTAINED ON A REGULAR BASIS BY THE CONTRACTOR. 13. THE CONTRACTOR SHALL CONDUCT AQUATIC ANIMAL RESCUE/RELOCATION EFFORTS WHEN DEWATERING A STREAM REACH OR PRIOR TO BACKFILLING AN EXISTING STREAM REACH. THIS SHALL CONSIST OF, AT A MINIMUM, COLLECTING AQUATIC SPECIES IN BUCKETS OR SEIN NETS AND MOVING THEM TO A SAFE UPSTREAM (PREFERRED) OR DOWNSTREAM LOCATION. 14. ONCE A LENGTH OF STREAM WORK IS COMPLETE, THE CONTRACTOR WILL APPLY TEMPORARY SEEDING, PERMANENT SEEDING, AND MULCH TO ALL AREAS DISTURBED DURING CONSTRUCTION. TEMPORARY AND PERMANENT SEEDING MIXTURES WILL BE APPLIED AS SHOWN ON THE PLANTING PLAN. TEMPORARY SEEDING WILL BE APPLIED IN ALL AREAS SUSCEPTIBLE TO EROSION SUCH THAT GROUND COVER IS ESTABLISHED WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF ANY GRADING PHASE. PERMANENT GROUND COVER WILL BE ESTABLISHED FOR ALL DISTURBED AREAS WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION. 15. ALL SEEDING AND MULCHING SHALL BE COMPLETED BEFORE LEAVING THE PROJECT SITE ALONG WITH REMOVAL OF ANY TEMPORARY STREAM CROSSINGS AND TEMPORARY CHECK DAMS. 16. THE CONTRACTOR OR OTHER QUALIFIED PERSONNEL SHALL INSTALL LIVE STAKING ACCORDING TO THE PLANTING DETAILS AND SPECIFICATIONS. ALL PERMANENT SEEDING AND PLANTINGS SHALL BE PERFORMED DURING THE APPROPRIATE TIME OF YEAR AS INDICATED IN THE PLANTING DETAILS. 17. THE CONTRACTOR SHALL ENSURE THAT THE SITE IS FREE OF TRASH AND LEFTOVER MATERIALS PRIOR TO DEMOBILIZATION OF EQUIPMENT FROM THE SITE. Thank you for the opportunity to respond to this request for additional information. Please do not hesitate to reach out if any additional questions arise or if any further clarification is necessary. Respectfully, 6 7 J Christopher Engle, PE Associate Phone: (828) 229-8446 chris.engle@stantec.com Design with community in mind