Loading...
HomeMy WebLinkAboutNCG160236_Application-20200806 &G-[l,02%(p FOR AGENCY USE ONLY Date Received Year Month Day Division of Energy, Mineral, and Land Resources ZDo oV o(p Land Quality Section Certificate of Covera e - National Pollutant Discharge Elimination System NIC►Gh h IC. ►L 3►b , g y Check# Amount ��et) Environmental b32 5 3t 4 I rc Quality NCG160000 Permit Assigned to A. We&5 NOTICE OF INTENT National Pollutant Discharge Elimination System application for coverage under General Permit NCG160000 for STORMWATER DISCHARGES associated with activities classified as: (�� SIC 2951 The manufacture of Asphalt Paving Mixtures and Blocks, RECEIVED `ECI IVED And, Like activities deemed by DEMLR to be similar in the process, or the expA116e Qfa21u2O materials, intermediate products, final products, by-products, or waste ' eriatsAND QUALITY STORMWATER PERMITTING (Please print or type) 1) Mailing address of the owner/operator(address to which official permit correspondence will be mailed): Name S.T.Wooten Corporation Owner Contact James Washburn Street Address P.O.Box 2408 City Wilson State NC ZIP Code 27893 Telephone No. 919 779-9752 Fax: 919 779-3963 E-mail Address James.Washburn@stwcorp.com 2) Location of the facility producing the discharge: Facility Name S.T.Wooten Corporation Jacksonville Asphalt Facility Contact James Washburn Street Address 135 Garnet Ln.,STE-1 City Jacksonville State NC ZIP Code 28526 County Onslow Telephone No. 910 333-8604 Fax: Email James.Washburn@stwcorp.com 3) Physical Location Information: Please provide a narrative description of how to get to the facility(use street names, state road numbers, and distance and direction from a roadway intersection). us Highway 17 north approximately 2 miles north of Jacksonville,NC;right on Garnet Ln. Figure 1 attached (A copy of a county map or USGS quad sheet with facility clearly located on the map is a required part of this application.) 4) Latitude 34deg.48min.11sec. Longitude -77deg.21min.11sec. (degrees, minutes,seconds) 5) This NPDES Permit Application applies to which of the following : ❑ New or Proposed Facility` Date operation is to begin ❑✓ Existing *If this new or proposed facility is located in one of the 20 coastal counties, please contact the appropriate DEMLR Regional Office (see page 4)to determine if a State Stormwater Permit is required prior to construction. Page 1 of 5 SWU-231-030909 Last revised 9/10/14 NCG160000 N.O.I. 6) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code (SIC Code)that describes the primary industrial activity at this facility SIC Code: 2 9 5 1 7) Services and Activities a) Provide a brief narrative description of the types of industrial activities and products manufactured at this facility: (Include a site diagram showing the process areas and location of activities present at this facility.)Production of hot mix asphalt utilizing on site stockpiles of sand and aggregates b) Check all activities conducted at this facility. El Outdoor stockpiling of materials ElTransport of materials by a conveyor ❑✓ Storage of raw materials or front-end loader ❑✓ Storage of materials in above- ❑ Vehicle and equipment maintenance ground tanks ❑ Vehicle or Equipment Washing ✓❑ Material Loading and Unloading ❑✓ Vehicle and equipment fueling 8) Discharge points/Receiving waters: How many discharge points (ditches, pipes, channels, curb and gutter, swales, etc.) convey stormwater from the property? Two(2)internal discharges from asphalt plant area into Morton Mine;One(1)combined discharge from Morton Mine to Northeast Creek What is the name of the body or bodies of water(creek, stream, river, lake, etc.)that the facility stormwater discharges end up in? Northeast Creek If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). N/A Receiving water classification (if known):SC;NSW List discharge points (outfalls)that convey discharge from the site (both on-site and off-site) and location coordinates.Attach additional sheets if necessary, or note that this information is specified on the site plan. Figure 3 Stormwater Outfall No. 01 Latitude (degrees/minutes/seconds): 34deg 47min.47sec N Longitude (degrees/minutes/seconds): -77deg.21min.5sec W Stormwater Outfall No. Latitude (degrees/minutes/seconds): N Longitude (degrees/minutes/seconds): W Stormwater Outfall No. Latitude (degrees/minutes/seconds): N Longitude(degrees/minutes/seconds): W Stormwater Outfall No. Latitude (degrees/minutes/seconds): N Longitude (degrees/minutes/seconds): W Stormwater Outfall No. Latitude (degrees/minutes/seconds): N Longitude (degrees/minutes/seconds): Stormwater Outfall No. only Latitude (degrees/minutes/seconds): _ N Longitude(degrees/minutes/seconds): W Page 2 of 5 SWU-234-030909 Last revised 09/10/14 NCG160000 N.O.I. Stormwater Outfall No. Latitude (degrees/minutes/seconds): N Longitude (degrees/minutes/seconds): W 9) Does this facility a) Have an untreated wastewater discharge? I No ❑ Yes b) Have a treated wastewater discharge? I No ❑ Yes If yes, list the permit number. c) Have a wastewater discharge from a recycle system? I No ❑ Yes If yes, list the permit number. d) Have a non-discharge permit? I No ❑ Yes If yes, list the permit number. e) Discharge wastewater to a municipal wastewater collection system? I No ❑ Yes If yes, list the municipality and permit number Note: Stormwater discharge permit NCG160000 does not authorize the discharge of any wastewater. y .� If this site discharges wastewater,you must obtain the appropriate wastewater discharge permit in addition to coverage for stormwater discharges under NCG160000. 10) Does this facility employ any best management practices for stormwater control? El No I Yes (Show any structural BMP's on the site diagram.) If yes, please briefly describe: Storm water is captured by several yard inlets and directed into the active/adjacent Morton Mine. Morton Mine current COC NCG020755 _Figure 2 attached 11) Does this facility have a Stormwater Pollution Prevention Plan? ❑ No • Yes If yes, when was it implemented? Juiy2020 12) Are vehicle/equipment maintenance activities occurring at this facility? No ❑ Yes 13) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? I No ❑ Yes b) Is this facility a Small Quantity Generator(less than 1000 kg. of hazardous waste generated per month) of hazardous waste? I No ❑ Yes c) Is this facility a Large Quantity Generator(1000 kg. or more of hazardous waste generated per month)of hazardous waste? I No ❑ Yes d) Is hazardous waste stored in the 100-year flood plain? I No ❑ Yes If yes, include information to demonstrate protection from flooding. e) If you answered yes to questions b. or c., please provide the following information: Type(s) of waste: How is material stored: Page 3 of 5 SWU-234-030909 Last revised 09/10/14 NCG160000 N.O.I. Where is material stored: How many disposal shipments per year: Name of transport/disposal vendor: Vendor address: 14) Certification: North Carolina General Statute 143-215.6B(i) provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record, report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management]Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s)and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true,complete,and accurate. Printed Name of Person Signing: Brian Gurganus Title: Vice President- .Wooten Corporation (Signature Appliq (Date Signed) This Notice of Intent must be accompanied by a check or money order for$100.00 made payable to: NCDEQ Page 4 of 5 SWU-234-030909 Last revised 09/10/14 NCG160000 N.O.I. Final Checklist This application will be returned as incomplete unless all of the following items have been included. Please do not ask us to "hold" an incomplete application in anticipation of a check under separate cover. ❑ Check for$100 made payable to NCDEQ ❑ This completed application signed by the applicant, and all supporting documents ❑ A site diagram showing, at a minimum, (existing or proposed): (a) outline of drainage areas, (b) stormwater management structures, (c) location of stormwater outfalls (corresponding to which drainage areas), (d) runoff conveyance structures, (e)areas where materials are stored, (f) impervious areas, (g) site property lines, (h)vehicle and equipment maintenance, blasting, painting, and washing areas, and (i) location of activities listed in 7b. ❑ Copy of county map or USGS quad sheet(preferred)with location of facility clearly marked on map Please mail the entire package to: DEMLR- Stormwater Program Dept. of Environmental Quality 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Please note: The submission of this document does not guarantee the issuance of NPDES permit coverage. For questions,please contact the DEMLR Regional Office for your area. To visit our website please go to http://portal.ncdenr.orq/web/lr/stormwater DEMLR Regional Office Contact Information: Asheville Office (828) 296-4500 Fayetteville Office (910) 433-3300 Mooresville Office (704) 663-1699 Raleigh Office (919) 791-4200 �'0°Win a Sate Washington Office ...(252) 946-6481 mei 14, Wilmington Office (910) 796-7215 -y m {, Winston-Salem (336) 771-5000 t ' `� 4 for Central Office (919) 707-9220 ; r welp tyett ev,ttea ngtan Page 5 of 5 SWU-234-030909 Last revised 09/10/14 Figure 1 Site Location Plan - USGS . , ...„,„ _... .„,..z4.— ?-.1 k�a,r:,k ._ SITE . d ^sue k 6 ue s^�'7`' p _c ..� 1.[6{{ ,,,- t, ,, ';. 74\ ¢ /" tw. l''i.a 4 -•*l y,, 3M^.I±. i r' am. � t ?t i . ' •. 0 c.. 4' " 7. r' cr 1511 ,Y `°'f,7 p �P'�,, s ,„ ., :f,;31.1r),,,. ..,:.,;41,, 1 ,.., � r; , fit', °{✓A ,...„ .5� '`l oa�S r PNY 448 �' t 1.,•$,x�F,� "` A ,, I r .;cS-y.. d -3 3 ,3 r �J rt: y.�r,( �., f ,� a-:: '� !�-° �ti"` Yt � ro ID ,) Xt ` c, . . - ^. } �, r � ' ,-,,o40,f. A a ; jh � g ris � z'-b c 4 • so ;� ! t sar 1 �r• .,,�I..� 11- `` ,,7 3 �'f.{ �' - V. eS, l.3'{^`"'t ./, ,,„ a$q"4„. irv,., \4;fi! "'Sh t( Y ��"a y. +� �`• �/F4` '` +...d' !„" r ^g .ad'N-„ 0 " r e •f`` . 7 s.^",`l •''' /J .<. ' 1\}-,\hi6 , ij , , ,�A 4 t?, } C� d. a 9* T.: � 2,c z: „ °i `"t¢ , ' t � k 1 t: `-'" :0..:-41., V* 1i s 1iF �a1, "Y 1,10'4 x ! ' /1'"3/_"r t 'E1.. x�""y``- 54,. i'"'.,a �-` i t ! S / !•?�!yw a /< !t 5,, '''''' $ ''s 1. '4, "._.' I „'' ,4.- -,'� ji r "/, � if Ne L�r£','f�,,�! ri -._tr t.,,-"" 1 :,N(cn ,t' ,..erg•. ° - ' ' • £.r.`. ,c" /-. ---";Y 'A, ?- d48 , % 'S�i `\ ` £S`s a.'dS ,...5,...: A lam _ 7. x '.-...e.. �� A 5 FF �..,'� Y�4-k.'...,� .°"��,��r"�Sa,i�=�4.e «- ' J��7�...__ � L`Y"'_ f, Se -. tyF;.d...���:.... , .�4 � 8J 84 85 86 87 88 89 SOURCE: USGS 7.5 MINUTE TOPOGRAPHIC QUADRANGLE; KELLUM,NC 2019 N APPROXIMATE SCALE: 1"=3,400' Wzela TOPOGRAPHIC SITE LOCATION MAP FIGURE m C)n5,1angru-c S.T. WOOTEN CORPORATION JACKSONVILLE ASPHALT Eng:neer:11g, 'e" w Srr°mpl 123 GARNET LANE 1 Fsz'w.;sc V708 JACKSONVILLE,NC ono)assa or Figure 2 SPPP Site Plan Reduced to 11 X 17 for this submittal ` \ �) l�/_ R �! LEGEND: EXISTING TOPOGRAPHIC CONTOUR f OUTFALL"A" ..• 1 EXISTING LIMITS OF WETLANDS i i j' EXISTING LIMITS OF RESTORED WETLANDS / / ������••• LIMITSEXISTING STORM WATER YARD INLET ' �/ // s••YI-n / �„ EXISTING STORM WATER CONVEYANCE PIPE FLOW PREDICTION ARROW ---------"—,,z__::;"'V:„ aUTFALL"B" • S.T.WOOTEN CORPORATION JACKSONti1LLE ASPHALT /�� Above C3mund Storage Tank(AST)Inventory � Secondary Secondary Secondary ® O Comai ment Containment Containment �c.� ca Lncuion Cap10,000gal) TanRConeIVA No. Fuel Products (5'Til Corigtnstimt Capacity{pal) Notes / 1 Asphalt Plant 10,000 StceL sme aaE `�o.2 Fuel OD Y Cas['vm place Concrete 67,T:0 Open Ac'T3o Cover /j.---- -- --- ' ...:,) .Cr'. '- . O 2 Asphak Phan 25,000 Steel,singe wall AC-20 Liquid Asphah Y Cast in place Concrete 61,710 Open ArNo Covet �� TANKS 1&2 _Total AST Foxed Storage 35,000 ,,,,,,.....,- ..---..........3 S.T.WOOTEN CORPORATION JACKSONVILLE ASPHALT YI-4 / a ` I Above Ground Storage Tank(AST)Release Plow Prediction PROPERTY BOUNDARY i'�' ` , Overland Flaw Towards S.T.WOOTEN / \ ` YI 2 • • Taaks Locad:n eapxty(pal.) ras,Recipe« Second Recepl« Tlmd.'.r.:ri,.,�-\V�\ •i.41„.... y t , I , Asphak Plan 10,00D Secondary Coriammem Yard Inlet Y1.2 O1rfoL A®'00 &- ` -- y y a 2 Asphak Plan 25,000 Secondary Contanment Yad Inlet Yl 2 Ottfat A '-- YI-5 • ` ` y� , , • • ' In the evert of a release from secondry containment or from delivery,vendors,the following steps should be taken: / ` y a i t , , • a t. For small amounts,apply absorbent to area remove pith shovel and containerize for disposal / 2. For amounts the exhibit flow beyond immediate area,proceed to'Second Receptor'Location and place absorbent / YI-6 c W i • " " '� y booms or socks to prevent Cow from entering receptor./ / Ahlik. j ' ' y y y , . ' ' A y A ' ' ` STOCKPILE AREAS '';‘N 44. PROPERTY BOUNDARY , , S.T.WOOTEN i rz • • * up....... "r 4rf if AAAa a Ole 3 PERIMETER BERM el-6- , ���� "........et _ ' 0,.. �V� '' 44 — riw`•�0�/�'/•••�/ SCALE/ IN FEET X `Ih�at�• 40k /0000••••••• ' ' ' Northeast Creek D ins �s IL NOTES: s j�T=''e SPPP SITE PLAN FIGURE 31 PLAN INCLUDING TOPOGRAPHY,WETLANDS AND LOCATIONS OF STRUCTURES TAKEN FROM FIELD SURVEY PERFORMED BY PARKER& ••{,.i""dO1g Ml'r S. T. WOOTEN CORPORATION ASSOCIATES,ING;ASPHALT PLANT,SITE PLAN 2013.PHOTOS AND SPECIFIC FIXED STORAGE INFORMATION COMPILED BYWASIELA CONSULTING Ferns,A,-:iaos ie a.,wia:,« 2 DURING A SITE VISIT ON FEBRUARY 12,2020.NEW S.T.WOOTEN PROPERTY BOUNDARY TAKEN FROM PARKER&ASSOCIATES,INC.SURVEY,2020. . sc r — JACKSONVILLE ASPHALT AA, JACKSONVILLE, NORTH CAROLINA Figure 3 Morton Mine Site Plan Reduced to 11 X 17 for this submittal ' s i~'"' FlAODINSE UANCE INFORMATION TAIff.N PRDM ..i .,.{ _-`__ n••y4,RAM: ' PIAOD INSURUANLE HATE MAP � NI,MBER 3]3N419R001 � �"'`•"� "'••R•'• I 4 l FPPECI'IV6DATF.NOVF.MNF.R 3,3005 ♦ u;"uv,. N ,•� EASE FLOOU ELEVATION•19A MSL Aillitiii 1 FT' vferr�J , / / VRUVEkTY INPUkMAT1UN P I i /�RRwe ,t �/ "// PROYERtY OWNER"MORTON TNVNgNV,ING I'QB1IN • ' \ /...a."J ,' ..�. /41 // '\-,r TAXYAt`,,E .349fi .annw.r +..ere ,._. e._ NC YIN NUMBER 4lYXq 11A200 I i s ---., .• :�.A�If �y✓i� ADDRESS"123 GARNET LANE S ruvi i a>a s}r.zkwnwxa!\:Y1 ... •j' 2�„"-_ ...-... " '•....• • DEED BOOR/FAce-1o93/ne E °. .tw - ACNEALE-109A6IW00 JCrURFY OFFICES. L L/�/Jn EXISTING STRUCILIRFS-OPPICFSIAA3,9 ommurnolo ` f ..yyJ-�""�— STORAGE/MAINTENANLE.SR$IS SP .n ..3. y T ..„„k,�y .y...V.v >•'Y - almr NOTES: POMMY n°o°vw xlmww�AM.�aw26 Nu MURiux NNx.PIM. �� MID MTIS /NI "' INTERNAL OUTFALi. A` x/ \1 �v, v "aAr° Arm°.. TIONS Z WITHIN MIXING IONS /; OO+/� �V ��I fi17:r/ w`�"R�..wa .M MI MC ▪N,..iNL pox OUTLETS. xwi°xM.NRwn,.EIUTIONSI” �( 111 .......' , „ , , ///„dieD°‘°."4.'':,.' MINERALS, ,7) ' .� ,el .... �EDSEs xESI°NRTm oixmwisE �' \ \�\ INC row IS OWNED PROPERTY I -" '`0�"' \� °sNnR xN r<en sr e•rA�e �; °RroNiNNIX PROPERTY R ERNNN°x //, /, � 1 / HAS WA.NINGIxwr.NEM. t is 17 / -. \, /. /. ��g )) 1`2 •;-, uvDev�AMrvsa�uw°rER°D.0 rwl:°;"srXrnrrmvm er xe°ExxuTo. �o ��v INTERNAL OUTFACE"B" ;; TIM RN \ - � % CID ENex..NIT., .. IT I I I ' L,, , � a,, xExnvm EE•wAxm amc 4, ` \ ' \ ff •rtx°• Rrevulr.eWUNmmN°�axi�uxe.INC. MO Nm01 . ''.. Ito O, S �/�-.. viz.: 2I ) � rL j'I �..—._ MXUANY IX.eRXXXn'rx yr xArwx DATE Iee:aXST° T tJ •' 1 MIN_EDEWATERING PUMP 11 1Y� { '� j I OCATION IS MOBILE / - i - -- / Ail ;j j E N� �� ,\ - .... � a •• ,�/f L_- ''... ',A. ..•...-.- TEMPORARY DIVERSION BENCH DETAIL < IY �s,, / M1NE DEWATERING +''` 4 '^, -._ E s � UISCIIA HGC PIPE TO POND •��. � _ 6 ,` ,t \\ x1.R/ •ROPERTY PURCHASED Met_ •.µ j / ,„,^ / - - BYSTWOOTEN 1 Do- "..(marru�r POa t;�. i7 �\ I �\ / . 'pN• A Ira. _ LIIIr , 4, x..rI n.., roe-n A/rRlr1 I / / 66 g1 tit �....'..... ::L ..� MINE NPDES OUTFALL 01 LOCATION — °p" -—— TYPICAL SIL i FENCE MSTALL.1 TKW BEiAEL Ra'�• IXOc 24"CMP-COC NCG020755 i -•— "� •- � ."-s 34deg.47min.47sec N;77deg.21min.5sec W P IPALSPILLWAY-24" _ `�"� sa ' _.,, "' CMP RISER AND BARREL \ .RDo.,,p, it "'� • \ TYPICAL N M1 DAM DETAEL' 0, ROCK CHECKnc • MERGENCYSPILLWAY 'V" M % � r rA / \\ ` • WALL IN RR 3 \ ' III \ \ \ '' / ' THIS PLAN IS FOR PERMITTING PURPOSES ONLY i NW 3 3 Wasiela Consulting PLLC 317 Brixham P1 Fort Mill,SC 29708 (980)355-4535 Wasiela Cnsultmg PLLC Mgvleenng,Penurttingd Compliutre July 21, 2020 DEMLR-Stormwater Program R E C F IVE D Dept. of Environmental Quality 1612 Mail Service Center AUG 06 2020 Raleigh, North Carolina 27699-1612 DENR-LAND QUALITY STORMWATER PERMITTING Reference: NOTICE OF INTENT National Pollutant Discharge Elimination System(NPDES) Application for Coverage under General Permit NCG160000 S. T. Wooten Corporation Jacksonville Asphalt Jacksonville,Onslow County,North Carolina Storm Water Program: On behalf of S. T. Wooten Corporation.,Wasiela Consulting PLLC (WC) is submitting the enclosed Notice of Intent(NOI) for coverage under General Permit NCG160000 for the S. T. Wooten Corporation Jacksonville Asphalt facility owned by S. T. Wooten Corporation. The asphalt plant was recently purchased from Morton Trucking, Inc./Eastern Asphalt and is co-located with adjacent trucking and mining activities. This facility was previously covered under Morton Mine NPDES General Permit NCG 020000 (COC NCG020755) and constructed in 2012-2013. S. T. Wooten Corporation has purchased the asphalt plant along with 10-acres of land located internal to ongoing Morton Mine activities. This NOI submittal is necessary due to transfer of ownership. Storm water from the asphalt plant industrial activities drains to the active mine area via yard inlet structures and pipes that discharge water at two outfall locations: "A" and "B" (as shown on attached Figures 2 and 3). Storm water is then co-mingled with dewatering operations within the mine that discharges to an onsite 6.9-acre pond. Discharge from this pond is noted as Outfall 01. As this asphalt facility was originally developed and operated by the current owner of onsite mine and trucking operations,the storm water collection system does not segregate the various overall site activities. Therefore, the current outfall location(Outfall 01)used for NPDES compliance for existing mine operations is also proposed for the S. T. Wooten Corporation Jacksonville Asphalt facility. DEMLR-Stormwater Program July 21,2020 Page 2 A completed NOI for NCG 160000 is attached along with necessary supporting information for your review. If you should have any questions or require additional information concerning this letter and attachments,please contact me at(980) 355-4535 or via e-mail at dwasiela@wasielallc.com Sincerely, Wasiela Consulting PLLC David W. Wasiela,P.E. Senior Engineer/Project Manager Cc: Mr.James Washburn-S. T. Wooten Corporation Attch: NOI for NCG 160000 Coverage Application Fee-$100.00 (Separate Cover) Figure 1 -Site Location USGS Map Figure 2-SPPP Site Plan Figure 3 - Morton Mine Site Plan 2 NOTICE OF INTENT National Pollutant Discharge Elimination System application for coverage under General Permit NCG160000: Application for Mining Permit