HomeMy WebLinkAbout20200622 Ver 1_More Info Received_20200724Strickland, Bev From: Owens, Jennifer L CIV USARMY CESAW (USA) <Jennifer.L.Owens@usace.army.mil> Sent: Friday, July 24, 2020 3:38 PM To: Wojoski, Paul A; Mairs, Robb L; Snider, Holley Cc: Cox, Keleigh C CIV USARMY CESAW (USA); Gasch, Eric K CIV USARMY CESAW (US); Benson, Tyler G Subject: RE: [External] RE: 401 WQC DWR# 2020-0622 Attachments: SCNT offshore resources-GEOINFO.pdf External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Paul - Thanks for the update. We appreciate you working with us on this. The 2010 EIS we completed identified 20 borrow sites. The 2014 EA addressed refinement of those sites and addressed new information on sediment compatibility. Since 2014 we have done much more work and have eliminated many of the borrow sites due to hardbottoms, poor sediment quality, or both, so now we are down to 8 borrow areas (shown on the attached file — areas marked "yes"), which were all covered in the 2010 EIS and 2014 EA. For this first contract, only portions of the remaining borrow areas within 3 miles will be used since we don't have BOEM leases yet for areas beyond 3 miles. We were attempting to get 401s for the entire 50-year project life, but if DWR would feel more comfortable issuing 401s (beach and intertidal) forjust this first contract, that's fine. We're working on an EA to expand the environmental windows, to update borrow area information and to obtain the BOEM leases for use of borrow areas beyond 3 miles and could certainly apply for new, updated 401s, if that will help with this initial request. That new EA is scheduled to go out for review in November 2020. So, the bottom line is we've been deleting borrow areas since the 2010 EIS as we get new information and have not added any new ones. It's a large project, with a lot of moving parts. It will take about 3 years to construct, so our plan is to do this first contract in accordance with the window and commitments made in the 2010 EIS and 2014 EA with follow- on contracts to be done in accordance with the new EA and any permits/commitments made as part of that NEPA process. Feel free to call me if you want to discuss any of this (910-620-8718). Thanks - Jenny Jenny Owens Chief, Environmental Resources Section Wilmington District, U.S. Army Corps of Engineers 69 Darlington Ave. Wilmington, NC 28402 910-251-4757 From: Wojoski, Paul A <Paul.Wojoski@ncdenr.gov> Sent: Friday, July 24, 2020 3:14 PM To: Owens, Jennifer L CIV USARMY CESAW (USA) <Jennifer.L.Owens@usace.army.mil>; Mairs, Robb L <robb.mairs@ncdenr.gov>; Snider, Holley <holley.snider@ncdenr.gov> Cc: Cox, Keleigh C CIV USARMY CESAW (USA) <Keleigh.C.Cox@usace.army.mil>; Gasch, Eric K CIV USARMY CESAW (US) <Eric.K.Gasch@usace.army.mil>; Benson, Tyler G <Tyler.Benson@ncdenr.gov> Subject: [Non-DoD Source] RE: [External] RE: 401 WQC DWR# 2020-0622 Hi Jenny — I've been working with Robb to provide support on the project and wanted to provide a quick update. The issue we have is certifying a project that includes borrow areas that were not previously used and do not have an environmental assessment. As Robb clarified: the 401 would only be for the borrow areas and open water fill (intertidal) templates that were previously impacted by the Surf City/North Topsail Beach projects until we can confirm that the and EIS has been completed for the "new" (previously un-impacted) borrow areas. As I understand it, a SEIS was completed in 2014 to refine the borrow areas for this project broadly, but it's unclear if that assessment covered the "new' borrow areas. I think there are about currently 20 small borrow areas for the project with 13 partially or wholly in the state's 3 mile limit. We are working with our SEPA state clearing house staff to get the 2014 SEIS and associated documents to review what they covered and will confirm with you as soon as we do. We are sensitive to the time schedules for contracts/bids and are working to quickly resolve. Please let us know if you have questions. Thanks, Paul Paul Wojoski 401 & Buffer Permitting Branch Supervisor Division of Water Resources Department of Environmental Quality (919) 707-3631 office Pau l.Woioskia-ncdenr.gov 512 N. Salisbury Street (Archdale Building), Suite 942-F, Raleigh, NC 27604 1617 Mail Service Center, Raleigh, NC 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Owens, Jennifer L CIV USARMY CESAW (USA) [mailto:Jennifer.L.Owens@usace.army.mil] Sent: Wednesday, July 22, 2020 2:45 PM To: Mairs, Robb L <robb.mairs@ncdenr.gov> Cc: Cox, Keleigh C CIV USARMY CESAW (USA) <Keleigh.C.Cox@usace.army.mil>; Wojoski, Paul A <Paul.Woloski@ncdenr.gov>; Gasch, Eric K CIV USARMY CESAW (US) <Eric.K.Gasch@usace.army.mil>; Benson, Tyler G <Tyler.Benson@ncdenr.gov> Subject: [External] RE: 401 WQC DWR# 2020-0622 Importance: High External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good afternoon. Keleigh is out of the office until next Wednesday, so while she's out would you please contact me or Eric Gasch with any questions or updates on the status of the 401 WQC for the Surf City North Topsail beach project? We are planning to issue the first contract to begin construction later in the summer and obtaining the 401 is key to that contract. If DWR has any concerns or questions, please call or email us. Thanks - Jenny 910-620-8718 Eric 910-742-7400 Jenny Owens Chief, Environmental Resources Section Wilmington District, U.S. Army Corps of Engineers 69 Darlington Ave. Wilmington, NC 28402 910-251-4757 From: Cox, Keleigh C CIV USARMY CESAW (USA) <Keleigh.C.Cox@usace.army.mil> Sent: Tuesday, July 21, 2020 12:49 PM To: Owens, Jennifer L CIV USARMY CESAW (USA) <Jennifer.L.Owens@usace.army.mil> Subject: FW: [External] RE: 401 WQC DWR# 2020-0622 FYSA From: Mairs, Robb L <robb.mairs@ncdenr.gov> Sent: Tuesday, July 21, 2020 11:26 AM To: Cox, Keleigh C CIV USARMY CESAW (USA) <Keleigh.C.Cox@usace.army.mil>; Benson, Tyler G <Tyler.Benson@ncdenr.gov> Cc: Wojoski, Paul A <Paul.Woioski@ncdenr.gov> Subject: [Non-DoD Source] RE: [External] RE: 401 WQC DWR# 2020-0622 Hi Keleigh, I hope all is well. I had a chance to speak with Paul Wojoski (cc's) in our Central Office about this late yesterday, and he is going to review the PCN and get back to me. As discussed before I went on leave, the 401 Water Quality Certification we would issue will only be for the borrow areas and open water fill (intertidal) templates that were previously impacted associated with both the Surf City and North Topsail Beach projects. Thanks, Robb Mairs Environmental Specialist II Division of Water Resources North Carolina Department of Environmental Quality 910 796.7303 office robb.mairs(cancdenr.gov BlockedBlockedhttps://deg.nc.gov/about/divisions/water-resources/water-resources-permits/wastewater-branch/401- wetlands-buffer-permits 127 Cardinal Drive Extension Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Cox, Keleigh C CIV USARMY CESAW (USA)[mailto:Keleigh.C.Cox@usace.army.mil] Sent: Monday, July 13, 2020 4:28 PM To: Benson, Tyler G <Tyler.Benson@ncdenr.gov> Cc: Mairs, Robb L <robb.mairs@ncdenr.gov> Subject: RE: [External] RE: 401 WQC DWR# 2020-0622 • External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ��maDnc.gov Tyler, Yes, that is fine. Please let me know what he says next week when you talk with him. Thanks, Keleigh From: Benson, Tyler G <TVIer.Benson@ncdenr.gov> Sent: Monday, July 13, 2020 4:18 PM To: Cox, Keleigh C CIV USARMY CESAW (USA) <Keleigh.C.Cox@usace.armV.mil> Cc: Mairs, Robb L <robb.mairs@ncdenr.gov> Subject: [Non-DoD Source] RE: [External] RE: 401 WQC DWR# 2020-0622 Keleigh, This may require change concerning the 401 WQC, however, I will need to speak with Robb on the matter. Unfortunately, he is on vacation until next Monday. Would it be ok with you for me to place the project review on hold until I am able to speak with him concerning this? Thanks, Tyler From: Cox, Keleigh C CIV USARMY CESAW (USA) <Keleigh.C.Cox@usace.armV.mil> Sent: Monday, July 13, 2020 2:35 PM To: Benson, Tyler G <Tyler.Benson@ncdenr.gov> Cc: Mairs, Robb L <robb.mairs@ncdenr.gov> Subject: [External] RE: 401 WQC DWR# 2020-0622 email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to la-Ixternal Hey Tyler, I spoke with Robb last week about the borrow areas. Turns out that Borrow Area Q, which we will NOT be using for this contract, was the only borrow area used by any entity previously. However, the borrow areas that we will use within 3 miles were surveyed in the past and in 2020 (except Borrow Area A last surveyed in 2011). That being said, we will still dredge within the established footprints of the borrow areas as shown in the plans. I apologize for the confusion on my part. Please let me know if this will change the 401 WQC. Thanks, Keleigh From: Benson, Tyler G <Tyler.Benson@ncdenr.gov> Sent: Monday, July 13, 2020 11:24 AM To: Cox, Keleigh C CIV USARMY CESAW (USA) <Keleigh.C.Cox@usace.army.mil> Cc: Mairs, Robb L <robb.mairs@ncdenr.gov> Subject: [Non-DoD Source] 401 WQC DWR# 2020-0622 Hey Keleigh, Please find attached the certification letter and corresponding General Certifications (GC4146 and GC4150) for the Surf City and North Topsail Coastal Storm Risk Management Project. Please note this approval letter supersedes the letter issued on July 7, 2020. Thanks, Tyler Benson Environmental Technician I Division of Water Resources Wilmington Regional Office: 127 Cardinal Drive Extension; Wilmington, NC 28405 Tyler.Benson(@,ncdenr.gov; (P)910 796 7336 i Erna co ewu drarc CIO d � o s address s subk-"ct CIO the Ncxth aarofiria Public Records Law arx1imay b'�e discc sed 1c) th krtie s • od . Go •• 0 0.5 1 2 Miles • Borings • � • • g Project Extent • . . Year — Territorial_Seas_Limit • 2003 Paleochannels • 2006 = Bedrock • = Borrows 2007 Expanded Area Q • 77� P 2010 Lo-Relief Buffer • r 2011 ® Hardbottom • 2013 CBRA_Zones Surf City & North Topsail Beach, NC US Army Corps Coastal Storm Risk Management Project Of Engineers Data By: Date: Wilmington District LMB/WTH/SJF 09June2020 Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community N Kbdh sh— �_ Guunity Glub rr�1 - 94 L06' .. �a . • • • • 0 0.5 1 2 Miles • Borings Year 2003 2006 2007 2010 • 2011 • 2013 Surf City & North Topsail Beach, NC U5 Army Corps Coastal Storm Risk Management Project of Engineers x Data By: Date: Wilmington District LMB/WTH/SJF 09June2020 Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community