Loading...
HomeMy WebLinkAbout20140762 Ver 5_R-2915 A section streambank stab_20200804 Wanucha, Dave From:Hining, Kevin J Sent:Tuesday, August 4, 2020 3:08 PM To:Beckwith, Loretta A CIV USARMY CESAW (USA) Cc:Wanucha, Dave Subject:RE: \[External\] RE: R-2915 A section streambank stab_ Thanks Lori - I’ve contacted our central permitting unit to see what I can do to assist with the modification. In the past, they usually handle the modifications to centrally permitted projects like R-2915. As a result, they may contact you about the issue instead of me. Regarding the urgency of the issue – I know we would like to knock it out soon, if possible, but the time table you mentioned may be fine. I’m planning to swing by later this week to see how it held up after the recent rains. Kevin From: Beckwith, Loretta A CIV USARMY CESAW (USA) <Loretta.A.Beckwith@usace.army.mil> Sent: Friday, July 31, 2020 4:37 PM To: Hining, Kevin J <kjhining@ncdot.gov> Cc: Wanucha, Dave <dave.wanucha@ncdenr.gov> Subject: RE: \[External\] RE: R-2915 A section streambank stabilization CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hello again, I talked to Monte and we agreed that since it’s in the ROW and the fence is for the R-2915 project, it will require a permit modification vs. a NWP. Is this urgent? It looks like it’s really close to the fence post. A permit modification typically takes 35 days or longer once we receive the request. Please let me know. Thanks, Lori From: Hining, Kevin J <kjhining@ncdot.gov> Sent: Friday, July 31, 2020 1:56 PM To: Beckwith, Loretta A CIV USARMY CESAW (USA) <Loretta.A.Beckwith@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Subject: \[Non-DoD Source\] RE: \[External\] RE: R-2915 A section streambank stabilization Yes, that’s correct – thanks, Kevin 1 From: Beckwith, Loretta A CIV USARMY CESAW (USA) <Loretta.A.Beckwith@usace.army.mil> Sent: Friday, July 31, 2020 1:50 PM To: Hining, Kevin J <kjhining@ncdot.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Subject: \[External\] RE: R-2915 A section streambank stabilization CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Kevin, Just want to make sure that I understand -the erosion on the bank isn’t caused by the R-2915 project, but it is threatening the fence that is there because of the R-2915 project, correct? Thanks, Lori From: Hining, Kevin J <kjhining@ncdot.gov> Sent: Friday, July 31, 2020 12:44 PM To: Beckwith, Loretta A CIV USARMY CESAW (USA) <Loretta.A.Beckwith@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Subject: \[Non-DoD Source\] R-2915 A section streambank stabilization Hey Lori and Dave We are experiencing some streambank loss along HWY 221/R-2915 on the A section. The streambank loss is not believed to be a result of anything we are doing, but it is undermining our controlled access fence. There are livestock animals close by, so we’d like to preserve the controlled access fence as a safety measure. Also, the eroding banks may soon start to undercut some new, large powerlines that are between the streambank and HWY 221. I’ve contacted our central staff, since they permitted the R-2915 project, to see if we need to handle as a modification or a separate permit. Ultimately, that depends on your thoughts, but their initial opinion was that since the streambank loss doesn’t appear to be caused by the project, that I could treat it as a separate issue and handle the permitting for it. It looks like we will need 150’ of rip rap to fix the issue. As a result, I believe it will require a NW13 / GC4134 with notification, since the work is within a trout watershed and exceeds 100’. Prior to filling out the PCN, I thought I’d get your thoughts on handling it as a separate issue, and not a modification to R-2915. Attached is a plan sheet and some photos. I’m more than happy to provide additional information. Thanks in advance and hope you both have a great weekend! Kevin Kevin Hining Division 11 Environmental Officer North Carolina Department of Transportation 828-386-7202 cell kjhining@ncdot.gov 801 Statesville Rd. PO Box 250 2 North Wilkesboro, NC 28659 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. _____________________________________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3