Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NC0004961 I11 121 20/07/16 I17 18I � I 19 I s I 201 I
211IIIII 111111III II III III1 I I IIIII IIIIIIIII II r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
1.0 701d I 711„ I 72 I r., I 71 I 74 79
L—I tyI I I I I I I I I80
L-1
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES Dermit Number)
09:25AM 20/07/16
16/12/01
Riverbend Steam Station
NC Hwy 16
Exit Time/Date
Permit Expiration Date
Mount Holly NC 28120
10:30AM 20/07/16
20/02/29
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Not Required/ORC/919-807-6353/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Tim Hill,400 S Tryon St Charlotte NC 28202/Station Manager/919-546-2565/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar 0 Records/Reports
Self -Monitoring Progran 0 Facility Site Review Effluent/Receiving Wate
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
DocuSigned by:
Ori A Tuvia DWR/MRO WQ/704-663-1699/ 7/2 7/2020
ERRQr)7AqnF-n17APA
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
Andrew Pitner DWR/MRO WQ/704-663-1699 Ext.2180/
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
DocuSigned by:
7/27/2020
aiaccsaini=vazs... Page#
NPDES yr/mo/day Inspection Type
NC0004961 I11 12I 20/07/16 117 18 i c i
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit: NC0004961 Owner -Facility: Riverbend Steam Station
Inspection Date: 07/16/2020 Inspection Type: Compliance Evaluation
Permit
Yes
No
NA
NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
0
❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
0
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The permit has been reclassified since the past inspection and is no longer a major permit.
Since the past inspection, the facility has removed the coal ash pile and the treatment unit
associated with it.
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRS complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operatc
on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility classification
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Yes No NA NE
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
•
❑
❑
❑
•
❑
❑
❑
■
❑
❑
❑
❑
❑
■
❑
❑
❑
■
❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ❑ ■
❑ ❑ ■ ❑
Comment: Inspection conducted during Covid-19 restrictions. A full file review was not conducted.
Requested lab results and COCs for the month of April 2020. These were sent via email in
a timely manner and were complete.
Page# 3
Permit: NC0004961
Inspection Date: 07/16/2020
Effluent Sampling
Is composite sampling flow proportional?
Owner -Facility: Riverbend Steam Station
Inspection Type: Compliance Evaluation
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Yes
No
NA
NE
❑
❑
■
❑
•
❑
❑
❑
•
❑
❑
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
Comment: Site seeps are visited by PACE laboratory staff. Flow permitting, PACE collects and
analyzes the samples. For the month of April, the only seeps with flow were 102, 107 and
108.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: Since the past inspection, the facility has removed the coal ash pile and the treatment unit
associated with it.
Effluent Pipe
Yes
No
NA
NE
Is right of way to the outfall properly maintained?
❑
0
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
❑
0
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
0
❑
❑
Comment: Outfall 002 is no longer active since treatment unit has been removed. Last discharge from
Outfall 002 was on March 20, 2019.