HomeMy WebLinkAbout20170508 Ver 1_NMFS Response 8-3-20_20200803Doliber, Brian C From: Twyla Cheatwood - NOAA Federal <twyla.cheatwood@noaa.gov> Sent: Monday, August 3, 2020 9:49 AM To: Doliber, Brian C Subject: Re: [External] Re: Southdock Basin Dredging- July 20, 2020 Moratorium Relief Request External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov No issues. Thanks Brian. On Fri, Jul 31, 2020 at 2:37 PM Doliber, Brian C <bcdoliber@ncdot.gov> wrote: Thank you Twyla. However, is NMFS agreeable to the first or second week in September? Below is an excerpt from my 7/22 e-mail. If our tug boats that are needed to mobilize the dredge come in when they are supposed to (nothing guaranteed these days) then we would look to dredge the first or second week in September. "...1 apologize for changing this once again, I have just been informed that the Coast Guard will not allow our existing tug boats to be certified in their current condition. With our new tugs coming at the end of August it doesn't make sense financially to make any repairs to the ones we have. Therefore we would now be looking to dredge the first or second week of September so the dredge can make it back to the yard for maintenance as soon as possible (it is currently tied up right next to the Southdock basin). If anything postpones this work further we would just wait until the moratorium is no longer in effect and dredge in October." From: Twyla Cheatwood - NOAA Federal <twyla.cheatwood@noaa.gov> Sent: Friday, July 31, 2020 2:29 PM To: Doliber, Brian C <bcdoliber@ncdot.gov> Subject: Re: [External] Re: Southdock Basin Dredging- July 20, 2020 Moratorium Relief Request • inks or open attachments unless you verify. Send all suspicious email as an Brian, The NMFS has reviewed your request for additional time extension to dredge within the Southdock Basin. Your request states the dredging will take one week for completion and is scheduled for either the first or second week of August. The NMFS has no objection to the extension being granted to allow for this one week window. Extensions for this project have been approved for both May 1 and June 30th dredging dates. While certain circumstances surrounding COVID- 19 have been unavoidable, the NMFS continues to strongly encourage projects to stay within dredge windows to avoid potential impacts to EFH habitat and protected species in the area. Thank you for your coordination, Twyla On Fri, Jul 31, 2020 at 1:54 PM Doliber, Brian C <bcdoliber@ncdot.gov> wrote: Good afternoon Twyla, I just wanted to follow up on this request and see if you required any additional information. Thank you, Brian Doliber Environmental Specialist Ferry Division 252 232 8025 mobile 252 621 6251 office bcdoliber(@ncdot.gov 159 Lucinda Lane Powells Point, NC 27966 From: Doliber, Brian C Sent: Wednesday, July 22, 2020 3:28 PM To: Twyla Cheatwood - NOAA Federal <twvla.cheatwood@noaa.gov> Cc: Winslow, Lancelot D <Iwinslow@ncdot.gov> Subject: RE: [External] Re: Southdock Basin Dredging- July 20, 2020 Moratorium Relief Request Twyla, Yes, I have attached your April response and it was for the end of June. The NC DOT Dredge Manteo ended up staying out and dredging the South Ferry Channel for Dare County longer than planned before having mechanical issues and having to pull off of the project. Dare County took care of the moratorium relief requests for this as the work was done under their permits. There are no plans to go back to South Ferry or the old ferry channel that was mentioned in the April request. This basin is last dredging we plan to do in the area for the foreseeable future. However, and I apologize for changing this once again, I have just been informed that the Coast Guard will not allow our existing tug boats to be certified in their current condition. With our new tugs coming at the end of August it doesn't make sense financially to make any repairs to the ones we have. Therefore we would now be looking to dredge the first or second week of September so the dredge can make it back to the yard for maintenance as soon as possible (it is currently tied up right next to the Southdock basin). If anything postpones this work further we would just wait until the moratorium is no longer in effect and dredge in October. Please feel free to give me a call if I need to clarify any of this. Thank you, Brian Doliber Environmental Specialist Ferry Division 252 232 8025 mobile 252 621 6251 office bcdoliber(@ncdot.gov 159 Lucinda Lane Powells Point, NC 27966 From: Twyla Cheatwood - NOAA Federal <twvla.cheatwood@noaa.gov> Sent: Wednesday, July 22, 2020 2:48 PM To: Doliber, Brian C <bcdoliber@ncdot.gov> Cc: Winslow, Lancelot D <Iwinslow@ncdot.gov> Subject: [External] Re: Southdock Basin Dredging- July 20, 2020 Moratorium Relief Request • of click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Brian, Just trying to catch up on projects. We originally agreed to June 30th on this, I believe? Thanks, Twyla On Mon, Jul 20, 2020 at 11:01 AM Doliber, Brian C <bcdoliber@ncdot.gov> wrote: Hi Twyla, The NC DOT Ferry Division is requesting authorization to dredge within the Southdock ferry basin. The mouth of the basin is beginning to display signs of shoaling that could potentially be severe enough to impact the safety of those aboard the ferries, including the traveling public. The dredge is currently out of service for repairs but it should be operational within a couple of weeks. If the NMFS and the NC DMF grant permission to dredge within the basin we would then request authorization from the US ACE and the DCM. If all approvals are received, NC Ferry would plan to begin work the first or second week of August. The work would take approximately one week. I have attached a survey of the basin for reference. It is from February 2020 so it does not display the current levels of encroachment adequately. However, a new survey is scheduled to be take place within the next two weeks and can be provided upon its receipt. Please let me know if you need any additional information. Thank you, Brian Doliber Environmental Specialist Ferry Division 252 232 8025 mobile 252 621 6251 office bcdoliber(a.ncdot.gov 159 Lucinda Lane Powells Point, NC 27966 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Twyla H Cheatwood Fishery Biologist Southeast Region, Habitat Conservation Division NOAA Fisheries Beaufort, NC 28516 Office: (252) 728-8758 Twyla.cheatwood P noaa.gov Q Web www.nmfs.noaa.gov Facebook www.facebook.com/usnoaafisheriesgov Twitter www.twitter.com/noaafisheries YouTube www.youtube.com/usnoaafisheriesgov Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Twyla H Cheatwood Fishery Biologist Southeast Region, Habitat Conservation Division NOAA Fisheries Beaufort, NC 28516 Office: (252) 728-8758 Twyla.cheatwood Pnoaa.gov FMI Web www.nmfs.noaa.gov Facebook www.facebook.com/usnoaafisheriesgov Twitter www.twitter.com/noaafisheries YouTube www.youtube.com/Usnoaafisheriesgov Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Twyla H Cheatwood Fishery Biologist Southeast Region, Habitat Conservation Division NOAA Fisheries Beaufort, NC 28516 Office: (252) 728-8758 Twyla.cheatwood@noaa.gov 141 Web www.nmfs.noaa.gov Facebook www.facebook.com/usnoaafisheriesgov Twitter www.ttvitter.com/noaafisheries YouTube www.youtube.com/usnoaafisheriesgov 10