Loading...
HomeMy WebLinkAbout20200922 Ver 1_USCG Sector Email_20200731Williams, Paul C From: Akers, Brittany S LT <Brittany.S.Akers@uscg.mil> Sent: Thursday, July 30, 2020 9:14 AM To: Pitts, Hal R CIV Cc: JordanWP@booth-assoc.com; Kyle.W.Barnes@usace.army.mil; Ward, Garcy; Hernandez, Pablo A; Williams, Paul C; Barnes, Jerry R CIV Subject: [External] RE: B-2500B Project in Rodanthe, Dare County Good morning Mr. Pitts, Sector NC WWM has no concerns with this proposal and believes navigation impact to be negligible. Please let me know if you need anything else on our end. v/r, LT Brittany Akers Chief, Waterways Management Division US Coast Guard Sector North Carolina 721 Medical Center Dr. Wilmington, NC 28401 910-772-2230 Brittany.S.Akers@uscg.mil From: D05-SMB-SecNC-Marine <D05-SMB-SecNC-MarineEvents@uscg.mil> Sent: Tuesday, July 28, 2020 7:37 AM To: Akers, Brittany S LT <Brittany.S.Akers@uscg.mil> Subject: FW: B-2500B Project in Rodanthe, Dare County From: Pitts, Hal R CIV <Hal.R.Pitts@uscg.mil> Sent: Friday, July 24, 2020 1:47 PM To: D05-SMB-SecNC-Marine <D05-SMB-SecNC-MarineEvents@uscg.mil> Cc: Bill P. Jordan <JordanWP@booth-assoc.com>; Barnes, Kyle W SAW <KVIe.W.Barnes@usace.armV.mil>; Ward, Garcy <garcy.ward@ncdenr.gov>; Hernandez, Pablo A <phernandez@ncdot.gov>; Williams, Paul C <pcwilliams2@ncdot.gov>; Barnes, Jerry R CIV <JerrV.R.Barnes@uscg.mil> Subject: RE: B-2500B Project in Rodanthe, Dare County Oops — now with enclosure. From: Pitts, Hal R CIV Sent: Friday, July 24, 2020 1:46 PM To: D05-SMB-SecNC-Marine <D05-SMB-SecNC-MarineEvents@uscg.mil> Cc: Bill P. Jordan <JordanWP@booth-assoc.com>; Barnes, Kyle W SAW <Kyle.W.Barnes@usace.armV.mil>; Ward, Garcy <garcy.ward@ncdenr.gov>; Hernandez, Pablo A <phernandez@ncdot.gov>; 'Williams, Paul C' <pcwilliams2@ncdot.gov>; Barnes, Jerry R CIV <JerrV.R.Barnes@uscg.mil> Subject: RE: B-2500B Project in Rodanthe, Dare County Importance: High Sector WWM, 1. USACE is processing a Section 10 permit application to facilitate the re -location of a power line near the southern end of the Rodanthe Bridge (under construction) . It will involve floating a power conduit (approximately 700 feet in length) beneath the bridge and feeding the conduit back ashore over a 3-day period. Given the potential impact on marine navigation the USACE is requesting CG review and comment on the Section 10 application. I am forwarding this to Sector WWM. Please contact me with any questions. Very Respectfully, Mr. Hal R. Pitts Chief, Bridge Branch Fifth Coast Guard District 431 Crawford Street Portsmouth, VA 23704 (757) 398-6222 Hal.R.Pitts@uscg.mil Captain, U. S. Coast Guard (retired) Master, Any Gross Tons MBA From: Williams, Paul C <pcwilliams2@ncdot.gov> Sent: Friday, July 24, 2020 12:05 PM To: Pitts, Hal R CIV <Hal.R.Pitts@uscg.mil> Cc: Bill P. Jordan <JordanWP@booth-assoc.com>; Barnes, Kyle W SAW <Kyle.W.Barnes@usace.army.mil>; Ward, Garcy <garcy.ward@ncdenr.gov>; Hernandez, Pablo A <phernandez@ncdot.gov> Subject: [Non-DoD Source] B-2500B Project in Rodanthe, Dare County Mr. Pitts, During a permitting discussion for the power line relocation to the new bridge in Rodanthe, the Corps requested that we coordinate with USCG on the potential impacts to navigation. The powerline relocation will include a directional bore from high ground near the existing NC 12 roadway to an underground vault in the wetlands near the southern end of the bridge. Over 800' of conduit pipe will need to be laid out near the existing underground vault under the bridge prior to the underground bore. Due to limited space in that area, the intent is to temporarily float the pipe into the Pamlico Sound. The capped HDPE pipe will float on its own and be tied off to the existing bridge piles in the water to prevent it from moving. The pipe will only be floating in the Sound during the directional bore operation and not for an extended period of time. I've attached the erosion control plans that depict the directional bore operation. Sheets ESCPS and ESCP6 show the HDPE pipe floating under the new bridge spans. NCDOT requests any comments from USCG on this part of the project. Please feel free to call me if you would like to discuss. Thanks, Paul C. Williams, Jr. Division Environmental Officer Division One NC Department of Transportation (252) 482-1861 office (252) 333-9812 mobile (252) 482-8722 fax pcwilliams2(c_ncdot.gov 113 Airport Dr. Suite 100 Edenton, NC 27932 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.