Loading...
HomeMy WebLinkAboutNCC200749_NOT Closeout Documents_20200804North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Blackbridge Subdivision Phase Two County: Cumberland Project: Lots 6, 16 & 17 River basin: Cape Fear Person financially responsible: Caviness Land Development, Inc. - Watson G Project N: CUNME-2020-109 Caviness, President Address: 1041 B Robeson Street, Fayetteville, NC 28305 1. Project Location: Low Oak Court / Narrow Pine Co, Rockfish Pictures: No 2. Weather and soil conditions: Dry, workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: No If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one Title: Inspection report: Sent Report Date given/sent: July 31, 2020 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination_ Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Date of inspection: July 28, 2020 Time arriving on site: 1:00 PM Time leaving site: 1:15 PM cc: