HomeMy WebLinkAboutNCC200736_NOT Closeout Documents_20200804North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
Blackbridge Subdivision Phase Two Lot
County: Cumberland Project: 38 River basin: Cape Fear
Person financially responsible: Caviness Land Development, Inc. - Watson G Project N: CUNME-2020-108
Caviness, President
Address: 1041 B Robeson Street, Fayetteville, NC 28305
1. Project Location: Narrow Pine Court/Long Lake Dr, Rockfish
Pictures: No
2. Weather and soil conditions: Dry, workable soils
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
Initial inspection: No
If no, check violations below:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one Title:
Inspection report: Sent Report Date given/sent: July 31, 2020
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance with the SPCA and
released. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities should be requested by the permittee via a Notice of Termination_
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process.
Reported by: Melissa Joyner Others present:
Date of inspection: July 28, 2020 Time arriving on site: 1:15 PM Time leaving site: 1:25 PM
cc: