HomeMy WebLinkAboutNCC203263_ESC Approval Submitted_20200804DEPARTMENT OF PUBLIC UTILITIES
Post Office Box 2263
SMITHFIELD, NC 27577
(919) 989-5075
March 25, 2019
LETTER OF APPROVAL
Capital Properties of Raleigh
Attn: David Stallings
3724 National Drive, Suite 220
Raleigh, NC 27612
RE: Project Name: Mason Park Phase 3
Project ID: JC# 18-086-P
Disturbed Acres Approved: 11.50
Stream Classification: Swift Creek, (C; NSW)
Submitted By: Adams & Hodge Engineering, PC
Submittal Date: March 8, 2019
To Whom It May Concern:
Johnston County has reviewed the referenced erosion and sedimentation control plan, finds the plan
acceptable, and hereby issues this Letter of Approval. This plan approval shall expire three (3) years
following the date of approval, if no -disturbing activity has been undertaken as required by Title 15A
NCAC 4B .0129.
Please be aware that your project will be covered by the enclosed NPDES Construction Stormwater
General Permit NCGO 10000. You are required to comply with all the requirements and conditions of this
permit.
The enclosed Certificate of Approval must be posted at the job site. Title 15A NCAC 4B .0118(a)
requires that a copy of the approved erosion control plan be on file at the job site. Also, the letter gives
the notice required by G.S. 113A — 61.1 (a) of our right of periodic inspection to insure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Stature 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to insure compliance with the
Act.
Acceptance and approval of this plan is condition upon your compliance with Federal, State, and Local
water quality laws, regulations, and rules. This approval does not supersede any other permit or approval.
Letter of Approval
Mason Park Phase 3
JC# 18-086-P
3/25/19
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any
change in the information included on the form. You are required to notify this office of the proposed
starting date for this project. In addition, please notify us if you plan to have a preconstruction
conference.
Sincerely,
Jessica Batten, EI
Development Engineer/Stormwater Manager
Cc: Charles Pender, Johnston County