Loading...
HomeMy WebLinkAboutNCC203126_Modification Review (LEG RESP CHANGE)_20200804Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 8/4/2020 6:14:59 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany 8/4/2020 2:28:42 PM (Construction COC ADD TO FILE Review- NCC203126) • The task was assigned to Georgoulias, Bethany. The due date is: August 7, 2020 5:00 PM 8/4/2020 6:15 AM Y . Ta4M1 NORTH CAPOLINA EnYlrenmemf& Qnalay Certificate of NCC203126 Coverage (COC) Enter the Certificate of Coverage Ninber (Use capital letters) No.* Information associated with this permit Project Name Academy Pointe 1-2 & 5-9 Address Rosemary Street, Clayton, NC County Johnston Latitude 35.6575 Longitude -78.4451 Permittee Listed Academy Point, LLC Legally Responsible David DeYoung Individual NC Reference No. NCG01-2020-3126 E&SC Plan ID JOHNS-2021-001 Original NOI 28471 Tracking No.* Date COC Issued* 07/28/2020 Prior Rescission This field will populate only if CCChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification * a Additional Lots/Outparcels Approved - E&SC Revised r Other Revision(s) to E&SC Plan F Legally Responsible Individual Has Changed f Multiple Reasons (List) Addional IVbre information if necessary Explanation You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Upload Supporting Documentation (%vised ESCApproval, (lose -Out Doc, etc.) Documentation ACADEMY POINTE NCG01 NAME CHANGE.pdf 84.13KB Mast be FDFfon-rat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). 17 I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual f Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Reid Smith Title * Manager Organization* Academy Point, LLC Date * 08/04/2020 Email Address* reid@theriverwildteam.com 5-mil for confirmation Telephone Number* 919-901-3178 Contact nun ber if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email Additional email for confirmation (Optional) Original Permittee david@therivervaldteam.com Email Original Site Contact david@theriverwildteam.com Email Review Date 08/04/2020 Rescinded Since Submitted? Request Date 20200804 Formatted Review Date 20200804 Formatted