Loading...
HomeMy WebLinkAboutNCC203280_ESC Approval Submitted_20200804ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality July 29, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Caviness and Cates Building and Development Co. ATTN: Christopher E. Cates, VP 639 Executive Place, Suite 400 Fayetteville, NC 28305 RE: Project Name: Winston Pines Lot #13 and #14 Acres Approved: 1.24 Project ID: MOORE-2021- 002 County: Moore, City: Mineral Springs, River Basin: Lumber Stream Classification: Other Submitted By: ECLS Global Date Received by LQS: July 10, 2020 Plan Type: New Dear Mr. Cates: Address: Winston Pines Drive This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. I I 3A-54. 1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas(c-r�,ncdenr.gov or Paul Clark at Paul.clark(kncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. D North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources EQ> Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 NORTH CAROLINA - Dwsn ntmEnimn—WWu� /� 910.433.3300 Letter of Approval with Modifications Caviness and Cates Building and Development Co. July 29, 2020 Page 2 of 3 Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan, including the use of equipment and technology owned and operated by the Department, (e.g., survey equipment, vehicles, unmanned aerial vehicles, etc.). Unless this office hears otherwise from you, this correspondence serves as your authorization for DEMLR to utilize equipment and / or technology on your property for inspection purposes. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Jodi Pace, EI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO1 Fact Sheet cc: Johnnie Glen Tew, ECLS Global (electronic copy) Debra Ensminger, Moore County Planning (electronic copy) DEMLR - Fayetteville Regional Office File Letter of Approval with Modifications Caviness and Cates Building and Development Co. July 29, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: WINSTON PINES LOT #13 AND #14 Project ID: MOORE-2021-002 County: Moore Provide two full size copies of the revised plan sheet 2, showing all the Modifications required for approval, prior to beginning any land -disturbing activity. Per G.S. 113A-57(4), 15A NCAC 04B.0118 & G.S. 113A-54(d)(4)