HomeMy WebLinkAboutNCC203280_ESC Approval Submitted_20200804ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
July 29, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
Caviness and Cates Building and Development Co.
ATTN: Christopher E. Cates, VP
639 Executive Place, Suite 400
Fayetteville, NC 28305
RE: Project Name: Winston Pines Lot #13 and #14
Acres Approved: 1.24
Project ID: MOORE-2021- 002
County: Moore, City: Mineral Springs,
River Basin: Lumber
Stream Classification: Other
Submitted By: ECLS Global
Date Received by LQS: July 10, 2020
Plan Type: New
Dear Mr. Cates:
Address: Winston Pines Drive
This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter
of Approval with Modifications. A list of the modifications and reservations is attached. This plan approval
shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken,
as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will
be required (G.S. I I 3A-54. 1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction
Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement
of any land disturbing activity on the above -named project. The NOI form may be accessed at
deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas(c-r�,ncdenr.gov or Paul Clark at Paul.clark(kncdenr.gov. After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged
annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central
Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
D North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
EQ>
Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
NORTH CAROLINA -
Dwsn ntmEnimn—WWu� /� 910.433.3300
Letter of Approval with Modifications
Caviness and Cates Building and Development Co.
July 29, 2020
Page 2 of 3
Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan, including the use of equipment and technology owned and operated by
the Department, (e.g., survey equipment, vehicles, unmanned aerial vehicles, etc.). Unless this office hears
otherwise from you, this correspondence serves as your authorization for DEMLR to utilize equipment and
/ or technology on your property for inspection purposes.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job
site. Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change
in the information included on the form. This permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee. In addition, it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
Sincerely,
Jodi Pace, EI
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCGO1 Fact Sheet
cc: Johnnie Glen Tew, ECLS Global (electronic copy)
Debra Ensminger, Moore County Planning (electronic copy)
DEMLR - Fayetteville Regional Office File
Letter of Approval with Modifications
Caviness and Cates Building and Development Co.
July 29, 2020
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: WINSTON PINES LOT #13 AND #14
Project ID: MOORE-2021-002
County: Moore
Provide two full size copies of the revised plan sheet 2, showing all the Modifications
required for approval, prior to beginning any land -disturbing activity.
Per G.S. 113A-57(4), 15A NCAC 04B.0118 & G.S. 113A-54(d)(4)