HomeMy WebLinkAboutNCC203269_NOI Application_20200804Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 7/29/2020 8:28:02 AM (NCG01 NOI Submission)
Approve by Morman, Alaina 7/30/2020 10:23:26 AM (Review- Construction NOI 29016)
• Morman, Alaina reassigned the task to Morman, Alaina 7/29/2020 9:04 AM
• The task was assigned to Garcia, Lauren V by round robin distribution 7/29/2020 8:28 AM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: July 31, 2020 5:00 PM
7/29/2020 8:28 AM
Submit by Selkane, Aziza 8/4/2020 8:03:08 AM (Payment Verification for NCC203269)
* Denise Everette
• Selkane, Aziza assigned the task to Selkane, Aziza 8/4/2020 8:02 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: September 10, 2020 5:00
PM 7/30/2020 10:23 AM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting r No
an NOI that was r Yes
rejected before?
Previous Rejected 28882
NOI No.
Prior Reviewer Alaina Morman
Name
1a. Project Name *
Wade Jurney Homes - Gresham Park II
1 b. Specific Lot
This field may be used to list specifc lot numbers.
Numbers
55-92
2. County*
Granville
3. Highway or Street Gresham Drive
Address * Street narre only is acceptable if no address number assigned yet
4. City or Township* Fishing Creek
5. State * NC
6. Zip Code * 27565
7. Latitude * Enter the latitude in decimal degrees
36.2464
8. Longitude* Enter the longitude in decimal degrees (MJSTbe negative)
-78.5357
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 08/01/2020
Estimated Construction Project Start Date
10. Date to End* 08/01/2021
Estimated Construction Project End Cute
11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521)
Standard Industrial aassification for Developrrent
12. Acres to be 47.52
disturbed* (including off -site borrow and waste areas)
13. Total site area 47.41
(acres) *
14. Post- 2.00
construction (Estimated)
impervious area
(acres) *
NCC Project NCC-GRANV-2020-Wade Jurney Homes - Gresham Park II
Tracking ID Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Tabbs Creek
Wate rbody* %rre of waterbody into which stornwater runoff will discharge
15b. Waterbody 28-17-(0.5)
Index No.* NCWaterbody Index Nurrber
Stormwater rJ No
discharges will flow r- Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization
Legally Responsible Entity
Name *
WJH LLC
It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
2. First Name *
David
If Corporation, enter Registered Agent First %rre
3. Last Name*
Jennings
It Corporation, enter F;bgistered Agent Last %ne
3b. Title
Vice President of Finance
4. Permitee E-mail david.jennings@centurycommunities.com
Address*
5. Permittee 18337910192
Telephone No.*
6. Permittee Mailing Street Address
Address* 3091 Governors Lake Drive
Address Line 2
Suite 200
City State / Frovince / Fbgion
Atlanta GA
Fbstal / Zip Code Country
30071 United States
Check box if the V Yes
street address the
same as mailing
address
7. Permittee Street
Street Address
Address*
3091 Governors Lake Drive
Address Line 2
Suite 200
City
State / Frovince / Region
Atlanta
GA
Fbstal / Zip Code
Country
30071
United States
8. Type of
Non -Government
Ownership
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
.......................................................................................................................................................................................................
1. Primary Site
Alan
Contact - First
Name *
2. Primary Site
Mooring
Contact - Last
Name *
3. Title
Division Manager
4. Site Contact E-
Alan.Mooring@centurycommunities.com
mail Address*
5. Site Contact
336-604-2879
Telephone No.
6. Organization
WJH LLC
Name
7. Site Contact
Street Address
Mailing Address*
3091 Governors Lake Drive
Address Line 2
Suite 200
city
Atlanta
Fbstal / Zip Code
30071
8. Consultant Name
(Optional)
Ashton R. Smith, PE
First and Last narre
9. Consultant E-mail
ashtons@bapa.eng.pro
This person will be copied on all correspondence.
10. Consultant
9199290481 x 107
Telephone No.
State / Rovince / Region
GA
Country
United States
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 07/23/2020
Approved *
2. E&SC Plan Project GRANV-2020-010
Number/ID * Assigned by agency or local program
3. E&SC Plan r State DEQ Office
Approved by* r Local Program
4. State DEQ Office * Raleigh (RRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. For linear projects, please also upload a site map showing the overall extent of the project or
include the beginning point and end point coordinates in the "Notes" box below.
5. E&SC Plan 2020-07-23 NCDEQ EC Permit - Gresham.pdf 60.94KB
Approval letter or Mast beRDFformat
Grading Permit
6. Site Location Map Helpful for linear project review
(Optional) Mast be FCFfornat. Rease do not upload entire set of E&SCplans.
7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support
the application. Include additional waterbodies for linear projects if necessary.
8. NOI Certification NCG01 NOI Gresham.pdf 1.21VIB
Form Mist be RDFfornat
This is an Express r No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.6E (i) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
r Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name * Alan Mooring
Title Division Manager
Organization Legally Plesponsible Entity
WJH LLC
Date * 07/29/2020
F. Tracking and COC Info
NOI Tracking No. 29016
NC Reference No.
NCG01-2020-3269
Uses 'count_nurrber' variable (increrrented by SP)
Certificate of
NCC203269
Coverage (COC)
Uses 'count_nurrber' variable (increrrented by SP)
No.*
Count Number 3269
Sequential nurrber for subrrittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)
Initial Invoice No. NCC203269-2020
Invoice Due Date 8/29/2020
Initial Fee $ 100.00
Invoice Status OPEN