HomeMy WebLinkAbout20190230 Ver 2_WETLAND AND SURACE WATER IMPACTS SUMMARY - Revised 08.03.2020_20200803WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
-L- 34+78 to 42+09
36" RCP -III / Roadway Fill
0.38
0.01
< 0.01
101
10
2
-L- 81+96 to 85+94
Triple 9 X 9 RCBC / Roadway Fill
0.03
0.01
0.03
0.14
0.01
226
35
3
-L- 92+72 to 96+17
Roadway Fill
0.17
< 0.01
0.04
4
-L- 138+79 to 144+44
42" RCP -III / Roadway Fill
2.10
0.28
0.01
< 0.01
252
21
5
-L- 186+64 to 194+68
Roadway Fill
3.33
0.25
6
-L- 201+68 to 205+06
Double 48" RCP -III / Roadway Fill
3.37
0.08
0.12
0.09
< 0.01
826
9
7
-L- 248+36 to 251+62
84" RCP -IV / Roadway Fill
1.26
0.02
0.07
0.04
< 0.01
480
63
8
-L- 282+72 to 287+92
Triple 8 X 7 RCBC / Roadway Fill
0.18
0.10
0.11
< 0.01
332
29
9
-L- 381+38 to 390+97
Roadway Fill
0.64
0.19
10
-L- 409+20 to 409+39
Roadway Fill
< 0.01
11
-L- 420+24 to 421+45
Roadway Fill
< 0.01
< 0.01
12
-L- 150+32 to 151+20
42" RCP -III / Roadway Fill
0.02
< 0.01
209
20
TOTALS':
11.45
0.11
1.09
0.43
0.03
2426
187
0
*Rounded totals are sum of actual impacts
NOTES:
Site 6 includes 0.465 acres of fill impact due to the total take of wetland within the proposed roadway loop.
2016 09 09
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
-L- 34+78 to 42+09
36" RCP -III / Roadway Fill
0.38
0.01
< 0.01
101
10
2
-L- 81+96 to 85+94
Triple 9 X 9 RCBC / Roadway Fill
0.03
0.01
0.03
0.14
0.01
226
35
3
-L- 92+72 to 96+17
Roadway Fill
0.17
0.09
< 0.01
9.4
4
-L- 138+79 to 144+44
42" RCP -III / Roadway Fill
2.10
0.28
0.01
< 0.01
252
21
5
-L- 186+64 to 194+68
Roadway Fill
3.33
0.25
6
-L- 201+68 to 205+06
Double 48" RCP -III / Roadway Fill
3.37
0.08
0.12
0.09
< 0.01
826
9
7
-L- 248+36 to 251+62
84" RCP -IV / Roadway Fill
1.26
0.02
0.07
0.04
< 0.01
480
63
8
-L- 282+72 to 287+92
Triple 8 X 7 RCBC / Roadway Fill
0.18
0.10
0.11
< 0.01
332
29
9
-L- 381+38 to 390+97
Roadway Fill
0.64
0.19
10
-L- 409+20 to 409+39
Roadway Fill
< 0.01
11
-L- 420+24 to 421+45
Roadway Fill
< 0.01
< 0.01
12
-L- 150+32 to 151+20
42" RCP -III / Roadway Fill
0.02
< 0.01
209
20
TOTALS':
11.45
0.11
1.09
0.43
0.03
2426
187
0
*Rounded totals are sum of actual impacts
NOTES:
Site 6 includes 0.465 acres of fill impact due to the total take of wetland within the proposed roadway loop.
Site 3: Additional Temp. Fill and remove 0.04 of Mechanized Clearing
I