Loading...
HomeMy WebLinkAbout20190230 Ver 2_WETLAND AND SURACE WATER IMPACTS SUMMARY - Revised 08.03.2020_20200803WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 34+78 to 42+09 36" RCP -III / Roadway Fill 0.38 0.01 < 0.01 101 10 2 -L- 81+96 to 85+94 Triple 9 X 9 RCBC / Roadway Fill 0.03 0.01 0.03 0.14 0.01 226 35 3 -L- 92+72 to 96+17 Roadway Fill 0.17 < 0.01 0.04 4 -L- 138+79 to 144+44 42" RCP -III / Roadway Fill 2.10 0.28 0.01 < 0.01 252 21 5 -L- 186+64 to 194+68 Roadway Fill 3.33 0.25 6 -L- 201+68 to 205+06 Double 48" RCP -III / Roadway Fill 3.37 0.08 0.12 0.09 < 0.01 826 9 7 -L- 248+36 to 251+62 84" RCP -IV / Roadway Fill 1.26 0.02 0.07 0.04 < 0.01 480 63 8 -L- 282+72 to 287+92 Triple 8 X 7 RCBC / Roadway Fill 0.18 0.10 0.11 < 0.01 332 29 9 -L- 381+38 to 390+97 Roadway Fill 0.64 0.19 10 -L- 409+20 to 409+39 Roadway Fill < 0.01 11 -L- 420+24 to 421+45 Roadway Fill < 0.01 < 0.01 12 -L- 150+32 to 151+20 42" RCP -III / Roadway Fill 0.02 < 0.01 209 20 TOTALS': 11.45 0.11 1.09 0.43 0.03 2426 187 0 *Rounded totals are sum of actual impacts NOTES: Site 6 includes 0.465 acres of fill impact due to the total take of wetland within the proposed roadway loop. 2016 09 09 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 34+78 to 42+09 36" RCP -III / Roadway Fill 0.38 0.01 < 0.01 101 10 2 -L- 81+96 to 85+94 Triple 9 X 9 RCBC / Roadway Fill 0.03 0.01 0.03 0.14 0.01 226 35 3 -L- 92+72 to 96+17 Roadway Fill 0.17 0.09 < 0.01 9.4 4 -L- 138+79 to 144+44 42" RCP -III / Roadway Fill 2.10 0.28 0.01 < 0.01 252 21 5 -L- 186+64 to 194+68 Roadway Fill 3.33 0.25 6 -L- 201+68 to 205+06 Double 48" RCP -III / Roadway Fill 3.37 0.08 0.12 0.09 < 0.01 826 9 7 -L- 248+36 to 251+62 84" RCP -IV / Roadway Fill 1.26 0.02 0.07 0.04 < 0.01 480 63 8 -L- 282+72 to 287+92 Triple 8 X 7 RCBC / Roadway Fill 0.18 0.10 0.11 < 0.01 332 29 9 -L- 381+38 to 390+97 Roadway Fill 0.64 0.19 10 -L- 409+20 to 409+39 Roadway Fill < 0.01 11 -L- 420+24 to 421+45 Roadway Fill < 0.01 < 0.01 12 -L- 150+32 to 151+20 42" RCP -III / Roadway Fill 0.02 < 0.01 209 20 TOTALS': 11.45 0.11 1.09 0.43 0.03 2426 187 0 *Rounded totals are sum of actual impacts NOTES: Site 6 includes 0.465 acres of fill impact due to the total take of wetland within the proposed roadway loop. Site 3: Additional Temp. Fill and remove 0.04 of Mechanized Clearing I